June 7, 1996
Todd Whipple, P. E.
IPEC
SUBJECT: 1414C - Riverwalk 7th Addition
, Construction Drawings - Submittal Not Accepted at This Time
Gentlemen:
We have conducted a cursory review of your recent submittal for this project, and we have
found items which do not appear to meet the minimum standards of the Sookane Countv
Standards for Road and Sewer Construction. We are, therefore, unable to accept your submittal
at this time.
The attached comment list contains items of concern which we discovered during a cursory
review of this submittal. You should be certain, before you resubmit the plans and calculations
for this project, that your submittal meets the requirements of all applicable agencies. When the
vlans are resubmitted. vlease mark all chanLyes on the revised print in color.
If you have any questions about this review, please contact Ed Parry at 456-3600. Thank you.
Very truly yours,
William A. Johns, P. E.
Spokane County Engineer
Y P-E.
~
Edward J. Pa~y, Jr., P. E.
Plan Review Engineer
encls: Construction Drawings & Drainage Calculations- P1414F
cc: project file
Michael Miller, Pacific Properties, Inc, 14410 Bel-Red Road, Bellewe, WA 98007 reviewer
r
1026 W. Broadway Ave. 0 Spokane, WA 99260-0170 •(509) 456-3600 FAX: (509) 324-3478 TDD: (509) 324-3166
- ' } • •
t ,
. SPOKANE COUNTY INfiERIM ROAD & DRAINAGE
SUBMITTAL CHECKLIST
PR4JECT # DATE:
PROJECT NAME: ~1?
PROJECT SPONSOR: TELA~~*N) rO~ - Z 31 2
PRO.iECT ENGINEER: ~e Qb ~R • ~ ~ PPC.~ , ~P. C TELJ 45_9-G$di?
(Read & Drainage Plans) .
PROJECT SURVEYOR: ~~T ~ t- S • T ~ '~840
~lat, kkeIVED
PLEASE PROVIDE A RESPONSE TO EACH OF '`HE FOLLOWIl~iG I'TEMS. cENExAL rrEMs J U N 04 1996
YaUr,011N/A❑ 1. A sigaed "AGREEMffNT TO PAY FEES" form has been submitted to Spokane County along with any
applicable plat fees, prior to any pre-design/Presubmittal meeting SPOKANE COUNTY ENGINEER
YaUrro❑N/A❑ 2. I have a copy of, and have reviewed the most recent conditions of approval and any EISlMDNS requirements
and conditions of approval have been incorporated in this plan submittal.
. PROJECT DFSIGN
YaSivo❑N/A❑ 1. I have completed a minimum of one pre-design meeting -with Spokane Counry Development Engineering
Services Engineers whete agreement was reached on drainage design approach. .
YeSuivo❑N/A❑ 2. I have included the results of any geotechnical testing that is required by the design approach to verify design
parameters.
Ya131N'o0N1A❑ 3. I have included any required pavement design calculations on new Public roadways as required by the
"SPOKANE COUN''Y STANDARDS FOR ROAD AND SEWER CONS'I'RUCTION°, latest edition.
Yesxo❑N/A❑ 4. The road and drainage plans comply with the"STANDARD ROAD PLAN" requirements for plan, profile, and
typical cross section elements contaiaed in"SPOK:ANE COLTNTY STANDARDS FOR ROAD AND SEWER
CONSTRUC'I'ION" latest edition except as allowed through approved design deviations.
YesONZIN/A❑ 5. The drainage report incorporates the minimum requirements for a storm drainage analysis as noted in the GSM
and other items which are appropriate to demonstrate that the design meets all requirements of the Spokane
County Guidelines for Stormwater Management except as allow6d through approved design deviations.
Ya ONoCINIA❑ 6. A complete drainage basin map with time of concentration paths shown has been included with the detailed
hydrology calculations. Drainage basin map shows topograph, proposed drainage features, and correlates with
hydrology calculations.
YANXIN/A❑ 7. All applicable traffic signing requirements are met and have been incorgorated'in the plan submittal.
YesONoCIrvfAa 8. I have included copies of all approved DESIGN DEVIA7'IONS which are required for this project.
YesONoOrue❑ 9. The plans and drainage report are stamped, signed, and dated, and contains, the applicable certification
statement.
YaEXoON/A❑ 10. I have included an adequate erosion control plan and applicable standard plan notes.
veSex 1IxrA❑ 11. I have secured approvals from all applicable outside agencies such as fire districts where applicable and have
included proof of their approvals..
v~120NI"00NlA11 12. I have provided an acceptable means for perpetual maintenance of street and drainage facilities that is acceptable
to Spokane County and have secured and included copies of any required easements.
veSOx 11N/A❑ 13. I have reviewed the plans, calculations and other submittal data for completeness, accuracy and consistency and
have submitted two copies of plans and (1) bound drainage report.
Uckplatv 1.0/May95 1
I:n-derstand that the requirements noted above are the minimum requirements necessary to perform a cursory review of the project
, pla.%,--; and 'r't2at addidonal information should be included with this submittal as necessary.
I understaad that this submittal will be checked for completeness prior to review, and that it will be returned for further information
if it is found to be incomplete.
I understand that this submittal will not be accepted for review (a.nd placed on the review list) until alt required information has
been submitted.
Form completed by the responsible Engineer: TO Dt> t~ • W4 C P pLJE
Company: (OC-'Ai-t> -PPe--t Ft C_
Address: ~ - -?O`"1 ~IUCJLe' (.~.1~. ~°CZog
Zip code
Date:
FOR SPOK:ANE COUN'I'Y USE ONLY
SUBMITTAL: Accepted for review.
~ Retumed for submittal of the following: ~
GENERAL ITEM # :
PROJECT DESIGN RESUBMITTAL ITEM ' Form returned to: ~ ~ ! p•~r ~
Company: ~E
Address:
Date: 4Public ~
B ` ~ ~y:
Spokane Counor e elopment Services
I/ckplatv 1.0/May95 2
REVIEW COMMENTS
SPOKANE COUNTY
DNISION OF ENGINEERING & ROADS
1026 W BROADWAY, SPOKANE WA 99260-0710
PHONE (509)456-3600 FA.X (509)324-3478
SUBMITTAL 1 REVIEWER: Ed Parrv
PROJECT P 1414F DATE: 7 June 96
PROJECT NAME: Riverwalk 7th Addition
N.B.: Since this project is governed by the edition of the Spokane County Standards for Road and
Sewer Construction (the "Standards", adopted 2 May 95, with an effective date of 15 May 95), these
comments are general in nature, and do not represent a listing of all items which may not be in
compliance with the Standards. The responsibility for ensuring compliance with the Standards lies solely
with the Sponsor's Design Engineer. ALL DISCREPANCIES MUST BE ADDRESSED AND
RESOLVED PRIOR TO PLAN ACCEPTANCE
PRUJECT DESIGN
3. Calcs for the Mission Avenue pavement section were not included in this submittal.
4. Pipe profiles were not included in this submittal
5. Project overlay on the soils map obscures the underlying soil type. Pipe flow in supercritical regime
(Froude Number > 1) needs an energy gradeline analysis to confirm the pipe sizing
6. The existing topographic contours were not very clear. Tc paths could be shown more clearly,
perhaps with a different linetype & labeling. Basin limits on Mission Avenue do not correlate with the
high points shown on the curb profile elevations
8. The proposed section for Mission Avenue (IPEC's 29 May 96 letter) does not match either with the
Special Section provided to IPEC, nor with the section constructed in phase 1. As Todd Whipple noted
in a 4 Jun 96 telephone conversation with Ed Parry, the section constructed in phase 1(a contiguous
sidewalk) is obviously not in conformance to the approved plans for phase 1. As we discussed in our
pre-design conference, a request for Design Deviation for the proposed Mission Avenue section, or at
least a request to extend approval of the Design Deviation for the Mission Avenue section submitted
for phase 1, is needed.
9. Delete "Not Approved for Construction", as the certification statement explicitly approves the plans
for construction. The purpose of the entire process is to ensure that a"ready-taaccept" set of plans is
submitted, in order to minimize the number of resubmittals
REVIEW CONIlVIENTS Page 2 of 2
7 June 96
PROJECT # P1414F
SUBMIT'TAL # 1
10. Curbs less than 0. 8% need to have the grades and elevations verified by a P. L. S., per the Standard
Notes provided at the pre-design meeting. Soil in swale floors needs to meet percolation requirements
per Standard Notes provided at the pre-design meeting. Copy of Standard Notes is attached for your
reference
Other:
a. The Statement of Agreement for Construction Services needs to be notarized, per the format provided
at the pre-design conference (copy attached)
Standard Plan Notes for Developer Plan Submittals
1) All work and materials shall be in conformance with the "SPOKANE COUNTY STANDARDS FOR
ROAD AND SEWER CONSTRUCTION 1995", and as amended.
2) Locations of existing utilities shown in the plans are approximate. The Contractor shall be
responsible for locating all underground utilities. Any conflicting utilities shall be relocated prior
to construction of road and drainage facilities.
3) The Contractor is required to have a complete set of the approved road and drainage plans on the
}ob site whenever construction is in progress.
4) If the Contractor discovers any discrepancies between the plans and existing conditions encountered,
the Contractor shall inunediately notify the Design Engineer and the Spokane County Engineer's
Office.
5) For construction of drywells, install filter fabric (Amoco 4545 or approved equivalent) between the
drywell barrel and the washed drainrock, and between the washed drainrock and the native soils.
6) Prior to site construction, the Contractor is responsible for locating underground utilities. Call the
underground utility location service at 456-8000 before you dig.
Optional Notes (when aolicable to projectl
7) For any curb grades less than 0.8% (0.008 ftlft), a Washington State-licensed Professional Land
Surveyor shall verify that the curb forms are at the grades noted on the approved plans, prior to
placement of curb material. The Contractor is responsible for arranging and coordinating work
with the Professional Land Surveyor.
8) The Contractor shall employ a Licensed Surveyor to verify that the cross-gutter forms are at the
conect plan grade and elevation prior to concrete placement. The cross-gutters shall be constructed
prior to paving, and the pavement shall then match the edge of the concrete cross-gutter
Use note #9 whenever '208' swales are used:
9) The floor of a 208 swale includes the level portion of tbe floor of the swale, and the sideslopes of
the swale up to the 208 overflow elevarion or top of drywell. The soil located in the floor of a ZOS
swale shall be a medium to well-draining material, with a minimum infiltration rate of 0.5 inches
per hour. The Engineer shall provide a written statement which verifies that all '208' swales conform
to this requirement. This written statement shall be submitted to the Spokane County Engineer's
Office prior to installing finished landscaping/sod and prior to final acceptance. The swale floor
material shall be installed to a native soil stratum which also meets or exceeds this minimum
percolation rate of 0.5 inches per hour
Standard Erosion Control Notes
These notes are to be included in the plan set when erosion control facilities are required and incorporated
into the plans.
ER1) An Erosion/Sedimentation Control (ESC) plan is required for this project. Implementation of tbe
ESC plan, and construction, maintenance, and upgrading of the ESC facilities are the responsibility
of the Developer until all construction is completed and accepted by Spokane County, or until
vegetatioa is established throughout the site, and accepted by Spokane County, whichever is later.
ER2) Approval of the ESC plan does not constitute approval of any of the proposed road, storm drainage,
grading or utility design elements shown on the ESC plan.
ER3) The erosion/sedimentation control measures shown are the minimum requirements for the anticipated
site conditions. The Contractor shall inspect and maintain these ESC measures daily, and shall
maintain and upgrade these measures as necessary to prevent sediment-laden water from either
flowing off the site, or into new/existing storm drainage facilities, such as drywells, culverts, or
gravel galleries.
ER4) The Contractor/Developer is responsible for installing Rock Construction Entries at any and all
locations used to enter or exit the project site.
,
~
STATEMENT OF AGRFF.MENT
•.Vt.l: i::::. '.:•.4:~ •.•lt1:..• . . : . . : . . ~~y
. . . • .:..~..ItXflli:::.:~'•:.:..~:.~:..:...~:~ +J ~ff'•1•li.l:•:{.•~••:•:j::...
~ ~ : . . . t!.••:•:::: ~ ~ . ~~'~•~J:~~ ~I':•••• ~ . ~ .
~~~~~:~::~:e_:::~:~:o~ .
. . r::: . ~ . r.:........ . ..i. • j•:::•::::
. . :
4.
:
v.v. n.; rw:: - ~ : w:: ~ ~ ~
. .....v: .................""'..v:.~::::: ~ :•:.v.ti~v.{:::v::•: ::::~..r.~.~r.ti:•.~:}:vi:~:.. kt
' }v'v'.v.....:..~.h
into a contititi•Xv::.*r.{•.•:::.*:. ractuaY:•: :•.x:::•....::.:.::•i?:::v:i::Y.~:YXvr:~:,
~"SP~IVS~OR" ~as entered
agreement
: ~ ~ sw: •-r
w~t~f M, zo.("ENGINEER" ) for construction en ineerin
.
M::::::: . . 1
. ...............:::..::.....r~:::......:.......
. . .
. r .:v.:..:.:~
♦j~
services ~or ~~.~9.::
•{J{.'..~':.~:.~L1~:•.ti:Y: .~.•f.::f:.~ •.~'J.~~:~.. 1ff
;:;:•::::.:.:::{.::.:{_::•i:~:iiL~i:::.::•:~:•S..n.~..~.}.~},......ti...........r::.~•r ........1..:'v...'..::::.:....~.r.:~:.~• ~.r v~r:~.~~::r~:S•}'r:.~:'•. : . : M.
1. The scope services incl~ udes~,..~~-but~* ...i:*s not-Limited*'~*to": "
A) Daily observation and reporting of constr-uction activities
on this proj ect ; .
B) Maintenance of all construction records related to this
project, to include, but not limited to daily inspection reports,
manufacturer' s certifications, _material test reports, and
correspondence;
C) Assurance that the construction of the roads and
appurtenant drainage facilities is according to the plans accepted
by the Spokane County Engineer, Spokane County General Provisions,
the Standard Specifications, and applicable portions of the WSDOT
Construction Manual;
D) Development of Record Drawings; and
E) Testing of construction materials for compliance to the
plans accepted by the Spokane County Engineer, Spokane County
General Provisions, the Standard Specifications, and applicable
portions of the WSDOT Construction Manual, ~
all according to the edition of the "Spokane County Standards for
Road and Sewer Construction" governing this project.
2. Prior to acceptance of the roads and drainage facilities by
Spokane County, the Engineer shall submit all construction records
and the Record Drawings to the Spokane County Engineer
3. The cost of the Construction Engineering Services for the
project is:
: . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
DATED this day of , 1994
Page - 1
.~.~.~~~:~s~~~~'-.,~_`.:..~4..~~,~~~.',.-•.~~~.'..~',.,,~,'.,~„~~:~;:;':i~::,~,~~,~,~,.~~:~~'
• ~ . : . .
: • . ~:.xti~:,, . ~ ny..:....ri : : ~ :
1~ ~'ashingtori~~ Corporatiori
By
- ;:•~:t::•..
~::::;•::~:~:-i ;~;.:•:::•:~.e-' bQ-
x~~
Pre s i~c~ent~
STATE OF WASHINGTON )
) ss
County of Spokane )
I certify that I know or have satisfactory evidence that
: : : . .
is the person who appeared before me, and that said person
~ackriowl*edged that he signed this instrument, on oath stated that he
was authorized to execute this instrument, and acknowledged it as
y . ».tit.; ...r :•r:::':'•:':;;'::•r:::::~:.~•~:: .
t he P re s i dent o f :.::..ne:~ w<: ~~a Wa hi
:.~•.::....•"'.htiJ.~'..~.. ~~~•.1•}.1•:':•::•:'~'•...:~.•'. s ngton
corporation, to be the reeanc~ vo~urity act or ~said corporation,
for the uses and purposes therein mentioned in the instrument.
Dated this day of , 1994.
NOTARY PUBLIC in and for the State
of Washington, residing at .
My appointment expires
DATED this day of , 1994
Page - 2
,
,•r.~ ~.~r:::.:
`~t f 0--ation
By..
.
:b:#'c~2<~: ~ ra:>::::~+ r:: . ,
Presic~ent
STATE OF WASHINGTON )
) ss
County of Spokane )
I certify that I know or have satisfactory evidence that
is the person who appeared before me, and that said person
~ackriowl edged that he s igned thi s ins t rument , on oath s tat ed that he.
was authorized to execute this instrument, and acknowledged it as
the President of a Washin9'ton
sr: ~ . . .....::.:tie•::•:. :
- corporation, to be the ~f ree:.:.:and~ ~vo!untary act of****said corporation,
for the uses and purposes therein mentioned in the instrument.
Dated this day of , 1994.
NOTARY PUBLIC in and for the State
of Washington, residing at .
My appointment expires .
Page - 3
, - - - -
SPOKANE COUNTY INTERIM ROAD & DRAINAGE
SUBMITTAL CHECKLIST
PROJECT # (4" - DATE:
PROJECT NAME:
PROJECT SPONSOR: TEL-d`~~ rO~ ' Z 3~ Q
PRO.IECT ENGINEER: To pD R• L.UI[41P PL~ ~ p• C TEL#~ 45'~f)"G$`4Q
(Road & Drainage Plans)
PRQJECT SURVEYOR: T -~840
(Plat) ~ 7 L._ V EIVED
PLEASE PROVIDE A RESPONSE TO EACH OF TSE FOLLOWING TI'EMS.
G~NERALITEMS J U N 0 41996
vC5uNo0r,iA❑ 1. „A signed "AGREEMENT TO PAY FEES" form has been submitted to Sp okane County along with any
aPPlicable Plat feest Prior to anY Pre-design/Presubmittal meeting SPOKAPIE COUNTY ENGINEER
.
YtlusoDN/A❑ 2. I have a copy of, and have reviewed the most recent conditions of approval and any EIS/MDNS requiremeats
and conditions of approval have been incorporateti in this plan submittal.
PROJECT DESIGN
,re,aNoIN/A❑ 1. / have completed a minimum of one pre-design meeting with Spokane County Development Engineering
Services En,gineers whete agreement was reached on drainage design approach.
YeSErvoQr,/A❑ 2. A have included the results of any geotechnical testing that is required by the design approach to verify design
parameters.
Ycs 3. I ave u any r- eQuired Pavement desip calculations on new Public roadways as required by the
No
"SPOK;ANE COUNTY STANDAR.DS FOR ROAD AND SEWER CONSTRUCTION", latest ediaon.
YnDONoON/A❑ 4. The road and drainage plans comply with ihe"STANDARD ROAD PLAN" requirements for plan, profile, and
typical cross section elements contained in"SPOK;ANE COUN7'Y STANDARDS FOR ROAD AND SEWER
CO STRU_CTLO " est e"tion c pt as al~pwed thr ~ugh approved design deviations.
~ ~j~11W SANtA/~~
,r~L=lrro~N/A❑ 5. e dramage repo corporates the ements o~ r'~a storm drainage analysis as noted in the GSM
and other items which are appropriate to demonstrate that the design meets all requirements of the Spokane
County Guidelines for Stormwater Management ex t ;as all owed ough approved design dev' tio .
44 , - 4.
Y~~o~N,,►❑ 6. A comPlete drainage basin maP with time ofccllacentran paths s owCn h~d b en inc u ed wi e e'
hydrology calculations. Drainage basin map shows topo h, proposed drainage features, and correlates with
hydrox calculations. ~~N4 ~~D ~ ~l ~'iL • ~IN Ll*tfS ~J 1~► (t?~~Z-~
A+k~sca~l/~J~S .
` '~p 6 ~.g1y~l~j~i4
,r~~ivo❑N/A❑ Y,. All applicale tra~c sig requirements are met and have been incorporated'in the plan submittal.
b gn~n
I alI ~D`~N VIA''IONS which are required for this project.
va❑ ❑ A ~ 8. I ave iPP
~
Ye, A❑ 9. The plans and drainage report are stamped, signed, and d.ated, and contains, (he icable certification
statement. Zw" "W ft COMORM014A C /j
YdQNo❑N/A❑ 10. I have included an adeQuate erosion control Plan and applicable stan~~~dplan nltes!t~ i~
,rea"XIr,t,►❑ #41. I have secured approvals from all applicable outside agencies such as fi.re districts where applicable and have
included proof of their approvals..
v~calr*41IN/A❑ vf2. I have provided an acceptable means for perpetual maintenance of street and drainage facilities that is acceptable
- to Spokane County and have secured and included copies of any required easements.-
vnarvXINlA❑ 13. I have reviewed the plans, calculations and other submittal daia for completeness, ac,curacy and consistency aad
have submitted pvo copies of plans and V) bound drainage report.
~
I c:n?erstand that the requirements noted above are the minimum requirements necessary
to perform a cursory review of the project
plans, and that additional information should be included with this subm.ittal as necessary.
I understand that this submittal will be checked for completeness prior to review, and that it will be returned for fiuther information
if it is found to be incomplete.
I understand that this submittal will not 6e accepted for review (and placed on the review list) until all required information has
been submitted.
Form completed by the responsible Engineer: Te> T>-D w4 t P pLe~~~•
Company: (1..-)(-AQ~> ~P~ t Fl L~!~ c 1~~ rZt I.~E~
Address: (iJ . -70 -1 -144,\ 2~=o W,4. C°~' Zoq
Date: 60 3 "16 Zip code
FOR SPOB:ANE COUNTY USE ONLY SUBMITTAL: Accepted for review.
Returned for submittal of the following:
GENER.AL ITEM # :
PROJECT DESIGN # : RESUBMITTAL ITEM
Form renuned to:
Company:
Address:
Date:
By:
Sgokane County Public Works Development Services I/ckplaa 1.0/May95 ' 2
1~ a
. , ~
May21, 1996 INLAND PACIFIC ENGINEERING, INC.
W.O. No. #96070
. Spokane County Engineers
West 1026 Broadway
Spokane, Washington 99260
ATTN: Mr. Ed Parry, P.E.
RE: Results of Soil Classification Testing
Riverwalk 7th Addition
Liberty Lake, Washington
Mr. Parry:
Please find enclosed the results of soils classification testing by our subcontractor,
Gifford Consultants, Inc. on a soil sample obtained from the above referenced
residential development. The soil sample was obtained from McMillan Lane, Sta.44 + 05 at centerline, 2 feet
below existing adjacent grades by members of our staff. We certify herein that ii»
sample tested was obtained from the location stated above and that based on the
data enclosed, t
Please do not hesitate to call if you have any questions regarding this letter or other
aspects of the project.
Respectfully,
wA ST~
INLAND PACIFIC E GI
o O~
Jer E. Peterson, P.E. R~~3I',~ ~
Project Engineer `sl
AL E~
JEP/ell ~ EXPIRES
Enc.