1974, 10-14 Permit App: K6088 ResidenceN *s
County of Spokane, Washington
BUILDING CODES DEPARTMENT, N. 811 JEFFERSON, SPOKANE, WASHINGTON 99201
APPLICATION FOR LAND USE OR STRUCTURE PERMIT
GENERAL REQUIREMENTS
PERMIT REQUIRED. A land use or structure permit is required by County Resolution to erect a building or structure of any
kind or alter any building or structure already erected, or to change a land use. Construction must conform with the
Spokane County Building Code and Zoning Ordinance. Construction is subject to inspection.
WATER. Water supply must be approved by the County and State Health Departments. Where work on water connections disturbs
the surface, shoulders or ditches of County Roads, permission must be obtained from the County Engineer's Office.
SEWAGE SYSTEM. Permits are required in all cases by County Resolutions Nos. 45-133 and 47.235.
SET -BACK FROM PROPERTY LINES. In most zones and under most circumstances, a set -back from the front property line, of at
least 25' is required, a 5' side yard, 15' side yard from a flanking street, and a 25' rear yard are required.
STATE HIGHWAYS. Where the structure abuts a State Highway, clearance must be obtained pertaining to set -back and ingress
and egress.
COUNTY ROADS. Work on street right-of-way may not be performed until staked by County Road Department and work must be
performed in accordance with stakes. Points of ingress and egress must be approved by the County Engineer.
MOVING OF BUILDINGS. A permit is required to move an existing building. When a building is moved on a County or State
Highway, clearance must be obtained from the County Engineer and/or State Highway Department.
ACCESSORY BUILDINGS. Accessory buildings (garages, sheds, etc.) require a separate permit.
RESTRICTIVE COVENANTS. Builders should check provisions of covenants or dedications and easements running with the land
which are enforceable through civil action. County Officials can not bring action to enforce covenants or dedications.
APPLICANT FILL IN BELOW THIS LINE
Name of Owner W•
Hoerner AddressE• 11511. — 12 th Phone
Architect Address Phone
Engineer Address Phone
Phone
g 924-7950
Contractor
Legal Description of Property (Give complete description from deed, tax rriceipt, etc ) Lot 1, Block 2, Timberlane
First Addition to Spokane County, �iashino.ton Parcel / s 5 y3_a 6 0/
$59.00
PERMIT FEE
sunning Builders, Inc. AddressE• 9616 ^"ont ;omery
DESCRIPTION OF WORK: New XXX Addition
Size of Lot 125 X 1 50
Remodel
Moving Bldg. Zon
_sewer
Sewage ystem p
t
Stories 1" Dimensions 68x28
Rooms_2_ Baths 3 Basement full Foundation Const
Full, part, none)
Heat. System FAG Type of Roofing Shake
Residence �jJy
Use of Bldg.
Total
Concrete
Ext. Finish Cedar
e / Fire Zone 3
ublicFrame
Sq. Ft 2856 onst.
Fr., Con Br., et
Vaivationr 30, 00
Chimney IV'asonr replace 2
(Kind) (N ber
Int. Wall Finish Drywa��l
No. of Units _ Bedrooms 5
PLOT PLAN
Draw sketch with dimensions showing: (1) property lines; (2) street or road locations; (3) location of existing and
proposed buildings; (4) distance to property lines and streets; (5) dimensions of buildings; (6) location of sewage sys-
tem and water supply lines.
NORTH
as sh
I hereb`•rtify informs
O';
A 4
SOUTH
ion s bmitted
m
to
State License No.
Ind. Ins. Acct. No.
REQUIRED
Plumbing Permit
Heating Permit
Sewage Permit
Plans Received
Plans Checked
Plans Returned
Plans Picked Up
Plans Mailed
is correct and there are no other structures
Owner
or Agent
located on this property except
�—
Date
A LAND USE OR STRUCTURE PERMIT MUST BE ON THE PREMISES BEFORE CONSTRUCTION COMMENCES.
THIS IS NOT A PERMIT.
/4/-
Coiner r -
Tour street address will be
Sewage Permit Number Issued
DO NOT WRITE BELOW THIS LINE
Building Permit
The zone is
Receipt
Issued
Remarks
• • - vc+ i
Form 523 Bldg. Code