Loading...
HomeMy WebLinkAbout2010, 06-23 Permit App: 10001834 GarageProject Number: 10001834 Inv: 1 Application THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Project Information: Permit Use: 20 X 24 GARAGE Contact: TUFF SHED Address: 415 N THIERMAN C - S - Z: SPOKANE VALLEY, WA 99212 Setbacks: Front Left: Right: Rear: Phone: (509) 535-8833 Group Name: Site Information: Project Name: Plat Key: CONV Name: CONVERTED CNTY DATA District: Nort Date: 6/23/2010 Page 1 of 2 Parcel Number: 45074.0433 Block: Lot: SiteAddress: 8712 E SHANNON AVE Owner: Name: MATSUI, EVERETT & TSUYOKO Address: 8712 E SHANNON AVE Location:: CSV SPOKANE VALLEY, WA 99212 Zoning: R-3 SF Res District Water District: 098 SPO CO WATER DIST#1 Hold: L Area: 10,187 Sq Ft Width: 0 Depth: 0 Right Of Way (ft): 0 Nbr of Bldgs: 0 Nbr of Dwellings: 10 Review Information: Review Building Plan Review Released By: Originally Released: 6/23/2010 By: tmelbourn Landuse/Zoning/HE Conditions Released By: Permits: AS per SVMC 19.40.020B. All residential driveways and off-street parking areas shall be paved with asphalt, Portland cement, grasscrete, paver blocks or other equivalent hard surface material. Originally Released: 6/22/2010 By: tschmidt Operator: jmm Printed By: jmm Print Date: 6/23/2010 Project Number: 10001834 Inv: 1 Application THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Date: 6/23/2010 Contractor: TUFF SHED INC Address: 17500 W VALLEY HWY STE 100 TUKWILA, WA 98188 Description Grp Type POLE BDLG U-1 VB Item Description RESIDENTIAL PERMIT FEE ACCESSORY PLANS REVIEW WSBCC SURCHARGE Building Permit Firm: TUFF SHED INC Phone: (509) 535-8833 Page 2 of 2 This Application: Total Project: Notes Su Ft Valuation Sq Ft Valuation PLAN 480 $9,120.00 480 $9,120.00 REVIEW FEE Totals: 480 $9,120.00 480 $9,120.00 Units Unit Desc 1 SELECT 1 SELECT 1 SELECT Permit Total Fees: Fee Amount $181.25 $45.31 $4.50 $231.06 Notes: As per SVMC 19.40.020 B. All residential driveways and off-street parking areas shall be paved with asphalt, Portland cement, grasscrete, paver blocks or other equivalent hard surface material. Payment Summary Permit Type Building Permit Fee Amount $231.06 $231.06 Invoice Amount $231.06 $231.06 Amount Paid $45.31 $45.31 Amount Owing $185.75 $185.75 Disclaimer: Submittal of this application certifies the owner (or person(s) authorized by the owner) has both examined and finds the information contained within to be true and correct, and agrees that all provisions of laws and/or regulations governing this type of work will be complied with. Subsequent issuance of a permit shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of the code or of any other state or local laws or ordinances. Signature: Operator: jmm Printed By: jmm Print Date: 6/23/2010 - :.:r wt t_e "; ' $CITY OF EIg to Ave, Su e B-3 15 a#ie .,ire Valley, WA 992 6JOIE Spra 111y� (509)688-0036 FAX: (54)688-0037 114424o `o lley.org ! Community Development �-'= �C., 1 New Construction Accessory Bldg n Addition/Remodel Deck Other: PERMIT NUMBER: (C ` / /'( PERMIT FEE: Resident aICon Permit SITE ADDRESS: '8/ la_ W1 IHA Mkt/ ,2%.1 ASSESSORS PARCEL NO: LEGAL DESCRIPTION: Building Owner: Name: TA it Name: �? ¶ is 1 City.]Q1DGU�Lt•( ViaState: 1,04 Zip: Qua 12 kA— Address: a-7 (a- £ S hNvie'✓� } City )tits /111 qNo: C O f ( `f.�:' 3 City: C„1,144u r'I( State: I , 1 � Vll� 7i _p: Phone'lOg - 95(0- (,(11-1)-vFax: DECK/COV. PATIO SQ. FTG: Contact Person Name: `5 ` - U./z V 6 -✓ Phone: 50 ° - 31-tg- 0„)99` Describe the scope of work in detail: Contractor: Name: TA it Address: clic A) 7-11 iev.evi l City.]Q1DGU�Lt•( ViaState: 1,04 Zip: Qua 12 Phone``. d 9 -S3S- $1S3Fax: ,.510-635_5075 S3S.5075 S Contractor Lic No: Exp Date: TtA,FP.sIC - 61-5-0..--,---9 /so t 0 } City )tits /111 qNo: C O f ( `f.�:' 3 Cost of Project: $ oho`6v'4 e Proposed Use: i D, AA).( i -,a- 64 v 02; 6o0°9-- do' OO ° - **************The following MUST be complete: (write N/A if not applicable)********************** HEIGHT TO PEAK: DIMENSIONS: # OF STORIES: / TOTAL HABITABLE SPACE: MAIN FLOOR TO SQ. FTG: q3-0- k/i 2ND FLOOR SQ. FTG: / UNFIN BASEMENT SQ. FTG: �� IMP RVIOUS SURFACE AREA: FINISHED BASEMENT SQ. FTG: 0 GARAGE SQ. FTG: t{ �� d DECK/COV. PATIO SQ. FTG: 30% SLOPES ON PROPERTY: # OF BEDROOMS: CONSTRUCTION E: �sci int ° P� HEAT SOURC SEWER OR SEPTIC? The permitee verifies, acknowledges and agrees by their signature that: 1) If this permit is for construction of or on a dwelling, the dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley Permit inure to the property owner. 3) The signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done in full compliance with the City of Spokane Valley Development Code. Referenced codes are available for review at the City of Spokane Valley Permit Center. 5) This City of Spokane Valley Permit is not a permit or approval for a - - - •r local laws, codes or ordinances. 6) Plans or additional information may be required to be submitted, ar a oc' this application can be processed. / AMOK.c DATE: ❑ VISA 4-r Wei SLC Expires: VIN#: SIGNATURE: Method of Payment: 0 Cash Bankcard #: Authorized Signature: REVISED 2/15/07 K- Check ❑ Mastercard • RESIDENTIAL CHECK LIST DIRECTIONS: Place a check mark in box next to each document required for complete submittal. ❑ SITE PLAN ❑ Property lines and dimensions ❑ Direction arrow pointing North and orientation to streets ❑ Proposed/existing buildings (footprint and dimensions) ❑ Utilities, septic tank/drain field locations and distances ❑ Setbacks to property lines ❑ Distance between buildings ❑ Right of way/easement location & sizes ❑ Driveway approach size and location BUILDING PLANS (3 SETS) (minimum 1/8 inch scale or completely dimensioned) ❑ Elevations (Front/Rear/Sides) with roof peak and wall height including basement: ❑ Foundation Plan (crawlspace, basement or slab on grade): ❑ Footing sizes and locations ❑ Perimeter concrete foundation wall sizes ❑ Crawlspace ventilation ❑ Supporting wood cripple walls or beams ❑ Thickened concrete pads supporting beams or girder trusses ❑ Floor Plan of each level (finished or unfinished) with dimensions: ❑ Floor Joist direction, size and spacing ❑ Header, beam or concrete lintel sizes ❑ Brace wall panel locations ❑ Water heater and furnace locations ❑ Exhaust fan locations ❑ Deck or concrete patio sizes and locations ❑ Roof Plan: ❑ Engineered truss direction and spacing ❑ Rafter and over frame direction, size and spacing ❑ Wall Section Detail including: Roof ❑ Slope/ roofing material/ underlayment/ ice dam protection ❑ Sheathing size and type Ceiling ❑ Joist size and spacing Wall ❑ Height/ top plate/ stud size and spacing/ sole plate ❑ Exterior sheathing size and type Floor ❑ Joist size and spacing Foundation Wall ❑ Concrete or Masonry unit width ❑ Earth to wood separation distance Footing ❑ Size Radon ❑ Passive system with 6mi1 vapor barrier Miscellaneous Construction Details ❑ Deck: ❑ Floor plan/ side view/ dimensions ❑ Floor Joist/ decking direction, size and spacing ❑ Stairway tread rise & run and nosing ❑ Window and door location and sizes ❑ Window well locations if applicable ❑ Room usage labels ❑ Smoke detector locations ❑ Attic and crawl space access locations ❑ Fire Wall construction ❑ Ridge, eave and valley lines ❑ Beam and girder size and location ❑ Truss or rafter size, spacing & connection ❑ Attic insulation/ air space baffle/ ventilation ❑ Size of ceiling gypsum wall board ❑ Siding/ exterior house wrap/ anchor bolts ❑ Insulation, vapor barrier, gypsum wall board ❑ Sheathing or concrete floor size/ insulation ❑ Footing bottom to finished ground level depth ❑ Horizontal & vertical reinforcement if any ❑ Reinforcement if any ❑ Active system with 6 mil vapor barrier ❑ Footings/ post/ and beam size and locations ❑ Handrail / Guard height & spacing Spokane _.. Valley® For City Use Only PLUS Project Number 7O—J!,3 Project Address 11703 E Sprague Ave Suite B-3 ♦ Spokane Valley WA 99206 509.688.0036 ♦ Fax: 509.688.0037 ♦ permitcenter®spokanevalley.org As part of our on-going commitment to customer service during the review process of your project application, we are providing you with a TARGET DATE for the initial technical application review. If for any reason we cannot meet this date, we will contact you with a revised target date. /q/1 o Your application review TARGET DATE is The TARGET DATE is the date we estimate your project application will have had its initial technical review. It is not the date for approval or permit issuance. Tips for a Smoother Project Application Review ➢ Submit complete, accurate plans and documents. Extra time may be required for re -submittals as project application reviewers work on multiple applications and it may be several days before they can look at your new or revised information. ➢ Designate a specific contact person to communicate with the City. While the person designated as the applicant's contact person with the City can be changed, one individual with the expertise for dealing with reviewer comments would be the best choice for the entire review process. ➢ Call staff regarding the status of your project only after the target date shown at the top of the page. Although you should be contacted on or by the target date, please feel free to contact us if you haven 't heard from us by your target date. Staff may contact you before the target date if the initial review is complete. By following this procedure, you will save time and allow the reviewers to complete the work more expeditiously. Steps in the Permit Process 1. Counter Complete. Your application has been accepted as counter complete. This means all of the required documents, as indicated on your Pre -Application Checklist have been submitted or have been approved for deferred submittal. This does not prevent technical staff from requesting additional information as a result of their technical review. 2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free from substantive flaws that would prevent technical staff from completing the technical review once it is started. When this step is complete, your application will be routed to the appropriate staff and remain in their review queue until it comes up for review. 3. Technical Compliance. Once an application is administratively complete, it is routed to technical staff for compliance review. Depending on the type of project, technical staff may include multiple reviewers. You should be contacted by phone, fax, email, or mail by your TARGET DATE once the initial technical compliance review is complete. 4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re - submittals, each reviewer will approve their section of the application and route it to the Permit Center. When all sections of the application are received, a Permit Specialist will process the application and contact the person specified on your application for permit pick-up. Information regarding fees and pre -construction meetings (if required) will be provided by the Permit Specialist at that time. WHITE -APPLICANT PINK - BUILDING FILE REV 9/07 04/27/2010 TUE 14:24 FAX 509 625 6013 Spokane City Hall 3rd FL 2002/002 SITE PLAN STREET, ALLEY OR ADJOINING LOT (Circle One) Side Property Line 1' I Lot Width P PLANNING DEPT. APPROVED BY: .____41111111. _de Rear Property line I •--- Dwelling it 0 7/f_4 Front Property Line Side Property Line 0 tr STREET, ALLEY OR ADJOINING LOT (Circle One) T ED TW%�;E_NTER SIDEWALK ,,5H .. ,- a�: �L DATE: I nting Str Curb Zoning: Building: This site plan may be used for garages, additions, fences or other structures. Please provide dimensions from existing buildings to property lines, as well as dimensions of all structures, existing and new. Commercial LI Residential ) Site Address: FENCE CERTIFICATE REQUIRED? YES ❑ NO ❑ Owner: