Loading...
2005, 02-14 Plan Submittal Conditions Letter49;00vaiky February 14, 2005 Carston Mortenson, EIT Storhaug Engineering 510 E. 3rd Avenue Spokane, WA 99202 Re: Flagstone Short Plat (SHP-23-03) 1St Submittal Construction Plans 11707 E Sprague Ave Suite 106 ♦ Spokane Valley WA 99206 509.921.1000 ♦ Fax: 509.921.1008 ♦ cityhaLL@spokanevalley.org The Public Works Department received your January 25, 2005 1St Plan Submittal for review. The following items shall be addressed prior to plan acceptance. 1. Per Condition #6 of the rezone (REZ-22-03), a crash gate may be required to prevent traffic from this plat to access Sargent Road. The City is coordinating with Fire District #1 on this issue. 2. Fire District approval is required for the proposed turn -around. 3. A "No Outlet" sign is required at the intersection of Bessie Road and Nora Avenue. 4. Private street name signs are required at the beginning of Bessie Lane. 5. A pavement design report is required for the proposed improvements. 6. Please include the City standard construction notes per the Spokane County Standards. 7. It is suggested to include the private driveway in the swale treatment if it is proposed to be a paved driveway. 8. Please address the street design for the Public portion of Bessie Road. This shall include a cross-section of the improvements indicating the cross -slope and pavement section. If you have any questions, please contact me at 688-0174. Sincerely, Sandra Raskell, P.E. Assistant Development Engineer cc: Brett Sullivan — Flagstone Development Planning Coordinator — Community Development Department of Public Works — Development Project File