~ DRAINAGE TECHNICAL REPORT
-
--i ~~r the .
~
~ SPRINGFIELD
AT AUr--'UMN CREST PLAT
~
-JANUARY 1998 -
W.0, ~97117
Prepared for:
~ Scott Lalncireth, L,andreth Construction
r-. - - 10801 E. Valleyway Avenue
J Spokane, WA 99206
f_.
Prepared By:
Inland Pae~;~c Engineering Comparay
707 W. 7th Avenue S'ur'te 200
Yr Spokane, WA 99204
~l (509)458-6840
i
~r-
j I
DRAINAGE REPORT
for the
Springfield at Autumn Crest
--Plat -
~ Spokane County, Washington
~ January 1998
~
he design ftmprove ents s ow in this s-t of plaw an calcu a~ ~ ons co.nform o the
- app Aicabl e0moam (Cf m)e ko m e County ft~ 0s for ' oad an Od ' e er onswac ion
- at~he Spo • ne County u~ de ines for So wate ana,gem~n . I~l esign e~Ya ~'.on:s
~ been arove by ~he Spo •an. Cou~nty ngi~neer. ap rove these plans
-J calculations) for construction.
v This report has been prepared by Susan K. Murphy, E.I.T. of Inland Pacific Engineering Company
^ under the direction of the undersigned professional engineer whose seal and signature appear hereon.
•
,
~
. 7~.
~
. ~ p-25462~
, s NAL
~ , EXPIRES 9/24 ~
-
,
Todd R. Whipple, P.E.
,
i I ' •
i
i
~ I
- Springfield at Autumn Crest .
~ DYainage Narrative ~0
GENERAL
The Springfield at Autumn Crest Plat is a 4.61 acre development ofosingle family residential
,
i lots located east and south of Progress Road and 161 Avenue in the Spokane Valley within
- Spokane County, Washington. The site is currently vacant with field grass, alfalfa and fallow
fields as the predominant land cover and vegetation. Single family residential development lies
~ to the south. A vicinity and location map have been included within the technical section of this
~ document.
I ! pURPOSE ~The purpose of this report is to determine the extent of storm drainage facilities which will be
required to dispose of the increase in stormwater runoff created by the development of the ,
Springfield at Autumn Crest plat. The stonn drainage facilities on this project will be designed to
dispose of runoff from a ten year design storm for the onsite basins, and the fifty year storm
event for basins with offsite drainage, as required by the Spokane County Guidelines for
Stormwater Management. This development is within the Aquifer Sensitive Area of Spokane
County and is subject to'208' requirements. For this project, the 10- and 50- year curve from the
Spokane, Medical Lake, Reazdon, Cheney and Rockford intensity curves was used, as well as the
SCS iso-pluvial rainfall curves.
!
;
,
LJ ANALYSIS METHODOLOGY .
Per the Spokane County Guidelines for Stormwater Management, the Rational Method, which is
- recommended for basins less than ten acres in size, will be used to determine the peak discharges
and runoff volumes for all onsite basins.
V PROJECT DESCRIPTION
_The Springfield at Autumn Crest subdivision is located in Section 26, T. 25 N., R. 44 E.; W.M.
within Spokane County, Washington.
~
~
TOPOGRAPHY
~ The existing site naturally drains to the south and east. Within the plat the natural topography
was used as much as possible to route stonn drainage. Due to the flat slopes encountered, no
, concentrated pre-existing flows were observed nor were there any signs that anything other than
j s sheet flow and ground absorption have occurred on this site. The general slopes within this plat
,
i' Inland Pacific Engineering Company D 1 Springfield at Autumn Crest Drainage Report
;
~
f .
~ J
.
i
vary from flat to nearly flat with the maximum existing slope at 0.02 ft./ft. For development
purposes as stated the natural sloping was used for design and is maintained as possible
throughout the proj ect.
~
SOILS
_ _As can be seen from the accompanying soils map from the Spokane County Soils Survey as
performed by the SCS, the site consists of one type of soil within the Class B type. This soil type
_J is described as follows.
i GmB - Garrison gravelly loam, 0 to 5 percent slopes: Soils within this soil type are somewhat
excessively drained, gravelly or stony soils of moderately rapid permeability, with a surface layer
of gravelly loam, and a subsoil stratum of sand, loam and cobblestones. They formed under grass
;
' in glacial outwash mixed in the upper part with volcanic ash. Surface runoff is slow, and the
I
hazard of erosion is slight. Snokane Countv Guidelines for Stormwater Manaizement indicate this
to be a Soil Group Type A and pre-approved for drywell installation.
,
~J
Hydrologic Soil Classification - B r
DRAINAGE NARRATIVE
Offsite
L_1
There is an offsite flow crossing the plat area from southwest to northeast, in Basins labeled "T"
and "V" on the enclosed basin map. Those basins will be analyzed using a 50 year storm event.
~
Onsite
_As this plat is within the aquifer sensitive area of Spokane County all onsite drainage will be
collected and treated using the "208" runoff method- as described in the Spokane County
Guidelines for Stormwater Management. To facilitate this analysis the Springfield at Autumn
Crest plat was divided into 6 permanent basins (T through V). Table 1 lists the basins and pond
~ combinations for easy reference.
~
~
,I
,
Inland Pacific Engineering Comparry D2 _ Springfield at Autumn Crest Drainage Report
~
.
i
~
s
~
r--
i I
Table No. 1
• ~ • ~
~ ~ a ins o al Area ; ,tree m, . ' e7g te I
(S~ ' / ) ea
~ ✓ ✓ ✓ .
` T1 31630/0.73 4644/0.11 0.39~
T2 3513 0.81 759 /5 0.17 0.43~ ,
( T 66768/1.53 00-1 12239/0.28 0.43 .41 ~
I U 1 3 6260/0.8'5'- 4644/0.11 0.3 8~
~ vo",
~ ~U2 27816/0.64 5908/0.14 0.43'~
_ U 64076 4< 10o520 4 0.4e
~ V 386750.89" 7031/0.16 0:41 ~
.
W 2 8402/0. ~ 5 542/0 1~ 0.42
f ✓ ✓ ✓ v
OFFSITE + 101108/2.32 12239/0.28 0.37✓
BASIN T
j *5542 SF includes the half width of Progress Road; the widening from the sawcut at 10'
off centerline to the gutter is 6 S; which is all that is required to be treated. The
~ impervious area of the widening only is 2463 SF.
V "208" Calculations
Within each basin the streets are divided into sub-basins by high and low roadway profiles. .
~ These facilities capture upstream stormwater runoff from the impervious street surface and direct
- the runoff into grassy '208' ponds. As shown on the '208' calculation worksheets included, the
'208' storage volume provided is adequate to perform '208' treatment for the runoff created by the
~ first half inch of rainfall.
Curb Inlets and Catch Basin Calculations
It is necessary to check the adequacy of the curb inlets, inlets or catch basins provided to divert
the runoff from the gutter into the '208' ponds. The curb inlet calculation sheet included shows
the required lengths of curb openings, as well as the adequacy of the inlet grates or. catch basin
grates.
~
l~
^ Inland Pacific Engineering Company _ D3 Springfield at Autumn Crest Drainage Report
}J .
,
~DRAINAGE CALCULATIONS SUMMARY
~Calculations have been included for Drainage Basin considerations such as Peak Flow, Time of
~ Concentration, "208" sizing, drywell requirements, inlet sizing and curb inlets, which are
summarized below with the remaining calculations included in the appendix.
,
~ r
Within the calculation section and where it has been determined necessary for clarity, several
^ sketches, as well as details from the plans have been incorporated to demonstrate assumptions
and conclusions.
BASIN DESCRIPTIONS
~
Basins T through W
^i -
J
Within this plat, and due to the general geographic features, several basic assumptions were
followed and can be used to describe each basin. First, due to the relative flatness of the plat and
project vicinity, minimum road grade is lunited to 0.0080 ft./ft; second; ponds will be of the lot
~ pond configuration. All of these steps have been used in various basins throughout the drainage
design of this project. .
l~
` The drainage design for the remainder of Progress Road to 161 Avenue will extend the proposed
~ 2' wide pond to the east. The pond extension will be designed to provide enough `208' treatment
j for the future improvements on Progress Road to the intersection of Progress and 16`' Avenue,
as well as meet bowstring requirements for the future basin.
~
~ Table No. 2- Pond, 208 And Drywell Summary
,
,
, din
~ .
ji i i II~ I• i i I• u i i i~~,ee ~ I' ~
eq QC oV' , e ~ , , • _ ,
~
T1 T1 194 ~ 200 '20 x 20' v -
.
v ~
T2 T2 316 ~ 436 , Irregulaz -
~ T - 510 ~ 636 - 2 - "B" ~l
U 1 U 1 194~ 200 ✓ 20' x 20' ~ -
U2 U2 246~ 262Irregulaz -
U - 440462 - 1 "B" ~
V V 293 1/ 30020'x 30 1-"B
W W 231 vi 298 ~ 2'x298' ~ 1-"B`/
* Based on (bottom area)(.5')
~ Type A is a Spokane Standard Drywell - Single Depth, Capacity 0.3 cfs
Type B is a Spokane Standard Drywell - Double Depth, Capacity 1.0 cfs
Inland Paci, fic Engineering Company D4 Springfield at Autumn Crest Drainage Repon
I
i 1 lI I l1 1II (l I 1) 1 `r` fI 1 I
~ 1 = ~ ,~tie__.11~111~~..:~,.1 i ~--.f 0
}.i ~ V Y- a `Y4~18i~~r
UN E SI ~ R ~A m QRSITY; NIVERSRY I A~ Im 1
1Of1 T~ ~
d w s L-D ~ RTER VAN NA TFR yp~1W ~R1FA D ' ~
~ Z 108 GL ~ m 2 n m
>
~ GLENN CT N s OIL ~ Y~ a pN ~30 1, > o m
Illl ~ r GII US ti'Ut~
110 ~ 0 =~IEI CE ' RD m PI RC : AO m I PI CE ~ =
m ERCE m RD a m~ACE RD ~
<
o N°~ m m m m m~m m m m N o' YOfFITT ~M a p~ ~OMM60M m
gq P W ORtt s l f 6 P w o A 7 N S K I P W OI T M i m ~ 1y~(~,NTN m
~
~ SKIPW V V r cr
Ikl
112 sKi w _ AD - u~ s
Kivwo s~nvw mx s '
o~ m s m
ne m m ,-w s~WOODWOAD IN m m m w 0 0 R D 2 W0,00'ARD WO 7DWAAD p
x am C T 114 m 4ON Dl ~ RD 0 BOWDISH A A vt, ~ BOwo~sN ~
SUN
r BAlEB
BATES w BATES ~ < ~ • n n a ~ BATE9A0 °i ~~9 a x s~ m
p~ m
OOO.N ~ WILBUA m WILBUA ~ m m 531
116 ~ wi eu WILBUA
10 ttILBUA RD I IIA ~ N VI NI WlHUNION ll UA s~% r ~~z o m =WILBUA RD „ IIBV i U I E N F O% > o'a F O x D i 9 o i WILJUA
r ~
~ 1 0 m ? Cl ~ mUNION m > A ~
g
118 F07IoA0 aao y U: UIIIdN AEEYE83UN10N -yi =UNIOH ' OAFY
j m > s
P E R A{ N~ U N 1 0 N m CT m~
V,U~ I O .7 ~ ERAINE o ifABINE ~ `o ~ o uum pEpPJLE RD
ROBIE e~0
a ^a' m 3 0 ~ o o'~ ^ g,;BIE ~ A081f pp Ii08t a sa ~ -'i C►
m N_
N $ Otl ~I PLE ~ ~ PL IPPL WHIPPLE ~
W P lE s O 1YIp PlE
N >
m wHIvvLe pINES m" m- -J m PINES ROAD F► ~ • ~ PINES AOAD ~
~ CHEA Y tNEAm o #X3 o m HOUK HOVK NOUK NOUa 2 ^ g a u; ~ ~ 0 IK U m ~ ~LUNg ~ ~
~ NOUX ~ UI~ 9
> C UNS Ol N COLUH9 CT I wll~ R~ ~ OUK o ~s RCl4A YERCLEA E
C lUN4 p YEACLER RD m
~I o YEAC ro q r~ : YERCIEA AO `~A ~ s ~onaA c~i
\l ~ a w ~ $ YIRQINIA ~ = r
f ~ = u ~ ~`,Dn aao'~ GO U- VIRGIt~A~ nooouwnVIR01HIA ~ < o
128 N' ooU'NN H = M O~ a ~am AO .,..r...Wi NDUwN WOODL. WN a H m~ cN m~z .
N AAOW OAA MOAAOW + o m MDAAOW ~ p ow.0
130 Y OONAI m l.,o a c~ON~ID m 90 R~AD 9 a ~
CLINTO r
132 C1 o a'~ N s ~ ~~i ~ s s s> ewrtai _ k ~ ~ o m s
m m m m"N' z z DM~ ~ m o ~ m
~ A ~ m p tXlIUA o~ C U I T ~ --°D1 MeCABE 61eCAAE 0 9~ m
NC I ABE MC CAEF -1 = m m m m
134 ~j BLAKE RD A m m m lLA. E 1D B44K AO { B I A K E R O A D
~ ' I
AVAyON RUb mj ~ N A 1
FATN ►H I An+e
~ < , r.
MANEii ROAO
136 E~ e m MAYEII ~ MAMEB RD m m RD o o NA TN E I~~ ~ YA ER ~
m ~T ~n ~lAME r••••••
~ m O~h ° DAYIS AD m ~ m i
138 DA IS r~ ~ EVERGAEEN ROAD ~ EVEAGREEN ROAD ~
g %0
60UYAR
N~ BOIrvAR RD ' OIrvA = eourAA eauvAA so rvA o W= e 0 ~ 00 ' 140 vuifl x[MCT ~ BANNEN ~ BAN EN R~ lN ~ BOU xA ~ AA NEN n= S 9
G ' BrtitNE BANNEN s wNNEx s e~~ m y y 1
SU NWKh EApl1DANN BOLIVAR ~ BANNEN r o ~
142 BUNN EAOOK ~ ~EN BEST BrILREES M m y BEST B E T ~A D ~ O 'BANNEN 0 O ~
~ A. REE9 I BEST B E S 1 A O h
EEt REE9 4 CALVIN o~ C TioC A l Y 1 N CAIYIN A L N I N cAivuN lx m
CAIYIN WARREN " a o
WA MAAAEN WA AEN t a Q ~ AAREN 100- 146 LN 3 ADAMS AOAD m 3= ADAM$ AOAD
MAft
YAII~ ~ R100 ~w ~ YARCVS C
~48 D = ~~0 ~ a, BURNS RD
m T". _ A w ~ m BU N9 ~~euaxS eL 3- ~ euAM9 NAN
3- 6 pAOGAESS ROADi
150 p OGRESS ~0 ~ ~ ~ • OA
IL-
~ o
8i CIiARIFS RD g 9T. ALF9 ~ y tl m
152 m !TC 1RAG- CXA LE YYEF 3»9 Gtl SOH~ MER ~N E N F A C T ~ N E R~ M E E R ~ N R N ° E ~ f ~ ON y E p FD~Q ~ AY a i o
~ N NfWEI p EtRUR'f
154 , SULLIYAN RD cExruar ~ Ar a~+ Y = cE Rr = f-~~ o SULLIVAN ROAD ~ % ,
~ T
PIOHEEAIs s
~ ,xn ~ °PIONEEAIN ~ PIONEEA~CT LN 9 a
156 f
p~~ = e N AE lN s ~
d~0 Q ~ v ti" ~(1l1381111~ ti ERIANE 7 eL ( O pRK2NDg z
158 ° 0 m < a s 'a _
i a~d~ SO/AP °0 850o m m Mp}E
oa k ls v ~ R e 9
N
16~ y'i a ~ ~NFOq r ~D , CANNERY AD ~ x
. Y T O oA ~ I p~6 Q C T
~
SPOKANE C4UNTY, V11ASHdNGTON - "3HEET I
R, 44 E. 1 R. 45 E.
(loins sheet 87) -
Y,ti ,x -ti. yj: d~" '.~:i~' E"; ~ys ~~r' _ f ' F~ ' ~4 - ~ $ - _ - - - j -~~r.~, ~ - -•d
i :M ~'S~ „ ~i~ i r ~
f-~-i" ~'~'A S .~x'k3-S,~~Y ~Ss~" ' L'~,~. r = Si•+ - * - "r~
5~ t '1 f^ ~ a,~~ ~C - ~ ° 'Y • i Ly . /
..•s W k ~ A:""9~ " _ _ ~ ~ ~ _ _ 1 1T _ ' -'f.' ~ _
- - _ -
x ~
-
_.._J N - - ,
,r
' . ~ ~ . ~ ~ , - ' J ~Y^_ rc 1 ' •OS~S
L
I '~t~ , i - • V '~L.7r
* ~ _ - ~ ~-rT ~ ~j~ ,
~~A. { J - - ~J~.iu _ I I_ _ ~ F~ . ' ~ _ - 4 _
i
~ N' ~ ~ ' . / t ~ •~(y_~ B ~ ~~f `I ~J~
&MOMM
1*
•
l.~ Ln
`s p ti t".y°r ~ • iy ~ w
~ - .2 • ~ T~
'°"w~~~• r
~ = • ~ ~L/• ~ - ,r _ ~ ~ ~ ~tj
.9~1.i"''~.~ ' ~ r w, • ' ~
~+y y S~ i
•t k+=• V {f Y,~'f ' S 1
' iR7 • -h`~ ~ C I F 5 _ ~ 'c`74 ~ ~ 'r _ ' _ 7~,'
. ~ `~tiL ~ ~ ~_ti~' ~ y } .y~ A a~
` ~ : = ~ ~ ~ ~
r~'~e ~°f`~' ' y . ti~~• - ~ ~F,. ~ - I~.
'v^,~ .IF ` :~~y~.~~.fe' ? '4,_~y ' - - -'f ` ' • ' ~4 1 '
~ ' ~ ~ - - ' ~ S 1~ r ,
, k ~'x~
' ~+-~~~~R'~i~~- _I _ 2.~ y~ 4-~ ~ `'d _4'• 1 D
_ - ~ { ,,,"~a~•
' ' - M ~ I I - ~ il - i ~ - - - _ • ~ - ~ ~ -
;t ry _~~rz ➢1~~~ r ~ ' ' " i
am,~
' Hf'I~Y ' ~ ~ ~_.•'~1 . ' r _ Y~ ~`~3,, ~ ~r..,• ~ r# ~
r ~.L ~ ~ i ~ ti ~ .F ' ~ ~ 1 ^ ` +n'at~'+C4.TZ~ • f _,qy~ 4' 'oL~t`~ir`; ~ . B 8~ ~ t
~ .~~j t~. ~ ' ' .a: _ . n"~~,,v , r •i ~ . , s.
• , ~ .r ~ i~':i'' ~ '.~~.e~ yd ' ~ ~ ''4~ ' ~ " • rt-'t, ' •'A, ~ ' E -
- a~; : s~ n. ~;y~.e'%J i~n-~. - #.`,x t 1+ ~ _ ~~,~y-~'~.r~,~,Y~~~••' ~r'iY~~~` .~~~x,+.rk~ ' ~,ag
• -7 IN
BaLd
i ' '7$ s. r a~'n t - ' ~`i R . r~~. - • r t. y : . ' ,iY` iw _ 4..
~ , ,.•~~-~~i-i. .aL ~ rt - ^ "'E" f' ~ „a. . R`.. ' tlY , I - ~ ; ` _ 4~a4`G
~~:6~. ,y~-y S;y ~'y~ ~ t' • ~rh~r'^~ r , ) ~ ~f'!+ .`ZTt ~ °y ~~,~.,''L' i { ~ - • ~ '
~ ~iy^, ~ ..+.c''{~ _
~ ~3 ~E~.f _ _ : - " ' ~s r - r:tii •~•``'S` a~:;~ ~'i~ y~
' ' • ' , , , _ '~.~L' . ~ t~;.; } 4 • ~ r-•~ °
sat7 ~
~r ' ~ ~ ~ ~ . - ; ~sa-: ~ f~,• { c:~;:~r,•"y' - - -
L~w F ■Y~~` ~ '~i~'~' Y _ ~ r ~4~ Z ~ Y.~ y~ , y~''~ ~
•ti; •a~_ „~n~;. N
B h ~
(JOIf15 Shei--t 85)
~ Weighted Runoff Coefficient Calculation
Project: Springfield at Autumn Crest
Basin: . T1 ✓ IPE Job 97117
~ Total Area (acres): 0.7300 Designer: S. Murphy
~ Imp. Area (acres): 0.1100% Date: 01/14
Grass Area (acres): 0.6200
~ Imp. Area "C": 0.90 ~ ~
Grass Area "C": 0.30
,
(Imp. Area)(Imp. "C")= 0.0990
(Grass Area)(Grass "C")= 0.1860
~
~ 0.7300 0.2850
Weig hted "C"= 0.2850 00-1 ~
~ = 0.39 0.7300
~
I
G
9
Y Weighted Runoff Coefficient Calculation
Project: Springfield at Autumn Crest
Basin: T2 IPE Job 97117
~ Total Area (acres): 0.8100 Designer: S. Murphy
~.J Imp. Area (acres): 0.1700 Date: 01/14
Grass Area (acres): 0.6400
Imp. Area "C": 0.90
Grass Area "C": 0.30 J
~ .
~
^ (Imp. Area)(Imp. "C")= 0.1530
(Grass Area)(Grass "C")= 0.1920
~ 0.8100 0.3450
~ Weighted "C"= 0.3450 0.43 ~
~ 0.8100
~
~
~
.
z
~
~
4
~
~
~
- `
Weighted Runoff Coefficient Calculation
_ Project: Springfield at Autumn Crest
Basin: T IPE Job 97117
Total Area (acres): 1.5300 Designer: S. Murphy
~ Imp. Area (acres): 0.2800 Date: 01/14
Grass Area (acres): 1.2500
` Imp. Area "C": 0.90
' J
Grass Area "C": 0.30
„
(Imp. Area)(Imp. "C")= 0.2520
(Grass Area)(Grass "C")= 0.3750
1.5300 0.6270
~
I
Weighted "C"= 0.6270 -
, - 0.41
1.5300 ~
i~
~
,
.
I
~ I
1 I
~ •
I- •
I
~ I
l I
1Neigh#ed Runoff Coefficient Ca[culation
Project: Springfield at Au#umn Crest
Basin; OfiFsite + Basin T IPE Job 97117
' Total Area {acres}: 2.3200 Designer: S. Murphy
_Imp. Area (acres); 0.2800 Date: 01116
Grass Area {acres}: 2.0400
~ lmp. Area "C": 0.90
Grass Area "C": 0.30
~
(Imp, Area)(Irnp. ~~C")= 0,2520
I i (Grass Area)(Grass "G")= 0.6120
~
~--2.3200 0.8640
1111eig hted „C"- 0.8640
0.37 .
2.3200
~
~I
.
--1
~I
,
,
(I
LJ
r-
ij _
~
~
i
,
Weighted Runaff Coeificient CaIculation
~ .
-
I Praject: Springfield at Au#umn Crest
Basin: L1l IPE Job 97117
TvtaE Area (acres): 0.8300'~- Designer: S. Murphy
Irnp. Area (acres): 0,1100 Date: 01114
Grass Area (acres): 0.7200 Imp. Area "C,". 0.90 ~
Grass Area "C": 0.30
-
. (Imp. Area) (lmp. "e")= 0.0990
(Grass Area){Grass T")R 0.2160
0.8300 0.3150
ii .
~ Weighted T"- . 0.3150
0,38 w
~ -
0.8300
~
I
LJ
I
~
fi r
c ~
s,
I ~
a
~ I -
~j
I ,I
- Weighted Runoff Coefficient Calculation
Project: Springfield at Autumn Crest
Basin: U2 40w IPE Job 97117
7-, Total Area (acres): 0.6400 ,o.. Designer: S. Murphy
' Imp. Area (acres): 0.1400 Date: 01/14
Grass Area (acres): 0.5000
Imp. Area "C": 0.90
Grass Area "C": 0.30 "
(Imp. Area)(Imp. "C")= 0.1260
(Grass Area)(Grass "C")= 0.1500
~
~ 0.6400 0.2760
~ Weighted "C"= 0.2760 v
'0.43
0.6400 ~
~
l~
,
I
-
~
;
~
~
;
.
~
-
~
-
i
i •
i~
_i
r 1
I
~ l
Weighted Runoff Coefficient Calculation
Project: Springfield at Autumn Crest
Basin: U IPE Job 97117
~ Total Area (acres): 1.4700 ~ Designer: S. Murphy
Imp. Area (acres): 0.2400 Date: 01 /14
Grass Area (acres): 1.2300
~ Imp. Area "C": 0.90
Grass Area "C": 0.30 - J
~
(Imp. Area)(Imp. "C")= 0.2160
(Grass Area)(Grass "C")= 0.3690 .
1.4700 0.5850
.
Weighted "C"= 0.5850
I -
0.40
- 1.4700
- -
1 ~
E
i
.
{
~ ' -
j
1
~ f
i I
I1
J
1 I
I ~
i
1 ~
I
i
l .
Weighted Runoff Coefficient Calculation
Project: Springfield at Autumn Crest
Basin: V IPE Job 97117
^ Total Area (acres): 0.8900 ~ Designer: S. Murphy
. Imp. Area (acres): 0.1600 Date: 01/14
Grass Area (acres): 0.7300
` imp. Area "C": 0.90
Grass Area "C": 0.30 +
I
~
(Imp. Area)(Imp. "C")= 0.1440
(Grass Area)(Grass "C")= 0.2190
~
i 0.8900 0.3630
i
`
~ Weighted C = 0.3630
~
~ - 0.41 ~
-
~ 0.8900
~I
1 ,
~
-
( i
~ i -
~ I
. ,
, , .
i- 1
` -
~ ~
1 (sI
l
~ - Weighted Runoff Coefficient Calculation
Project: Springfieid at Autumn Crest
Basin: W WI IPE Job 97117
~ Total Area (acres): 0.6500 600* Designer: S. Murphy
Imp. Area (acres): 0.1300 Date: 01 /14
Grass Area (acres): 0.5200
Imp. Area "C": 0.90
Grass Area "C": 0.30 "
ll
(Imp. Area)(Imp. "C")= 0.1170
~ (Grass Area)(Grass "C")= 0.1560
~ , 0.6500 0.2730
S j Weig hted "C"= 0.2730 v
~ 0.6500
,
~ f
i ~
~ .
7
( 1
~ I
~
i ~
~ j
l
i
r~
BOWSTRING METHOD PROJECT: Springfiled at Autumn Crest
PEAK FLOW CALCULATION PROJECT Springfiled at Autumn Crest DETENTION BASIN DESIGN BASIN: T1
BASIN: T1 10-Year Design Storm DESIGNER: SKM
Tot. Area 0.73 Acres DATE: 01113
Imp. Area 4644 SF
r
C = ' 0.39
Time Increment (min) 5
CASE 1 Time of Conc. (min) 7.15
Outfiow (cfs) 0
140 ft. Overland Flow Design Year Flow 10
Area (acres) 0.73
Ct = 0.15 ~ Impervious Area (sq ft) 4644
L= 140 ft. 'C' Factor 0.39
n= 0.40 ✓ '206' Volume Provided 200
S= 0.020 ✓ Area' C 0.285
Tc = 5.43 min., by Equation 3-2 of Guidelines
Time Time Inc. Intens. Q Devel. Vol.ln Vol.Out Storage
160 ft. Gutter flow ~ (min) (sec) (inlhr) (cfs) (cu ft) (cu ft) (cu ft)
Z1 = 50.0V For Z2 7.15 429 2.66 0.76 435 0 435
Z2 = 3.5 Type B =1.0
n= 0.01 V Rolled = 3.5 5 300 3.18 0.91 364 0 364
S= 0.010✓ 10 600 2.24 0.64 476 0 476
15 900 1.77 0.50 527 0 527
d= 0.136 ft. 20 1200 1.45 0.41 556 0 556
25 1500 1.21 0.34 567 0 567
A R Q Tc Tc total I Qc 30 1800 1,04 0.30 576 0 576
35 2100 0.91 0.26 582 0 582
_
0.49 0.07 0.76 1.73 7.15 2.66 0.76 40 2400 0.82 0.23 594 0 594
45 2700 0.74 0.21 600 0 600
Qpeak for Case 1= 0.76 cfs 50 3000 0.68 0.19 609 0 609
55 3300 0.64 0.18 628 0 628
60 3600 0.61 0.17 651 0 651
CASE 2 65 3900 0.60 0.17 691 0 691
70 4200 0.58 0.17 718 0 718
Case 2 assumes a Time of Concentration less than 5 minutes so that the 75 4500 0.56 0.16 741 0 141
peak flow =.90(3.18)(Imp. Area) = 0.31 cfs 80 4800 0.53 0.15 746 0 746
85 5100 0.52 0.15 777 0 711
90 5400 0.50 0.14 789 0 789
So, the Peak flow for the Basin is the greater of the two flows, 95 5700 0.49 0.14 816 0 816
0.16 cfs 100 6000 0.48 0.14 840 0 840
208' DRAINAGE POND CALCULATIONS ~
Required'208' Storage Volume
Impervious Area x.5 in ! 12 inlft 194 cu ft
208' Storage Volume Provided 200 cu ft`
DRYWELL REQUIREMENTS -10 YEAR DESIGN STORM
Maximum Storage Required by Bowstring 717 cu ft
Number and Type of Drywells Required 0 Single
ERR Double
( 7
BOWSTRING METHOD PROJECT: Springfiled atAutumn Crest
PEAK FLOW CALCULATION PROJECT Springfiled at Autumn Crest DETENTION BASIN DESIGN BASIN: T2
BASIN: T2 10-Year Design Storm DESIGNER: SKM
Tot. Area 0.61 Acres DATE; 01130
Imp. Area 7595 SF '
C = • 0,43 t •
Tim6 Increment (min) ' 5
CASE 1 Time of Conc. (min) 9.11
Outflow (cfs) 2
300 ft. Overland Flow ✓ Design Year Flow 10
Area (acres) 0.81
Ct = 0.15 Impervious Area (sq ft) 7595 ~
L= 300 ft. 'C' Factor 0.43
n= 0.40 '208' Volume Provided 322
S= 0.020 Area ` C 0.348
Tc = 8.58 min., by Equation 3-2 of Guidelines '
Time Time Inc, Intens. Q Devel. Vol.ln Vol.Out Storage
125 ft. Gutter fiow ~ (min) (sec) (inmr) (cfs) (cu ft) (cu ft) (cu ft)
Z1= 50.0 For Z2 9.11 583 227 0.79 617 1165 -548
Z2 = 1 Type B =1.0
n= 0.016 Rolled = 3.5 5 300 3.18 1.11 445 600 -155
S= 0.015 10 600 2.24 0.78 623 1200 -577
15 900 1.77 0.62 677 1800 -1123
d= 0.130 ft. 20 1200 1.45 0.51 106 2400 -1694
25 1500 1.21 0,42 716 3000 -2284
A R Q Tc Tc total I Qc 30 1800 1.04 0,36 724 3600 -2876
35 2100 0.91 0.32 728 4200 -3472
0.43 0.06 0.79 1.14 9.71 2.27 0.79 40 2400 0.82 0.29 742 4800 -4058
' 45 2700 0.74 0.26 747 5400 4653
Qpeak for Case 1= 0.79 cfs 50 3000 0.68 0.24 757 6000 -5243
55 3300 0.64 0.22 780 6600 -5820
60 3600 0.61 0.21 807 1200 -6393
CASE 2 65 3900 0.60 0.21 856 7800 -6944
70 4200 0.58 0.20 888 8400 -7512
Case 2 assumes a Time of Concentration less than 5 minutes so that the 75 4500 0.56 0.20 916 9000 -8084
peak flow =,90(3.18)(Imp. Area) = 0.50 cfs 80 4800 0.53 0.18 923 9600 -8617
85 5100 0.52 0.18 960 10200 -9240
90 5400 0.50 0.17 975 10800 -9825
So, the Peak flow for the Basin is the greater of the two flows, 95 5700 0.49 0.17 1007 11400 -10393
0.79 cfs 100 6000 0.48 0.17 1036 12000 -10964
208' DRAINAGE POND CALCULATIONS
Required'208' Storage Volume
= Impervious Area x.5 in /12 inlft 316 cu
• 208' Storage Volume Provided 322 cu ft
DRYWELL REQUIREMENTS -10 YEAR DESIGN STORM
Maximum Storage Required by Bowstring -155 cu ft
Number and Type of Drywells Required 0 Single
2 Double
BOWSTRING METHOD PROJECT: Springfiled at Autumn Crest
PEAK FLOW CALCUTATION PROJECT Springfiled at Autumn Crest DETENTION BASIN DESIGN BASIN; T
BASIN: T 10-Year Design Storm DESIGNER: SKM
Tot. Area 1.53 Acres DATE: 02101
Imp. Area 12239 SF
C = 0.43 • Time Increment (min) 5
CASE 1 Time of Conc. (min) 7.72
Outflow (cfs) 2
140 ft. Overland Fiow Design Year Flow 10
Area (acres) 1.53
Ct = 0,15 Imperoious Area (sq ft) 12239
L= 140 ft. 'C' Factor 0.43
n= 0.40 '208' Volume Provided 636
S= 0.020 Area' C 0,658
Tc = 5,43 min., by Equation 3-2 of Guidelines
Time Time Inc. Intens. Q Devel. Vol.ln Vol.Out Storage
305 ft. Gutter flow (min) (sec) (inlhr) (cfs) (cu ft) (cu ft) (cu ft)
'
Z1 = 50.0 For Z2 7.12 463 2.56 1.68 1046 927 119
Z2= 1 TypeB=1.0
n= 0.016 Rolled = 3.5 5 300 3.18 2.09 841 600 241
S= 0.015 10 600 2,24 1.47 1116 1200 -84
15 900 1.77 1.16 1232 1800 -568
d= 0.173 ft. 20 1200 1.45 0.95 1295 2400 -1105
25 1500 1.21 0.80 1320 3000 -1680
A R Q Tc Tc total I Qc 30 1800 1.04 0.68 1339 3600 -2261
35 2100 0.91 0.60 1352 4200 -2848
0.76 0.09 1.68 2.30 7.72 2,56 1.68 40 2400 0,82 0.54 1380 4800 -3420
45 2700 0.74 0.49 1391 5400 -4009
Qpeak for Case 1= 1.68 cfs 50 3000 0.68 0.45 1413 6000 -4587
55 3300 0.64 0.42 1456 6600 -5144
60 3600 0.61 0.40 1508 7200 -5692
CASE 2 65 3900 0,60 0.39 1602 7800 -6198
70 4200 0.58 0.38 1663 8400 -6737
Case 2 assumes a Time of Concentration less than 5 minutes so that the 75 4500 0'.56 0.37 1716 9000 -7284
peak flow =.90(3.18)(Imp. Area) = 0.80 cfs 80 4800 0.53 0.35 1729 9600 -7871
85 5100 0.52 0.34 1799 10200 -8401
90 5400 0.50 0.33 1828 10800 -8972
So, the Peak flow for the Basin is the greater of the two flows, 95 5700 0.49 0.32 1888 11400 -9512
1.68 cfs 100 6000 0.48 0.32 1945 12000 -10055
208' DRAINAGE POND CALCULATIONS
Required'208' Storage Volume ~
= Impervious Area x.5 in ! 12 inlft 510 cu ft
208' Storage Volume Provided 636 cu ft
DRYWELL REQUIREMENTS -10 YEAR DESIGN STORM
Maximum Storage Required by Bowstring 241 cu ft
Number and Type of Drywells Required 0 Single
2 Double
L_ A
50-year STORM BOWSTRING METHOD PROJECT: Springfield Parc Centre
PEAK FLOW CALCULATION PROJECT Springfield Parc Centre DETENTION BASIN DESIGN BASIN: Offsite + Basin T
BASIN Offsite + Basin T DESIGNER: SKM
Tot. Area 2.32 Acres DATE: 02/01
Imp. Area 12239 SF
C = 0.37 ' . Time Increment (min) 5
CASE 1 Time of Conc. (min) 9.42
Outflow (cfs) 2
300 ft. Overiand Flow Design Year Flow 50
Area (acres) 2.32
Ct = 0.15 Impervious Area (sq ft) 12239
L= 300 ft. 'C' Factor 0.37
n= 0.40 '208' Volume Provided 636
S= 0.020 Area' C 0.858
Tc = 8.58 min., by Equafion 3-2 of Guidelines
Time Time Inc. Intens. Q Devel. Vol.ln Vol.Out Storage
125 ft. Gutter flow (min) (sec) (inlhr) (cfs) (cu ft) (cu ft) (cu ft)
Z1= 50.0 9.42 565 3.06 2.62 1986 1130 856✓
Z2 = 1
n= 0.016 5 300 4.58 3.93 1580 600 980
S= 0.015 10 600 3.20 2.75 2176 1200 976
15 900 2.45 2.10 2297 1800 497
d= 0.204 ft. 20 1200 1.95 1.67 2330 2400 -70
25 1500 1.62 ' 1.39 2353 3000 -647
A R Q Tc Tctotal I Qc 30 1800 1,56 1.34 2668 3600 -932
35 2100 1.28 1.10 2518 4200 -1682
1.06 0.10 2.62 0.84 9.42 J 3.06 2.62 40 2400 1.19 1.02 2637 4800 _2163
45 2700 1.08 0,93 2681 5400 -2719
Qpeak for Case 1= 2.62 cfs 50 3000 0.99 0.85 2713 6000 -3287
55 3300 0.92 0.79 2758 6600 -3842
60 3600 0.87 0.75 2832 7200 -4368
CASE 2 65 3900 0.82 0.70 2880 7800 -4920
70 4200 0.80 0.69 3016 8400 -5384
Case 2 assumes a Time of Concentration less than 5 minutes so that the 75 4500 0.77 0.66 3101 9000 -5899
peak flow =.90(4.58)(Imp. Area) = 1.16 cfs 80 4800 0,75 0.64 3214 9600 -6386
85 5100 0.72 0.62 3211 10200 -6929
90 5400 0.71 0.61 3408 10800 -7392
So, the Peak flow for the Basin is the greater of the two flows, 95 5700 0.69 0.59 3490 11400 -7910
2,62 cfs 100 6000 0,67 0.58 3561 12000 -8439
208' DRAINAGE POND CALCULATIONS
~ Required'208' Storage Volume
= Imperoious Area x.5 in 112 inlft 510 cu ftt r/
. 50 year Volume Provided 985 cu ft 6[~s'
DRYWELL REQUIREMENTS - 50 YEAR DESIGN STORM -E-- CTZ~ ~ FSS ~
Maximum Storage Required by Bowstring 980 cu ft G~~s v
Number and Type of Drywells Required 0 Single
2 Double
INLAND PACIfIC ENGINEERING ~ _ 400 ✓F('S) 9-7-Z 5FC 9)
BOWSTRING METHOD PROJECT: Springfiled atAutumn Crest
PEAK FLOW CALCULATION PROJECT Springfiled at Autumn Crest DETENTION BASIN DESIGN BASIN: U1
BASIN: U1 10-Year Design Storm DESIGNER: SKM
Tot. Area 0.83 Acres DATE: 01114
Imp. Area 4644 SF
C 0.38 • • '
Time Increment (min) 5
CASE 1 Time of Conc. (min) 5.18
Outflow (cfs) 0
80 ft. Overland Flow Design Year Flow 10
Area (acres) 0.8311,
Ct = 0.15 / Impervious Area (sq ft) 4644 i
L= 80 ft. we 'C' Factor 0.38 _
n= 0.40 '208' Volume Provided 200
S= 0.020 Area * C 0.315
Tc = 3.88 min., by Equation 3-2 of Guidelines
Time Time Inc. Intens. Q Devel, Vol.ln Vol.Out Storage
150 ft. Gutter flow ~ (min) (sec) (inmr) (cfs) (cu ft) (cu ft) (cu ft)
Z1= 50.0 For Z2 5.18 311 3.13 0.99 412 0 412
Z2 = 3.5 Type B =1.0 n= 0,016 Rolled = 3.5 5 300 3.18 1.00 403 0 403
S= 0.015 10 600 2.24 0.71 499 0 499
15 900 1.77 0.56 561 0 561
d= 0.139 ft. 20 1200 1.45 0.46 597 0 597
25 1500 1.21 0.38 613 0 613
A R Q Tc Tc total I Qc 30 1800 1.04 0.33 625 0 625
35 2100 0.91 0.29 633 0 633
0.52 0.07 0.99 1.30 5.18 3.13 0.99 40 2400 0.82 0.26 648 0 648
45 2700 0.74 0.23 655 0 655
Qpeak for Case 1= 0.99 cfs 50 3000 0.68 0.21 666 0 666
55 3300 0.64 0.20 687 0 687
' 60 3600 0.61 0.19 713 0 713
CASE 2 65 3900 0.60 0.19 758 0 758
70 4200 0.58 0,18 788 0 788
Case 2 assumes a Time of Concentration less than 5 minutes so that the 75 4500 0.56 0,18 813 0 813
peak flow =.90(3.18)(Imp. Area) = 0.31 cfs 80 4800 0.53 0.17 820 0 820
85 5100 0,52 0.16 854 0 854
90 5400 0.50 0.16 868 0 868
So, the Peak flow for the Basin is the greater of the two flows, 95 5700 0.49 0.15 897 0 897
0.99 cfs 100 6000 0.48 0.15 924 0 924
208' DRAINAGE POND CALCULATIONS ~
Required'208' Storage Volume
. = Impervious Area x.5 in ! 12 inlft 194 cu ft v
208' Storage Volume Provided 200 cu ft~
DRYWELL REQUIREMENTS -10 YEAR DESIGN STORM
Maximum Storage Required by Bowstring 854 cu ft
Number and Type of Drywells Required 0 Single
ERR Double
BOWSTRING METHOD PROJECT: Springfiled at Autumn Crest
PEAK FLOW CALCUlATION PROJECT Springfiled at Autumn Crest DETENTION BASIN DESIGN BASIN: U2
BASIN: U2 10-Year Design Storm DESIGNER: SKM
Tot. Area 0.64 Acres DATE: 02101
Imp. Area 5908 SF '
' C = 0.43 • Time Increment (min) 5
CASE 1 Time of Conc. (min) 6.58 ✓
Outflow (cfs) 1
140 ft, Overiand Flow Design Year Flow 10
Area (acres) 0.64
Ct = 0.15 Impervious Area (sq ft) 5908000,
L= 140 ft. 'C' Factor 0.43
n= 0.40 '208' Volume Provided 262
S= 0.020 Area * C 0.275
Tc = 5.43 min., by Equation 3-2 of Guidelines
Time Time Inc. Intens. Q Devel. Vol.ln Vol.Out Storage
125 ft. Gutter flow(min) (sec) (inmr) (cfs) (cu ft) (cu ft) (cu ft)
Z1 = 50.0 For Z2 ✓ 6.58 395 2.76 0.76 401 395 6
Z2 = 1 Type B =1,0
n= 0.016 Rolled = 3.5 5 300 3.18 0.88 352 300 52
S= 0.015 10 600 2.24 0.62 453 600 -147
15 900 1.77 0.49 504 900 -396
d= 0.128 ft. 20 1200 1.45 0.40 532 1200 -668
25 1500 1.21 0.33 544 1500 -956
A R Q Tc Tc total I Qc 30 1800 1.04 0.29 554 1800 -1246
35 2100 0.91 0.25 560 2100 -1540
0.42 0.06 0.76 1,15 6.58 2,76 0.76 40 2400 0.82 0.23 572 2400 -1828
45 2700 0.74 0.20 577 2700 -2123
Qpeak for Case 1= 0.76 cfs ~ 50 3000 0.68 0.19 587 3000 -2413
55 3300 0.64 0.18 605 3300 -2695
60 3600 0.61 0.17 627 3600 -2973
CASE 2 65 3900 0.60 0.17 666 3900 -3234
70 4200, 0.58 . 0.16 692 4200 -3508
Case 2 assumes a Time of Concentration less than 5 minutes so that the 75 4500 0.56 0.15 714 4500 -3786
peak flow =.90(3.18)(Imp. Area) = 0.39 cfs SO 4800 0,53 0.15 720 4800 4080
85 5100 0,52 0.14 749 5100 -4351
90 5400 0.50 0.14 762 5400 4638
So, the Peak flow for the Basin is the greater of the two flows, 95 5700 0.49 0.13 787 5700 -4913
0.76 cfs 100 6000 0.48 0.13 810 6000 -5190
, 206' DRAINAGE POND CALCULATIONS
Required'208' Storage Volume ~
, = Impervious Area x.5 in I 12 inlft 246 cu ft
208' Storage Volume Provided 262 cu ft✓
DRYWELL REQUIREMENTS -10 YEAR DESIGN STORM
Maximum Storage Required by Bowstring 52 cu ft
Number and Type of Drywells Required 0 Single
1 Double
BOWSTRING METHOD PROJECT: Springfiled atAutumn Crest
PEAK FLOW CALCULATION PROJECT Springfiled at Autumn Crest DETENTION BASIN DESIGN BASIN: U
BASIN; U 10-Year Design Storm DESIGNER: SKM
Tot. Area 1.47 Acres DATE: 02101
Imp. Area 10552 SF ,
C = 0.40 . , Time Increment (min) 5
CASE 1 Time of Conc. (min) 6.22
Outflow (cfs) 1
80 ft. Overland Flow ' Design Year Flow 10
Area (acres) 1.47
Ct = 0.15 Impervious Area (sq ft) 10552
' L= 80 ft. 'C Factor 0.4
n= 0.40 '208' Volume Provided 462
S= 0.020 Area ` C 0,568
Tc = 3.88 min,, by Equation 3-2 of Guidelines
Tme Time Inc. Intens. Q Devel, Vol.ln Vol.Out Storage
310 ft. Gutter flow (min) (sec) (inlhr) (cfs) (cu ft) (cu ft) (cu ft)
Z1 50.0 For Z2 6.22 373 2.84 1.67 834 373 461
Z2 = 1 Type B =1.0
n= 0.016 Rolled = 3.5 5 300 3.18 1.87 152 300 452
S= 0,015 10 600 2.24 1.32 957 600 357
15 900 1.77 1.04 1069 900 169
d= 0.172 ft. 20 1200 1.45 0.85 1131 1200 -69
25 1500 1.21 0.71 1157 1500 -343
A R Q Tc Tc total I Qc 30 1800 1.04 0.61 1178 1800 -622
35 2100 0.91 0.54 1192 2100 -908
0.75 0.09 1.67 2.34 6.22 2.84 1.67 40 2400 0,82 0.48 1218 2400 -1182
45 2700 0,74 0.44 1230 2700 -1470
Qpeak for Case 1= 1,67 cfs 50 3000 0.68 0.40 1250 3000 -1750
55 3300 0,64 0,38 1290 3300 -2010
60 3600 0,61 0,36 1337 3600 -2263
CAS E 2 ' 65 3900 0.60 0.35 1421 3900 -2479
70 4200 0.58 0.34 1476 4200 -2724
Case 2 assumes a Time of Concentration less than 5 minutes so that the 75 4500 0.56 0.33 1524 4500 -2976
peak flow =,90(3,18)(Imp, Area) = 0.69 cfs 80 4800 0.53 0.31 1535 4800 -3265
85 5100 0.52 0.31 1598 5100 -3502
90 5400 0,50 0.29 1625 5400 -3775
So, the Peak flow for the Basin is the greater of the two flows, 95 5700 0.49 0.29 1679 5100 -4021
1.67 cfs 100 6000 0.48 0,28 1729 6000 -4271
208' DRAINAGE POND CALCULATIONS
Required'208' Storage Volume ~
= Impervious Area x.5 in / 12 inlft 440 cu ft
, 208' Storage Volume Provided 462 cu ft
DRYWELL REQUIREMENTS -10 YEAR DESIGN STORM
Maximum Storage Required by Bowstring 461 cu ft
Number and Type of Drywells Required 0 Single
1 Double
BOWSTRING METHOD PROJECT: Springfiled at Autumn Crest
PEAK FLQW CALCULATION PROJECT Springfiled at Autumn Crest DETENTION BASIN DESIGN BASIN; V
BASIN: V 10-Year Design Storm DESIGNER: SKM
Tot. Area 0.89 Acres DATE: 01114
Imp, Area 7031 SF .
• C= 0.41 • '
Time Increment (min) 5
CASE 1 Time of Conc. (min) 7.15
OutFlow (cfs) 1
140 ft. Overland Flow 40010, Design Year Flow 10
Area (acres) 0.89
Ct = 0.15 Impervious Area (sq ft) 7031
L= 140 ft. 'C' Factor 0.41
n= 0.40 '208' Volume Provided 300 S= 0.020 Area' C • • 0.365
Tc = 5.43 min., by Equation 3-2 of Guidelines
Time Time Inc. Intens. Q Devel, Vol.ln Vol.Out Storage
180 ft. Gutter flow 000000 (min) (sec) (inlhr) (cfs) (cu ft) (cu ft) (cu ft)
Z1= 50.0 For Z2 7,15 429 2.66 0.97 557 429 128
Z2 = 1 Type B =1.0
n= 0.016 Rolled = 3.5 5 300 3.18 1,16 466 300 166
S= 0,011 10 600 2.24 0.82 610 600 10
15 900 1.77 0.65 675 900 -225
d= 0.148 ft. 20 1200 1.45 0.53 712 1200 488
25 1500 1.21 0.44 727 1500 -773
A R Q Tc Tc total I Qc 30 1800 1.04 0.38 738 1800 -1062
35 2100 0.91 0.33 746 2100 -1354 '
0.56 0.07 0.97 1.72 7.15 2.66 0.97 40 2400 0.82 0.30 762 2400 --1638
45 2100 0,74 0.27 168 2700 -1932
Qpeak for Case 1= 0.91 cfs✓ 50 3000 0.68 0.25 781 3000 -2219
55 3300 0.64 0.23 805 3300 -2495
60 3600 0.61 022 834 3600 -2766
CASE 2 65 3900 0.60 0.22 886 3900 -3014
70 4200 0,58 0.21 920 4200 -3280
Case 2 assumes a Time of Concentration less than 5 minutes so that the 75 4500 0.56 0,20 949 4500 -3551
peak flow =.90(3.18)(Imp. Area) = 0.46 cfs 80 4800 0.53 0,19 957 4800 -3843
' 85 5100 0.52 0.19 995 5100 4105
90 5400 0.50 0.18 1012 5400 -4388
So, the Peak flow for the Basin is the greater of the two flows, 95 5700 0.49 0.18 1045 5700 4655
0.97 cfs 100 6000 0.48 0.18 1076 6000 -4924
208' DRAINAGE POND CALCULATIONS
Required'208' Storage Volume ~
= Impervious Area x.5 in I 12 inlft 293 cu ft
208' Storage Volume Provided 300 cu ft r'
DRYWELL REQUIREMENTS -10 YEAR DESIGN STORM
Maximum Storage Required by Bowstring 166 cu ft,~,►
~
Number and Type of Drywells Required 0 Single
1 Double
BOWSTRING METHOD PROJECT: Springfiled at Autumn Crest
PEAK FLOW CALCULATION PROJECT Springfiled at Autumn Crest DETENTION BASIN DESIGN BASIN: W
BASIN: W 10-Year Design Storm DESIGNER: SKM
Tot. Area 0.65 Acres DATE: 01116
Imp. Area 5542 SF
C = 0.42 • Time Increment (min) 5
CASE 1 Time of Conc. (min) 6,22
Outflow (cfs) 1
80 ft. Overland Flow Design Year Flow 10
Area (acres) 0.65
Ct = 0.15 Imperoious Area (sq ft) 5542
L= 80 ft. 'C' Factor 0.42
n= 0.40 '208' Volume Provided 448
S= 0.020 Area' C 0.273
Tc = 3.88 min., by Equation 3-2 of Guidelines
Time Time Inc. Intens, Q Devel. Vol.ln Vol.Out Storage
310 ft, Gutter flow (min) (sec) (inlhr) (cfs) (cu ft) (cu ft) (cu ft)
Z1= 50.0 For Z2 6,22 313 2.84 0.77 387 373 14
Z2 = 1 Type B =1.0
n= 0.016 Rolled = 3.5 5 300 3.18 0.81 349 300 49
S= 0.015 10 600 2.24 0,61 444 600 -156
15 900 1.77 0.48 496 900 -404
d= 0.172 ft. • 20 1200 1.45 0,40 525 1200 -675
25 1500 1.21 0.33 537 1500 -963
A R Q Tc Tc total I Qc 30 1800 1.04 0.28 547 1800 -1253
- - 35 2100 0.91 0.25 553 2100 -1547
0.75 0.09 1.67 2,34 6.22 2.84 0.77 40 2400 0.82 0.22 566 2400 -1834
45 2700 0.74 0.20 511 2700 -2129
Qpeak for Case 1= 0.77 cfs 50 3000 0.68 0.19 580 3000 -2420
55 3300 0.64 0.17 599 3300 -2701
60 .3600 0.61 0.17 621 3600 -2979
CASE 2 65 3900 0.60 0.16 660 3900 -3240
70 4200 0.58 0.16 685 4200 -3515
Case 2 assumes a Time of Concentration less than 5 minutes so that the 75 4500 0,56 0.15 707 4500 -3793
peak flow =.90(3.18)(Imp. Area) = 0.36 cfs 80 4800 0.53 0.14 713 4800 4087
85 5100 0.52 0.14 742 5100 -4358
90 5400 0.50 0.14 754 5400 -4646
So, the Peak flow for the Basin is the greater of the two flows, 95 5700 0.49 0,13 779 5700 -4921
0.77 cfs 100 6000 0.48 0.13 803 6000 -5197
208' DRAINAGE POND CALCULATIONS
Required'208' Storage Volume ~
= VOOOO
Impervious Area x.5 in 112 inlft 231 cu ft
208' Storage Volume Provided 27ir p4ecu ft
DRYWELL REQUIREMENTS -10 YEAR DESIGN STORM
Maximum Storage Required by Bowstring 49 cu ft
Number and Type of Drywells Required 0 Single
1 Double
f I I ~ 1
50-year STORM BOWSTRING METHOD PROJECT; Springfield Parc Centre
PEAK FLOW CALCULATION PROJECT Springfield Parc Centre DETENTION BASIN DESIGN BASIN: W
.BASIN W DESIGNER: SKM
Tot. Area 0.65 Acres DATE: 02101
Imp. Area 5542 SF
C = 0.42 ' Time Increment (min) 5
CASE 1 Time of Conc. (min) 6.47
Outflow (cfs) 1
80 ft. Overland Flow Design Year Flow 50
Area (acres) 0.65
Ct = 0.15 ImpeNious Area (sq ft) 5542
L= 80 ft. 'C' Factor 0.42
n= 0.40 '208' Volume Provided 448
S= 0,020 Area' C 0.273
Tc = 3.88 min,, by Equation 3-2 of Guidelines
Time Time Inc. Intens. Q Devel. Vol.ln Vol.Out Storage
310 ft. Gutter flow (min) (sec) (inlhr) (cfs) (cu ft) (cu ft) (cu ft)
Z1 = 50.0 6,47 386 4.07 1.11 518 388 190
Z2 = 1
n= 0.016 5 300 4.58 1.25 503 300 203
S= 0.015 10 600 3.20 0.87 639 600 39
15 900 2.45 0.67 690 900 -210
d= 0.148 ft. . 20 1200 1.95 0.53 709 1200 -491
25 1500 1.62 0.44 722 1500 -778
A R Q Tc Tc total I Qc 30 1800 1.56 0.43 823 1800 -977
35 2100 1.28 0.35 780 2100 -1320
0.55 0.07 1.11 2.59 6.41 4.07 1.11 40 2400 1.19 0.32 819 2400 -1581
45 2700 1.08 0.29 835 2700 -1865
Qpeak for Case 1= 1.11 cfs 50 3000 0.99 0.27 846 3000 -2154
55 3300 0.92 0.25 862 3300 -2438
60 3600 0.87 0.24 886 3600 -2714
CASE 2 65 3900 0.82 0.22 903 3900 -2997
70 4200 0.80 0,22 946 4200 -3254
Case 2 assumes a Time of Concentration less than 5 minutes so that the , 75 4500 0.77 021 974 4500 •3526
peak flow =.90(4.58)(Imp, Area) = 0.52 cfs 80 4800 0.75 0,20 1010 4800 -3790
85 5100 0.72 0.20 1028 5100 -4072
90 5400 0,71 0.19 1072 5400 -4328
So, the Peak flow for the Basin is the greater of the two flows, 95 5100 0.69 0.19 1099 5700 -4601
1.11 cfs 100 6000 0.67 0.18 1122 6000 -4878
208' DRAINAGE POND CALCULATIONS
Required'208' StorageVolume ~
. = Impervious Area x.5 in 112 inlft 231 cu ft
50 yearVolume Provided 536 cu ftCw".= 5~~
DRYWELL REQUIREMENTS - 50 YEAR DESIGN STORM
Maximum Storage Required by Bowstring 203 cu ft
Number and Type of Drywells Required 0 Single
INLAND PACIFIC ENGINEERING 1 Double
CURB INLET CALCULATIONS - Springfield at Autumn Crest
Curb Inlet Depression = 2 in. . ,
Standard Curb Inlet Length = 4 ft. •
Upstream 10-Yr. Gutter Roughnes Reciprocal Depth Length
Curb Inlet Imperoious Peak Flow Slope Coeff. Cross slope of Flow Required
Sub-Basin Station R1L Area c.f.s. S n Z Zln d* Qa/La** QI(QalLa) Remarks
T1 3+15 R 4644 ~ 150 0.0160 50 3125 0.09 0.059 5.17 Need 1- 5' curb drop
0•
U1 3+15 L 4644 010 0.0150 0.0160 50 3125 0.09 0.059 5.17 Need 1- 5' curb drop
*W 46+41 R 1057 0.07✓ 0.0047 0.0160 50 3125 0.06 0.042 1.65 Need 1 curb drop
*W 47+00 R 1350 0.09ri/ 0.0048 0.0160 50 3125 0.07 0.046 1.93 Need 1 curb drop
*W 48+60 R 1350 0.09 ✓ 0.0032 0.0160 50 3125 0.47 0.050 1.79 Need 1 curb drop
*W 49+40 R 1620 0.110#0 0.004 0.0160 50 3125 0.07 0.051 2.09 Need 1 curb drop
* See attached calculation sheet
. 1
Calculated per Figure 18 of Guidelines
Calculated per Figure 16 of Guidelines
A 4 foot curb drop with a 6" gutter has a
capacity of 4.0 cfs in sump condition.
A
~
I y
~7¢)
r
4 -7 47 t -75 _ (7-5)(/e
I
r~ .
P7- LD 4-7 t 7 S
I
.
~ 47 -,L- -75- / 3 5D 51f
~-"zo
;
I
,
I
~ rl
r~
~
r1L
~ I n I a n d MEMO ❑ PROJECT -
.
P a ci1 C CALC. ❑ JOB N0. ~`711-7 SHEET OF ~
~ En ineerin
g g MEETING ❑ BY DATE
west 707 7tn, suite 200 sPokane, wasninyton 99204 OTHER ❑ CHK'D BY DATE
509 458-6840 Fax No. 509 458-6644 ~ ~ , ,