Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
2011, 07-25 Permit App: 11002189 Residence
Project Number: 11002189 Inv: 1 Application THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Date: 7/25/2011 Page 1 of 3 Project Information: Permit Use: SFR W/ATT GAR Contact: BIG SKY HOMES & DEVELOPMENT Address: PO BOX 147 C - S - Z: SPOKANE VALLEY WA 99016 Setbacks: Front Left: Right: Rear: Phone: (509) 294-4375 Group Name: Site Information: Project Name: Plat Key: Name: Range District: East Parcel Number: 55074.3908 Block: Lot: SiteAddress: 18110 E SHANNON AVE Location:: CSV Owner: Name: PAKIBA II / BIG SKY HOMES & D Address: 712 S MOEN ST GREENACRES, WA 99016 Zoning: R-4 SF Res Urban District Water District: 134 CONSOLIDATED ID #19 Area: 8,071 Sq Ft Width: 0 Nbr of Bldgs: 0 Nbr of Dwellings: 0 Review Information: Review Building Plan Review Other Reviews ADDRESS Hold: ❑ Depth: 0 Right Of Way (ft): 0 Released By: Originally Released: 7/25/2011 By: tmelbourn Released By: Originally Released: 7/25/2011 By: jdavis Landuse/Zoning/HE Conditions Sewer Review Released By: Originally Released: 7/22/2011 By: mpalaniuk Released By: Originally Released: 7/22/2011 By: jdavis Operator: JD Printed By: JD Print Date: 7/25/2011 Project Number: 11002189 Inv: 1 Permits: Application THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Date: 7/25/2011 Page 2 of 3 Building Permit Contractor: BIG SKY HOMES & Firm: BIG SKY HOMES & DEVELOPMN Address: Po Box 147 Phone: (509) 294-4375 GREENACRES WA 99016 This Application: Total Project: Description Grp Type Notes Sq Ft Valuation Sq Ft Valuation 1&2 FAMILY R-3 VB 779 $78,640.05 779 $78,640.05 2ND FLOOR R-3 VB 1,161 $86,157.81 1,161 $86,157.81 COV DECK R-3 VB 108 $1,620.00 108 $1,620.00 GAR WOOD U-1 VB 462 $8,778.00 462 $8,778.00 Item Description RESIDENTIAL PERMIT FEE WSBCC SURCHARGE SF PLNS RVW < 7999 SQ FT Totals: 2,510 $175,195.86 2,510 $175,195.86 Units Unit Desc 1 SELECT 1 SELECT 1 SELECT Permit Total Fees: Mechanical Permit Fee Amount $1,419.35 $4.50 $567.74 $1,991.59 Contractor: BIG SKY HOMES & Firm: BIG SKY HOMES & DEVELOPMN Address: Po Box 147 Phone: (509) 294-4375 GREENACRES WA 99016 Item Description DUCT WORK SYSTEM GAS WATER HEATER GAS APPLIANCE<=100,000BTU GAS PIPING VENTILATING FANS 1 DUCT APPL VENTS 1NSTL/MOVE/RPL Units Unit Desc 1 NUMBER OF 1 NUMBER OF 1 NUMBER OF 2 # OF UNITS 3 NUMBER OF 1 EACH Operator: JD Printed By: JD Permit Total Fees: Fee Amount $11.00 $11.00 $13.00 $2.00 $33.00 $10.00 $80.00 Print Date: 7/25/2011 Project Number: 11002189 Inv: 1 Application THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Date: 7/25/2011 Page 3 of 3 Contractor: BIG SKY HOMES & Address: Po Box 147 GREENACRES WA 99016 Item Description TOILETS/BIDETS SINKS TUBS DISH WASHERS GARBAGE DISPOSAL CLOTHES WASHER FLOOR DRAINS MISCELLANEOUS FIXTURES Notes: Payment Summary: Permit Type Building Permit Mechanical Permit Plumbing Permit Plumbing Permit Firm: BIG SKY HOMES & DEVELOPMN Phone: (509) 294-4375 Units 2 3 2 1 1 1 1 1 Fee Amount $1,991.59 $80.00 $72.00 $2,143.59 Unit Desc NUMBER OF NUMBER OF NUMBER OF NUMBER OF NUMBER OF NUMBER OF NUMBER OF NUMBER OF Permit Total Fees: Invoice Amount $1,991.59 $80.00 $72.00 $2,143.59 Fee Amount $12.00 $18.00 $12.00 $6.00 $6.00 $6.00 $6.00 $6.00 $72.00 Amount Paid $482.62 $0.00 $0.00 $482.62 Amount Owing $1,508.97 $80.00 $72.00 $1,660.97 Disclaimer: Submittal of this application certifies the owner (or person(s) authorized by the owner) has both examined and finds the information contained within to be true and correct, and agrees that all provisions of laws and/or regulations governing this type of work will be complied with. Subsequent issuance of a permit shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of the code or of any other state or local laws or ordinances. Signature: Operator: JD Printed By: JD Print Date: 7/25/2011 Spokane „,o0ValleyR RESIDENTIAL CONSTRUCTION PERMIT APPLICATION Community Development Department Permit Center 11703 East Sprague Avenue, Suite B-3 Spokane Valley, WA 99206 Tel: (509) 688-0036 Fax: (509) 688-0037 permitcenter©spokanevallev.orq i (Staff Use Only) PERMIT NUMBER: f oC� I a 1 PERMIT FEE: Q NEW CONSTRUCTION ❑ DECK ❑ ADDITION/REMODEL 0 ACCESSORY BUILDING ❑ OTHER SITE ADDRESS: 18110 E Shannon ASSESSORS PARCEL NO.: LEGAL DESCRIPTION: BUILDING OWNER NAME: Big Sky Homes and Development NAME: Travis Paske ADDRESS: PO Box 147 cm: Spokane Valley STATE: WA zip: 99016 PHONE: 294-4375 FAX: 893-2985 CELL: 294-4375 CONTACT NAME: Big Sky Homes and Development PHONE: 294-4375 FAX: 893-2985 CELL: 294-4375 CONTRACTOR NAME: Big Sky Homes and Development MAILING ADDRESS: 18110 E Shannon Crry: Spokane Valley STATE: WA zip: 99016 PHONE: 294-4375 FAX: 893-2985 CELL: 2944375 CONTRACTOR LICENSE No.: BIGSKSH898BC EXPIRES: 12/29/2011 CITY BUSINESS LICENSE NO.: BIGSKSH DESCRIBE THE SCOPE OF WORK IN DETAIL AND INDICATE USE & PROPOSED USE: Single Family residential construction Single Family residential construction ****YOU MUST COMPLETE THE FOLLOWING**** MARK N/A IF NOT APPLICABLE Height to Peak: 20, Dimensions: 40x33 No. of Stories: 2 Total Habitable 1940 Space: Main Floor ' FT:y�, Garage SQ FT: �I 462 0 Up// Floor SQ FT: Deck overed Patio SQ /D' Unfinished Basement SQ FT: r(J Impervious Surface Area: Finished Basement SO • ,73 30% Slopes on // FT:Property: No. of Bedrooms: 3 Constr r ctioii Type: Heat Source: gas furnace TOTAL COST OF PROJECT: $ 85000 Sewer nr a^—`e-- DISCLAIMER The permitted verifies, acknowledges and agrees by their signature that: 1) if this permit is for construction or be served by potable water. 2) Ownership of this City of Spokane Valley permit inure to the property owner. owner or has permission to represent the property owner in this transaction. 4) All construction is to be done Spokane Valley Development code. Referenced codes are available for review at the City of Spokane Valle Spokane Valley permit is not a permit or approval for any violation of federal, state or local laws, codes or or information may be required to be submitted and subsequently approved before this application can be process Effective October 28, 2007 P:\Community Development\02 Administration\03 Forms - Official Versions\Permit Center\Resic App 10.28.07.doc A/o 0R✓`Jy Spokane �° Target Date sheet For City Use Ony1y, PLUS Projectj1;, Project Address 11703 E Sprague Ave Suite B-3 ♦ Spokane Valley WA 99206 509.720-5240 ♦ Fax: 509.688.0037 ♦ permitcenter®spokanevalley.org As part of our on-going commitment to customer service during the review process of your project application, we are providing you with a TARGET DATE for the initial technical application review. If for any reason we cannot meet this date, we will contact you with a revised target date. I i Your application review TARGET DATE is i I Z a ` The TARGET DATE is the date we estimate your project application will have had its initial technical review. It is not the date for approval or permit issuance. Tips for a Smoother Project Applicatiop Review > Submit complete, accurate plans and documents. Extra time may be required for re -submittals as project application reviewers work on multiple applications and it may be several days before they can look at your new or revised information. > Designate a specific contact person to communicate with the City. While the person designated as the applicant's contact person with the City can be changed, one individual with the expertise for dealing with reviewer comments would be the best choice for the entire review process. > Call staff regarding the status of your project only after the target date shown at the top of the page. Although you should be contacted on or by the target date, please feel free to contact us if you haven't heard from us by your target date. Staff may contact you before the target date if the initial review is complete. By following this procedure, you will save time and allow the reviewers to complete the work more expeditiously. Steps in the Permit Process 1. Counter Complete. Your application has been accepted as counter complete. This means all of the required documents, as indicated on your Pre -Application Checklist have been submitted or have been approved for deferred submittal. This does not prevent technical staff from requesting additional information as a result of their technical review. 2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free from substantive flaws that would prevent technical staff from completing the technical review once it is started. When this step is complete, your application will be routed to the appropriate staff and remain in their review queue until it comes up for review. 3. Technical Compliance. Once an application is administratively complete, it is routed to technical staff for compliance review. Depending on the type of project, technical staff may include multiple reviewers. You should be contacted by phone, fax, email, or mail by your TARGET DATE once the initial technical compliance review is complete. 4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re - submittals, each reviewer will approve their section of the application and route it to the Permit Center. When all sections of the application are received, a Permit Specialist will process the application and contact the person specified on your application for permit pick-up. Information regarding fees and pre -construction meetings (if required) will be provided by the Permit Specialist at that time. CD -003 V-7/ 06-21-11 Page 1 of 1 fill fX kan-/e\-ft ISValk' Permit Center 11703 E Sprague Ave, Suite B-3 Spokane Valley, WA 99206 (509)688-0036 FAX: (509)688-0037 perm itcenter(spokanevalley .org Community Development Plumbing Permit Application PERMIT NUMBER: PERMIT FEE: ❑ Commercial ❑■ Residential SITE ADDRESS: 18110 E Shannon Building Owner Big Sky Homes and Development Name: Travis Paske Phone: 294-4375 Fax: 893-2985 Address: PO Box 147 City: State: Zip: Contractor Big Sky Homes and Development Name: 294-4375 Phone: 294-4375 Fax: 893-2985 Address: PO Box 147 Cry: Spokane Valley State: WA Zip: 99016 License No: BIGSKSH898BC City Business Lic: Contact/Project Manager: Name: Travis Paske Phone. 294-4375 # OF UNITS PLUMBING FIXTURE ON A TRAP TOILETS 2 URINALS TUBS 2 SHOWERS (per trap) SINKS Lav/Basins, Bar, Floor, Kitchen, Laundry, Utility, Janitor, Photo, X-ray, Food, Prep/Culinary Meat 3 DISHWASHER 1 CLOTHES WASHER 1 GARBAGE DISPOSAL 1 WATER SOFTNER FLOOR DRAIN Area, Case, Coil, Trench, Condensate 1 ROOF DRAIN/OVERFLOW DRAINS FOUNTAIN, DRINKING WATER PIPING/DRAIN-IN WASTE Installation, Alterations, Repair, Reversals WATER USING DEVICE Ice and/or Coffee maker, hose bib, steamer proofer, carbonator, swamp cooler 1 PRIVATE SEWAGE DISPOSAL SYSTEM WATER HEATER If Gas, See Mechanical INDUSTRIAL WASTE PRETREATEMENT INCEPTORS Including traps, vents except kitchen type grease interceptors functioning as fixture traps REPAIR OR ALTERATION Water piping, drainage or vent piping ATMOSPHERIC TYPE VACUUM BREAKER BACK FLOW PROTECTIVE DEVICE Other than atmospheric type vacuum breakers MEDICAL GAS INCEPTORS ❑CASH ❑ CHECK ❑ VISA 0 MC Card# SIGNATURE: EXPIRES: VIN: P:\Community Development\02 Administration\03 Forms - Official Versions\Permit Center\Plumbing Permit Application 04-03-09 dg.doc Permit Center ltiln' a `_ 11703 E Sprague Ave, Suite B-3 Spokane Valley, WA 99206 (509)688-0036 FAX: (509)688-0037 perm itcentcr,uspokaneval Iey_orz, .000Valley Community Development Mechanical Permit Application SITE ADDRESS: 18110 E Shannon PERMIT NUMBER: PERMIT FEE: ❑ Commercial n Residential Building Owner Big Sky Homes and Development Name: Travis Paske Phone: 294-4375 Fax: 893-2985 Address: PO Box 147 City Spokane Valley State: WA zip: 99016 Contractor Big Sky Homes and Development Name: Travis Paske Phone: 294-4375 Fax: 893-2985 Address: PO Box 147 City: Spokane Valley State: WA Zip: 99016 License No: BIGSKSH898BC City Business Lic: Contact/Project Manager: Name Phone: ❑CASH ❑ CHECK ❑ VISA ❑ MC CARD #: EXPIRES: SIGNATURE VIN: P:\Community Development\02 Administration\03 Forms - Official Versions\Pernit Center\Mechanical Permit Application 04-03-09 dg.doc #UNITS FURNACES & SUSPENDED HEATERS -INSTALLATION OR RELOCATION Up to & including 100,000 BTU 1 FURNACES & SUSPENDED HEATERS -INSTALLATION OR RELOCATION Over 100,000 BTU DUCT WORK SYSTEM 1 HEAT PUMP/AIR CONDITIONER 0-3 TON AIR CONDITIONER Over 3-15 TON AIR CONDITIONER Over 15-30 TON AIR CONDITIONER Over 30-50 TON AIR CONDITIONER Over 50 TON GAS WATER HEATER 1 GAS PIPING SYSTEM (each outlet) 2 GAS LOG, FIREPLACE, & GAS INSERT APPLIANCE VENTS INSTALLATION, RELOCATION, REPLACEMENT 1 REPAIRS OR ADDITIONS BOILER, COMPRESSORS, ABSORPTIONS SYSTEM 0 to 3 hp -100,000 BTU or less BOILER, COMPRESSORS, ABSORPTIONS SYSTEM Over 3 - 15 hp — 100,001 to 500,000 BTU BOILER, COMPRESSORS, ABSORPTIONS SYSTEM Over 15 — 30 hp - 500,001 to 1,000,000 BTU BOILER, COMPRESSORS, ABSORPTIONS SYSTEM Over 30 hp — 1,000,001 to 1,750,000 BTU BOILER, COMPRESSORS, ABSORPTIONS SYSTEM Over 50 hp — over 1,750,000 BTU AIR HANDLER (DOES NOT include ducting) Each unit up to 10,000 cfm, including ducts AIR HANDLER (DOES NOT include ducting) Each unit over 10,000 cfm EVAPORATIVE COOLERS(other than portables) VENTILATION AND EXHAUST Each fan connected to a singe duct 3 VENTILATION AND EXHAUST Each ventilation system VENTILATION AND EXHAUST Each hood served by mechanical exhaust INCINERATORS Installation or relocation of residential INCINERATORS Installation or relocation of commercial APPLIANCES Range, Clothes Washer UNLISTED APPLIANCES Under 400,000 BTU UNLISTED APPLIANCES Over 400,000 BTU HOOD Type I HOOD Type II L P STORAGE TANK WOOD OR PELLET STOVE INSERT WOOD STOVE SYSTEM — FREE STANDING ❑CASH ❑ CHECK ❑ VISA ❑ MC CARD #: EXPIRES: SIGNATURE VIN: P:\Community Development\02 Administration\03 Forms - Official Versions\Pernit Center\Mechanical Permit Application 04-03-09 dg.doc SPOKANT CoUKrY Site Information SPOKANE COUNTY DEPARTMENT OF BUILDING & PLANNING 1026 WEST BROADWAY AVENUE • SPOKANE, WA 99260-0050 Project Information Site Address: 18110 E SHANNON AVE Parcel Number: 55074.3908 Subdivision: CITY OF SPOKANE VALLEY Block: Lot: Zoning: Owner: BIG SKY HOMES & DEVELOPMENT Address: PO BOX 147 SPOKANE VALLEY, WA 99206 Building Inspector: Water Dist: Project Number: 11003520 Inv: 1 Issue Date: 7/22/2011 Permit Use: SEWER CONNECTION Applicant: BIG SKY HOMES & DEVELOPMENT PO BOX 147 SPOKANE VALLEY, WA 99206 Phone: (509) 294-4375 Contact: BIG SKY HOMES & DEVELOPMENT PO BOX 147 SPOKANE VALLEY, WA 99206 Phone: (509) 294-4375 Setbacks - Front: Left: Right: Group Name: Project Name: Rear: Permits Sewer Connection Permit Contractor: BIG SKY HOMES & DEVELOPMENT LL License #: BIGSKSH898BC SEWER CONNECTION 1 $125.00 PROCESSING FEE 1 $25.00 Total Permit Fee: $150.00 **FOR SEWER INSPECTIONS CALL THE UTILITIES DEPT AT (509) 477-3604 FROM 8:30-5:00 MONDAY -FRIDAY PRIOR TO COVER. ONE WORKING DAY NOTICE REQUIRED. PERMIT ALLOWS FOR A 30 -MINUTE INSPECTION. ADDITIONAL INSPECTION FEES APPLY AFTER 30 MINUTES. **CALL 1-800-424-5555 BEFORE YOU DIG --AT LEAST 2 WORKING DAYS IN ADVANCE. SPOKANE COUNTY CODE REQUIRES THE INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR & INDUSTRIES, INCLUDING THOSE RELATED TO TRENCH SAFETY. **INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF SEWER STUB PRIOR TO ANY OTHER EXCAVATION. **SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED. SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE. **THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF UNDERGROUND FACILITIES. Payment Summary Total Fees AmountPaid AmountOwing $150.00 $150.00 $0.00 Tran Date Receipt # Payment Amt 7/22/2011 3082 $150.00 Processed By: DOMPIER, DAWN Printed By: Lemley, Linda Page 1 of 1 PERMIT NOTICE It is the responsibility of the applicant/permittee to see to it that the use described on the front of this permit complies with applicable code; and requirements and that required inspections are requested. Failure to request inspections as listed below and obtain the necessary approvals before progressing beyond the point where inspections are required may necessitate removal of certain parts of the construction at the applicant's/permittee's or property owner's expense. At a minimum, the following inspections ARE REQUIRED by County Code: 1 FOOTING - all structures, including manufactured homes when forms and reinforcement are in place and prior to placement of concrete. NOTE: This inspection includes review of the structure's setbacks from property lines. Minimum setbacks are established by County zon- ing regulations. Front, flanking, side and rear yard setbacks are measured from property lines. Curb lines and fence lines are not necessarily indicative of property lines. In some residential areas, the County can own as much as 20 feet of right-of-way between your property and the actual improved street/curb. The responsibility to comply with applicable setback provisions lies solely with the permittee — neither Spokane County nor its authorized representatives assume any responsibility for the verification or location of your property lines. Please verify their location prior to locating your structure. Failure to properly locate the structure may require its relocation at the owner's/permittee's expense. 2. FOUNDATION - when forms and reinforcement are in place and prior to placement of concrete. 3. FRAMING - after all framing, bracing and blocking is in place, plumbing, mechanical rough -in inspections have been approved, and prior to concealing. 4. INSULATION - prior to the installation of drywall. 5. PLUMBING - after rough -in, before covering, and final. 6. MECHANICAL - rough -in of piping, before covering, metal chimneys before concealment, and final. 7. FINAL - all permits - when complete and prior to occupancy and/or use. Please provide 24 hours notice. NOTE: In addition to inspection of the structure, this inspection includes review of site improvements (typically depicted on the approved site plan) required by ordinance or as a condition of approval of this permit. Items such as the installation of fire hydrants, fire department access, on-site drainage ("208 swales"), road improvements, parking, and landscaping are common requirements of a permit/site plan which must be completed prior to final ap- proval of a building or issuance of a Certificate of Occupancy. 8. MANUFACTURED HOMES - foundation inspections prior to pouring pads, inspection of blocking/tie-downs, when completed per manufacturers installation instructions. Final Inspection approval prior to occupancy: stairs, handrails, skirting, etc., installations completed WAINS Tag(s) must be affixed to the home, completed inspection record card and manufacturer's installation instructions must be available on site. 9. SEWERS - prior to cover 10. RIGHT-OF-WAY/APPROACH - prior to placement of concrete, or, if gravel approach, after completion. In addition to the above, any plumbing or mechanical systems or material which would be concealed by framing, drywall, concrete, etc., must be inspected prior to cover. Check with the department for "special inspections" in conjunction with commercial projects. FOR INSPECTIONS: TO INSURE PROMPT SERVICE, PLEASE GIVE ONE WORKING DAY/24 HOUR NOTICE . PARTS OF YOUR PROJECT MAY REQUIRE PERMITS AND INSPECTIONS FROM MORE THAN ONE AGENCY. • Building, plumbing, mechanical and fire inspections -Department • Road cuts for utilities or driveways - Division of Engineering & of Building & Planning 477-3675 Roads - 48-HOUR NOTICE REQUIRED 477-3600 or State • Construction in a flood plain - Division of Engineering & Roads 477- Department of Transportation 456-3000 3600 • Sewer connection, Division of Utilities- 477-3604 or City Pub- • Electrical wiring - State Department of Labor and Industries 324-2640 lic Works Department 625-6300 • On-site waste disposal system, Spokane Regional Health District • Asbestos, Renovations, and Demolitions - Spokane Regional 324-1560 Clean Air Agency 477-4727 PERMIT EXPIRATION & EXTENSION Building permits shall automatically expire and become invalid by limitation of time three (3) years from the date of permit issuance. Other permits not issued in conjunction with the construction or completion of a building or structure shall automatically expire and become invalid by limitation of time 18 months from the date of permit issuance. The Director is authorized within his/her discretion to grant one (1) extension of time, for a period not to exceed 180 days. A request for an extension shall be made by the permit holder in writing and shall be submitted to and received by the Spokane County Building and Planning Department prior to the expiration date of the permit and shall demonstrate just cause for the requested extension. REFUNDS The building official may authorize refunding: (1) Any fee paid which was erroneously paid or collected; or, (2) Not more than 80% of a permit fee paid when no work has been done under the permit; or, (3) Not more than 80% of the plan review fee paid when an application for a permit for which a plan review fee has been paid is withdrawn or canceled before any plan reviewing is done; or, (4) Any fee paid except on written application filed by the original permittee not later than 180 days after the date of fee payment. Please note that application processing fees are nonrefundable unless the application was erroneously processed. MISTAKE? If you think we've made an error in processing this permit or find erroneous information on the permit, please bring it to our attention immediately by filing a written request for correction within 10 working days of discovery. All such requests should be directed to the Department of Building and Planning at: Spokane County Department of Building & Planning 1026 West Broadway Avenue Spokane, WA 99260 Phone: (509) 477-3675 Fax: (509) 477-4703 TDD: (509) 477-7133 REVISED I2/10 BLDG PERMIT 07/22/2011 14:23 5092289070 PLANNING DEPT. APPROVED BY: DATE: -7/3,7-/ BANNER BANK REAL EST PAGE 02/02 54 4.4000XVii,----/ Pe S F4 t%.1 s 44.4-0. Lo4 a %it 3 801) SA r 18110 E. s4MAroom Ada Big S1 ktorin 4 --ib sc^te_I zot :1 ) t • C'rojc?ci. Narno Sub r nit", v