Loading...
2014, 06-16 Permit: SW-14000891 SewerSPOKANE COUNTY UTILITIES PERMIT Application Number: SW -14000891 Permit Issued Date: 06/16/2014 Expiration Date: 06/16/2015 Project Description: Project Name: Primary Contact: Phone: SEWER CONNECTION ALTERATION TRENTWOOD JCRS ENTERPRISES LLC 509-939-5808 Applicant: JCRS ENTERPRISES LLC Address: Phone: Email: PO BOX 141910 SPOKANE VALLEY, WA 99214-1910 509-939-5808 SITE INFORMATION: Site Address: Parcel Number: 4219 N SILAS RD 45031.2909 Assessor's Description: SILAS JOHNSON'S ADD TR 58 LT 3 BLK 2 E XC S65' Inspection Area: : (509)-477-3675 Zoning: Owner: Address: Phone: Email: JCRS ENTERPRISES LLC PO BOX 141910 SPOKANE VALLEY, WA 99214-1910 509-939-5808 Water District: Trentwood Irrigation District Fire District: Spokane Valley Fire #3 Land Area: 8398.99 Square Feet DETAILS: Class Type Quantity Unit Charge Value SEWER ALTERATION TO EXISTING FEE DETAIL: Processing - Utilities Utilities Permit Total Fee: $26.64 $125.00 $151.64 1 $125.00 $125.00 $125.00 CONDITIONS: Plan review fee is required for all site plan reviews conducted by Spokane Valley Fire. Inside Public Transit Benefit Area CALL 1-800-424-5555 BEFORE YOU DIG --AT LEAST 2 WORKING DAYS IN ADVANCE. SPOKANE COUNTY CODE REQUIRES THE INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR & INDUSTRIES, INCLUDING THOSE RELATED TO TRENCH SAFETY. SEWER PERMITS ARE VALID FOR ONE (1) YEAR FROM THE DATE OF ISSUANCE. FOR SEWER INSPECTIONS CALL THE UTILITIES DEPT AT (509) 477-3604 FROM 8:30-5:00 MONDAY -FRIDAY PRIOR TO COVER. ONE WORKING DAY NOTICE REQUIRED. PERMIT ALLOWS FOR A 30 -MINUTE INSPECTION. ADDITIONAL INSPECTION FEES APPLY AFTER 30 MINUTES. INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF SEWER STUB PRIOR TO ANY OTHER EXCAVATION. SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED. SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE. THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF UNDERGROUND FACILITIES. Date Printed: 06/16/2014 09:52:32 Project Coordinator: Kathy Cummings