Loading...
2009, 12-04 Permit App: 09003813 ResidenceProject Number: 09003813 Inv: 1 Application THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Date: 12/4/2009 Page 1 of 3 Project Information: Permit Use: SFR W/ATT GAR Setbacks: Front Site Information: Plat Key: Contact: CLIFF SCHMITZ CONSTRUCTION, IN Address: 16520 E SECRETARIAT C - S - Z: VERADALE, WA 99037 Left: Right: Rear: Phone: (509) 999-7733 Group Name: Project Name: Name: Range District: East Parcel Number: 55074.3911 Block: Lot: SiteAddress: 18204 E SHANNON AVE Location:: CSV Owner: Name: CLIFF SCHMITZ CONSTRUCTIO Address: 16520 E SECRETARIAT VERADALE, WA 99037 Zoning: R-4 SF Res Urban District Water District: 134 CONSOLIDATED ID #19 Area: 7,142 Sq Ft Width: 0 Nbr of Bldgs: 0 Nbr of Dwellings: 0 Review Information: „ Hold: ❑ Depth: 0 Right Of Way (ft): 0 Review Building Plan Review Released By: Originally Released: 12/3/2009 By: tmelbourn Landuse/Zoning/HE Conditions Released By: Sewer Review Permits: Originally Released: 12/3/2009 By: cjjanssen Released By: Originally Released: 12/4/2009 By: jdavis Operator: JD Printed By: JD Print Date: 12/4/2009 Project Number: 09003813 Inv: 1 Application THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Date: 12/4/2009 Page 2 of 3 Contractor: CLIFF SCHMITZ Address: 16520 E SECRETARIAT VERADALE WA 99037 Description Gtr Type Notes 1&2 FAMILY R-3 VB GARAGE U-1 VB Item Description RESIDENTIAL PERMIT FEE WSBCC SURCHARGE SF PLNS RVW < 7999 SQ FT Contractor: CLIFF SCHMITZ Address: 16520 E SECRETARIAT VERADALE WA 99037 Item Description GAS APPLIANCE<=100,000BTU GAS PIPING VENTILATING FANS 1 DUCT HOOD - TYPE I Contractor: CLIFF SCHMITZ Address: 16520 E SECRETARIAT VERADALE WA 99037 Item Description TOILETS/BIDETS SINKS TUBS DISH WASHERS CLOTHES WASHER MISCELLANEOUS FIXTURES Building Permit Firm: CLIFF SCHMITZ CONSTRUCTIO Phone: (509) 922-4297 This Application: Total Project: Sq Ft Valuation Sq Ft Valuation 1,147 $111,064.01 1,147 $111,064.01 475 $9,025.00 475 $9,025.00 Totals: 1,622 $120,089.01 1,622 $120,089.01 Units Unit Desc 1 SELECT 1 SELECT 1 SELECT Permit Total Fees: Mechanical Permit Fee Amount $1,111.35 $4.50 $444.54 $1,560.39 Firm: CLIFF SCHMITZ CONSTRUCTIO Phone: (509) 922-4297 Units Unit Desc 1 NUMBER OF 2 # OF UNITS 3 NUMBER OF 1 NUMBER OF Units 2 3 2 1 1 3 Operator: JD Printed By: JD Permit Total Fees: Plumbing Permit Fee Amount $13.00 $2.00 $33.00 $52.00 $100.00 Firm: CLIFF SCHMITZ CONSTRUCTIO Phone: (509) 922-4297 Unit Desc NUMBER OF NUMBER OF NUMBER OF NUMBER OF NUMBER OF NUMBER OF Permit Total Fees: Print Date: Fee Amount $12.00 $18.00 $12.00 $6.00 $6.00 $18.00 $72.00 12/4/2009 Project Number: 09003813 Notes: Inv: 1 Application THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Date: 12/4/2009 Payment Summary: y,; ,�. �.w.,,..., Permit Type Building Permit Mechanical Permit Plumbing Permit Fee Amount $1,560.39 $100.00 $72.00 Invoice Amount $1,560.39 $100.00 $72.00 Amount Paid $433.34 $0.00 $0.00 Amount Owing $1,127.05 $100.00 $72.00 $1,732.39 $1,732.39 $433.34 $1,299.05 Page 3 of 3 Disclaimer: Submittal of this application certifies the owner (or person(s) authorized by the owner) has both examined and finds the information contained within to be true and correct, and agrees that all provisions of laws and/or regulations governing this type of work will be complied with. Subsequent issuance of a permit shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of the code or of any other state or local laws or ordinances. Signature: Operator: JD Printed By: JD Print Date: 12/4/2009 • �a11ey Community Development Residential Construction Permit Application Permit Center 11703 E Sprague Ave, Suite B-3 Spokane Valley, WA 99206 (509)688-0036 FAX: (509)688-0037 pennitcenter@spokanevalley.org PERMIT NUMBER: ?-3,-73 PERMIT FEE: New Construction ❑ Accessory Bldg n Addition/Remodel ❑ Deck ❑ Other: SITE ADDRESS: ASSESSORS Building Ow) Name: Address: City: Phone: �j 0v GAL DESCRIPTION: ' k LA l p y f S 41 Tz /6-pcer AGO Contact Person Name: l`_ I- [ F P SC H-0 1-1--z, Phone: cls (lei —2-2.3 "3 Describe the scope of work in detail: Contractor: Li_ i Er scAil,1-1...2- c!!nS7 Z J - Name: ., 4 lY Address: 1 (aczo i • s �1 7e^ ,,, City: Ue, 1� 2Nu FLOOR SQ. FTG: �.-�>� Si, a3 v� Zipq, -, Phone: 4 qq,7 7 3 3 Fax: Z l- S(vOjj Contractor Lic No: 30% SLOPES ON PROPERTY: -e Exp Date: City Business Lic. No: HEAT SOURCE: SEWER OR SEPTIC? Cost of Project: $ I () 1, OODco ,\ie -01) us? G irl Proposed Use: •MUST be com Tete• (write N/A if not applicable)********************** •' "' 1 Ile Mini TV mg P • HEIGHT TO PEAK: l DIMENSIONS: # OF STORIES: TOTAL HABITABLE SPACE: i/L7 MAIN FLOOR TO SQ.I FTG: -6- I .1147 2Nu FLOOR SQ. FTG: �.-�>� UNFIN BASEMENT SQ. FTG: 'ems IMPERVIOUS SURFACE AREA: a - - FINISHED BASEMENT SQ. FTG: GARAGE SQ. FT : f DECK/COV. PATIO SQ. FTG: -- "� 30% SLOPES ON PROPERTY: -e ....44:-9-7 # OF BEDROOMS: CONSTRUCTION TYPE: HEAT SOURCE: SEWER OR SEPTIC? The permitee verifies, acknowledges and agrees by their signature that: 1) If this permit is for construction of or on a dwelling, the dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley Permit inure to the property owner. 3) The signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done in full compliance with the City of Spokane Valley Development Code. Referenced codes are available for review at the City of Spokane Valley Permit Center. 5) This City f Spokane Valley Permit is not a permit or approval for any violation of federal, state or local laws, codes or ordinances. 6) PI. s .diti.r al information may be required to be submitted, and subsequently approved before this application can be pjocessed SIGNATURE: Method of Payment: 0 Cash Bankcard #: Authorized Signature: REVISED 2/15/07 heck DATE:NL 1 ? d 6 1 ❑ Mastercard 0 VISA Expires: VIN#: -14;0- Valley. Community Development Mechanical Permit Application n Commercial 11703 E Sprague Ave, Suite B-3 Spokane Valley, WA 99206 (509)688-0036 FAX: (509)688-0037 permitcentera,,spokanevalley.org PERMIT NUMBER: PERMIT FEE: SITE ADDRESS: ( 25?J) L1 6 . S ket,n rk Residential Building Owner Name: Phone: Fax: Address: City: State: Zip: Contractor Name: K tj-f kt, J 6 Phone: Fax: Address: City: State: Zip: License No: City Business Lic: Contact/Project Manager: • Phone: DCASH 0 CHECK 0 VISA 0 MC CARD #: EXPIRES: SIGNATURE http://www.spokanevalley.org/uploads/Community_Development/Documents/Forms/Bui lding/MechanicalPermitApplication040309.doc #UtITS FURNACES & SUSPENDED HEATERS -INSTALLATION OR RELOCATION Up to & including 100,000 BTU FURNACES & SUSPENDED HEATERS -INSTALLATION OR RELOCATION Over 100,000 BTU DUCT WORK SYSTEM HEAT PUMP/AIR CONDITIONER 0-3 TON AIR CONDITIONER Over 3-15 TON AIR CONDITIONER Over 15-30 TON AIR CONDITIONER Over 30-50 TON AIR CONDITIONER Over 50 TON GAS WATER HEATER GAS PIPING SYSTEM (each outlet) Z GAS LOG, FIREPLACE, & GAS INSERT APPLIANCE VENTS INSTALLATION, RELOCATION, REPLACEMENT REPAIRS OR ADDITIONS BOILER, COMPRESSORS, ABSORPTIONS SYSTEM 0 to 3 hp -100,000 BTU or less BOILER, COMPRESSORS, ABSORPTIONS SYSTEM Over 3 -15 hp —100,001 to 500,000 BTU BOILER, COMPRESSORS, ABSORPTIONS SYSTEM Over 15 — 30 hp - 500,001 to 1,000,000 BTU BOILER, COMPRESSORS, ABSORPTIONS SYSTEM Over 30 hp -1,000,001 to 1,750,000 BTU BOILER, COMPRESSORS, ABSORPTIONS SYSTEM Over 50 hp — over 1,750,000 BTU AIR HANDLER (DOES NOT include ducting) Each unit up to 10,000 cfm, including ducts AIR HANDLER (DOES NOT include ducting) Each unit over 10,000 cfm EVAPORATIVE COOLERS(other than portables) VENTILATION AND EXHAUST Each fan connected to a singe duct 3 VENTILATION AND EXHAUST Each ventilation system 66 >�z. VENTILATION AND EXHAUST Each hood served by mechanical exhaust INCINERATORS Installation or relocation of residential INCINERATORS Installation or relocation of commercial APPLIANCES Range, Clothes Washer UNLISTED APPLIANCES Under 400,000 BTU UNLISTED APPLIANCES Over 400,000 BTU HOOD Type I HOOD Type II L P STORAGE TANK WOOD OR PELLET STOVE INSERT WOOD STOVE SYSTEM — FREE STANDING DCASH 0 CHECK 0 VISA 0 MC CARD #: EXPIRES: SIGNATURE http://www.spokanevalley.org/uploads/Community_Development/Documents/Forms/Bui lding/MechanicalPermitApplication040309.doc m~ k .*Valley. Community Development Plumbing Permit Application I 'Zoikatie\ r) )'-\ r cuuu •caucI 11703 E Sprague Ave, Suite B-3 Spokane Valley, WA 99206 (509)688-0036 FAX: (509)688-0037 permitcenter a,spokanevallev.org SITE ADDRESS: PERMIT NUMBER: PERMIT FEE: ❑ Commercial ® Residential Building Owner Name: Phone: Fax: Address: City: State: Zip: Contractor 0 K pawl (- ))0 G Name: Phone: Fax: Address: City: State: Zip: License No: City Business Lic: Contact/Project Manager: Name: Phone: # OF UNITS PLUMBING FIXTURE ON A TRAP TOILETS Z.-, URINALS TUBS SHOWERS (per trap) SINKS Lav/Basins, Bar, Floor, Kitchen, Laundry, Utility, Janitor, Photo, X-ray, Food, Prep/Culinary Meat DISHWASHER l CLOTHES WASHER Y GARBAGE DISPOSAL WATER SOFTNER FLOOR DRAIN Area, Case, Coil, Trench, Condensate ROOF DRAIN/OVERFLOW DRAINS FOUNTAIN, DRINKING WATER PIPING/DRAIN-IN WASTE Installation, Alterations, Repair, Reversals WATER USING DEVICE Ice and/or Coffee maker, hose bib, steamer proofer, carbonator, swamp cooler 2 J PRIVATE SEWAGE DISPOSAL SYSTEM WATER HEATER If Gas, See Mechanical INDUSTRIAL WASTE PRETREATEMENT INCEPTORS Including traps, vents except kitchen type grease interceptors functioning as fixture traps REPAIR OR ALTERATION Water piping, drainage or vent piping ATMOSPHERIC TYPE VACUUM BREAKER BACK FLOW PROTECTIVE DEVICE Other than atmospheric type vacuum breakers MEDICAL GAS INCEPTORS ❑CASH 0 CHECK 0 VISA 0 MC Card# SIGNATURE: EXPIRES: VIN: CURRENT FEES AVAILABLE AT: http://www.spokanevallevorq/ under the quick links for Forms, Master Fee Schedule. http://www.spokanevalley.org/uploads/Community_Development/Documents/Forms/Building/PlumbingPermitApplication040309.doc okane jUalley� For City Use Only PLUS Project Number Project Address { 11703 E Sprague Ave Suite B-3 ♦ Spokane Valley WA 99206 509.688.0036 ♦ Fax: 509.688.0037 ♦ permitcenter@spokanevalley.org As part of our on-going commitment to customer service during the review process of your project application, we are providing you with a TARGET DATE for the initial technical application review. If for any reason we cannot meet this date, we will contact you with a revised target date. I' c^ Your application review TARGET DATE is The TARGET DATE is the date we estimate your project application will have had its initial technical review. It is not the date for approval or permit issuance. Tips for a Smoother Project Application Review ➢ Submit complete, accurate plans and documents. Extra time may be required for re -submittals as project application reviewers work on multiple applications and it may be several days before they can look at your new or revised information. ➢ Designate a specific contact person to communicate with the City. While the person designated as the applicant's contact person with the City can be changed, one individual with the expertise for dealing with reviewer comments would be the best choice for the entire review process. ➢ Call staff regarding the status of your project only after the target date shown at the top of the page. Although you should be contacted on or by the target date, please feel free to contact us if you haven 't heard from us by your target date. Staff may contact you before the target date if the initial review is complete. By following this procedure, you will save time and allow the reviewers to complete the work more expeditiously. Steps in the Permit Process 1. Counter Complete. Your application has been accepted as counter complete. This means all of the required documents, as indicated on your Pre -Application Checklist have been submitted or have been approved for deferred submittal. This does not prevent technical staff from requesting additional information as a result of their technical review. 2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free from substantive flaws that would prevent technical staff from completing the technical review once it is started. When this step is complete, your application will be routed to the appropriate staff and remain in their review queue until it comes up for review. 3. Technical Compliance. Once an application is administratively complete, it is routed to technical staff for compliance review. Depending on the type of project, technical staff may include multiple reviewers. You should be contacted by phone, fax, email, or mail by your TARGET DATE once the initial technical compliance review is complete. 4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re - submittals, each reviewer will approve their section of the application and route it to the Permit Center. When all sections of the application are received, a Permit Specialist will process the application and contact the person specified on your application for permit pick-up. Information regarding fees and pre -construction meetings (if required) will be provided by the Permit Specialist at that time. WHITE -APPLICANT PINK - BUILDING FILE REV 9/07 CoC 'LDT I. ELibe r%,'4 PLANNING DE . APPROVED BY.C�'1��.� DATE: P13105 IS' 60-lickr e .st k SPOKANT COWrx Site Information SPOKANE COUNTY DEPARTMENT OF BUILDING & PLANNING 1026 WEST BROADWAY AVENUE • SPOKANE, WA 99260-0050 Project Information Site Address: 18204 E SHANNON AVE Parcel Number: 55074.3911 Subdivision: RANGE Block: Lot: Zoning: Owner: CLIFF SCHMITZ CONSTRUCTION, IN Address: 16520 E SECRETARIAT VERADALE, WA 99037 Building Inspector: Water Dist: Project Number: 09006309 Inv: 1 Issue Date: 12/3/2009 Permit Use: SEWER CONNECTION Applicant: CLIFF SCHMITZ CONSTRUCTION INC 16520 E SECRETARIAT VERADALE, WA 99037 Phone: (509) 922-4297 Contact: CLIFF SCHMITZ CONSTRUCTION INC 16520 E SECRETARIAT VERADALE, WA 99037 Phone: (509) 922-4297 Setbacks - Front: Left: Right: Rear: Group Name: Project Name: Permits Sewer Connection Permit Contractor: CLIFF SCHMITZ CONSTRUCTION INC License #: CLIFFSC937JD PROCESSING FEE 1 $15.00 S1 SEWER CONNECTION 1 $125.00 Total Permit Fee: $140.00 **FOR SEWER INSPECTIONS CALL THE UTILITIES DEPT AT (509) 477-3604 FROM 8:30-5:00 MONDAY -FRIDAY PRIOR TO COVER. ONE WORKING DAY NOTICE REQUIRED. PERMIT ALLOWS FOR A 30 -MINUTE INSPECTION. ADDITIONAL INSPECTION FEES APPLY AFTER 30 MINUTES. **CALL 1-800-424-5555 BEFORE YOU DIG --AT LEAST 2 WORKING DAYS IN ADVANCE. SPOKANE COUNTY CODE REQUIRES THE INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR & INDUSTRIES, INCLUDING THOSE RELATED TO TRENCH SAFETY. **INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF SEWER STUB PRIOR TO ANY OTHER EXCAVATION. **SEWER STUBS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED TO THE MAIN. SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE. **THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF UNDERGROUND FACILITIES. Payment Summary Total Fees AmountPaid AmountOwing $140.00 $140.00 $0.00 Tran Date Receipt # Payment Amt 12/3/2009 5268 $140.00 Processed By: DOMPIER, DAWN Printed By: HINTZ, FAITH Page 1 of 1 PERMIT • NOTICE It is the responsibility of the applicant/permittee to see to it that the use described on the front of this permit complies with applicable codes and requirements and that required inspections are requested. Failure to request inspections as listed below and obtain the necessary approvals before progressing beyond the point where inspections are required may necessitate removal of certain parts of the construction at the applicant's/permittee's or property owner's expense. At a minimum, the following inspections ARE REQUIRED by County Code: 1. FOOTING - all structures, including manufactured homes when forms and reinforcement are in place and prior to placement of concrete. NOTE: This inspection includes review of the structure's setbacks from property lines. Minimum setbacks are established by County zoning regulations. Front, flanking, side and rear yard setbacks are measured from property lines. Curb lines and fence lines are not necessarily indicative of property lines. In some residential areas, the County can own as much as 20 feet of right-of-way between your property and the actual improved street/ curb. The responsibility to comply with applicable setback provisions lies solely with the permittee—neither Spokane County nor its authorized representatives assume any responsibility for the verification or location of your property lines. Please verify their location prior to locating your structure. Failure to properly locate the structure may require its relocation at the owner's/permittee's expense. 2. FOUNDATION - when forms and reinforcement are in place and prior to placement of concrete. 3. FRAMING - after all framing, bracing and blocking is in place, plumbing, mechanical rough -in inspections have been approved, and prior to concealing. 4. INSULATION - prior to the installation of drywall. 5. PLUMBING - after rough -in, before covering, and final. 6. MECHANICAL - rough -in of piping, before covering, metal chimneys before concealment, and final. 7. FINAL - all permits - when complete when complete and prior to occupancy and/or use. Please provide 24 hours notice. NOTE: In addition to inspection of the structure, this inspection includes review of site improvements (typically depicted on the approved site plan) required by ordinance or as a condition of approval of this permit. Items such as the installation of fire hydrants, fire department access, on-site drainage (`208 swales"), road improvements, parking, and landscaping are common requirements of a permit/site plan which must be completed prior to final approval of a building or issuance of a Certificate of Occupancy. 8. MANUFACTURED HOMES - foundation inspections prior to pouring pads, inspection of Blocking/Tie-downs, when completed per manufacturers installation instructions. Final Inspection approval prior to occupancy: stairs, handrails, skirting, etc., installations completed WAINSTag(s) must be affixed to the home, completed inspection record card and manufacturer's installation instructions must be available on site. 9. SEWERS - prior to cover 10. RIGHT-OF-WAY/APPROACH - prior to placement of concrete, or, if gravel approach, after completion. In addition to the above, any plumbing or mechanical systems or material which would be concealed by framing, drywall, concrete, etc., must be inspected prior to cover. Check with the department for "special inspections" in conjunction with commercial projects. FOR INSPECTIONS: TO INSURE PROMPT SERVICE, PLEASE GIVE ONE WORKING DAY/24 HOUR NOTICE . PARTS OF YOUR PROJECT MAY REQUIRE PERMITS AND INSPECTIONS FROM MORE THAN ONE AGENCY. • Building, plumbing, mechanical and fire inspections, Department • of Building & Planning 477-3675 • Construction in a flood plain, Division of Engineering & Roads 477-3600 • Electrical wiring, State Department of Labor and Industries 324-2640 • • On-site waste disposal system, Spokane Regional Health District 324-1560 Road cuts for utilities or driveways, Division of Engineering & Roads - 48-HOUR NOTICE REQUIRED 477-3600 or State Department of Transportation 456-3000 Sewer connection, Division of Utilities 477-3604 or City Public Works Department 625-6300 PERMIT EXPIRATION Unless otherwise noted, building, plumbing, fire and mechanical permits will be considered null and void by limitation if the work authorized by the permit is not commenced within 180 days or is stopped for a period of 180 days, unless a written request for an extension of the permit is received and approved by the Building Department prior to expiration. At a minimum an inspection should be requested at least once every 180 days to assure the validity of the permit. Please call if you have any questions. REFUNDS All requests for building permit refunds must be made in writing by the applicant/permittee (shown on the reverse) no later than 180 days after the date of fee payment. Refunds of not more than 80% of the permit fee paid may be authorized when no work has been done under the permit. No refunds may be authorized more than 180 days after fee payment. Please contact the other agencies with respect to their refund policy on all other permit types. MISTAKE? If you think we've made an error in processing this permit or find erroneous information on the permit, please bring it to our attention immediately by filing a written request for correction within 10 working days of discovery. All such requests should be directed to the Department of Building and Planning at: Spokane County Department of Building & Planning 1026 West Broadway Avenue Spokane, WA 99260 Phone: (509) 477-3675 Fax: (509) 477-4703 TDD: (509) 477-7133 REVISED 11/08 BLDG PERMIT