Loading...
2013, 03-13 Permit: Sw-13000217 SewerSPOKANE COUNTY UTILITIES PERMIT Application Number: SW -13000217 Permit Issued Date: 03/13/2013 Project Description: Project Name: Primary Contact: Phone: SEWER CONNECTION COUTH GREENACRES ACME EXCVT & SEWER BORING CO (509)228-0691 Applicant: ACME EXCVT & SEWER BORING CO Address: Phone: Email: 6808 S. LINKE RD. GREENACRES, WA 99016 (509)228-0691 SITE INFORMATION: Site Address: Parcel Number: 18414 E SINTO AVE 55181.2403 Assessor's Description: VALLEY VIEW ADD N1/2 L2 B11 Inspection Area: : (509)-477-3675 Zoning: Owner: Address: Phone: Email: Water District: Consolidated Irrigation District #19 SHUMAN, J P & A 18414 E SINTO AVE GREENACRES, WA 99016-9574 Fire District: Spokane Valley Fire Land Area: 15370 Square Feet CONTRACTOR INFORMATION: ACMEEES963LD, Exp. 06/04/2014 ACME EXCVT & SEWER BORING CO 6808 S. LINKE RD. GREENACRES, WA 99016 (509)228-0691 DETAILS: Class Type Quantity Unit Charge Value SEWER SEWER CONNECTION FEE DETAIL: Processing - Utilities Utilities Permit Total Fee: $26.32 $125.00 $151.32 1 $125.00 $125.00 $125.00 CONDITIONS: Inside Public Transit Benefit Area CALL 1-800-424-5555 BEFORE YOU DIG --AT LEAST 2 WORKING DAYS IN ADVANCE. SPOKANE COUNTY CODE REQUIRES THE INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR & INDUSTRIES, INCLUDING THOSE RELATED TO TRENCH SAFETY. FOR SEWER INSPECTIONS CALL THE UTILITIES DEPT AT (509) 477-3604 FROM 8:30-5:00 MONDAY -FRIDAY PRIOR TO COVER. ONE WORKING DAY NOTICE REQUIRED. PERMIT ALLOWS FOR A 30 -MINUTE INSPECTION. ADDITIONAL INSPECTION FEES APPLY AFTER 30 MINUTES. INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF SEWER STUB PRIOR TO ANY OTHER EXCAVATION. Date Printed: 03/13/2013 14:55:24 Project Coordinator: Dawn Dompier SPOKANE COUNTY UTILITIES PERMIT Application Number: SW -13000217 Permit Issued Date: 03/13/2013 SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED. SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE. THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF UNDERGROUND FACILITIES. Date Printed: 03/13/2013 14:55:24 Project Coordinator: Dawn Dompier