2010, 09-16 Permit App: 10002937 Pole Bldg ithg
Permit Center
SSCI II 01 / -� PERMIT NUMBER:
Q�T� ne 11703 E Sprague Ave,Suite B-3 ��J�
pokane Spokane Valley,WA 99206 PERMIT FEE: ALI i, 75
11ey$ (509)688-0036 FAX: (509)688-0037
www.spokanevallev.org
Community Development
Residential Construction New Construction Accessory Bldg
Permit Application Addition/Remodel Deck
Other:
SITE ADDRESS: 1Z < L ( e A.✓ C o C ac/ - t/tly L.-) 1
ASSESSORS PARCEL NO: LEGAL DESCRIPTION:
Building Owner: 0 r ..,/-
Name: , Name:
Address: arc r Address:
City: p,9 V 1}� State: I- Zip: City: State: Zip:
Phone:5 e , ,,/-®g; Fax: Phone: Fax:
Contractor Lic No: Exp Date:
Contact Person City Business Lic.No:
Name:
Phone:
Describe the scope of work in detail: Cost,of Project: $ 5 S Dd - 4'efo0
I , C r u s k-,r-t) &t
I en 14 .
' . Oy ��t' pv I1J 3 c2 �.::/elt A 6,2',f '"-,
Proposed Use: Ck,"P c l of A ri 'C,.
**''''******The following MUST be complete: (write N/A if not applicable)******xwx"'""**'"'"Ixx
HEIGHT TO PEAK: / i ,. DIMENSIONS: #OF STORIES: TOTAL HABITABLE SPACE:
Ki‘ b
MAIN FLOOR TO SQ. 2ND FLOOR SQ. FTG: UNFIN BASEMENT SQ. FTG: IMPERVIOUS SURFACE
FTG: j... ,, 7 AREA:
FINISHED BASEVkNT GARAGE SQ,..Zip: DECK/COV. PATIO SQ. FTG: 30% SLOPES ON
SQ. FTG: ' 1'' �. ?V `d (.26` PROPERTY:
#OF BEDROOMS: CONSTRUCTIONTYPE: HEAT SOURCE: SEWER OR SEPTIC?
Wit-t. d/C., 11 A--
The permitee verifies, acknowledges and agrees by their signature that: 1) If this permit is for construction of or on a dwelling, the
dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley Permit inure to the property owner. 3) The
signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done
in full compliance with the City of Spokane Valley Development Code. Referenced codes are available for review at the City of
Spokane Valley Permit Center. 5) This City of Spokane Valley Permit is not a permit or approval for any violation of federal, state or
local laws, codes or ordinances. 6) Plans or additional information may be required to be submitted, and subsequently approved before
this application can be processe
SIGNATURE: ,%
For City Use Only
sonokairiPLUS Project Number
Project Address
4000
a evy® 11703 E Sprague Ave Suite B-3 • Spokane Valley WA 99206
509.688.0036 • Fax: 509.688.0037 • permitcenter®spokanevalley.org
As part of our on-going commitment to customer service during the review process of your project
application, we are providing you with a TARGET DATE for the initial technical application review. If for
any reason we cannot meet this date, we will contact you with a revised target date.
Your application review TARGET DATE is
The TARGET DATE is the date we estimate your project application will have had its initial technical
review. It is not the date for approval or permit issuance.
Tips for a Smoother Project Application Review
➢ Submit complete, accurate plans and documents.
Extra time may be required for re-submittals as project application reviewers work on multiple applications and it
may be several days before they can look at your new or revised information.
➢ Designate a specific contact person to communicate with the City.
While the person designated as the applicant's contact person with the City can be changed, one individual with the
expertise for dealing with reviewer comments would be the best choice for the entire review process.
➢ Call staff regarding the status of your project only after the target date shown at the top of the page.
Although you should be contacted on or by the target date,please feel free to contact us if you haven't heard from us
by your target date. Staff may contact you before the target date if the initial review is complete. By following this
procedure,you will save time and allow the reviewers to complete the work more expeditiously.
Steps in the Permit Process
1. Counter Complete. Your application has been accepted as counter complete. This means all of the required
documents, as indicated on your Pre-Application Checklist have been submitted or have been approved for deferred
submittal. This does not prevent technical staff from requesting additional information as a result of their technical review.
2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free
from substantive flaws that would prevent technical staff from completing the technical review once itis started. When
this step is complete, your application will be routed to the appropriate staff and remain in their review queue until it
comes up for review.
3. Technical Compliance. Once an application is administratively complete, it is routed to technical staff for compliance
review. Depending on the type of project, technical staff may include multiple reviewers. You should be contacted by
phone, fax, email, or mail by your TARGET DATE once the initial technical compliance review is complete.
4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re-
submittals, each reviewer will approve their section of the application and route it to the Permit Center. When all sections
of the application are received, a Permit Specialist will process the application and contact the person specified on your
application for permit pick-up. Information regarding fees and pre-construction meetings (if required) will be provided by
the Permit Specialist at that time.
WHITE-APPLICANT PINK-BUILDING FILE REV 9/07
kadsoioN,
Pro•ectNew project 0
Previous pre-app meeting ,,,
6 oF n e
Transmittal Plan revisions 0
City of Spokane Valley Transmittal Date:
.0,00Valley
Community Development Thursday,September 16,2010
Department
11703 E.Sprague Ave,Suite B3
Spokane Valley,WA 99206
Phone: 509.688.0036
Site Address: 9712 E SHARP AVE Project Number: 10002937
Parcel Number: 45172.0616
Zoning: R-3 Water District: MODERN
Fire District: FD 01
Applicant: DOHERTY. PATRICK F Owner: DOHERTY, PATRICK F
9712 E SHARP AVE 9712 E SHARP AVE
SPOKANE, WA 99206- SPOKANE, WA 99206-
(509) 924-2983
e-mail: e-mail:
Contact: DOHERTY, PATRICK F Occupant:
9712 E SHARP AVE e-mail:
SPOKANE, WA 99206-
(509) 924-2983
e-mail: D E C E Il 11/7 2
Contractor: OWNER Arch/Engineer: _ U V L5 D
SP I 0 MO
( ) - 03
e-mail: U il IL DD 0 k �l
Project 24 X 30 POLE BLDG
Description:
Building Landuse Engineer Utilities Health Fire Dist Assessor
APPLICATION
SITE PLAN Z
t
PLANS
Li
•
•
1
Please send all plan review and project comments via e-mail to the
highlighted individuals.
'70 )'', 1.1 ..)xi 03
. 17
p)J1,,r)1 r) /PPM\-,"
, 1
i , ----------1
k 1
\ 1 i
. r m
M i
1 ,
1
1 1
, 1
-T- ,
,.
2X
•._ ...... ;'
COI'
,41,7„,
9t771 , w Itel •e 1 INir
I ;i i 1•0 i
i
I J
VI
I
it' 1
1
Zb'I 1
1 i
1 ?
,
do-J-4
J --1Qd
1
1
om z_ttadl...
0 i 1
ti ‘il .
. ------
/
403) S .°A ,S
aii 1 rt-1
-. PLANNING DEPT. APPROVED
. \-4 .c) (,)<;\
Pursuant to SVMC 19.140.020(b) /—s—;=2-2•L---)-------
All Residential Driveaways and off
street parking areas shall be paved
w/asphalt, portland cement, grasscrete,
paver blocks or other equivalent hard surface'
material. D ATE: q PI 1 1°