2012, 03-29 Permit: SW-12001014 SewerSPOKANE COUNTY BUILDING AND PLANNING
PERMIT
Application Number: SW -12-001014
Permit Issued Date:
03/29/2012
Expiration Date: 03/30/2012
Project Description: SEWER CONNECTION Primary Contact: LAUER EXCAVATION & CONSTRUCTION
INC.
Applicant: LAUER EXCAVATION & CONSTRUCTION
INC.
Permit Type: SEWER Address: P O BOX 11581
SPOKANE, WA 99220
Phone: (509)981-7954
Email:
SITE INFORMATION:
Site Address:
Parcel Number:
1409 S SIESTA DR
45203.1707
Subdivision: MICA PARK ADDITION
Assessor's Description: MICA PARK ADD L7 B1
Inspection Area:
Owner:
Address:
Phone:
Email:
THOMAS, STEVEN E & PATRICIA A
1409 S SIESTA DR
SPOKANE, WA 99206
Water District: Spokane Fire District: Fire District 1
County Water District #3
Zoning: Land Area: 0.2 acres
CONTRACTOR INFORMATION:
General Contractor
LAUER EXCAVATION & CONST
PO BOX 11581
SPOKANE VALLEY, WA 99211
509-893-9070
DETAILS:
Class
Type
Quantity Unit Charge Value
SEWER SEWER CONNECTION 1 $125.00 $125.00
FEE DETAIL:
Processing - Utilities
Utilities Permit
Total Fee:
$125.00
$25.94
$125.00
$150.94
CONDITIONS:
CALL 1-800-424-5555 BEFORE YOU DIG --AT LEAST 2 WORKING DAYS IN ADVANCE. SPOKANE COUNTY CODE REQUIRES THE
INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR & INDUSTRIES, INCLUDING THOSE
RELATED TO TRENCH SAFETY.
FOR SEWER INSPECTIONS CALL THE UTILITIES DEPT AT (509) 477-3604 FROM 8:30-5:00 MONDAY -FRIDAY PRIOR TO COVER.
ONE WORKING DAY NOTICE REQUIRED. PERMIT ALLOWS FOR A 30 -MINUTE INSPECTION. ADDITIONAL INSPECTION FEES
APPLY AFTER 30 MINUTES.
Date Printed: 03/29/2012 12:25:50
Printed by: IIS APPPOOL\ASP.NET v4.0
SPOKANE COUNTY BUILDING AND PLANNING
PERMIT
r-�
Permit Issued Date:
Application Number: SW -12-001014 03/29/2012
Expiration Date: 03/30/2012
INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED
TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF
SEWER STUB PRIOR TO ANY OTHER EXCAVATION.
SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE
ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED. SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR
GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE.
THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE
LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF
UNDERGROUND FACILITIES.
Date Printed: 03/29/2012 12:25:50
Printed by: IIS APPPOOL\ASP.NET v4.0