2013, 08-26 Permit App: BLD-2013-1700 Storage Bldg Community Development Department (Staff Use Only)
Permit Center
11703 East Sprague Avenue,Suite B-3 PERMIT NUMBER:
CIT OF Spokane Valley,WA 99206
Tel: (509)720-2540 PERMIT FEE:
1\/Klley Fax 80037
phi�7iit:.0(509)fl E`68t_���K1e , cYO:'...� 6L-1/ ZO 1 j ^ 17 V
4000
0
RESIDENTIAL CONSTRUCTION PERMIT APPLICATION
❑ NEW CONSTRUCTION 0 ADDITION/REMODEL `ACCESSORY BUILDING
0 DECK '' jj 0 OTHER -- -i
SITE ADDRESS: 1 q`4 2- 1 E S YAck 1'V ? r r o l e c i ___
ASSESSORS PARCEL NO.: 5 131. 23-+-U 2._ LEGAL DESCRIPTION: '` a 15 H'"":
BUILDING OWNER NAME: /,
NAME: -\C (\Vo O c\,N,fl h C LI 1 v AUG z t !Olt_ 1 I
ADDRESS:
$1-}ZL-1 SY1C'Y (-,;-,-;:‘,/ i---,-_---
/ 'Xr � y�_
CITY: VC}i t Cl n e L�1 1 -Li STATE: w p ! u s ..- lZIP: T"� 'Cl lo._
PHONE: 50 CA - Yl1`-i -®t..Q/ a- FAX.
CONTACT NAME: 1\nl C{11 CI.o
PHONE: 5 G ci - 4-S1 - 37 IP FAX: G O C) ;J 3,7 "7a 33 CELL:
CONTRACTOR NAME: sod 5 u C A4 t e
MAILING ADDRESS: (J 7 z'T 1\ 001-slot L-q
Cm: , \(.)c,1L a_Y\ STATE: \ ZIP: 0192_17
PHONE: GC 9 - 4 7 - 7 7(o ( FAX: 656q- g 7- 7a 33 CELL:
CONTRACTOR LICENSE No.: 30L1 h S L a ci o N EXPIRES: b q I3 U I(-{ CITY BUSINESS LICENSE NO.:
DESCRIBE THE SCO E OF WORK IN DETAIL AND INDICATE USE & PROPOSED USE:
0� LI-L X I D (1200 sci-C,± ) i t.t Vi LILA c -r -_3
****YOU MUST COMPLETE THE FOLLOWING****
MARK N/A IF NOT APPLICABLE
Height to Peak: i 5i Dimensions: 30 40 I O No.of Stories: Total Habitable
Space:
Main Floor SQ FT: Upper Floor SQ FT: Unfinished Basement SQ Finished Basement SQ
FT: Fr:
Garage SQ FT: Deck/Covered Patio SQ Impervious Surface 30%Slopes on
12 v U i--c k- FT: Area: cg-7, O Property:
No.of Bedrooms: Construction Type: Heat Source: Sewer or Septic: 141 1 t 19C,
TOTAL COST OF PROJECT: $ 1-j, CSOC� Se1^I
elY
DISCLAIMER
The permitted verifies,acknowledges and agrees by their signature that: 1)if this permit is for construction or on a dwelling,the dwelling is/will
be served by potable water. 2)Ownership of this City of Spokane Valley permit inure to the property owner.3) The signatory is the property
owner or has permission to represent the property owner in this transaction. 4) All construction is to be done in full compliance with the City of
Spokane Valley Development code. Referenced codes are available for review at the City of Spokane Valley Permit Center. 5) The City of
Spokane Valley permit is not a permit or approval for any violation of federal,state or local laws,codes or ordinances. 6) Plans or additional
Information may be required to be submitted and su. .-.uentiy approved before this application can be processed.
Signature 2% Date: 8'/S / 3
Updated 1-11-11 Page 1 of 1
http://www.spokanevalley.org/i:llestorage/124/936/210/948/1496/Building_Permit_-_Residential_11-11-11.doc
Residential Driveway
SQ PAVING WAIVER
.0,00Va11ey. Community Development- Planning Division
11703 E Sprague Ave Suite B-3•Spokane Valley WA 99206
509.720.5026♦ Fax: 509.688.0037•planning@sookanevallev.orR
Spokane Valley Municipal Code(SVMC)Section 18.40.020.8;"All residential driveway and off-street parking areas shall be paved with
asphalt,Portland cement grasscrete,paver blocks or other equivalent hard surface material". A paving waiver can only be granted If
the structure you are proposing is not going to require a driveway for daily use.
, PART I - ,OWNER INFORMATION
OWNER NAME: K i cier\at C\ 6 U13 i71 1 t U LL e_. PARCEL#: S. S I `Z 1 . 24 C)'2
ADDRESS: 1 `L 1 I E- '.,:.,V Ack...N
CITY: is . c\,. 0,..k. _1STATE: N ZIP; C) C) C� I l_C
PHONE: a f L1 otc, )L FAX: CELL: EMF�LOj eCt `: Si" —201 - L7 00
RECEIVED
i
PART Il-DETAILS OF PAVING WAIVER -1
,-30lL013
1. Do you have an existing garage for parking daily use vehicles? OYES 0 NO
2. Is the proposed detached structure used for storage only? N YES I 0 N6S V PERMIT CENTER
3. Do you plan on using the detached structure to park vehicles? t2zYES U Fil NO If yes, /.
what type of vehicles? OA Qui CJ ) k i me --
4. Do you plan to conduct a business from proposed detached structure? 0 YES p NO if so,what
is the nature of your business?
PART III-AUTHORIZATION
I,(PRINT NAME) _ I/1 I .#. ...i ,s• , ner, hereby confirm that the information provided on this
form is true and correct. I acknowledge that any change In the foregoing conditions, could require
the City to impose paving requirements. I further agree to report any change in these conditions to
the Spokane Valley Community De elopment Department, Planning Division, within 30 days.
Pfrr4e,4-.1 0 01 ;12,- -'- S - g
Owner Signature
Date
PART IV- DECISION
STAFF HAS REVIEWED THE PROPOSED PAVING WAIVERONBEHALF OF THE COMMUNITY DEVELOPMENT
DIRECTOR AND FIND THE REQUEST IS GRANTED AT I U4 2_1 E. SA---1-0-0 AVL
SAID ADDRESS FOR PERMIT#: IJLl.- D-OI'D -
Planning Division Staff Signature Date
Created 6/27111 Page 1 of 1
08/14/2013 14:08 5093241567 SRHD EHS PAGE 02
�Px
Q : OKANE COUNTY HEALTH DE rARTM .T
ARTHUR E. LIEN. Mrt,D.M.P.H., HossIjp Officr
Division of Sanitation , ` ---
N, Ri9Jefferson DATE 411" . e V vi
Spokane 1, Wbshington
JJ
N4 1001.7
AP•LICATtMN FOR P,r ! TO INSTALL OR RECONST• T SEW', E DISPOSAL ACILITIES G/�
Name- *+/ *� /, .. Ad /p .1 ;.. `
Address of.Proposed Site.../. f 7`_'--(1 ,/ .. ..., A Rize {)t. Property-_ d No -
Type of Use :.
Number of Bedrooms...,.,-----building Capacity' ,-Camp 'C(pacity _.., Other,::
Is property below grade of streets or elle a? -_:_Are streets graded'int.
is basement for bu ifit. g planned? .��.:vv - ... .............:-,-__Flow much exc./atL,n or fill posed?__-..„.....
Water Supply
- r., .Well, Spring), Drywall- >� • _. fez �: :x.., ..r�r
Septic tank capacity P P8 y ��.:......�. gals. Style of tank___.- -, _ ._ Air.:
Length of disposal field.....„,.:..12..,--„_•--.-_-_----.....--.....,.___Lear • : Bed
- - - ...._.. .. , Dist. Box :,, -
(1) Draw in property area to scale,
(2) Show relative Ideation' of: Proposed house, septic tank,
disposal field, well, garage, and other out buildings.
(3) Make note of any heavy slopeor swampy area or any
other important topographic details
Date when test hole will be ready for i
inspection
Date installation will be ready for final inspection (that is,
before baokfilling) ,
SANITARIAN'S REPORT ND RECOMMENDATIONS: • Date At InspeGtton. _(-14-$-4
_
Topography .. �,.._ .._..... �. ,._.,
Ground Water /� ,
Soil Condition-. . eF. 4,,,:e.,. .
Peroalatinn tests: IVIttMeb__.-rrLr^--�- , •
Special Recommendations
F'lnal 1nspctian Date -
-.. ._,. .s. _ _.-��- �.. -• --..... _., .- ._ - - -
Remarks. ?ft's^etto:aug/ !'3,44c :_.
CONTRACTOR_......... ....... -- r - RZCA NDED'PERMIT 110_,_-_---------.,....-`,............-.--
M.. v,- ..-,...,y..
Sanitgxyari W 1
(Worm $a keatth-5.11.-45) By,..._. ..
Target Date sheet
For City Use Only
PLUS Project '-Sjiö1ne
Project Address
Valle
11703 E Sprague Ave Suite B-3 ♦ Spokane Valley WA 99206
509.720-5240♦ Fax: 509.688.0037 ♦ permitcenter®spokanevalley.org
As part of our on-going commitment to customer service during the review process of your project application,we are
providing you with a TARGET DATE for the initial technical application review. If for any reason we cannot meet
this date,we will contact you with a revised target date. I
Your application review TARGET DATE is -
The TARGET DATE is the date we estimate your project application will have had its initial technical review. It is
not the date for approval or permit issuance.
Tips for a Smoother Project Application Review
> Submit complete,accurate plans and documents.
Extra time may be required for re-submittals as project application reviewers work on multiple applications and it may be
several days before they can look at your new or revised information.
> Designate a specific contact person to communicate with the City.
While the person designated as the applicant's contact person with the City can be changed, one individual with the expertise
for dealing with reviewer comments would be the best choice for the entire review process.
> Call staff regarding the status of your project only after the target date shown at the top of the page.
Although you should be contacted on or by the target date,please feel free to contact us if you haven't heard from us by your
target date.Staff may contact you before the target date if the initial review is complete.By following this procedure,you will
save time and allow the reviewers to complete the work more expeditiously.
Steps in the Permit Process
1. Counter Complete. Your application has been accepted as counter complete. This means all of the required documents, as
indicated on your Pre-Application Checklist have been submitted or have been approved for deferred submittal. This does
not prevent technical staff from requesting additional information as a result of their technical review.
2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free from
substantive flaws that would prevent technical staff from completing the technical review once it is started. When this step is
complete,your application will be routed to the appropriate staff and remain in their review queue until it comes up for review.
3.Technical Compliance.Once an application is administratively complete,it is routed to technical staff for compliance review.
Depending on the type of project,technical staff may include multiple reviewers. You should be contacted by phone, fax, email,
or mail by your TARGET DATE once the initial technical compliance review is complete.
4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re-
submittals,each reviewer will approve their section of the application and route it to the Permit Center. When all sections of the
application are received, a Permit Specialist will process the application and contact the person specified on your application for
permit pick-up.Information regarding fees and pre-construction meetings(if required)will be provided by the Permit Specialist at
that time.
CD-003 V-7/06-21-11 Page 1 of 1