Loading...
25974 STORM DRAINAGE ANALYSIS 11 A ~s STORM DRAINAGE ANALYSIS for AUTUMN CREST FOURTH ADDITION October 1994 . A 9383 g► ST :ssl-NAL EYPiRES OFFlC;A! P1313LIC Dc_^<. Prenared Bv: SPOKA(VF COU:V~ ~INLAND PACIFIC ENGINEERING PRO,dECT # p r 5~„ W. 707 7th - Suite 200 SUBMInAL # ~ Spokane, WA 99204 RETURN Tp Cp~NTY ENGi (509) 4S8 6840 . r , ; BOWSTRING METHOD (TEN YEAR STORM DESIGN) PROJECT: P1570C TIME OF CONCENTRATION (minutes) DETENTION BASIN DESIGN @ASIN: M REVIEWER: REICH Tc (overtand) Tc (gutter) Areas "C A'C NUM9ER OF DRYWELLS PROPOSED DATE; 01-Nov94 0 Single (type A 1 Double (type B) C1= 0.15 L2 = 170 0.99 0.25 02475 Total Area (calc.) (see H1) 0.99 Z1 = 48 0.00 0,00 0 rme of Conc, (calc.) (sae H1) 9,32 L1(A) = 160 Z2 = 0.16 0.00 0.00 0 Composfte'C (calc.) (see Ht) 0.25 N(A) = 0.4 B = 0 0.00 0.00 0 Time of Conc. (min) 9.32 S(A) = 0.01 n ~ 0.016 0.00 0.00 0 Area (Acres) 0.99 s E 0.008 0.00 0.00 0 C Factor 0.25 Tc (A) ~ 1.24 d= 0.135 0.00 0.00 0 Impenious Area (sq. ft.) 4120 NOTE; Only ACP farm 20th Total A Comp "C Volume Provided 208: 176 slortn: 352 L1(8) = 0 Tc (gu) = 1.48 0.99 0.25 Out(low (cfs) 1 N(B) = 0 Tc(A+B) = 7.24 Area' C Faclot 025 S(B) = 0 Q=C'I'A= 0.59 . - - 4 Tc(tot.) = 9.32 Q(est.) ~ 0.60 #1 #2 #3 #4 95 96 #7 Tc (B) ~ 0,0 Intertsity ~ 2.31 Time Time tntensity Q dev. V ln V out Storage A° 0•438858 Inc. Inc. WP = 6.6181 (min,) (sec.) (nlhr.)(cfs) (cu. fl.) (cu. 8.) (cu, R.) R ■ o.osp (#1'80) (A'C'#3) (Outf."1!2) (#5-M V= 1.36 - =z Tc (totah = Tc (overland) + Tc (gullet) Tc(gu) ~ 2.08 9.32 559.49 2.37 0.59 439 559.49 -120 Tc (overland) = Ct'(L1'N/S"4.5)110.6) Q(est) = 0.60 Ct = 0.15 5 300 3.18 0.79 316 300 16 L1= Length of Overland Flow Holding ~ 6.06 10 600 2.24 0.55 438 600 •162 N=(ricGon facla of overland Oow (.4 for average grass cover) 15 900 1.77 0.44 478 900 -422 S= average slape of overland Ilow 20 1200 1.45 0.36 499 1200 -701 Tc (gutter) c Length (fl.)Nelocity (flJsec,)160 25 1500 1.21 0.30 506 1500 •994 B= Botlom widlh of gulter or ditch 30 1800 1.04 0.26 512 1800 -1288 Zt = inverse of crass slope one of ditch 35 2100 0.91 0.23 516 2100 •1584 Z2 = imrerse of cross slope lwo of ditch 40 2400 0.82 0.20 526 2400 •1874 d= depth of Oow in gutter (estimate, check estimate wilh Flow) 45 2700 0.74 0.18 529 2700 -1171 Area = d'B+d"212'(Z1+Z2) 50 3000 0.68 0.17 537 3000 -2463 Wetted penmeter= B'd+(1lsin(atn(121))+1lsin(atn(122))) SS 3300 0.64 0.16 553 3300 •2747 Hydraurc Redius = R= AreafWetted Perimeter 60 3600 0.61 0.15 572 3600 •3028 Velxity =1.486ln'R".661's"S 65 3900 0.60 0.15 601 3900 -3293 Flow = Velocity'Area 70 4200 0.58 0.14 630 4200 •3510 n= 0.016 (or a5phalt 75 4500 0.56 0.14 650 4500 •3850 s= longitudinal slope of gutler 80 4800 0.53 0.13 655 4800 4145 85 5100 0.51 0.13 681 5100 -4419 90 5400 0.50 0.12 692 5400 -4108 95 5700 0.49 0.12 714 5700 4986 100 6000 0.48 0.12 735 6000 •5265 _ DRAINAGE POND G4LCULATIONS Required grassy swale pond storage volume = Impervious Area x.5 in112 inJfl. = 172 cu. ft. provided: 176 cu. ft. Olq DRYWELL REQUIREMENTS • 10 YEAR DESIGN S70RM Mazimum storage required Dy Bowstrin8 = 16 cu. ft. provided: 352 cu. fl. OK! Number and type of Diyrvells Required = 0 Single 1 Double ~ \ ~ PURPOSE The purpose of tbis report is to determine the extent of storm drainage facilities which will be required to dispose of stormwater runoff created by the development of - Autumn Crest Fourth Addition. The storm drainage facilities on this project will be designed to dispose of runoff from a ten year design storm. This development is within the Aquifer Sensitive Area and is subject to '208' requirements. ANALYSIS METHODOLOGY . The Rational Method, which is recommended for basins less than ten acres in size, will be used to determine the peak discharges and runoff volumes. PROJ'ECT DESCRIPTION Autumn Crest Fourth Addition is a 24 lot, 8.77 acre subdivision located in Section 26, T 25 N, R 44 EWM. Sheet 76 of the Soil Survev of Svokane Countv, Washington (copy , attached) shows that the soil type for the area of the proposed plat is GmB (Garrison very gravelly loam, 0 to 8% sideslopes), which is somewhat excessively drained and has moderately rapid permeability. In the future developed condition, the subdivision will be divided into 9 basins, L through S, by the crowns and high points of the various road improvements as shown on the Basin Map included. Basin M includes impervious area from Progress Road which is included in the peak flow calculations, but is not accounted for in the '208' pond sizing. ~r"t~ri ~ l , . ~ ' T ~wl `r~~rr~,,.'~y } + ,r , 6/ . ~ c M ~ ~w . ~ . ` ir~~~~ . ~ K ~E •^'i' , ; „""y ~ y f' .s~ ~ - ~ _ f ~ !1'~t~' ~ ~'~~I' ~ ~ ~ r R~ ~ii ~ " ~r -mlB o~ ~ -~br ~ . . l . . ' ~.~v' ckC t+ r ~ ' ~ : Y ; " ` ` - ; a~ ' • ~i~,a . ' , ~"k~ ~ :a~ ~ _ ~ ~~~;r~~~j ~ ' t • ~~~~~i"ia J~ ~ i, f.'~' i , s ~ ~_S = ' gja~, 4: t.;`-j$ r ~ - GgA . . S \ i ~ y~^. ~ . ~ • • 1, ~ . I~ 1 .i ~ ~i ~ ( . . t r 'C ~ Q * 1 i • - ~ , . , ~ 1. ~+t fi ; ~ . ' ~ ~'r ; . j 7. ` ~,.'<~M;t•~ + _ , h'~' r r1. ' L-#-A' A"Y~e. ~ .~-~`=..'.""'~`'ti ~~~~~~1r' ~ ~ ~j,i~ ~ .1 , !r t, y ~ ,'Z 4~j~'~•~j,~"~• ~~t}~ 7 , ~ -.yy.- ~ '~C~ .~F-r ~•.R' waft.,;_ " •~y,..,'c'~ ~'y~ +l `t '1 ` 1, ' s ►y: - w • :.~,Y'! ' . ' . . • ~r ~ ~ ^,••i ~i~ w~l-.. ~.1~ ~a ~ y.~ i-.As + ~"~`'~a ~ 1~hg ,1_ . 1 _ - ~ _.r .-y _ ; , ~ ~ •1 ~ t~"~'~ ;y%~ ~ ~ 1 Qy~ ~ic C~. '~t ~ } \ , gI6 3T ' ~ ; : . • ~ - . ; ; ~ ~ • } ' tif - ..'y!!. . - . ~ ~ -t.•~ "~.,'Q ~ r j ' • t~;` _ - Ntt'!t~ ~ s~ ~-,,,j:y,+~ ~ : ,s. ` _ ~ ' . , G . . rsXB t . - . . „ - • c ' ! ' ~',~j_~ ~ r ,[i'.q, yf~ ~ t,.-,.... 1 .~1 M,~'., R ' 'u-'~ __.x y.~e;sf~ ~ . '.w.~ Ra ~ .r~r• t ~ ~ L~~ ~ . ~ - - . +'I~ ~,,~1►,1 ` ' ,ia-,, _i ' • v J~, }E~ ~ F,~;,~; i~` ~ ~T ' .1 • 1 t; 1 - ~t~ ~ . ` _ i;~' ` ~~.7`~: 'i~ ~ ' + _ ;`~i ~ j~ GU13 • ~ - . ` ~ ,S .~,t - • gbU ` ' il~{ ' ' . i~_ ' ~ { U.~t 5:-- _ • ~ ~.~,a~. a 11 ♦ ' a►~ !~•t" tR~t • . ~ „ i+ ti - ; " • 1: ~ _ r' 1 ~ :1 ~ _ ~n(.; a - ~ . - i. r~' t'~ , Gmg;, ' . :'R, • Nc J{ ~ Gc,,~ ~ ~i•.,. - _ ti', M~ ~ CUB ; psA ~ ~4A, .,c . ~ ti '.Y,. "k• :r''': . f. . ,`+/~r- G~0 • ~y . ''y` ~ . 6 GSA r N.~ ~ ~ty~t H , "'•7J. l.i• t \ • it Q`~ T•. ' . r• ~~.~^~~,~•~~I~t ~4~ ~•`~t7 1 + t ~ , + 1' 't ~ • ~~t{ g~Y il~ w r~ ' ~ti~t ~1~ 't '.~~"f'~jk ( r 4 Mte t'1c~ 1-; ~ ~ . .~~r ~ .i~ih~; ~r~'". Gftp`Y~~ . S~C . ~ - :*y ~ .►~+:Y' -~r ~r'' ~ p17 ~ . f~ SA ~ 8 '~1 y ~ ~ ` ~ ~ } ~ - ~ r~.. "~'t ~ 1~~1 (S ~~w \ ~T' ` ( ~ ' i r y.,~ ~ ' L~ , p • r~ ; -~'OL~_'~~~f'. f^~ ) y ~~i./'~ ♦ • h~~ ~aV a lTi 4.~~ ~'1 _t~.' ~.t~ Y. _ . t.4 i S _ ~ . ~ CALCULATIONS The total and impenrious basin areas used to calculate the times of concentration and the peak flows for each basin as shown on the pages following are tabulated below. Total . Impervious : Basin Area Area Lots DU/GA . Runoff . (acres) (SF) Coefficient . L ~t ~r~ ~ M ~ ~ ~ ~i► N O ~ ~ ~ ~ P 4op 40P *662M Q 4ow I" 00~.. R 4woor OF iOV- •~r.,, R(und) 0.99 , 40.10 S 4mm op-W ~ 4.49 The runoff coefficients shown above were based on the lot density and Table 1 of Spokane Coun~ G ii elines for Stormwater ManWmn . The lot density was calculated by taking T,~y the basin area divided into the number of lots represented in that basin. / r • J l,t; J ■ PEAK FLOW CALCULATION PROJECT: AUTUMN CREST, FOURTH ADDITION BASIN: L Tot. Area Acres Imp. Area C CASE 1 ow ~ Ct L S Tc = 'n., by Equation 3-2 of Guidelines 170 ft. Gutter f low Z1 = 48.0 Z2 = 0.00 n = 0.016 S = 0.0070 d = 0.130 ft. A R Q Tc Tc total I Qc 0.41 0.06 0.50 2.28 7.74 2.56 0.50 Qpeak for Case 1= . c s CASE 2 Case 2 assumes a Time of Concentration less than 5 minutes so that the peak f low =.90(3.18)(Imp. Area) = 0.27 cfs So, the Peak flow for the Basin is the greater of the two flows, INLAND PACIFIC ENGINEERING , BOWSTRING METHOD PROJECT: AUTUMN CREST, FOURTH ADDITI DETENTION BASIN DESIGN BASIN: L DESIGNER: MWK DATE: 09/19/94 Time Increment (min) 5 Time of Conc. (min) 7.74 Outf low ( cf s) 0.3 Design Year Flow 10 Area (acres) 0.49 Impervious Area (sq ft) 4120 'C' Factor 0.4 1208' Volume Provided 180 Area * C 0.196 ~ Time Time Inc. Intens. Q Devel. Vo1.In Vol.Out Storage (min) (sec) (in/hr) (cfs) (cu ft) (cu ft) (cu ft) 7.74 465 2.56 0.50 312 139 173 5 300 3.18 0.62 251 90 161 10 600 2.24 0.44 333 180 153 15 900 1.77 0.35 367 270 97 20 1200 1.45 0.28 386 360 26 25 1500 1.21 0.24 393 450 0 30 1800 1.04 0.20 399 540 0 35 2100 0.91 0.18 403 630 0 40 2400 0.82 0.16 411 720 0 45 2700 0.74 0.15 415 810 0 50 3000 0.68 0.13 421 900 0 208' DRAINAGE POND CALCULATIONS Required 1208' Storage Volume = Impervious Area x.5 in / 12 in/ft 208' Storage Volume Provided DRYWELL REQUIREMENTS - 10 YEAR DESIGN STORM Maximum Storage Required by Bowstring Number and Type of Drywells Required 0 Double INLAND PACIFIC ENGINEERING PEAK FLOW CALCULATION PROJECT: AUTUMN CREST, FOURTH ADDITION BASIN: M Tot. Area es Imp. Area C = : CASE 1 verland Flow Ct = A~ L n S = Tc = 7.24 min., by Equation 3-2 of Guidelines ow Z 1 = Z 2 = 64"P n = !lwe1.~ S = - ^n7n MMENNOWEEMOO d = 0.136 ft. A R Q Tc Tc total I Qc 0.44 0.07 0.57 2.21 9.45 2.31 0.57 Qpeak f or Case 1= 0.57 cf s CASE 2 Case 2 assumes a Time of Concentration less than 5 minutes so that the peak flow =.90(3.18)(Imp. Area) = 0.59 cfs So, the Peak flow for the Basin is the greater of the two flows, 0.59 cfs INLAND PACIFIC ENGINEERING _ , BOWSTRING METHOD PROJECT; AUTLMN CREST, FOURTH DETENTION BASIN QESIGN BASIN. M IMPERVIOUS DESIGNER: MWK DATE: 09/19f94 Time Increment (min) 5 Time af Conc. (min) 5 Outflow (cfs) 4.3 Design Year Flvw 10 Are~ (acres ) 0.21 Impervious Area (sq f~) 9050 C' Factor 0.9 208' Volume Provided 0 Area * C 0.187 Tinae Time Inc.Intensity Q Devel. . Vol ; In Vol.Out Storag~ (min) (rnin) (in/'hr) (cfs) (cu ft) (cu ft) (cu ft) 5 300 3.18 0.59 239 90 149 _----------,-s_-__---____________-_-.~ 5 300 3.18 0.59 239 90 149 10 600 2.24 0.42 294 180 114 15 900 1,77 0.33 332 270 62 20 1200 1.45 0.27 353 360 0 25 1500 1.21 0.23 362 450 a 30 1800 1.04 0.19 370 540 0 35 21Y.70 0.91 0.17 375 630 V 40 2400 0.82 0.15 3[]4 720 0 45 2700 0.74 0.14 38C] 810 0 50 3000 0.68 0.13 394 9V0 0 208' DRAINAGE PON'I3 CALCULATIONS R~qua,red 12081 Storaqe Volume = Impervious Area x .5 in ,I 12 inJft 377 cu ft 208f Starage Volume Pravided 0 cu ft DRYTn7'ELL REQUIR.EMENTS - 10 SCEAR I]ESYGN ST+C)FtM Maximum Stvrage Required by Bowstring 149 cu ft Number and Type of Drywells Required 1 Single 0 Dnub1e "P re s~ ~P - " ~ t~ f\, ~ . ~ • 1NLAND Pli~~~~C ENGINEERING _ ■ PEAK FLOW CALCULATION PROJECT: AUTUMN CREST, FOURTH ADDITION • BASIN: N Tot. Area 0.85 Acres Imp. Area 9810 SF C = 0.35 CASE 1 100 ft. Overland Flow Ct = 0.15 L = 100 ft. n = 0.40 S = ' 0.010 Tc = 5.46 min., by Equation 3-2 of Guidelines 280 ft. Gutter flow Z1 = 48.0 Z2 = 0.00 n = 0.016 S = 0.0142 d = 0.131 ft. A R Q Tc Tc total I Qc 0.41 0.06 0.74 2.62 8.08 2.50 0.74 Qpeak for Case 1= 0.74 cfs CASE 2 Case 2 assumes a Time of Concentration less than 5 minutes so that the peak flow =.90(3.18)(Imp. Area) = 0.64 cfs So, the Peak flow for the Basin is the greater of the two flows, 0.74 cfs INLAND PACIFIC ENGINEERING BOWSTRING METHOD PROJECT: AUTUMN CREST, FOURTH AD INITI DETENTION BASIN DESIGN BASIN: N DESIGNER: MWK DATE: 09/19/94 Time Increment (min) 5 Time of Conc. (min) 8.08 out f 1 ow ( c f s) 0.3 Design Year Flow 10 Area (acres) 0.85 Impervious Area (sq ft) 9810 - 'C' Factor 0.35 1208' Volume Provided 420 Area * C 0.298 Time Time Inc. Intens. Q Devel. Vo1.In Vol.Out Storage (min) (sec) (in/hr) (cfs) (cu ft) (cu ft) (cu ft) 8.08 485 2.50 0.74 483 145 338 5 300 3.18 0.95 380 90 290 10 600 2.24 0.67 510 180 330 15 900 1.77 0.53 561 270 291 _ 20 1200 1.45 0.43 589 360 229 25 1500 1.21 0.36 599 450 149 30 1800 1.04 0.31 608 540 68 35 2100 0.91 0.27 613 630 0 40 2400 0.82 0.24 626 720 0 45 2700 0.74 0.22 631 810 0 50 3000 0.68 0.20 640 900 0 2081 DRAINAGE POND CALCULATIONS Required '208' Storage Volume = Impervious Area x.5 in / 12 in/ft 408.8 cu ft 208' Storage Volume Provided 420 cu ft DRYWELL REQUIREMENTS - 10 YEAR DESIGN STORM Maximum Storage Required by Bowstring 338 cu ft Number and Type of Drywells Required 1 Single 0 Double INLAND PACIFIC ENGINEERING PEAK FLOW CALCULATION PR4JECT: AUTUMN CREST, FOURTH ADDITION BASIN: O Tot. Area 1.14 Acres Imp. Area 9440 SF C = 0.30 ' CASE-1- ~ 160 ft. Overland Flow Ct = 0.15 L = 160 ft. n = 0.40 S = 0.010 Tc = 7.24 min., by Equation 3-2 of Guidelines 280 ft. Gutter flow Z1 = 48.0 Z2 = 0.00 n = 0.016 S = 0.0138 d = 0.134 ft. ~ A R Q Tc Tc total I Qc 0.43 0.07 0.77 2.62 9.86 2.25 0.77 Qpeak f or Case 1= 0.77 cf s CASE 2 Case 2 assumes a Time of Concentration less than 5 minutes so that the peak f low =.90(3.18)(Imp. Area) = 0.62 cfs So, the Peak flow for the Basin is the greater of the two flows, 0.77 cfs INLAND PACIFIC ENGINEERING BOWSTRING METHOD PROJECT: AUTUMN CREST, FOURTH ADDITI DETENTION BASIN DESIGN BASIN: O , DESIGNER: MWK DATE: 09/19/94 Time Increment (min) 5 Time of Conc. (min) 9.86 Outf low ( cf s) 1 Design Year Flow 10 Area (acres) 1.14 Impervious Area (sq ft) 9440 'C' Factor 0.3 - 1208' Volume Provided 0 Area * C 0.342 Time Time Inc. Intens. Q Devel. Vol.In Vol.Out Storage - (min) (sec) ' (in/hr) (cfs) ('cu ft) (cu ft) (cu ft) 9.86 592 2.25 0.77 610 592 18 5 300 3.18 1.09 437 300 137 10 600 2.24 0.77 614 600 14 15 900 1.77 0.61 667 900 0 20 1200 1.45 0.50 695 1200 0 25 1500 1.21 0.41 704 1500 0 30 1800 1.04 0.36 712 1800 0 35 2100 0.91 0.31 716 2100 0 40 2400 0.82 0.28 729 2400 0 45 2700 0.74 0.25 734 2700 0 50 3000 0.68 0.23 744 3000 0 2081 DRAINAGE POND CALCULATIONS Required 1208' Storage Volume = Impervious Area x.5 in / 12 in/ft 393.3 cu ft 208' Storage Volume Provided 0 cu ft DRYWELL REQUIREMENTS - 10 YEAR DESIGN STORM Maximum Storage Required by Bowstring 137 cu ft Number and Type of Drywells Required 0 Single 1 Double ~ INLAND PACIFIC ENGINEERING PEAK FLOW CALCULATION PROJECT: AUTUMN CREST, FOURTH ADDITION BASIN: P Tot. Area 0.88 Acres Imp. Area 9100 SF C = 0.40 CASE 1 90 ft. Overland Flow Ct = 0.15 L = 90 ft. n = 0.40 S = 0.010 Tc = 5.13 min., by Equation 3-2 of Guidelines 175 f t. Gutter f low Z1 = 48.0 Z2 = 0.00 n = 0.016 ' S = 0.0069 d = 0.165 ft. A R Q Tc Tc total I Qc 0.65 0.08 0.94 2.02 7.14 2.66 0.94 Qpeak f or Case 1= 0.94 cf s CASE 2 Case 2 assumes a Time of Concentration less than 5 minutes so that the peak flow =.90(3.18)(Imp. Area) = 0.60 cfs So, the Peak flow for the Basin is the greater of the two flows, 0.94 cfs INI,AND PACIFIC ENGINEERING BOWSTRING METHOD PROJECT: AUTUMN CREST, FOURTH ADDITI DETENTION BASIN DESIGN BASIN: P DESIGNER: MWK DATE: 09/19/94 Time Increment (min) 5 Time of Conc. (min) 7.14 Outflow (cfs) 1 Design Year Flow 10 Area (acres) 0.88 Impervious Area (sq ft) 9100 'C' Factor 0.4 1208' Volume Provided 0 - Area * C 0.352 Time Time Inc. Intens.Q-Devel. Vo1.In Vol.Out Storage (min) (sec) (in/hr) (cfs) (cu ft) (cu ft) (cu.ft) 7.14 429 2.66 0.94 537 429 109 5 300 3.18 1.12 450 300 150 10 600 2.24 0.79 588 600 0 15 900 1.77 0.62 652 900 0 20 1200 1.45 0.51 687 1200 0 25 1500 1.21 0.43 701 1500 0 30 1800 1.04 0.37 712 1800 0 35 2100 0.91 0.32 719 2100 0 40 2400 0.82' 0.29 735 2400 0 45 2700 0.74 0.26 741 2700 0 50 3000 0.68 0.24 753 3000 0 2081 DRAINAGE POND CALCULATIONS Required 1208' Storage Volume = Impervious Area x.5 in / 12 in/ft 379.2 cu ft 208' Storage Volume Provided 0 cu ft DRYWELL REQUIREMENTS - 10 YEAR DESIGN STORM- Maximum Storage Required by Bowstring 150 cu ft Number and Type of Drywells Required 0 Single 1 Double INLAND PACIFIC ENGINEERING PEAK FLOW CALCULATION PROJECT: AUTUMN CREST, FOURTH ADDITION BASIN: Q Tot. Area 1.29 Acres Imp. Area 9893 SF C = 0.25 CASE 1 125 ft. Overland Flow Ct = 0.15 L = 125 ft. n = 0.40 S = 0.010 Tc = 6.24 min., by Equation 3-2 of Guidelines 250 ft. Gutter flow Z1 = 48.0 Z2 = 0.00 n = 0.016 . S = 0.0119 d = 0.139 ft. A R Q Tc Tc total I Qc 0.46 0.07 0.78 2.47 8.71 2.41 0.78 Qpeak for Case 1= 0.78 cfs CASE 2 Case 2 assumes a Time of Concentration less than 5 minutes so that the peak flow =.90(3.18)(Imp. Area) = 0.65 cfs So, the Peak flow for the Basin is the greater of the two flows, 0.78 cfs INI,AND PACIFIC LNGINEERING BOWSTRING METHOD PROJECT: AUTUMN CREST, FOURTH ADDITI DETENTION BASIN DESIGN BASIN: Q DESIGNER: MWK - DATE: 09/19/94 Time Increment (min) 5 Time of Conc. (min) 8.71 Outf low (cf s) 0.3 Des.ign Year Flow 10 Area (acres) 1.29 Impervious Area (sq ft) 9893 'C' Factor 0.25 1208' Volume Provided 0 Area * C 0.323 Time Time Inc. Intens. Q Devel. Vo1.In Vol.Out Storage (min) (sec) (in/hr) (cfs) (cu ft) (cu ft) (cu ft) 8.71 , 523 2.41 0.78 544 157 388 5 300 3.18 1.03 412 90 322 10 600 2.24 0.72 562 180 382 15 900 1.77 0.57 615 270 345 20 1200 1.45 0.47 644 360 284 25 1500 1.21 0.39 655 450 205 30 1800 1.04 0.34 663 540 123 35 2100 0.91 0.29 668 630 38 40 2400 0.82 0.26 682 720 0 45 2700 0.74 0.24 687 810 0 50 3000 0.68 0.22 697 900 0 208' DRAINAGE POND CALCULATIONS Required 1208' Storage Volume = Impervious Area x.5 in / 12 in/ft 412.2 cu ft 208' Storage Volume Provided 0 cu ft DRYWELL REQUIREMENTS - 10 YEAR DESIGN STORM Maximum Storage Required by Bowstring 388 cu ft Number and Type of Drywells Required 1 Single 0 Double INLAND PACIFIC ENGINEERING PEAK FLOW CALCULATION PROJECT: AUTUMN CREST, FOURTH ADDITION BASIN: R Tot. Area 1.32 Acres Imp. Area 10227 SF C = 0.25 CASE 1 125 ft. Overland Flow Ct = 0.15 L = 125 ft. n = 0.40 S = 0.010 Tc = 6.24 min., by Equation 3-2 of Guidelines r 250 ft. Gutter flow Z1 = 48.0 Z2 = 0.00 n = 0.016 S = 0.0102 d = 0.144 ft. A R Q Tc Tc total I Qc 0.49 0.07 0.79 2.60 8.85 2.39 0.79 Qpeak for Case 1= 0.79 cfs CASE 2 Case 2 assumes a Time of Concentration less than 5 minutes so that the peak flow =.90(3.18)(Imp. Area) = 0.67 cfs. So, the Peak flow for the Basin is the greater of the.two flows, 0.79 cfs t INLAND PACIFIC ENGINEERING BOWSTRING METHOD PROJECT: AUTUMN CREST, FOURTH ADDITI DETENTION BASIN DESIGN BASIN: R DESIGNER: MWK DATE: 09/19/94 Time Increment (min) 5 Time of Conc. (min) . 8.85 Outf low ( cf s) 0.3 Design Year Flow 10 Area (acres) 1.32 , Impervious Area (sq ft) 10227 'C' Factor 0.25 1208' Volume Provided 0 Area * C 0.330 Time Time'Inc. Intens. Q Devel. Vol.In Vol.Out Storage (min) (sec) (in/hr) (cfs) (cu ft) (cu ft) (cu ft) 8.85 531 2.39 0.79 561 159 402 5 300 3.18 1.05 422 90 332 10 600 2.24 0.74 577 180 397 15 900 1.77 0.58 631 270 361 20 1200 1.45 0.48 661 360 301 25 1500 1.21 0.40 671 450 221 30 1800 1.04 0.34 680 540 140 35 2100 0.91 0.30 685 • 630 55 40 2400 0.82 0.27 698 720 0 45 2700 0.74 0.24 703 810 0 50 3000 0.68 0.22 714 900 0 2081 DRAINAGE POND CALCULATIONS Required 1208' Storage Volume - = Impervious Area x.5 in / 12 in/ft 426.1 cu ft 208' Storage Volume Provided 0 cu ft DRYWELL REQUIREMENTS - 10 YEAR DESIGN STORM Maximum Storage Required by Bowstring 402 cu ft Number and Type of Drywells Required 1 Single 0 Double INLAND PACIFIC ENGINEERING PEAK FLOW CALCULATION PROJECT: AUTUMN CREST, FOURTH ADDITION BASIN: R UNDEVELOPED Tot. Area 0.99 Imp. Area 0 5D `~~Q- "~~~~►N STO¢.M. C CASE 1 s 445 ft. Overland Flow Ct = 0.15 L = 445 ft. n = 0.40 S = 0.013 Tc = 12.36 min., by Equation 3-2 of Guidelines 140 ft. Gutter f low Z1 = 48.0 Z2 = 0 n = 0.016 S = 0.0056 d = 0.11 ft. A R Q Tc Tc total I Qc 0.26 0.05 0.25 2.42 14.79 2.48 0.25 Qpeak for Case 1= 25 c s ~~7 oCASE 2 Case 2 assumes a Time of Concentration less than 5 minutes so that the peak flow =.90(4.57)(Imp. Area) = 0.00 cfs So, the Peak flow for the Basin is the greater of the two flows, 0.25 cfs INLAND PACIFIC ENGINEERING BOWSTRING METHOD PROJECT: AUTUMN CREST, FOURTH ADDITI DETENTION BASIN DESIGN BASIN: R UNDEVELOPED DESIGNER:SPS DATE: 09/19/94 A\0 Time Increment (min) 5 Time of Conc. (min) 14.79 . ' Out f 1 ow ( c f s) 0.3 Design Year Flow 10 Area (acres) 0.99 Impervious Area (sq ft) 0 C' Factor 0.10 208' Volume Provided 0 Area * C 0.099 Time Time Inc.IntensityQ Devel. Vol. In Vol. Out Storage (min) (sec) (in/hr) (cfs) (cu ft) (cu ft) (cu ft) 14.79 887.13 2.48 0.25 292 266.1387 26 5 300 4.57 0.45 182 90 92 10 600 3.20 0.32 255 180 75 15 900 2.45 0.24 291 270 21 20 1200 1.99 0.20 296 360 -64 25 1500 1.67 0.17 298 450 -152 30 1800 1.46 0.14 304 540 -236 208' DRAINAGE POND CALCULATIONS Required 1208' Storage Volume = Impervious Area x.5 in / 12 in/ft 0 cu ft 208' Storage Volume Provided 0 cu ft DRYWELL REQUIREMENTS - 10 YEAR DESIGN STORM Maximum Storage Requir.ed by Bowstrin 92 cu ft Number and Type of Drywells Required 1 Single 0 Double INLAND PACIFIC ENGINEERING PEAK FLOW CALCULATION PROJECT: AUTUMN CREST, FOURTH ADDITION BASIN: S Tot. Area 0.89 Acres Imp. Area 9173 SF C = 0.40 CASE 1 95 ft. Overland Flow Ct = 0.15 L = 95 ft. n = 0.40 S = 0.010 Tc = 5.30 min., by Equation 3-2 of Guidelines 206 ft. Gutter f low Z1 = 48.0 Z2 = 0.00 n = 0.016 S = 0.0062 - d = 0.166 ft. A R Q Tc Tc total I Qc 0.66 0.08 0.91 2.50 7.79 2.55 0.91 Qpeak f or Case 1= 0.91 cf s CASE 2 Case 2 assumes a Time of Concentration less than 5 minutes so that the peak flow =.90(3.18)(Imp. Area) = 0.60 cfs So, the Peak flow for the Basin is the qreater of the two flows, 0.91 cfs INLAND PACIFIC ENGINEERING BOWSTRING METHOD PROJECT: AUTUMN CREST, FOURTH ADDITI DETENTION BASIN DESIGN BASIN: S DESIGNER: MWK DATE: 09/19/94 Time Increment (min) 5 Time of Conc. (min) 7.79 Outf low ( cf s) 1 Design Year Flow 10 Area (acres) 0.89 Impervious Area (sq ft) 9173 'C' Factor 0.4 1208' Volume Provided 0 Area * C 0.356 Time Time Inc. Intens. Q Devel. Vo1.In Vol.Out Storage (min) (sec) (in/hr) (cfs) (cu ft) (cu ft) (cu ft) 7.79 467 2.55 0.91 568 467 101 5 300 3.18 1.13 455 300 155 10 600 2.24 0.80 605 600 5 15 900 1.77 0.63 667 900 0 20 1200 1.45 0.52 701 1200 0 25 1500 1.21 0.43 715 1:500 0 30 1800 1.04 0.37 725 1800 0 35 2100 0.91 0.32 732 2100 0 40 2400 0.82 0.29 747 2400 0 45 2700 0.74 0.26 753 2700 0 50 3000 0.68 0.24 765 3000 0 208' DRAINAGE POND CALCULATIONS Required 1208' Storage Volume = Impervious Area x.5 in / 12 in/ft 382.2 cu ft 208' Storage Volume Provided 0 cu ft DRYWELL REQUIREMENTS - 10 YEAR DESIGN STORM Maximum Storage Required by Bowstring 155 cu ft Number and Type of Drywells Required 0 Single 1 Double INLAND PACIFIC ENGINEERING STORMWATER DISPOSAL BASIN L The peak flow of .50 cfs will be disposed of in a.~Irdrywell in Pond L BASIN M The peak flow of .59 cfs will be disposed of in a Type "A" drywell in Pond M: BASIN N The peak flow of .74 cfs will be disposed of in a ell in Pond N. BASIN O The peak flow of .77 cfs will be disposed of in aqPIRMlftrywell in Pond O. BASIN P Tbe peak flow of .94 cfs will be disposed of in a drywell in Pond P. BASIN Q T'he peak flow of .78 cfs will be disposed of in drywell in Pond Q. BASIN R The 10 year peak flow from the developed portion of Basin R requires a Type "A" drywell and a volume of 426.1 cubic feet. BASIN S- The peak flow of .91 cfs will be disposed of in a "646grywell in Pond S. -t~ t4Ev 'Ta Go ~.15 ~ ~ ~ ~.n37 ~ Q-~ "g n-S7 . ~ 1k~•v E ' Q-~.Fo'R~~'D -f►k~SE GAa t~S -rypc ~ P~a~ 5~2~ sv~-o~J .A t„> >t-~. ?E A~EQuO~~. CURB DROP CAPACITY A.1] of the curb drops and inlets for this project are located in sump condition. The capacity for a 4' long curb drop and precast inlet are as follows. Ctiirb Drop Q = 3.087 L H3/2 L = 4' - H= for allowable depth outside 12' "dry zone" _ 12 (0.0233) + 0.17'(2" depression) _0.45' Q = 3.73 cfs V~0~`' Precast Inlet v ~ Q ~ = 3.087 L H3~2 L=4' , H = 14 (0.0208) + 0.17' = 0.46' ~ o Q = 3.86 cfs o ~ o ~L 0. , '208' VOLUME SUMMARY TABLE ' ' •..:i.ti.... . :,v,-. wa.v~~"::::: • . ;4.; - -•F: :w • ' rt,~.;.; ' . . . ~ :.~.~}':5:::::.:.~::::: : . . . :.~::ti•}J.::. ~ ~ . ~ ::v . . - . v:.~r.. j}'ti}~{:'v:L r_ v. y. :';b'' . :a''::'""' . . . . . : : t . t. = • . • : : : i v~,_ . : • . ' .::.....::::.r.:..::• ~ .:.:F:..ti...~ . • "'••r'"-- • OWS~tI~1'G ~~~'208'::~O'Li~iV~E-:P::RQ: s.~:. . ~ . - - : . . ...t. ..a. . . . . i~..: : . . . _ . . : . r . ~ t~ : . . : . : iD . . . . . N. . . . . . ~:~r~ ETE - . . . . . . . - . . . _ . . . . : . : . : ~ . . . . . , . . . : : . A . S . B IN. . CU.. ; . ~l•Sa . - .y.~. . . ' . . . ' ' • • " • ._........._Y•.V.•• . ' . _ _ ...J{....`.......'._. _ . . . L 173 M 149 N . 338 O 49TO' P ~ . ~ - . . . - . Q 388 Now R 402 ' ~ N S * VOLUME _ (5) AREA + (.375) PERIMETER ~ CURB DESIGN WITff EXISTING PAVING TYPE "B" CURB Street: PROGRESS ROAD Date: 09/15/94 Project: AOTUMN CREST FOURTH ADDITION Desiqner: 1{ARK 1/2 Paving width = 18.00 ft FIELD INFORMATION OFFICE CALCULATIONS Existing Distance Cross 1/2 PW -.Kin Curb. Kin Curb. Froposed Proposed Proposed Sta. C/L Blev EP Elev C/L Grade C/L to EP Sloge Dist C/L-EP -4.5% -2.0% Curb Elev. Slope Sta. Cross-slope .3969.70 2054.48 2054.19 18.00 0.0161 0.00 2054.69 2054.69 2054.69 3969.74 ERR 0.0066 0.0030 40U0.00 2054.68 2054.57 10.00 0.0110 6.50 2054.66 2054.83 2054.78 4000.00 0.0270 0.0088 0,0032 4025.00 2054.90 2054.73 10.00 0.0174 6.50 2054.82 2054.99 2054.86 4025.00 0.0393 ' 0.0020 0.0032 4050.00 2054.95 2054.74 10.00 0.0210 6.50 2054.83 2055.00 2054.94 4050.00 0.0285 0.0008 0.0032 4075.00 2054.97 2054.82 10.00 0.0150 6.50 2054.91 2055,06 2055.02 4075.00 0.0285 0.0032 0,0036 . 4100.00 2055.05 2054.85 10.00 0.0200 6.50 2054.94 2055.11 2055.11 4100.00 0.0193 ~ 0.0020 0.0036 4125.00 2055.10 2054. 94 10.00 0.0160 6.50 2055.03 2055.20 2055.20 4125.00 0.0193 0.0056 0.0044 4150.00 2055.24 2055.10 10.00 0.0140 6.50 2055.19 2055.36 2055.31 4150.00 0.0270 0.0072 0.0060 4175.00 2055.42 2055.27 10.00 0.0150 6.50 2055.36 2055.53 2455.46 4175.00 0.0301 0.0048 0.0040 4200.00 2055.54 2055.39 10.00 0.0150 6.50 2055.48 2055.65 2055.56 4200.00 0.0331 0.0032 0.0040 4225.00 2055.62 2055.48 10.00 0,0140 6.50 2055.57 2055.74 2055.66 4225.00 0.0316 0.0098 0.0040 4250.00 2055.74 2055.60 10.00 0.0140 6.50 2055.69 2055.86 2055.76 4250.00 0.0347 0.0032 0.0032 4275.00 2055.62 2055.66 10,00 0.0160 6.50 2055.75 2055.92 2055.84 4275.00 0.0316 0.0029 0.0032 4300.00 2055.88 2055.66 10.00 0.0220 6.50 2055.75 2055.92 2055.92 4300.00 0.0193 0.0049 0.0041 ~ 4324.26 2056.04 2055.76 10.00 0.0240 6.50 ' 2055.85 2056.02 2056.02 4324.26 0.0193 0.0062 0.0070 4350.00 2056.16 2055.98 10.00 0.0180 6.50 2056.07 2056.24 2056.20 4350.00 0.0254 0.0060 0.0060 4375.00 2056.31 2056.12 10.00 0.0190 6,54 2056.21 2056.38 2056.35 4375.00 0.0239 0.0052 0.0060 4400.00 2056.44 2056.24 10.00 0.0200 6.50 2056.33 2056.50 2056.50 4400.00 0.0193 0,0060 0.0060 ~ 4425.00 2056.59 2056.39 10.00 0,0200 6.50 2056.48 2056.65 2056.65 4425.00 0,0193 t-A Z° f a - q. ~J' GY p r • 150 O~ ro ~ ` • pl c.ti .