2012, 11-09 Permit App: BLD-2012-2050 Deck Community Development Department (Staff Use Only)
Permit Center
11703 East Sprague Avenue, Suite B-3 PERMIT NUMBER:
CITY OF Spokane Valley, WA 99206
Tel: (509) 688-0036 PERMIT FEE:
Fax: (509) 688-0037
40.01°111PVaikY'
permitcenter aispokanevalley.orq
RESIDENTIAL CONSTRUCTION PERMIT APPLICATION
J NEW CONSTRUCTION A ADDITION/REMODEL 0 ACCESSORY BUILDING
DECK 0 OTHER
SITE ADDRESS: 8424
8 1T rai AC-- '-(504--\
, GLreX1k""
ASSESSORS PARCEL NO.: LEGAL D RIPTION:
BUILDING OWNER NAME: : -• • - I_ - •••- ' ••' •• .e e 12a6St ii2i(-P C
NAME: Robert W Kirkpatrick
ADDRESS:304 N Sargent Rd ,' J G
CITY: �e �vrA STATE:WA ZIP: '� 9 Z
PHONE:425 344 1568 FAx:360 658 2586 CELL:same
CONTACT NAME: Builder's Choice Home Improvement Inc.
PHONE: 425 344 1568 FAx:360 658 2586 CELL:same
CONTRACTOR NAME: Builder's Choice Home Improvement Inc.
MAILING ADDRESS: 8124 83rd PI NE
CITY: Marysille STATE: WA ZIP: 98270
PHONE: 425 344 1568 FAX: 360 658 2586 CELL: same
CONTRACTOR LICENSE No.:Buildch922N1 EXPIRES: 8/2013 CITY BUSINESS LICENSE NO.: Buildch9221'
DESCRIBE THE SCOPE OF WORK IN DETAIL AND INDICATE USE & PROPOSED USE:
• _ .• , i _. ,-- _ & i _ _ - .. 'pro. : .r. ,r. 4'.tiw i-
w, c,) ija,10 DI;k L W(114 Ili X /0'Erik
****YOU MUST COMPLETE THE FOLLOWING****
MARK N/A IF NOT APPLICABLE
Height to Peak: Dimensions: No. of Stories: Total Habitable
Space:
Main Floor SQ FT: Upper Floor SQ FT: Unfinished Basement SQ Finished Basement SQ
/�{1�c7 FT: FT:
Garage SQ FT: Deck/Covered Patio SQ Impervious Surface 30%Slopes on
FT: Area: Property:
No. of Bedrooms: 'LL Construction Type: Heat Source: Sewer or Septic:
TOTAL COST OF PROJECT: $ .GCS a 1 ,cria P.
DISCLAIMER —Za'
The permitted verifies,acknowledges and agrees by their signature that: 1) if this perM�i rsCD�Oidis=- kilt e . on I i t is/ ill
be served by potable water. 2) Ownership of this City of Spokane Valley permit inure to the prope ••po3r1_if ry is e prop rty
owner or has permission to represent the property owner in this transaction. 4) All construction is t. •- e rrL�fuu I I e with the Cit of
Spokane Valley Development code. Referenced codes are available for review at the City of Spokane Valley Permit en er. 5) The Cit of
Spokane Valley permit is not a permit or approval for any violation of federal, state or local laws, codes or ordinances. 6) Plans or additi nal
information may be required to be submitted and subsequently approved before this application can beF Vsspdg 2012
CSV PERMIT CENTER
Effective October 28, 2007 Page 1 of12
P:\Community Development\02 Administration\03 Forms - Official Versions$ ®it, ter\ esiclentironstruction Permit
App 10.28.07.doc _ �... ..__._.-.- ..._.. •...._._,
Signature Date:
Method of payment: ❑ Cash .NeCheck ❑ Visa ❑ Mastercard
Bankcard #: EXP:8/2013 VIN#:
\s"-{Authorized Signature:
Effective October 28, 2007 Page 2 of 2
P:\Community Development\02 Administration\03 Forms - Official Versions\Permit Center\Residential Construction Permit
App 10.28.07.doc
it.11/4eS.PATRA.U4-.
Address 304 N Sargent Rd
Spokane Valley, WA 99212
z
cie
et c;
Valleyway Ave E Valleyway Ave E
1-15"
POI to-r
iz5
,z
'L
z
?3,
D.
43 :if:
•
E Mem Ave E Main Ave
Ave E Malt Ave
PLANNING DEPT. APPROVED
BY( L
,171_62c.. _01
DATE:
Target Date sheet
For City Use Only
crrYof PLUS Project 6-1(y? l(ALS kane U
Project Address
,JL4 1..1 : -,--( o
Valley®
11703 E Sprague Ave Suite B-3 ♦ Spokane Valley WA 99206
509.720-5240 ♦ Fax: 509.688.0037 ♦ permitcenter@spokanevalley.org
As part of our on-going commitment to customer service during the review process of your project application, we are
providing you with a TARGET DATE for the initial technical application review. If for any reason we cannot meet
this date,we will contact you with a revised target date.
Your application review TARGET DATE is I \
The TARGET DATE is the date we estimate your project application will have had its initial technical review. It is
not the date for approval or permit issuance.
Tips for a Smoother Project Application Review
)=. Submit complete,accurate plans and documents.
Extra time may be required for re-submittals as project application reviewers work on multiple applications and it may be
several days before they can look at your new or revised information.
➢ Designate a specific contact person to communicate with the City.
While the person designated as the applicant's contact person with the City can be changed, one individual with the expertise
for dealing with reviewer comments would be the best choice for the entire review process.
➢ Call staff regarding the status of your project only after the target date shown at the top of the page.
Although you should be contacted on or by the target date,please feel free to contact us if you haven't heard from us by your
target date.Staff may contact you before the target date if the initial review is complete.By following this procedure,you will
save time and allow the reviewers to complete the work more expeditiously.
Steps in the Permit Process
1. Counter Complete. Your application has been accepted as counter complete. This means all of the required documents, as
indicated on your Pre-Application Checklist have been submitted or have been approved for deferred submittal. This does
not prevent technical staff from requesting additional information as a result of their technical review.
2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free from
substantive flaws that would prevent technical staff from completing the technical review once it is started. When this step is
complete,your application will be routed to the appropriate staff and remain in their review queue until it comes up for review.
3.Technical Compliance. Once an application is administratively complete,it is routed to technical staff for compliance review.
Depending on the type of project, technical staff may include multiple reviewers. You should be contacted by phone, fax, email,
or mail by your TARGET DATE once the initial technical compliance review is complete.
4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re-
submittals, each reviewer will approve their section of the application and route it to the Permit Center. When all sections of the
application are received, a Permit Specialist will process the application and contact the person specified on your application for
permit pick-up.Information regarding fees and pre-construction meetings(if required)will be provided by the Permit Specialist at
that time.
CD-003 V-7/06-21-11 Page 1 of 1