2012, 07-09 Permit: SW-12001706 SewerSPOKANE COUNTY BUILDING AND PLANNING
PERMIT
Permit Issued Date:
Application Number: SW -12001706 Expiration Date:
Project Description: SEWER CONNECTION
Project Name: PINEVALLEY ESTATES
Permit Type: SEWER
Primary Contact: SOLID ROCK CONST
Applicant: SOLID ROCK CONST
Address: 4013 S LINKE RD
GREENACRES, WA 99016
Phone: 509-991-1463
Email:
SITE INFORMATION:
Site Address:
Parcel Number:
Subdivision:
Assessor's Description:
Inspection Area:
Zoning:
11915 E SINTO LN
45161.2301
(CITY OF SPOKANE VALLEY) PINE VALLEY
ESTATES LT 1 BLK 3 (AUDITORS #5728519 BK
35 PGS 41 & 42)
Owner:
Address:
Phone:
Email:
RADEZKY PROPERTIES WE1 LLC
12402 N DIVISION ST #369
SPOKANE, WA 99218
Water District: Modern Fire District: Spokane Valley Fire
Electric Water Company
Land Area: 7500 Square Feet
CONTRACTOR INFORMATION:
General Contractor
SOLIDRC929B2
SOLID ROCK CONSTRUCTION NW INC
4013 S LINKE RD
GREENACRES, WA 99016
509-891-5201
DETAILS:
Class
Type
Quantity Unit Charge Value
SEWER
SEWER CONNECTION
FEE DETAIL:
Processing - Utilities
Utilities Permit
1 $125.00 $125.00
Total Fee:
$125.00
$25.94
$125.00
$150.94
CONDITIONS:
Inside Public Transit Benefit Area
CALL 1-800-424-5555 BEFORE YOU DIG --AT LEAST 2 WORKING DAYS IN ADVANCE. SPOKANE COUNTY CODE REQUIRES THE
INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR & INDUSTRIES, INCLUDING THOSE
RELATED TO TRENCH SAFETY.
Date Printed: 07/09/2012 13:38:29
Printed by: IIS APPPOOLWSP.NET v4.0
SPOKANE COUNTY BUILDING AND PLANNING
PERMIT
Permit Issued Date:
Application Number: SW -12001706 Expiration Date:
FOR SEWER INSPECTIONS CALL THE UTILITIES DEPT AT (509) 477-3604 FROM 8:30-5:00 MONDAY -FRIDAY PRIOR TO COVER.
ONE WORKING DAY NOTICE REQUIRED. PERMIT ALLOWS FOR A 30 -MINUTE INSPECTION. ADDITIONAL INSPECTION FEES
APPLY AFTER 30 MINUTES.
INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED
TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF
SEWER STUB PRIOR TO ANY OTHER EXCAVATION.
SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE
ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED. SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR
GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE.
THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE
LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF
UNDERGROUND FACILITIES.
Date Printed: 07/09/2012 13:38:29
Printed by: IIS APPPOOL\ASP.NET v4.0