Loading...
2008, 08-20 Permit App: 08003219 ResidenceProject Number: 08003219 Inv: 1 Application THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Date: 8/20/2008 Page 1 of 3 Project Information: wow,: 1St Permit Use: SFR W/ATT GAR Setbacks: Front Left: Right: Rear: Site Information: Plat Key: Name: Range Contact: CLIFF SCHMITZ CONSTRUCTION, IN Address: 16520 E SECRETARIAT C - S - Z: VERADALE, WA 99037 Phone: (509) 999-7733 Group Name: Project Name: District: East Parcel Number: 55074.3913 Block: SiteAddress: 18216 E SHANNON AVE Location:: CSV Lot: Owner: Name: CLIFF SCHMITZ CONSTRUCTIO Address: 16520 E SECRETARIAT VERADALE, WA 99037 Zoning: R-4 SF Res Urban District Water District: 134 CONSOLIDATED ID #19 Area: 11,068 Sq Ft Width: 0 Nbr of Bldgs: 0 Nbr of Dwellings: 0 Review Information:. ;,, ,mo; . Hold: ❑ Depth: 0 Right Of Way (ft): 0 Review Building Plan Review Released By: Driveway/Approach Originally Released: 8/19/2008 By: tmelbourn Released By: Originally Released: 8/20/2008 By: TMELBOU Landuse/Zoning/HE Conditions Released By: Sewer Review Permits: Originally Released: 8/20/2008 By: tschmidt Released By: Operator: JD Printed By: jmm Print Date: 8/20/2008 Project Number: 08003219 Inv: 1 Application THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Date: 8/20/2008 Page 2 of 3 Contractor: CLIFF SCHMITZ Address: 16520 E SECRETARIAT VERADALE WA 99037 Building Characteristics Building Height 16 Building Permit Firm: CLIFF SCHMITZ CONSTRUCTIO Phone: (509) 922-4297 Description Gr Type Notes 1&2 FAMILY R-3 VB BASEMENT U R-3 VB GARAGE U-1 VB Item Description RESIDENTIAL PERMIT FEE WSBC SURCHARGE SF PLNS RVW < 7999 SQ FT Contractor: CLIFF SCHMITZ Address: 16520 E SECRETARIAT VERADALE WA 99037 Item Description GAS WATER HEATER GAS APPLIANCE<=100,000BTU GAS PIPING VENTILATING FANS HOOD -TYPE II This Application: Total Project: Sq Ft Valuation Sq Ft Valuation 1,109 $105,343.91 1,109 $105,343.91 1,097 $16,455.00 1,097 $16,455.00 903 $17,157.00 903 $17,157.00 Totals: 3,109 $138,955.91 3,109 $138,955.91 Units 1 1 1 Unit Desc SELECT SELECT SELECT Fee Amount $1,212.15 $4.50 $484.86 Permit Total Fees: $1,701.51 Mechanical Permit Firm: CLIFF SCHMITZ CONSTRUCTIO Phone: (509) 922-4297 Units Unit Desc 1 NUMBER OF 1 NUMBER OF 2 # OF UNITS 3 NUMBER OF 1 NUMBER OF Operator: JD Printed By: jmm Permit Total Fees: Print Date: Fee Amount $10.00 $12.00 $2.00 $30.00 $10.00 $64.00 8/20/2008 Project Number: 08003219 Inv: 1 Application THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Date: 8/20/2008 Page 3 of 3 Contractor: CLIFF SCHMITZ Address: 16520 E SECRETARIAT VERADALE WA 99037 Item Description TOILETSBIDETS SINKS TUBS DISH WASHERS GARBAGE DISPOSAL CLOTHES WASHER FLOOR DRAINS MISCELLANEOUS FIXTURES Notes: Payment Summar,: Permit Type Building Permit Mechanical Permit Plumbing Permit Plumbing Permit Firm: CLIFF SCHMITZ CONSTRUCTIO Phone: (509) 922-4297 Units Unit Desc 3 NUMBER OF 4 NUMBER OF 3 NUMBER OF 1 NUMBER OF 1 NUMBER OF 1 NUMBER OF 1 NUMBER OF 3 NUMBER OF Permit Total Fees: Fee Amount Invoice Amount $1,701.51 $1,701.51 $64.00 $64.00 $102.00 $102.00 $1,867.51 $1,867.51 Fee Amount $18.00 $24.00 $18.00 $6.00 $6.00 $6.00 $6.00 $18.00 Amount Paid $0.00 $0.00 $0.00 $102.00 Amount Owing $1,701.51 $64.00 $102.00 $0.00 $1,867.51 Disclaimer: Submittal of this application certifies the owner (or person(s) authorized by the owner) has both examined and finds the information contained within to be true and correct, and agrees that all provisions of laws and/or regulations governing this type of work will be complied with. Subsequent issuance of a permit shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of the code or of any other state or local laws or ordinances. Signature: Operator: JD Printed By: jmm Print Date: 8/20/2008 'po �3Valle Community Development Permit Center 11707 E Sprague Ave, Suite 106 Spokane Valley, WA 999 688 00372 06 (509)688-0036 FAX: www.spokanevalley ora.com Residential Construction Permit Application SITE ADDRESS LEGAL. DESCRIPTION: ASSESSORS PARCEL NO: S_<�-�-- PERMIT NUMBER: PERMIT FEE: ew Construction o Addition/Remodel o Other: o Accessory Bldg o Deck Building owner Name: Address: City: Phone: Fax: Zi Describe the scope of work in detail: **************The followin HEIGHT TO PEAK: • MAIN FLOOR TO SQ. FTG: 1 r1\ 09 FINISH • BASEMENT SQ FTG: # OF BEDROOMS: MUST be com DIMENSIONS: .1 FLOOR SQ. FTG: lete: GARAGE SQ. FTG: CONS UCTION TYPE: IP Cost of Project: write N/A if not a II 1 licable # OF STORIES: UNFIN BASEMENT SQ. FTG: ..s DECK/GOV. PATIO SQ. FTG: VEL • HEAT OURCE: i ********************** TOTAL HABIT BLE SPACE: IMPERVIOUS SURFACE AREA: 30% SLOPES ON PROPERTY: SEWER OR SEPTIC? DISCLAIMER Dhe verifies, acknowledges and agrees by their signature that: 1) -If this permit is for construction of or on a dwelling, The the dwelling is/will be served by potable water. 2) Ownership of this City of Spokaneinalll ey s Ptrermit inure to the construction owner. on is to done signatory is the property owner or has permission to represent the property of ownerS full ok Spokane Valley the City of Spokaneii y of Spokane Valley PermitValley Development Code. s not a permeferenced it or approval for any violation of federal, City state or Spokane Vcoey Permit Center. 5 This City Po approved before local laws, codes or ordin.nc � . % PI ns or dditional information may be required to be submitted, and subsequently this application can be p Signature Method of Payme 0 Cash Bankcard #: Authorized Signature: REVISED 8/2512005 xed permit appli 0 Check Date J5�-O __ ___ ons will only be accepted with major ba VISA ) ❑ Mastercard 0 VIN#: Expires: 0 Other -+� �a 17707 E Sprague Ave, Suite 106 ��i al Spokane Valley, WA 99206 Y� (509)688-0036 FAX: (509)688-0037 Corrcnunity Development v,mm• snokancvailev.ors Commercial Mechanical Permit Application SITE ADDRESS: PERMIT NUMBER.: PERMIT FEE: Residential Nam= Address: License No: Contac. Name: DESCRIPTION OF WORK 1 FUEL BURNING APPLIANCE 2 FUEL BURNING APPLIANCE 3 4 5 UNLISTED APPLIANCE (Additional Fee) UNLISTED APPLIANCE (Additional Fee) USED APPLIANCE (WSEC min. AFUE rating) 6 7 6 9 10 USED APPLIANCE (WSEC min. AFUE rang) BOILER/REFRIGERATION BOILER/REFRIGERATION BOILER/REFRIGERATION BOILER/REFRIGERATION 11 12 13 14 15 16 17 15 19 20 21 BOILER/REFRIGERATION GAS LOG, GAS INSERT, GAS FIREPLACE RANGE DRYER FUEL BURNING WATER HEATER MISC. FUEL BURNING APPLIANCE GAS PIPING (each outlet) DUCT SYSTEMS VENTILATING FANS AIR HANDLER (DOES NOT include ducting) AIR HANDLER (DOES NOT include ducting) City. City Business Lic: phone: Equal to or less than 100.000 More than 100.000 Equal to or less than 400,000 More than 400,000 Equal to or less than 400,000 More than 400.000 1-100MBTU 101 - 500M BTU 501 -1,000U BTU 1,001 -1,750M BTU More than 1,750M BTU Equal to or less than 10,000 CFM Greater than 10,000 CFM 22 23 24 25 EVAPORATIVE COOLERS TYPE I HOOD 26 27 25 29 30 TYPE II HOOD HEAT PUMP/AIR CONDITIONER AIR CONDITIONER 0-3 TON 3-15 TON AIR CONDITIONER AIR CONDITIONER 15-30 TON AIR CONDFf1ONER 30-50 TON More than 50 TON # OF UNITS 1 3 l State: X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X COST $1200 $15.00 $50.00 $100.00 $50.00 $100.1)0 $12.00 $20.00 $25.00 $35.00 $60.00 $10.D0 $10.00 $10.00 $10.00 $10.00 $1.00 $10.00 $10.00 $12.00 $15.D0 $10.00 $50.00 $10.OD $1200 $20.00 $25.00 $35.00 $60.00 Zip: TOTAL AMOUNT LPG STORAGE TANK 31 32 33 WOOD OR PELLET STOVEANSERT WOOD STOVE - FREE STANDING x X $10.00 $1D.00 34 35 36 37 REPAIR & ADDmONS VENTILATION SYSTEMS VENTILATION MECHANICAL EXHAUST INCINERATOR - RESIDENCE INCINERATOR - COMMERCIAL METHOD OF PAYMENT: ❑CASH ❑ CHECK ❑ VISA ❑ MC CARD TM. AUTHORIZED SIGNATURE: REVISED 626/fps EXPIRES: VIN: X X X x X x SUBTOTAL $25.00 $15.00 $12.00 $12.00 $19.00 $22.00 PROCESSING FEE TOTAL PERMIT FEE DUE: 535.00 ey Corry tuiityDrveloprrrt .6L IC 1 VD Spolca:ie Valley, WA 99206 (509)588-0036 FAX: (509)688-0037 www.svcikanevaTlev. ore Plumbing Permit Application SITE ADDRESS: n Commercial PERM! 1 NUMBER PERMIT FEE: Residential Sanding Owner Name: Phone: Fax: Adams: Contractor —Num: K /706 City. State: ZP: Phone-. Fax: Address: City: State: h p: License No: City Business Lic: Contact Name: Phone: DESCRIPTION OF WORK # OF UNITS X COST 1 = TOTAL AMOUNT TOILETS WATER CLOSET. BIDETS 3 X S6.00 2 URINALS X 56.00 3 TUBS X 56.00 4 SHOWERS (PER TRAP) BATH, STALL. ONSITE BUILT X 56.00 5 SINKS LAVS/BASINS. BAR, FLOOR, KITCHEN, LAUNDRY, UTR_ITY, JANITOR, PHOTO, X-RAY, FOOD. PREP/CULINARY MEAT $6.00 6 DISHWASHER I X 56.00 7 CLOTHES WASHER 1 X 56.00 8 GARBAGE DISPOSAL X 56.00 9 WATER SOFTENER X 56.00 1D ELECTRIC HOT WATER TANK NOTE IF GAS, SEE MECHANICAL X SB_00 11 FLOOR DRAINS AREA. CASE. COIL, TRENCH, CONDENSATE 1 X 56.00 1 = 12 ROOF DRAINS/OVERFLOW DRAINS x 56.00 1 = 13 FOUNTAINS, DRINKING X 56.00 14 WATER PIPING/DRAIN-IN WASTE. VENT, PLUMBING. REVERSAL NSTALLATION, ALTERATION, REPAIR, REVERSALS X 56.00 15 SEWAGE EJECTOR GRINDER, SUMP PUMP X 56.00 1 = 16 WATER USING DEVICE ICE AN/OR COFFEE MAKER HOSE BIB, STEAMER PROOFER, CARBONATOR, SWAMP COOLER 3 X 56.00 I = 17 CROSS CONNECTION DEVICE VACUUM BREAKER, CHECK VALVE, AND R.P.B.P.D. FOR VATS, TANKS, BOILERS X 56.00 1 = 18 INTERCEPTORS GREASE TRAP, SAND TRAP, CHEMICAL HOLDING TANK X 56.00 1 = 19 MEDICAL GAS jper outlet) NITROUS. OXYGEN X 56.00 1 = 20 MISCELLANEOUS PLUMBING FIXTURE X $6.00 1 = 21 PRIVATE SEWAGE DISPOSAL/SYS X 520.00 1 = 22 INDUSTRIAL WASTE INTERCEPTOR X 515.00 1 = METHOD OF PAYMENT: ❑CASH 0 CHECK ❑ VISA ❑ MC Card# AUTHORIZED SIGNATURE: REVISED S26/05 EXPIRES: VIN: SUBTOTAL PROCESSING FEE 535.00 TOTAL PERMIT FEE DUE: 0 0 0 n 10'd 14101 Sa'o"o 30•ono 8'6"0 LIFF SCHMITZ EW RANCHER MODEL # H-9316 7/12 PITCH 1-0-0 TAILS LOADING 30-7-0-10 8"0"0 > )!6" Spokane jUalley- For City Use Only PLUS Project Numb-- (_ i Project Address _Y E OK\ 11703 E Sprague Ave Suite B-3 • Spokane Valley WA 99206 509.688.0036 ♦ Fax: 509.688.0037 ♦ permitcenter@spokanevalley.org As part of our on-going commitment to customer service during the review process of your project application, we are providing you with a TARGET DATE for the initial technical application review. If for any reason we cannot meet this date, we will contact you with a revised target date. The TARGET DATE is the date we estimate your project application will have had its initial technical review. It is not the date for approval or permit issuance. Your application review TARGET DATE is Tips for a Smoother Project Application Review ➢ Submit complete, accurate plans and documents. Extra time may be required for re -submittals as project application reviewers work on multiple applications and it may be several days before they can look at your new or revised information. ➢ Designate a specific contact person to communicate with the City. While the person designated as the applicant's contact person with the City can be changed, one individual with the expertise for dealing with reviewer comments would be the best choice for the entire review process. ➢ Call staff regarding the status of your project only after the target date shown at the top of the page. Although you should be contacted on or by the target date, please feel free to contact us if you haven't heard from us by your target date. Staff may contact you before the target date if the initial review is complete. By following this procedure, you will save time and allow the reviewers to complete the work more expeditiously. Steps in the Permit Process 1. Counter Complete. Your application has been accepted as counter complete. This means all of the required documents, as indicated on your Pre -Application Checklist have been submitted or have been approved for deferred submittal. This does not prevent technical staff from requesting additional information as a result of their technical review. 2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free from substantive flaws that would prevent technical staff from completing the technical review once it is started. When this step is complete, your application will be routed to the appropriate staff and remain in their review queue until it comes up for review. 3. Technical Compliance. Once an application is administratively complete, it is routed to technical staff for compliance review. Depending on the type of project, technical staff may include multiple reviewers. You should be contacted by phone, fax, email, or mail by your TARGET DATE once the initial technical compliance review is complete. 4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re - submittals, each reviewer will approve their section of the application and route it to the Permit Center. When all sections of the application are received, a Permit Specialist will process the application and contact the person specified on your application for permit pick-up. Information regarding fees and pre -construction meetings (if required) will be provided by the Permit Specialist at that time. WHITE -APPLICANT PINK - BUILDING FILE REV 9/07 LOT 4,31 11,072 f 118211 E.AVE. \-\\--cN\_0(\tiok) PONe-- © to 20 Lo` PLANNING DEPT ROVED B DATE' Vt-��zg SPOKANE COUNTY DEPARTMENT OF BUILDING & PLANNING 1026 WEST BROADWAY AVENUE • SPOKANE, WA 99260-0050 Site Information Project Information Site Address: 18216 E SHANNON AVE Parcel Number: 55074.3913 Subdivision: RANGE Block: Lot: Zoning: Owner: CLIFF SCHMITZ CONSTRUCTION, IN Address: 16520 E SECRETARIAT VERADALE, WA 99037 Building Inspector: Water Dist: Project Number: 07008796 Inv: 1 Issue Date: 12/31/2007 Permit Use: SEWER CONNECTION - GREENACRES VALLEY ESTATES Applicant: CLIFF SCHMITZ CONSTRUCTION, IN 16520 E SECRETARIAT VERADALE, WA 99037 Phone: (509) 999-7733 Contact: CLIFF SCHMITZ CONSTRUCTION, IN 16520 E SECRETARIAT VERADALE, WA 99037 Phone: (509) 999-7733 Setbacks - Front: Left: Right: Group Name: Project Name: Rear: 1 Permits Sewer Connection Permit Contractor: J L HAWKINS EXCAVATING License #: JLHAWE*222LE SEWER CONNECTION 1 $85.00 PROCESSING FEE 1 $15.00 Total Permit Fee: $100.00 FOR SEWER INSPECTIONS CALL THE UTILITIES DEPT AT (509) 477-3604 FROM 8:30-5:00 MONDAY -FRIDAY PRIOR TO COVER. ONE WORKING DAY NOTICE REQUIRED. PERMIT ALLOWS FOR A 30 -MINUTE INSPECTION. ADDITIONAL INSPECTION FEES APPLY AFTER 30 MINUTES. THE INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF SEWER STUB PRIOR TO ANY OTHER EXCAVATION. SEWER STUBS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED TO THE MAIN. SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE. THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF UNDERGROUND FACILITIES. CALL 1-800-424-5555 BEFORE YOU DIG --AT LEAST 2 WORKING DAYS IN ADVANCE. SPOKANE COUNTY CODE REQUIRES THE INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR & INDUSTRIES, INCLUDING THOSE RELATED TO TRENCH SAFETY. Payment Summary Total Fees AmountPaid AmountOwing $100.00 $100.00 $0.00 Tran Date 12/31/2007 Receipt # Payment Amt 7387 $100.00 Notes / Conditions of Approval 1 FIRE DISTRICT 41 - PLAN REVIEW FEE IS REQUIRED FOR ALL SITE PLAN REVIEWS CONDUCTED BY FD 41. Processed By: Hargrove, Heidi Printed By: Lemley, Linda Page 1 of 1 PERMIT NOTICE It is the responsibility of the applicant/permittee to see to it that the use described on the front of this permit complies with applicable codes and requirements and that required inspections are requested. Failure to request inspections as listed below and obtain the necessary approvals before progressing beyond the point where inspections are required may necessitate removal of certain parts of the construction at the applicant's/permittee's or property owner's expense. At a minimum, the following inspections ARE REQUIRED by County Code: 1. FOOTING - when forms and reinforcement are in place and prior to placement of concrete—all structures, including manufactured homes. NOTE: This inspection includes review of the structure's setbacks from property lines. Minimum setbacks are established by County zoning regulations. Front, flanking, side and rear yard setbacks are measured from property lines. Curb lines and fence lines are not necessarily indicative of property lines. In some residential areas, the County can own as much as 20 feet of right-of-way between your property and the actual improved street/ curb. The responsibility to comply with applicable setback provisions lies solely with the permittee—neither Spokane County nor its authorized representatives assume any responsibility for the verification or location of your property lines. Please verify their location prior to locating your structure. Failure to properly locate the structure may require its relocation at the owner's/permittee's expense. 2. FOUNDATION - when forms and reinforcement are in place and prior to placement of concrete. 3. FRAMING - after all framing, bracing and blocking is in place, plumbing, mechanical rough -in inspections have been approved, and prior to concealing. 4. INSULATION - prior to the installation of drywall. 5. PLUMBING - after rough -in, before covering, and final. 6. MECHANICAL - rough -in of piping, before covering, metal chimneys before concealment, and final. 7. FINAL - when complete and prior to occupancy and/or use. Please provide 24 hours notice. All permits require final inspection. NOTE: In addition to inspection of the structure, this inspection includes review of site improvements (typically depicted on the approved site plan) required by ordinance or as a condition of approval of this permit. Items such as the installation of fire hydrants, fire department access, on-site drainage ("208 swales"), road improvements, parking, and landscaping are common requirements of a permit/site plan which must be completed prior to final approval of a building or issuance of a Certificate of Occupancy. 8. MANUFACTURED HOMES - In addition to Foundation inspections prior to pouring pads, inspection of blocking, tie -downs, stairs, handrails, skirting, etc., installations when completed per manufacturers installation instructions; Final inspection approval prior to occupancy: completed Wains Tag(s) must be affixed to the home and completed inspection record card and manufacturers installation instructions must be available on site. 9. SEWERS - prior to cover 10. RIGHT-OF-WAY/APPROACH - prior to placement of concrete, or, if gravel approach, after completion. In addition to the above, any plumbing or mechanical systems or material which would be concealed by framing, drywall, concrete, etc., must be inspected prior to cover. Check with the department for "special inspections" in conjunction with commercial projects. FOR INSPECTIONS: TO INSURE PROMPT SERVICE, PLEASE GIVE ONE WORKING DAY/24 HOUR NOTICE PARTS OF YOUR PROJECT MAY REQUIRE PERMITS AND INSPECTIONS FROM MORE THAN ONE AGENCY. • Building, plumbing, mechanical and fire inspections, Department of Building & Planning 477-3675 • Construction in a flood plain, Division of Engineering & Roads 477-3600 • Electrical wiring, State Department of Labor and Industries 324-2640 • On-site waste disposal system, Spokane Regional Health District 324-1560 • Road cuts for utilities or driveways, Division of Engineering & Roads - 48-HOUR NOTICE REQUIRED 477-3600 or State Department of Transportation 456-3000 • Sewer connection, Division of Utilities 477-3604 or City Public Works Department 625-6300 PERMIT EXPIRATION AND REFUNDS Unless otherwise noted, building, plumbing, fire and mechanical permits will be considered null and void by limitation if the work authorized by the permit is not commenced within 180 days or is stopped for a period of 180 days, unless a written request for an extension of the permit is received and approved by the Building Official prior to expiration. At a minimum an inspection should be requested at least once every 180 days to assure the validity of the permit. Please call if you have any questions concerning the validity of your permit. Please contact the other agencies with respect to their refund policy on all other permit types. All requests for building permit refunds must be made in writing by the applicant/permittee (shown on the reverse) no later than 180 days after the date of fee payment. Refunds of not more than 80% of the permit fee paid may be authorized when no work has been done under the permit. No refunds may be authorized more than 180 days after fee payment. MISTAKE? If you think we've made an error in processing this permit or in conducting inspections pertaining to it, or find erroneous information in the permit, please bring it to our attention immediately by filing a written request for correction within 10 working days of discovery. All such requests should be directed to the Department of Building and Planning at the below address. Spokane County Department of Building & Planning 1026 West Broadway Avenue Spokane, WA 99260 Phone: (509) 477-3675 Fax: (509) 477-4703 TDD: (509) 477-7133 REVISED 06/07 BLDG PERMIT