2012, 06-01 Permit: SW-12001468 SewerSPOKANE COUNTY BUILDING AND PLANNING
PERMIT
Permit Issued Date:
Application Number: SW -12001468 Expiration Date:
Project Description:
Project Name:
Permit Type:
SEWER CONNECTION
SOUTH GREENACRES
Primary Contact: ACME EXCAVATING
Applicant: ACME EXCAVATING
Address: 6808 S LINKE RD
GREENACRES, WA 99016
Phone: 509-251-8058
Email:
SITE INFORMATION:
Site Address:
Parcel Number:
18314 E SINTO AVE
55181.2409
Subdivision: PLAT A
Assessor's Description: VALLEY VIEW ADD N1/2 L5 B11
Inspection Area:
Owner:
Address:
Phone:
Email:
WHALEY, DEBRA L
18314 E SINTO AVE
SPOKANE VALLEY, WA 99016-8525
Water District: Fire District: Fire District 1
Consolidated Irrigation
District #19
Zoning: Land Area: 0.3528 acres / 15370 sqft
CONTRACTOR INFORMATION:
D L BROWN CONSTRUCTION
PO BOX 669
COLBERT, WA 99005
509-467-1009
SQUARE FOOTAGE:
1st Floor: Finished Basement:
2nd Floor: Unfinished Basement:
3rd Floor: Garage/Carport:
Deck: Mezzanine:
DETAILS:
Class
Type
Quantity Unit Charge Value
SEWER SEWER CONNECTION 1 $125.00 $125.00
$125.00
FEE DETAIL:
Processing - Utilities
Utilities Permit
Total Fee:
$25.94
$125.00
$150.94
CONDITIONS:
Inside Public Transit Benefit Area
CALL 1-800-424-5555 BEFORE YOU DIG --AT LEAST 2 WORKING DAYS IN ADVANCE. SPOKANE COUNTY CODE REQUIRES THE
INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR & INDUSTRIES, INCLUDING THOSE
RELATED TO TRENCH SAFETY.
Date Printed: 06/01/2012 11:00:22
Printed by: IIS APPPOOL\ASP.NET v4.0
SPOKANE COUNTY BUILDING AND PLANNING
PERMIT
Permit Issued Date:
Application Number: SW -12001468 Expiration Date:
FOR SEWER INSPECTIONS CALL THE UTILITIES DEPT AT (509) 477-3604 FROM 8:30-5:00 MONDAY -FRIDAY PRIOR TO COVER.
ONE WORKING DAY NOTICE REQUIRED. PERMIT ALLOWS FOR A 30 -MINUTE INSPECTION. ADDITIONAL INSPECTION FEES
APPLY AFTER 30 MINUTES.
INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED
TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF
SEWER STUB PRIOR TO ANY OTHER EXCAVATION.
SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE
ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED. SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR
GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE.
THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE
LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF
UNDERGROUND FACILITIES.
Date Printed: 06/01/2012 11:00:22
Printed by: IIS APPPOOL\ASP.NET v4.0