2001, 10-15 Permit: 01008707 Residence SPOKANE COUNTY DIVISIONOF BUILDING
AND CODE ENFORCEMENT
1026 WEST BROADWAY AVENUE • SPOKANE, WA 99260-0050
SPOKAW CW1*TY
Site Information Project Information
Site Address: 301 S SHELLEY LAKE LN Project Number: 01008707 Inv: 1 Issue Date: 10/15/2001
VERADALE,WA 99037 Permit Use:NEW RESIDENCE W/ATTACHED GARAGE-GAS
Parcel Number: 45245.9141
Subdivision: RANGE Applicant: GEORGE H WHITE
Block: Lot: PO BOX 52
Zoning: UR-3 Urban Residential 3.5 LIBERTY LAKE,WA 99019 Phone: (509)921-9752
Contact: GEORGE H WHITE
Owner: GEORGE H WHI'L'E PO BOX 52
Address: PO BOX 52 LIBERTY LAKE,WA 99019 Phone: (509)921-9752
LIBERTY LAKE,WA 99019
Setbacks-Front: 1740 Left: 160 Right: 400 Rear: 600
Building Inspector: DAN HOWARD
Water Dist:
Group Name:
Project Name:
Permits
Building Permit Contractor: GEORGE H WHITE CONST License#: GEORGHWO91P8
New Building BASEMENT F R-3 VN 1,650 RESIDENTIAL VALUATION $1,400.00
Dim: 64 X 70 1 Story BASEMENT U R-3 VN 829 STATE SURCHARGE $4.50
Sq Ft: 4,129 DECK R-3 VN 435 RESIDENTIAL SURCHARGE $308.00
Grp: R-3 Type: VN GARAGE U-1 VN 675
Total Permit Fee: $1,712.50
RESIDENCE R-3 VN 2,479
Total Value: $200,586.84
FOR BUILDING INSPECTIONS CALL(509)477-3675.
Flood Plain Contractor: UNKNOWN License#: UNKNOWN
FLOOD PLAIN INSPECTION 1 $20.00 FLOOD PLAIN PERMIT 1 $10.00
PERFORM BOND-FLOOD $300.00
Total Permit Fee: $330.00
Mechanical Permit Contractor: GEORGE H WHITE CONST License#: GEORGHWO91P8
DUCT SYSTEMS 1 $10.00 GAS WATER HEATER 1 $10.00
GAS APPLIANCE=100,000BT 1 $12.00 GAS PIPING 4 $4.00
AIR CONDITIONER:4-15 TONS 1 $20.00 VENTILATING FANS 4 $40.00
CLOTHES DRYER 1 $10.00 RANGE 1 $10.00
GAS LOG OR GAS INSERT 2 $20.00 HOOD-TYPE II 1 $10.00
Total Permit Fee: $146.00
FOR MECHANICAL INSPECTIONS CALL(509)477-3675.
FILE.
Processed By: DAWN DOMPIER PERMIT
Printed By: SCHNEIDER,PENNY Page 1 of 2
NOTICE
It is the responsibility of the applicant/permittee, not Spokane County, to s*e to it that the use described on the front of this permit complies with
applicable codes and requirements and that required inspections are requested. Failure to request required inspections and obtain the necessary
approvals prior to progressing beyond the point where inspections are required may necessitate removal of certain parts of the construction at the
applicant's/permittee's or property owner's expense.At a minimum, the following inspections ARE REQUIRED by County Code:
1. FOOTING - when forms and reinforcement are in place and prior to placement of concrete—all structures, including manufactured homes.
NOTE: This inspection includes review of the structure's setbacks from property lines. Minimum setbacks are established by County zoning
regulations.Typically, side and rear yard setbacks are measured from property lines,while setbacks for yards abutting streets are measured from
the property line or the center line of the roadway right-of-way,whichever provides the greater setback from the center line of the roadway right-of-
way.Curb lines and fence lines are not necessarily indicative of property lines. In some residential areas,the County can own as much as 20 feet of
right-of-way between your property and the actual improved street/curb.The responsibility to comply with applicable setback provisions lies solely
with the permittee—neither Spokane County nor its authorized representatives assume any responsibility for the verification or location of your
property lines. Please verify their location prior to locating your structure. Failure to properly locate the structure may require its relocation at the
owner's/permittee's expense.
2. FOUNDATION -when forms and reinforcement are in place and prior to placement of concrete.
3. FRAMING -after all framing, bracing and blocking is in place,and prior to concealing.
4. INSULATION-prior to the installation of drywall.
5. PLUMBING-after rough-in, before covering, and final.
6. MECHANICAL- rough-in of piping, before covering, metal chimneys before concealment,and final.
7. FINAL - when complete and prior to occupancy and/or use. Please provide 24 hours notice. All permits require final inspection.
NOTE:In addition to inspection of the structure,this inspection includes review of site improvements(typically depicted on the approved site plan)
required by ordinance or as a condition of approval of this permit. Items such as the installation of fire hydrants,fire department access,on-site
drainage("208 swales"), road improvements,parking, and landscaping are common requirements of a permit/site plan which must be com-
pleted prior to final approval of a building or issuance of a Certificate of Occupancy.
8. MANUFACTURED HOMES- Final inspection required when complete, stairs, handrails,skirting, etc. installed,and prior to occupancy; completed
inspection record card must be available on site.
9. SEWERS- prior to cover
10. RIGHT-OF-WAY/APPROACH - prior to placement of concrete, or, if gravel approach, after completion.
In addition to the above,any plumbing or mechanical systems or material which would be concealed by framing,drywall,concrete,etc.,must be inspected
prior to cover. Check with the department for "special inspections" in conjunction with commercial projects.
FOR INSPECTIONS:
TO INSURE PROMPT SERVICE, PLEASE GIVE ONE WORKING DAY/24 HOUR NOTICE .
PARTS OF YOUR PROJECT MAY REQUIRE PERMITS AND INSPECTIONS
FROM MORE THAN ONE AGENCY.
• Building, plumbing, mechanical and fire inspections, Division • Road cuts for utilities or driveways, Division of Engineering &
of Building and Code Enforcement Roads - 48-HOUR NOTICE REQUIRED
477-3675 477-3600
or State Department of Transportation
• Construction in a flood plain, Division of Engineering & Roads 456-3000
477-3600
• Sewer connection, Division of Utilities
• Electrical wiring, State Department of Labor and Industries
477-3604
324-2640 or City Public Works Department
625-6300
• On-site waste disposal system,Spokane Regional Health District
324-1560
PERMIT EXPIRATION AND REFUNDS
Unless otherwise noted,this permit will be considered null and void by limitation if the work authorized by the permit is not commenced or is stopped for
a period of 180 days, unless a written request for an extension of the permit is received and approved by the Building Official prior to expiration.At a
minimum an inspection should be requested at least once every 180 days to assure the validity of the permit.A permit may be renewed within one year
of the date of expiration for one-half the original fee,subject to certain limitations—please call us if you have any questions.
All refund requests must be made in writing by the applicant/permittee(shown on the reverse)no later than 180 days after the date of fee payment.
Refunds of not more than 80%of the permit fee paid may be authorized when no work has been done under the permit. No refunds may be authorized
more than 180 days after fee payment.
MISTAKE?
If you think we've made an error in processing this permit or in conducting inspections pertaining to it,or find erroneous information in the permit,please
bring it to our attention immediately by filing a written request for correction within 10 working days of discovery.All such requests should be directed to
the Division of Building and Code Enforcement at the below address.
Spokane County Division of Building& Code Enforcement
1026 West Broadway Avenue
Spokane, WA 99260
Phone: (509)477-3675 Fax: (509) 477-4703 TDD: (509)477-7133
SPOKANE COUNTY DIVISION OF BUILDING
,1, AND CODE ENFORCEMENT
It 1026 WEST BROADWAY AVENUE ' SPOKANE, WA 99260-0050
SPOMN,E COURTY
ISite Information Project Information I
Site Address: 301 S SHELLEY LAKE LN Project Number: 01008707 Inv: 1 Issue Date: 10/15/2001
VERADALE,WA 99037 Permit Use:NEW RESIDENCE W/ATTACHED GARAGE-GAS
Parcel Number: 45245.9141
IPermits
Plumbing Permit Contractor: GEORGE H WHITE CONST License#: GEORGHWO91P8
TOILETS/BIDETS 4 $24.00 SINKS 7 $42.00
SHOWERS 3 $18.00 TUBS 2 $12.00
DISH WASHERS 1 $6.00 GARBAGE DISPOSAL 1 $6.00
CLOTHES WASHER 1 $6.00 FLOOR DRAINS 1 $6.00
WATER USING DEVICES 3 $18.00
Total Permit Fee: $138.00
FOR PLUMBING INSPECTIONS CALL(509)477-3675.
IPayment Summary
Total Fees AmountPaid AmountOwing Tran Date Receipt# Payment Amt
$2,326.50 $2,326.50 $0.00 10/15/2001 8228 $2,326.50
INotes/Conditions of Approval
STRUCTURE MUST BE A MINIMUM OF 50 FT SETBACK FROM OHWM
Processed By: DAWN DOMPIER PERMIT
Printed By: SCHNEIDER,PENNY Page 2 of 2
NOTICE
It is the responsibility of the applicant/permittee, not Spokane County, to swe to it that the use described on the front of this permit complies with
applicable codes and requirements and that required inspections are requested. Failure to request required inspections and obtain the necessary
approvals prior to progressing beyond the point where inspections are required may necessitate removal of certain parts of the construction at the
applicant's/permittee's or property owner's expense.At a minimum, the following inspections ARE REQUIRED by County Code:
1. FOOTING - when forms and reinforcement are in place and prior to placement of concrete—all structures, including manufactured homes.
NOTE: This inspection includes review of the structure's setbacks from property lines. Minimum setbacks are established by County zoning
regulations.Typically, side and rear yard setbacks are measured from property lines,while setbacks for yards abutting streets are measured from
the property line or the center line of the roadway right-of-way,whichever provides the greater setback from the center line of the roadway right-of-
way.Curb lines and fence lines are not necessarily indicative of property lines. In some residential areas,the County can own as much as 20 feet of
right-of-way between your property and the actual improved street/curb.The responsibility to comply with applicable setback provisions lies solely
with the permittee—neither Spokane County nor its authorized representatives assume any responsibility for the verification or location of your
property lines. Please verify their location prior to locating your structure. Failure to properly locate the structure may require its relocation at the
owner's/permittee's expense.
2. FOUNDATION-when forms and reinforcement are in place and prior to placement of concrete.
3. FRAMING -after all framing, bracing and blocking is in place,and prior to concealing.
4.INSULATION-prior to the installation of drywall.
5. PLUMBING-after rough-in, before covering, and final.
6.MECHANICAL- rough-in of piping, before covering, metal chimneys before concealment,and final.
7. FINAL - when complete and prior to occupancy and/or use. Please provide 24 hours notice. All permits require final inspection.
NOTE:In addition to inspection of the structure,this inspection includes review of site improvements(typically depicted on the approved site plan)
required by ordinance or as a condition of approval of this permit. Items such as the installation of fire hydrants,fire department access,on-site
drainage("208 swales"), road improvements, parking, and landscaping are common requirements of a permit/site plan which must be com-
pleted prior to final approval of a building or issuance of a Certificate of Occupancy.
8. MANUFACTURED HOMES- Final inspection required when complete, stairs, handrails, skirting, etc. installed,and prior to occupancy; completed
inspection record card must be available on site.
9. SEWERS- prior to cover
10. RIGHT-OF-WAY/APPROACH - prior to placement of concrete, or, if gravel approach, after completion.
In addition to the above,any plumbing or mechanical systems or material which would be concealed by framing,drywall,concrete,etc.,must be inspected
prior to cover. Check with the department for "special inspections" in conjunction with commercial projects.
FOR INSPECTIONS:
TO INSURE PROMPT SERVICE, PLEASE GIVE ONE WORKING DAY/24 HOUR NOTICE .
PARTS OF YOUR PROJECT MAY REQUIRE PERMITS AND INSPECTIONS
FROM MORE THAN ONE AGENCY.
• Building, plumbing, mechanical and fire inspections, Division • Road cuts for utilities or driveways, Division of Engineering &
of Building and Code Enforcement Roads - 48-HOUR NOTICE REQUIRED
477-3675 477-3600
or State Department of Transportation
• Construction in a flood plain, Division of Engineering & Roads 456-3000
477-3600
• Sewer connection, Division of Utilities
• Electrical wiring, State Department of Labor and Industries
477-3604
324-2640 or City Public Works Department
625-6300
• On-site waste disposal system,Spokane Regional Health District
324-1560
PERMIT EXPIRATION AND REFUNDS
Unless otherwise noted,this permit will be considered null and void by limitation if the work authorized by the permit is not commenced or is stopped for
a period of 180 days, unless a written request for an extension of the permit is received and approved by the Building Official prior to expiration.At a
minimum an inspection should be requested at least once every 180 days to assure the validity of the permit.A permit may be renewed within one year
of the date of expiration for one-half the original fee,subject to certain limitations—please call us if you have any questions.
All refund requests must be made in writing by the applicant/permittee(shown on the reverse)no later than 180 days after the date of fee payment.
Refunds of not more than 80%of the permit fee paid may be authorized when no work has been done under the permit. No refunds may be authorized
more than 180 days after fee payment.
MISTAKE?
If you think we've made an error in processing this permit or in conducting inspections pertaining to it,or find erroneous information in the permit,please
bring it to our attention immediately by filing a written request for correction within 10 working days of discovery.All such requests should be directed to
the Division of Building and Code Enforcement at the below address.
Spokane County Division of Building& Code Enforcement
1026 West Broadway Avenue
Spokane, WA 99260
Phone: (509)477-3675 Fax: (509) 477-4703 TDD: (509)477-7133