2013, 10-29 Permit: BLD-2013-2197 WorkshopSpokane
.0 :0Va11ey.
City of Spokane Valley
Community Development
11703 E. Sprague Ave., Suite B-3
Spokane Valley, WA 99206
(509) 720-5240
permitcenter c7 spokanevalley.orq
BLD -2013-2197
PROJECT NAME:
SITE ADDRESS: 8704 E SHANNON AVE SPOKANE VALLEY
BLD -RES
ISSUED: 10/29/2013
EXPIRES: 10/29/2015
PROJECT DESCRIPTION: CONSTRUCTION OF 560 SQ FT DETACHED WORKSHOP/STORAGE/ACCESSORY BUILDING FOR
AN EXISTING RESIDENCE.
PARCEL: 45074.0434
APPLICANT: TUFF SHED INC OWNER: COLE, CLIFTON A & KIMBERLY L
17500 W VALLEY HWY STE 100 TUKWILA, 4510 S BATES RD
WA 98188 SPOKANE VALLEY, WA 99206
509-535-8833
GENERAL CONTRACTOR:
TUFF SHED INC
17500 W VALLEY HWY STE 100
TUKWILA, WA 98188
509-535-8833
License: TUFFSI*038RZ
Expires: 07/02/2015
VALUATIONS:
Entered Valuation
16000.00 $16,000.00
Total:
$16,000.00
FEES:
Washington State Building Code
Council Surcharge
Building Plan Review - R3 < 8K
Building Permit
Residential Site Plan Review
Totals :
Paid
$4.50
$106.10
$265.25
$50.00
$425.85
Due
$0.00
$0.00
$0.00
$0.00
$0.00
REQUIRED INSPECTIONS
Setbacks Sheathing
Footings Rough Framing
Reinforcement Eng Swale Inspection
Shear/Brace Wall Framing Final Building Inspection
Printed by : Heather Morris on: 10/29/2013 10:45 AM
Page 1 of 2
*Wane
,,,•O Valley.
City of Spokane Valley
Community Development
11703 E. Sprague Ave., Suite B-3
Spokane Valley, WA 99206
(509) 720-5240
ermitcenter • s.okanevalle .or.
BLD -RES
BLD -2013-2197
The ownership of a Spokane Valley Development Permit will inure to the property owner. The permit
applicant, by definition, is the property owner or an authorized agent of the property owner. It is the
responsibility of the applicant / permittee that the use described on the front of this permit complies with
applicable codes and that required inspections are requested. Failure to request inspections as listed
below and obtain the necessa approvals before progressing beyond the point where inspections are
required and may necessit. - moval of certain parts of the construction are the applicant's / permittee's
or property owner's,.exp
Owner/Age
Date:
Staff Approval Date:
Printed by : Heather Morris on: 10/29/2013 10:45 AM
Page 2 of 2