Loading...
25995 ENGINEERS REVIEW : Canceicd File ENGINEER' S REVIEW SHEET Date Filed Date As Built Plans Received Date Roacl Plans Approved PLAT FILE # PE-1570D -89 New Road Standards 5-15-95 Mylar 1f: Companion File Hearing Date H Time: H Nunlber: Related File P-1570 Building llept Technical Review Date: TR Titne: Review Date: R Time: R Number: TECH REVIEW fi Date Received: 01/05/1998 Review Type: Large Lot n Bldg. Square Feet: No. Lot 14 No. Acre 4.61 Project Name: SPRINGFIELD ADD AT AUTUM CREST Range-Township-Section: 44- 25 - 26 Site Address: E PROGRESSlS 16TH/N 19TH CT PARCEL(S): (first 20) Applicant Nanie: LANDRETE I CONSTRUCTION-LANDRETH, SCO Phone (509) 927-7401 45261.0306 45261.0614 Applicant Address: 10801 E VALLEYWAY Phone 2# SPOKANE, WA 99206 Date Conditions Maileci: Flood Zone No Water Sewer School 356 Fire Phone Billing 0* Owner: LANDRETH CONSTRUCTION Engineer Acldress: LANDRETH CONST-LANDRETH, Address 10801 E VALLEYWAY Company INLAND PACIFIC ENGINEERiNG SCOTT SPOKANE, WA 99206 Address: 707 W 7TH AVE STE 200 10801 E VALLEYVVAY SPOKANE WA 99204 Phone: (509) 927-7401 Phhu►ie: (509) 927-7401 Phone: 509-458-6840 Fax: 509-458-6844 Signed Name SCOTT LANDRETH Buildiq # 456-3675 / Planning #f 456-2205 Contact: nate Suhmitter~ fJLjl;Lj,2jU1 II]it! DATE TECHNICALLY COMPLETE DATE NOT TECHNICALLY COMPLETE 01/05/1998 DATE PAY FEES RECEIVED DATE PRIORITY rEES RECEIVED COPY TO ACCOUNTING 01J05/1998 FINAL PLAT FEES COMPLETED AND COPY TO ACCOUNTCNG ~ I NOTICE TO PUBLIC / NOTICE TO PUBLIC N 1 3 4 6 COMPLETED - OR NEEDS TO IIE STGNED Out //1 In-Out 1!2 1n-Out ft3 3~ g DESIGN DEVIATION DATES IN-OUT 3 In-Out f/4 In-Out /!5 In-Out 1!6 BOND QUANTITIES FOR DRAINAGE ITEM CALCULATED I DATE BOND RECEIVED BOND AMOUNT RECEIVED DATE BOND RELEASE - nATE IIOND REDUCED BOND BALANCE Hearing Date Decision Approved Deniecl Continued Appealed BCC Approved Denied Appealed to Court Approvec! Denied Continued Final Project Status -1/ C(,p /q,9 STAMPED MYLARS TO PERMIT TECHNICIAN O9ifl.) 7 / t(v /?25 STAMPED 208 LOT PLANS TO SECRETARY (SANDY) 1-I5-96 pr~-.-~ ~ a7- chX G 4c.-.-~ 5 CL V 1 A- ' --P ~ . J • 4-, , ~ _ ~ , A . ,~5~ ~ ~S ~ 1 • O • ~-c9~ • g~ ~'12~~.~z..~ I ~ . ~,o~. # . c_.~a„~ ~ ~--E~.J~ LA !t 51CANCa~ bL, 1< pwe* l, I I J i m • • ~ # ♦ REQUEST FO►R DESIGN DEVIATION $30.00 DATE February 27, 1998 R4AD NAME Proxress Road CRp/RID # NAME OF PLAT Springf ield Addition at Autumn Crest , Plat PE-1570D ADDRESS OF BLDG N/A N'AME OF BLDG PROJECT N/A BLDG# B9 5 T R FEDERAL/STATE PRO.TECT # PROJECT LIMZ'fS EXISTIlVG CONDITIONS: PROPOSED CMPROVEMENTS: ROA.D WIDTH 12' ~ 18' from centerline to face of curb ROAD SURFACE .Asphalt Asphalt AVG. DAILY TRAFFIC Current Txaffic Count Design Yeaz TrafFic Count PROJECT DESCRIFM(.N Addition of 6.5 ' of asphalt and concrete curb & gutter adjacent to the vroposed development and future pha.se. ?ROPOSED DESIGN DEWIATION Countv approval of proposed and future curb grades less t]ian 0.5% on Progress Road. Adjacent to Springfield Acidition at Autumn Crest and the future phase of Svringfield Addition at Autumn, Crest. JUSTIFICATION: ' The existing road grades on Progress Road are less than 0.5%. The flat grades encountered requires that the prouosed widening match the egisting,_j~rades, where possible grades will be constructed at.or above the minimum 4.005'. SUBMTTTED BY Todd R. Whipple, P.E., Presideat,r Inland Pacific Engineering.- bATE 3127198 ADDRESS 707 West 7th Avenue, Suite 200, Spokane, WA , ZIP CODE 99204 PHONE # f SU91458-6844 (509)458-6844 (fax) ADMINISTRATNE VAItTANCE FEE UF $30•00 PAID T4 SP4B:ANE CUUNTY 1026 W BROADWAY, 5POKANE WA 99260-0170 PHONE (509)456-3600 FAX (509)324-3478 -REQUEBT WILL NOT HE REVIEWEI7 WITHOUT FUNDS- CASH/CHECI{`'1.i # f'RECETVED BY DATE ~ ~ k%n~iw.a~ us~ DESIGN DEVIATION STAFF RECOMMENDATIONS ccv,.t vi r p A P P060 Jr_ i t i T15E'e. TU" 0 C O t T/ d g r1-4fli I4'2 -rA-)141 D + W T*E. tA- tatkve-nu3 042 m'YI i1 t `f- , 19 9 8 � ' ( Fe Z 3-.0 'z)JLtis fus1c0 Approved Approved w/conditions Not Approved ( ) ( ( ) _ _ ";.I .'71 - -98 Project Manager Date 12Cr-tiµt (1--Pp 62,A, tiZ' Ce)/.,14--(l-Z-Z3ia) 41gZ /BLiseo 3/cl(45 ftEv"-r Approved Approved w/conditions () Not Approved ( Project `Management Engineer Date Approved Approved w/conditions ( )> SPOKANE COUNTY ENGINEER'S DETERMINATION: Not Approved ( ) Operations Engineer Date Approved w/no conditions ( ) 2/96 Approved as recommended above ( Not Approved Spokane County Engineer 2/f79, Date ► . f' ``-r_ ~ S P O K A N E O U N- T Y DNISION OF ENGINEERING AND ROADS ~ A DNISION OF THE PUBLIC WORKS DPPARTMENT William A. Johns, P.E., County Engineer Dennis M. Scott, P.E., Director March 9, 1998 Mark Kamrath . Inland Pacific Engineering 707 W. 7`h Avenue, Suite 200 Spokane, WA 99204 Re: Design Deviation for Curb Grades, Springfield at Autumn Crest, P-1570D Dea.r Mark, . The deviation for this project has been approved. A copy of the approved deviation is enclosed. Please note the conditions of approval attached to the deviation. Please call if you have any questions regarding the Design Deviation approval. Sincerely, William A. Johns, P.E. Coun Engineer - Doug Busko Plans Review Engineer copy: Scott Landreth, Owner ' File 1026 W. Broadway Ave. • Spokane, WA 99260-0170 •(509) 456-3600 FAX: (509) 324-3478 TDD: (509) 324-3166 • S r c K A N DIVISION OF ENGINEERING AND ROADS William A. Johns, P.E., County Engineer C C30 U N T Y • A DIVISION OF THE PUBLIC WORKS DEPARTMENT Dennis M. Scott, P.E., Director Request for Design Deviation To: Bill Hemmings, P.E. From: Dean Franz, P.E. Doug Busko, P.E. Date: March 4, 1998 Plat: Springfield Addition at Autumn Crest, PE-1570D Summary, The applicant is seeking a Design Deviation to construct 308' of Type B curb on Progress Road at less than 0.5%. The proposed curb grades run from about 0.3% to 0.4%, with one 25 foot section at 0.08%. Proposed cross -slopes vary from 2.0% to 4.5% throughout. Recommendation I recommend approval of this deviation with the following conditions: 1. A Washington State -licensed Professional Land Surveyor shall verify that the curb forms are at the grades noted on the approved plans, prior to placement of curb material. 2. A Washington State -licensed Professional Engineer shall perform a water test on the completed curb and gutter, to verify that the improvements effectively drain runoff from the surface of the pavement into the roadside swale. Any sections of pavement or curbing that do not adequately drain the roadway shall be removed and replaced, prior to acceptance of the improvements by the County. 1026 W. Broadway Ave. • Spokane, WA 99260-0170 • (509) 456-3600 FAX: (509) 324-3478 TDD: (509) 324-3166 , , . , - . . RECEtPT Date - ~ 19 ~j12i3 Received From Address "'ZQ ? c.0 - 7 ~ .-4,'~ Dol la rs $ 3o - `~-C Fo r ~ r~'i? ~ L- <r~ v~~ . ~ . ,,c~ , _ ~ ACCOUNT HOW PAID A~OUONT I I CASH I I AMT. PAID CHECK~~3~ BA uECE I I OMONE R ERY I DY ~ 81(808 IRE0V<)RM10 • INLANC PACIFIC ENGINEERING CO., INC. Spokane, WA 99204 13 517 PO Num Invoice Inv Date Inv Amt Amt Paid Disc Amt Net Amt 97117 03/02/98 30.00 30.00 0.00 30.00 Check 13517 NET CHECK Vendor SP0008 SPOKANE COUNTY ENGINEERS Date 03/03/98 30.00 . . INLAND PACiF'IC ENGINEERING CO. ' INC. llp1 ~ sp°A~,8 Wash ngton 99210-2127 13 517 707 W. 7th AVE., SUITE 200 28-8/1251 SPOKANE, WASHINGTON 99204 (509) 458-6840 Check: 13517 DATE AMOUNT 03/03/98 30.00 PAY ***THIRTY AND N01100 DOLLARS*** TOTHE SPOKANE COUNTY ENGINEERS ORDER OF ~ `J AUTHORI D SIGNATURE . • • • ii'0 13 5 I 7I'' 1: 12 5 L000891: 1009 ?6L, L4 311' 0 0 ~ ~ . . ~ . . ' ~ ' ' ~ '1-~ { . _ . . ' - e D]VISIQN O`F ENGIIJEECtiNG AND ROADS a A 171VIS(cJN caF TlIE 'UOf.lC WORKS DET'ARTMENT - W9l^liam A. J'-phns, P.E., County Engineer lDennis M. Scott, P.L., Directbr ' . - - AGREM, ME, -N'' TO PAY FELi S _ ENGIIVE, ER'',S' AGREEME N'I' NUMPCIt - PE-1570-89 This-agreeEnenC~ betweet,Y Spokane County and ~ -~tt _ L andreth wbiQSe int~_r'est in, the project is awner _ . ~ „ . ~ is entere,6-'ihtq,this ~ . ~ 4th day of Decembex -19 9~7 This agreepletit is applicab_l'e to tiie ~project- - ld_ _P-hase I k[iQwn.,0: ' S~pr SL~.e , ' ; - - --rnc nunmcr) - -t. ~ That Ci_ie ild:lviduals aud*parties narned hereiri as having an interest in t1ae ab4ve de-scribed p~roperty ~4r project agree t4 thet~fQll4vving: - - - _ - ~ ~ . ~ - ~ 1,'. rnbur~~ S~okane ~~i~~nry for prQject,--revie~v ar~d'i~~.nspecti~,on, fees as,specif;~e~l' in Cliapt,er 9.14 -of - ' , , t . t.~e Spokane C'aunty ~Cvde. The, fees will be based on actual_ salary ~cQSts -incurred by Spokane P aten ercent ~a~lmir~istrativ~ cl~,ar. e., an~ will . ~ • C~untY--for P rc~J'ect reviews and / ar ins~ctions l- - n ~ us ~ . ~.;b c bille~ r~ont~ily as, accrued. -Ar~y b~iCting amoqnFs~d'ti~,,.1ncluditig a_n.y ex,penses in~urred i_n tlie~ c~1~lect~i~on,o~' a~~ overti~ue acco~a~at, rnu~st be,naid ;prio~r to, C~ie ~c~u~nty,-s acceRtance gf tlle -~n~rQj;ect f6 r ' , fill4fg: Jf aprpject ~s-approved ancf/or_ fil,ed vir.ith,a balance still owing, the uilliaid balailce shalfl.be . , , , - • . ~ . _ pai~ ~widitin 3,O day~ of (lie invQic~ dat(~-. . , _ ' . ~ . . _ - , . e Tlae unciersigned agrees that these fees, are due and pay-able up-65,n receipt qf the billi'ng as specifietl above. . . _ • 4 _ . 3. -,Any: invoices nQt paid within 30 c_lay,s of the -inv4Jdle-,dat.~ witl "~.~e cofisidered de'liriqiient. t~f i~yy Qui~sCanding 'balance on the acoount ~f9r -tlti~is prqject"jq nQt Raid, within 3'0 day~s df the- i~nvc~ice da~t~e,, ~ - ni~ furtlle~r reviews of the'project ~focuments v~il,l, be cQ~ldu~te~ u.~i~ti~''~ il~e ~ntire acc6unt kialaiiee is- ' paid- ,Any balance on, _the accaunt fox thisr.proj~-ct-,no~E.paidRVvitifin 65 days Qf 't1se ;invoice da~Ce rna y -result in iegal action Qr the initiation of - other,.cQillect'on ~procedures, i,ncluding referra'1Aa, a~ , coll'eetion age ncy. The Sponsor _wil'I he liable fbr ariy and alt expenses incurxed by the County f4_r the c'oltection of nverdue accounts. 4. The mqnthly hll;ling should be sent x4 fh'e atRention of: NAME: Landreth Construction _ ~ - - ' , - ~ - . . . , , . qj~DRESS; 10801 East Va1le~av QTY, STATE: SpokaiQ,e, W~~hinAtou ~ . ~ ZIP ~ODE: . 99206 Rl►ION E#: (509 ) 927-7401 . C _ . T . I' underst3ind, thai failure tQ pay, thes~e fees may 'result in _delay in completi6n or approval of the project b~r Q4lii~r.. . _ possibl'e sanekions. ~ - ~ _ • , - . . _ 0- Xf this fee agreement is comple-ted, by sQtneone otalldr;tha-n ,tl~~ -SpQnscir (i.e., tl-ie prQject owner or a - - - ~ - R~-.i~►cjpal in the_ firm sponsaring the prQj ect), s~icli;, as ct~e: ~'ngineer ct'esigi7ing the pro.ject, -th~n~ - - wrilten ~~uthoxization ~from the S~aonsQr. . specificall~y ailtlYOrizin~g rlie, Ageiit to exec«te,rl~is. Fe'e_ . ~ ~i,greernent'is attaci~e_d tc~ this F`~~ , ~ment. - . ~ . ~ ` • . SIGNI~TLJ1t~ B . . Y • ! ~ . . . . . _ . , ~ - ' {P _R_INT NAMEj :T_0 Si'OKA1Yf: .OUN ' (C`SV\BgrCC~;~~_C_ 7/1I96, _ y - - - • . . , ~ 102G ~~aaciwAy Av~ S~okane WA 99260-(}.170 -(5[19)'d56-3b00 • rA7~:~ (50,9) 324-3478 Tl~n: (SU9) .32'4r31-6 - . _ ~ • . ~.i= f - _ , _ , ~ ~ . . ; ~ . _ ; - • • , ' . ~ . , r .,:Fi!'- . - - , ~ - . ` _ ' . . • . ~ • ~ : - ~ . r. , ♦ i SPOKANE COUNTY HEARING EXAMINER COMMITTEE - FINDINGS & ORDER DATE: March 23rd, 1989 RE: HUNTER'S GLEN PE-1570-89 Preliminary Plat ZE-7-89 Agricultural to UR-3.5 1. The proposai is to divide approximately 38.2 acres into 109 lots for single family dwellings and to change the zoning from Agricultural to UR-3.5. 2. Located: On the southeast comer of Progress and 16th Avenue in the Spokane Valley. The property is "L" shaped extending south from 16th Avenue and Progress to the vicinity of 22nd Avenue and then east to Sullivan Road. Located in Section 26, Township 25 North, Range 44 E.W.M., Spokane County, Washington. 3. We find that the rtem has been properly advertised in accordance with state and local regulations. 4. We have considered and evaluated the information and oonditions contained in the Planning Report for this proposal. 5. . The Comprehensive Plan designates this area as Urban and is within the Priority Sewer Service Area (PSSA) boundary. 6. That we believe the proposal is compatible with existmg uses in the area which . include single family residential uses on similar size lots. 7. We note that ovmers of adjacent and nearby property spoke generally about improvements concerning 16th Avenue. No one appeared to oppose the proposal. 8. We find the provisions of the State Environmental Policy Act have been complied with. 9. That we approve the recommended changes in the conditions of approval presented at the public hearing. . 10. That the recommended guideline of 35' ft. setback was excessive along 16th Avenue and Sullivan Road due to existing development in the area and the remote necessity of the setbadc being necessary. DECISION AN D Q,$QEg VOTE: 2-1 to Approve lN REFERENCE TO THE ATTACHED FINDINGS & ORDER. THE HEARING EXAMINER C4MMITTEE ADOPTS THE FOLL4WING CONDITIONS OF APPRQVAL ATTAQNED HERET4; PLANNING DEPARJRFNT CONDITIONS; ` r . 3-89 HEC Findings Page 2 1. That the below listed oonditions of all Departments and Agencies are binding upon the applicant, owner(s) of the property, heirs, successors or assigns. 2. The preliminary plat of record approval is for the property legally described in the application for this proposal. 3. That the Final Plat be deslgned substantially in oonformance with the preliminary plat of reoord as legally described and advertised. No increase of density or lot number shall oocur without a new application submittal and approval. 4. The Spokane County Subdivisan Administrator shall review any proposed Final Plat to insure compliance with the Findings and Conditions of Approval. 5. That the preliminary plat be given conditional approval for three (3) years to April 1 st, 1992. The applicant may request an Extension of Time by submitting a written request forty-five (45) days prior to the above expiration date. 6. Upon filing the Final Plat the zone change of the Final Plat area shall be finalized and the existing Agricultural zone classification shall be changed to UR-3.5. 7. That a Final Plat namelnumber be indicated before the final plat is filed; such namelnumber to be approved by the County Planning Director/Designee. . 8. That appropriate road names be indicated on the plat. 9. That appropriate utility easements be indicated on oopies of the proposed final plat. Written approval of said utility easements by said utility companies must be received with the submittal of the final plat. 10. That 3 current certificates of title be fumished the County Planning Department prior to filing the final plat. 11. That the following statement be placed in the final plat dedication: "No more than one dwelling structure be placed on any Lot nor shall any lot be further subdivided for the purpose of creating additional lots, ownerships, or building sites without first filing a replat." 12. The final plat map shall indicate by a clear dashed line, the required setbacks from all private, tract x or public roads. the dedication shall contain a statement that: "Side yard and rear yand setbadcs shall be determined at the time building permits are requested. The setbadcs indicated on this subdivision may be varied from if proper zoning approvals are obtained." In addition setbacks for buildings shall be 25' ft. from the Sullivan and 16th Avenue right of way. 13. That a plan for water facilities adequate for domestic service and fire protection be approved by the water supplier, fire protection district, Spokane County Building & Safety Department and County health authorities. The agencies will certify on the WATER PLAN, prior to the flling of the final plat or any phase of the preliminary plat that the plan is in oonformance with their respective needs and regulations. The WATER PLAN and certification will be drafted on a transparency suitable for reproduction and be signed by the plat sponsor. • . 3-89 HEC Findings Page 3 14. The purveyor will also certify on the Water Plan that appropriate contractual arrangements and schedule of improvements have been made with the piat sponsor for construction of the water system in accordance with the approved WATER PLAN. The time schedule for improvements will provide for completion of the water system and inspection by the appropriate health authorities prior to application for building permits within the final plat. The arrangements or agreements will include a provision holding Spokane County and the purveyor harmless from claims by any lot purchaser refused a building permit due to the failure of the plat sponsor to satisfactorily oomplete the approved water system. 15. The final plat dedication will oontain the following statement: "The public water system, pursuant the WATER PLAN approved by County and State Health authorities, the local fire district, County Building 8 Safety Department, and water purveyor, will be installed within this plat, and the subdivider/sponsor will . provide for individual domestic water service as well as fire protection to each lot prior to sale of each L,ot and prior to issuance of a building permit for each Lot." 16. That no building permit will be issued for any lot within the Final Plat until certified by a Washington State licensed engineer "that the water system has been installed pursuant the approved WATER PLAN for the Final Plat", signed and stamped by said engineer. The certification may be in the form of a letter but is preferred to be certified on a copy of the WATER PLAN as a schematic map showing . the "As Built" water system. 17. That a survey is required prior to the filing of a final plat. _QQVNTY ENGINEER'S CONDITIQK 1. That plans, profiles, and cross-sections as designed to County standards showing proposed street centerline and curb grades be submitted to the County Engineer for approval prior to construction and/or the filing of each final plat; road plans to be ° prepared under the direction of a licensed Professional Civil Engineer. 2. That drainage plans and design calculations showing the alignment of drainage facilities be submitted to the County Engineer for approval prior to oonstruction and/or the filing of each final plat. Drainage plans to be prepared under the . direction of a licensed Professional Civi! Engineer. 3. Construction within the proposed public streets and easements shall be performed under the direct supervision of a licensed engineer/surveyor, who shall furnish the County Engineer with "As 6uilt" plans and a certificate in writing that all improvements were installed to the lines and grades shown on the approved construction plans and that all cfisiurbed monuments have been replaced. 4. No construction work is to be performed within the existing or proposed public right of way until a permit has been issued by the County Engineer. All work is subject to inspection and appraval by the County Engineer. 5. All construction within the existing or proposed public Right-of-Way is to be completed prior to filing each final plat or a bond in the amount estimated by the . County Engineer to cover the cvst of construction of improvements, construction . 3-89 HEC Findings Page 4 , certification. "As Buiit" plans, and monumenting the street centeriines shall be filed with the County Engineer. 6. No direct aa;ess from bts to Stub Road connections until such roads are constnucted to County Standards and established as County Roads. 7. Road design, oonstruction, and drainage oontrol for 1/2 Right of Ways and Stub Road connections are the responsibility of the developer. 8. That appropriate provisions be made that the following descxibed property be held in trust until the oontinuation of the streets be dedicated or deeded: A I-ft. strip at the ends or edges of all streets that terminate or border the final plat boundary. (Temporary cul de sacs are required when streets terminate at the plat boundaries.) 9. The applicant should be advised that individual driveway access permits are required prior to issuance of a building permit for driveway approaches to the County road system." 10. Ded'icaVon o 0' jif~ll of it~io.lal Rig ► f ay gPr,o,~ress R,~t ► as d~pict~ ► n theiPr1efi~m,inar~y,Plat. - . Dedication of 30' ft. of additionaliRig~ ~ntmoTaW,ay along 16th Avenue and Sullivan Road epicted on tTTe preH mina.;~ryAp,lat. 11. A statement shall be placed in plat dedication that no direct access be allowed from lots to 16th Avenue or Sullivan Road. 12. Existing County roads providing direct access to the plat shall be paved and curbed to Spokane County standards. 13. That all prublic roads within the plat b~'e'~''design;ediand •onstructed ti-'o'~Sk'raT`ne nty . stan_dar~ds. 14. T•'hai~i's`idewalk.s are required along th.art~'al(Us) on~Sulliv~n_Rc~adfl~6th Avenue and St. Chas~Roa,d. 15. The word "applicant" shall inGude the owner or owners of the property, his heirs, assigns and successors. 16. The,@'o`urn ,~AEngineer has designated Typ' . I Roadwa,y~SeGt~io~N~umber~Twvo, Collecto"'rvArterial Standard for die improvement of St. C•Fi~'arlesuRoad■whi lah■isuto be co,ns;tir~uctedrw,i,th`in?Nthe proposee development. This will■require~,ihe■instiall-at a~^"n" of 40' ft. of asphalt. The oens:tir,uc-b jon of_curb,in,grand•si d-e-mralkeia-l3-eurequired. The Geunty'NEngineer has designated Typic"'"lIRoadwa,y,cS.e.ctio_n~.N~,~,~um_ber&~Tiw"'a~'A~'ess St~re.et Standard for the improvement of int~ernal st!reet~s ot~her t~han St. Charles Road, which is to be oonst-ructe.d,►,,iift hinathemp~oposed~de~v.el.op._m.entoOffili's1will req,uiir~eot~he -installation ofJL3'61&ft.fto.fxasphal,~T~hen• e.ns~tructio'n-vofi u `inj"'g~i''s also Iq~u'i'rTe'd • ~ 4r- K.9 . 3-89 HEC Findings Page 5 The -eunty Engineer hasidesignatedlTjypical Roadway Section Number Two, Access Street Standard foffthe if~ ~ pruvemen:tsof~.P.r.ogr_ess Road_w..hichisYt_o~be~.►_•_ns~t~ructed adjacent to the proposed devebp e_n~t:..~T s~wequire th installati.onpo-f~ to 12~ft.,~o, f.a~,sphalt. The construction~of.c~.urbing-is,~also'required. 17. The proposed plat shall be improved to the standards set forth in Spokane County Board of Commissioners Resolution'~No. 80-15~9'2, as amended, which establishes regulations for roads, approaches, drainage, and fees in new construction. 18. This plat or development proposal is located within a drainage basin which has been identified by the Spokane County Engineer's Office as having stormwater runoff problems. Since this plat or development proposal is affected by or is a contributor to stormwater flows, property owners should participate in the planning and implementation of a future basinwide stormwater management system. The following statement shall be placed in the plat dedication: "That the owner(s) or successor(s) in interest agree to join in any County approved Stormwater Management Program and to pay such rates and charges as may be fixed through public hearings for service or benefit obtained by the planning, design, constructing, maintaining or operation of stormwater control facilities". Note: The proposed road rigM of way dedication depicted on tfie preliminary plat is consistent with the County Arterial Road Plan. This dedication eliminates the need • for the establishment of a reserve strip along either of the arterials. 19. That Sulliuan Road and 16th Avenue be improved per the approved Ty,pical wo,~„way Cross INefigns for those roadways. A copy of these Cross Se tions is av~a~ilabI the Co~ u ty~Engineer's Offic'e7fo^~r inspection. These irnprove,,ms~iwill~'co~~ist of ~r.ight~,,,,~of~,a,ygalong t,he frontage af th site. -20. Any change in alignment, removal or relocation of power lines located along the West side of Sullivan Road is the responsibility of the applicant. 21. That theilocatiiotiWfit,he 2!1 st Avenue intersection at~Sulliv1an.~~Road shall co ~ nd with the*in~ter►section alignrnent of21 st wit~hin t~he proposed platrfiR~idg"em • 61 d 11 , . Addi,t~io'n':~'If~t~hali'g;n~m,ent~ftihe intersect~ions is not poss~ible then t~he in~tersection shall be offseAper_SpokaneA'County Standards. 22. Constjr uctionrof the media,n dep:.i:cted on the preliminary pl-at at the 21s ewgie, Sulligan Road inters..ectio%ftsub,ject to t~he approv-a of the County ngineer. Additional -right of way width may be required if approval of construction is given. CQINTY HEALTH DI$TRICT GQNDITIQNa , 1. A plan for water facilities adequate for domestic use, domestic irrigation use, and fire protection use shall be approved by the water purveyor. Said water plan must have been approved by the fire protection district and the appropriate health authorities. The health authorities, water supplier (purveyor), and the fire protection district will certify, prior to the filing of the final plat, on the face of said water plan that the plan is in conformance with their requirements and will adequately satisfy their respective needs. Said water plan and certification will be drafted on a transparency suitable for reproduction. ~ . . . , , , 3-89 HEC Findings Page 6 2. The purveyor will also certify prior to filing the final plat on a oopy of said water plan that appropriate contractual arrangements have been made with the plat sponsor for construction of the water system, in accordance with the approved p(an and time schedule. The time schedule will provide, in any case, for completion of the water system and inspeciion by ihe appropriate health authorities prior to application for building permits within the plat. The contractual arrangements will include a provision holding Spokane County/City of Spokane. Spokane County Health District, and the purveyor harmless from claims by any IoVtract purchaser refused a building permit due to failure of the plat sponsor to satisfactorily complete the approved water system. 3. A public sewer system will be made available for the plat and individual service wiN be provided to each lot prior to sale. Use of individual on-site sewage disposal systems shall not be authorized. 4. A statement shall be placed in the dedication to the effect that: "A public sewer system will be made available for the plat and individual service will be provided to each lot prior to sale. Use of individual on-site sewage system shall not be authorized." 5. The dedicatory language on the plat shafl state: "Use of private wells and water systems is prohibited." 6. The plat dedication will contain a statement to the effect that: "The public water system as approved by County and State health authorities and the local fire district and purveyor will be installed within this plat, and the subdivider will provide for individual domestic water service as well as fire protec#ion to each lot prior to sale of each lot." CQ~INTY VTIL TI IES DRPgRTMENT QQNDITIQN5 1. This project will make connection to the Valley Sewer project. ,BSIILDING & SAFETY DEPARTM~NT QQND17IQNa 1. The applicant shall contact the Department of Building and Safety at the earliest possible stage of desigNdevebpment in order to be informed of code requirements admin istered/en forced by the department; e.g., State Building Code Act regulations such as requirements for fire hydranUflow, fire apparatus access roads, private road designation/naming, street address assignment, building/demolition permits and general coordination with other aspects of project implementation. FIRE DI$TRII;T NQ. 1 UNDITIQMS: 1. The installation of five (5) new fire hydrants. These fire hydrants for fire protection will be installed acoording to an approved water plan submiited to Fire District No. 1. • . ; . t ' 3-89 HEC Findings Page 7 Approved on 23rd day of March, 1989. THE HEARING EXAMINER COMMITTEE HEREBY ATTESTS TO THE ABOVE FiNDINGS AND CONCLUSION AND VOTE. Chairperson ~ ~ A T: DOUGLAS S. ADAMS DATE: 3-23-89 Spokane County Subdivision Administrator . . . . . . , , . ~ ' c• ~ • t BEFORE SPOKANE COUNTY DIVISION UF BUILDING AND PLANNING IN THE MATTER OF AN EXTENSION ) OF TIME REQUEST FOR } FINDINGS OF FACT PE-1570-89, AUTUMN CREST ) CONCLUSIONS AND AN APPROVED PRELIMINARY PLAT ) DECISION ) THIS MATTER, a request for an extension of time from Landreth Construction has been received and decided upon, pursuant to Spokane County Subdivision regulations (Section 12.100.118) and RCW 58.17.140. FINDINGS OF FACT 1. The individual signing below has been properly delegated the responsibility for rendering this decision by the Director of the Spokane County Division of Building and Planning. . 2. The original preliminary plat proposal was to divide approximately 38.22 acres into 109 lots for single family residences: . 3. The subject preliminary plat was approved by the Hearing Examiner Committee on March 23, 1989. . 4. The proposal is generally located at the southeast comer of 16' Avenue and Progress Road in Section 26, Township 25 North, Range 44 EWM, Spokane County, Washington. 5. The existing zoning of the property described in the application is Urban Residential-3.5 (UR-3.5) established in 1991 and previously classified as Agricultural (A) (ZE-60-42). Pursuant to RCW 58.17.195 the proposal does conform to the requirements of the existing ; Urban Residential-3.5 (UR-3.5) zone. : 6. The Comprehensive Plan designated this area of the preliminary plat as Urban, and the ~ location is within the Priority Sewer Service Area (PSSA). The Comprehensive Plan designation remains the same since the original preliminary plat approval. : 7. The subject property is located within the Interim Urban Growth Area (IUGA) adopted by the Board of County Commissioners (BOCC) Resolution #97-0321. 8. Spokane County has established specific criteria for considering ihe extension of time for . the expiration of preliminary subdivisions, specifically for regular subdivisions, and " department policy for short subdivisions. These criteria are found in Section 12.100.118 (Extensions of Time) of the Spokane County Subdivision Ordinance and have been used as a basis for this decision. Section 12.100.118 states that "The Director may administratively approve an extension provided there are no significant changed conditions which would render filing of the plat or binding site plan contrary to the public health, safety or general welfare, and further provided one or more of the following circumstances is found to apply." I f\ ► / Extension of Time Findings File No. PE-1570-89 Page 2 1) That some portion of the existing preliminary plat has been finalized since the last extension was granted and the remaining lots would form a unified developrrrent consistent with the original approval; RESPONSE: Of the 109 lots within the original preliminary plat, 75 lots have been finalized in four phases, identified as Autumn Crest ls`, Znd, 3' and 4th Additions. 2) That the preliminary subdivision, shor•t subdivision, or binding site plan remains generally consistent with the original plat or binding site plan that was approved, and the sponsor has taken substantial steps towards finalizing the plat or binding site plan, which shall include one, but is not limited to, the following: a. surveying the lots within the development, b. arYanging for public services to the site, c. obtaining necessary financing for all or a portion of the preliminary subdivision, short subdivision, or binding site plan; d. the completion of studies or other requirements which were part of preliminary subdivision, short subdivision, or binding site plan approval; RESPONSE: The preliminary subdivision remains consistent with the original plat that was approved. In addition, lots within the original preliminary plat have been surveyed and public services provided as evidenced by finalization of Autu.mn Crest ls`, 2nd~ 3`d~ and 4`hAdditions. 3) That at the time the preliminaYy plat approval was granted, development of the proposal was conditioned upon the extension of public services which are not yet available. This provision shall not apply to public utiliry extension which the project sponsor would normally fund. - RESPONSE: Not applicable. • 4) That administrative c'elays have caused the inabiliry of the applicant to f nalize the plat within the five (S) year time period. REPSONSE: Not applicable. 9. This is the third request for a time extension. The total life of the preliminary plat has been approximately eight years. 10. The proposal has been circulated to all affected agencies and departments for comments. No additional conditions have been recommended by the various reviewing agencies an departments, including the Spokane County Division of Engineering and Roads, the Spokane County Division of Utilities, the Spokane County Division of Building and Planning, and the Spokane Regional Health District. CONCLUSIONS BASED UPON A REVIEW of (a) the criteria for approving an extension of time of the expiration date for a preliminary plat and (b) the above Findings of Fact, the following conclusion is made: ~ • _ ~ Extension of Time Findings File No. PE-1570-89 Page 3 The proponent has demonstrated substantial progress toward completing the preliminary plat as evidenced in the above Findings of Fact, and there are no significant changed conditions which would render filing of the plat contrary to the public health, safety or general welfare. Therefore, a thiwretel(+~31)kyea~r-le-•~tens,io,ngolf~time.-,is,.warranted. DECISION BASED UPON THE ABOVE Findings offact an, d Conclusions, an e3ctension of time request for application PE-1570-89, Autumn Crest, is her^by-APRROM-fD~, ht.ii~1~A3ugus t~ , 20_~00. CONDITIONS OF APPROVAL Those previous Conditions of Approval specified in the Hearing Examiner Committee Findings of Fact, Conclusions and Order, dated March 23, 1989 together with the following updated conditions: SPOKANE COUNTY DIVISION OF BUILDING AND PLANNING (UPDATED) 1. The preliminary plat is given conditional approval for t~~ eQ(3) years, s_pecifically to ~`ig~u1st=~1.,-2,Q00. , The applicant may request an extension of time by submitting a written request approximately thirty (30) days prior to the above expiration date. 2. The owner shall negotiate with the Central Valley School District and submit a recorded copy of a voluntary agreement making provisions for public schools prior to finalization of the subject property to which the agreement applies and also state the dollar amount and any other agreed to mitigating measures. ' The owner shall also notify any potential purchasers who have made an agreement to purchase property within said plat pursuant to the Revised Lode of Washington (RCV)58.17.205, that adequate provisions for school facilities must be made conditioned on a future agreement between the plattor and school district. 3. The applicant shall contact the Division of Building and Planning at the earliest possible stage in order to be informed of code requirements administered/enforced as authorized by the State Building Code Act. Design/development concerns include: addressing; fire apparatus access roads; fire hydrantlflow; approved water systems; building accessibility; construction type; occupancy classification; exiting; exterior wa11 protection; and energy code regulations. DATED this 17`h day of July, 1997. 4 (wqz~~ ~ Yi q w d Tammy Jorie's ~ . Planner II ~ _ r ~ ~ • --%Extension of Time Findings File No. PE-1570-89 Page 4 Under state law and county ordinance, you have the right to appeal this decision to the Spokane County Hearing Examiner. Upon receipt of an appeal, a public hearing will be scheduled. To file such an appeal, you must submit a letter along with a processing fee, payable to the Spokane County Division of Building and Planning, within ten (10) calendar days from the date this decision is signed. If you have any questions, please call the Spokane County Division of Building and Planning at 456-3675. c: Spokane County Division of Engineering and Roads Spokane County Division of Utilities Spokane Regional Health District Spokane County Fire Protection District # 1 Vera Water & Power Central Valley School District Spokane County Air Pollution Control Authority Landreth Construction, 10801 E. Valleyway, Spokane, WA 99216 Inland Pacific Engineering, 707 W. 7`h Ave., #200, Spokane, WA 99204 File -w• - i BEFORE SPOKANE COUNTY DIVISION OF BUILDING AND PLANNING IN THE MATTER OF ANSE♦XTENSION ) ~TIME REQUEST FORe ) FINDINGS OF FACT PE-1570-89, AUTUMN CREST ) CONCLUSIONS AND AN APPROVED PRELIMINARY PLAT ) DECISION ) THIS MATTER, a request for an extension of time from Landreth Construction has been received and decided upon, pursuant to Spokane County Subdivision regulations (Section 12.100.118) and RCW 58.17.140. FINDINGS OF FACT 1. The individual signing below has been properly delegated the responsibility for rendering this decision by the Director of the Spokane County Division of Building and Planning. 2. The original preliminary plat proposal was.to divide approximately 38.22 acres into 109 lots for single family residences. , 3. The subject preliminary plat was approved by the Hearing Examiner Committee on March 23, 1989. 4. The proposal is generally located at the southeast corner of 16`h Avenue and Progress Road in Section 26, Township 25 North, Range 44 EWM, Spokane County, Washington. 5. The existing zoning of the property described in the application is Urban Residential-3.5 (UR-3.5) established in 1991 and previously classified as Agricultural (A) (ZE-60-42). Pursuant to RCW 58.17.195 the proposal does conform to the requirements of the existing Urban Residential-3.5 (UR-3.5) zone. 6. The Comprehensive Plan designated this area of the preliminary plat as Urban, and the location is within the Priority Sewer Service Area (PSSA). The Comprehensive Plan designation remains the same since the original preliminary plat approval. 7. The subject property is located within the Interim Urban Growth Area (IUGA) adopted by the Board of County Commissioners (BOCC) Resolution #97-0321. 8. Spokane County has established specific criteria for considering the extension of time for the expiration of preliminary subdivisions, specifically for regular subdivisions, and department policy for short subdivisions. These criteria are found in Section12.100.118 (Extensions of Time) of the Spokane County Subdivision Ordinance and have been used as a basis for this decision. Section 12.100.118 states that "The Director may administratively approve an extension provided there are no significant changed conditions which would render filing of the plat or binding site plan contrary to the public health, safety or general welfare, and further provided one or more of the following circumstances is found to apply." :-'Y ` ' ~ _ ~;r'.,' • ~ • r r . ` ~ . i I ~ • ' `y ~ ~ Extension of Time Findings File No. PE-1570-89 Page 2 I) That some portion of the existing preliminary plat has been finalized since the last extension was granted and the remaining lots would form a unified development consistent with the original approval; RESPONSE: Of the 1091ots within the original preliminary~lat, 75 lots have been finalized in four phases, identified as Autumn Crest 1 S`, Znd, 3 and 4' Additions. 2) That the preliminary subdivision, short subdivision, or binding site plan remains generally consistent with the original plat or binding site plan that was approved, and the sponsor has taken substantial steps towards finalizing the plat or binding site plan, which shall include one, but is not limited to, the following: a. surveying the lots within the development, b. arranging for public services to the site, c. obtaining necessary financing for adl or a portion of the preliminary subdivision, short subdivision, or binding site plan; d. the completion of studies or other requirements which were part of preliminary subdivision, short subdivision, or binding site plan approval; . RESPONSE: The preliminary subdivision remains consistent with the original plat that was approved. In addition, lots within the original preliminary plat have been surveyed • and public services provided as evidenced by finalization of Autumn Crest ls`, 2°a, 3", and 4' Additions. 3) That at the time the preliminary plat approval was granted, development of the proposal was conditioned upon the extension of public services which are not yet available. This provision shall not apply to public utility eztension which the project sponsor would normaldy fund. . RESPONSE: Not applicable. 4) That administrative delays have caused the inability of the applicant to finaliae the plat within the five (S) year time period. REPSONSE: Not applicable. 9. This is the third request for a time extension. The total life of the preliminary plat has been approximately eight years. 10. The proposal has been circulated to all affected agencies and departments for comments. No additional conditions have been recommended by the various reviewing agencies an departments, including the Spokane County Division of Engineering and Roads, the Spokane County Division of Utilities, the Spokane County Division of Building and Planning, and the Spokane Regional Health District. CONCLUSIONS BASED UPON A REVIEW of (a) the criteria for approving an extension of time of the expiration date for a preliminary plat and (b) the above Findings of Fact, the following conclusion is made: • • ~'l ~r l,' . : f . . • , ~ f ~ ~ • Extension of Time Findings File No. PE-1570-89 Page 3 The proponent has demonstrated substantial progress toward completina the preliminary plat as evidenced in the above Findings of Fact, and there are no significant changed conditions which would render filing of the plat contrary to the public health, saferiJ or general welfare. Therefore, a three (3) year extension of time is warranted. ~ DECISION BASED UPON THE ABOVE Findings of Fact and Conclusions, an extension of time request for application PE-1570-89, Autumn Crest, is hereby r P O~+D u~n~t~iil~Asu~~tu~st~l, 200'0~ CONDITIONS OF APPROVAL Those previous Conditions of Approval specified in the Hearing Examiner Committee Findings of Fact, Conclusions and Order, dated March 23, 1989 together with the folloNving updated conditions: SPOKANE COUNTY DIVISION QF BUILDING AND PLANNING (IJPDATED) 1. The preliminary plat is given conditional approval for three (3) years, specifically to August 1, 2000. The applicant may request an extension of time by submitting a written request approximately thirty (30) days prior to the above expiration date. ~ 2. The owner shall negotiate with the Central Valley School District and submit a recorded copy of a voluntary agreement making provisions for public schools prior to finalization of the subject property to which the agreement applies and also state the dollax amount and any other agreed to mitigating measures. The owner shall also notify any potential purchasers who have made an aareement to purchase property within said plat pursuant to the Revised Code of Washington (RCV)58.17.205, that adequate provisions for school facilities must be made conditioned on a future agreement between the plattor and school district. 3. The applicant shall contact the Division of Building and Planning at the earliest possible stage in order to be informed of code requirements administered/enforced as authorized by the State Building Code Act. Design/development concerns include: addressing; fire apparatus access roads; fire hydrant/flow; approved water systems; building accessibility; construction type; occupancy classification; exiting; exterior wall protection; and energy code regulations. DATED this 17`h day of July, 1997. Taxnmy Jorb's ~ . Planner 11 . . . • , ' ' Page 4 i ' Exlc:nsioii ut"l"imc 1~ iiidings File No. PE-1570-89 , Unclc, this decision to the Spokane .r 5.tatc, . ta~v and cou~lty ordinance, you have the right to apPeal ~„~ill be scheduled. To ublic hearing County 1 Ic:~ric~g isxailliner. Upon receipt of an aPP~th a processing fee, payable to the Spokane ti lc stic li u~l ~ip~~c:a l, yc~ll must su bmi t a l e tte r a l o n g ca len dar d a y s fro m t h e date this Cc~utlty l~iviston o[ 13uilding and Planning, ~thin ten dccisic.~n is, sigiiec1. Division of Building and Pl~ing at t t' you ~i;t~lc; .~tiy c~liestions, please call the Spokane CountY 4SG-3G7i. . c: Sp~~hunc: Cul«iiy l~ivision of Engineering and Roads Spokane Cuutity Division of Utilities 5pok,ttic: Rcgit»>;il 14ealth District 5pol;;mc Cuvinly Fire Protection District 41 Ver;l Watcr & 1'ower Cemr:il Valley School District Spokane Cuurit~~ 1~ir Pollution Control Authority wA 99216 L:itlcjrettl Coi»truction,10301 E. Va11eywaY5 Sp°kane' ~IA 99204 ' l~ll;»t~i 1'acitic l~~>>ineering, 707 W. 7''' AVe•, #200, Spokane, F ilc , - SEFORE SPOKAN~ ~OUNTY F'LANNING DEPA'RT1ViENT IY- 7['HE MATTER OF AN EXTENSIQN OF TIME REQUEST FOR PE*1570-89 ) FINDINGS C~F FACT AUTUMN CRES"I"3 AN APPROVED ) C(]NCLUSiO1VS A1YD PRELIMINARY PLAT WITH ~ONE ~ - DECISION RECLASSIFICATION, ~E..7-89 FR[]iVI ) AGRICUL'TURAL (A) TD URBAN ) RESIDENTIAL-3,5 (UR-3.5) THIS 1VIAT'TER, arequest for axi extensivn of time frorn Landreth Constructivn has been received and decided upon, pursuant to Spokane Caunty Subdivisian -regulativn (Chapter III, , &ction''G) 'and'RCW' 58.17.140. ' FINDINGS OF FACT AND CONCLUSIONS 1. 'Me individual sYgnirig.belvw has been, properly delegated the responsibility for -rend,ering this decisivn by the Spokane Cvunty 1]ireeCor of Planning. 2. The proposal was to subdivide approxinately 38 acres into 109 lats for siiigle family dweltings, _ 3. T'he subject preiiminary plat was approved by the Hearing Examiner Commiitee ort - March 23t 1989. 4. The propasal is generaliy 1ocated at the sout~~~t cvmer of lfith avenve and Progress Rvad in Section 26, Tawnship 25 North, Ra.nge 44 EWM, Spokane County, Washington. 5. The exis&g zoning of the property descr-ibed in the applicadon is Urban Residential-3.5 ]R-3.5), previausly established as Agricultiira.l zoning in 1942 anr~ redesi~ated tv Urban Residential-3.5 (LTR-3.5) on Ja~uary 1, 1991 consistent with the Pragram to Implement the Spokane County Zoning Code. Pursuant tv RCW 58.37.195 the praposal does confvrm to the requirernents of the existing Urban Residential-3.5 (UR-3.5) zone. 6. The Comprehensive Plan designates this area af the preliminary plat as Urban, and the location is widiin the Priarity Sewer Service Area. The Comprehensive P1an designativn rernamis the saYne sirtce the Miginal preliminary plat agpraval. 7. Spokane Caunty las established specific cfiteria far considering the extension of time for, the expiration of preliminary subdivisionsa specifi~aNy for regular subdivisions, and departrnent poli~y for short subdivisions. These criteria ase found xn Chapter III, Section G vf the Spvk,ane County Subdivision Ordinance and have been used as a basis for this decision. Section Cx states, "APprvval of a preliminary subdivisian sha11 autotnatically expi,M ttrree years after pre]].imiriary approval is gmted unIess a time extension is applied for." and f.ollows with "Upon applicatian for time extension, the Planning Drirectvr vr designee may administratively approve extenstions for up ta three (3) y,ear perivds provided at least one af the fo1lvwing cir+cumstances is fvunt to app1y;'i The following are the reZevant sections of Secrion G and the Plann.ir~g Deparunent response: 1 . nat same partivn vf the existing preliminary plat has been finalized since the last extension was'sg=ted and the remaining lots wauld ~offn a unified develvpment - - consistent with the cmginal approvail; . RES1~C11~S~: Of the 109 lvts within the vriginal prelirninary p1at, 52 lats have been finalized in three pharses, xdentifed as Autumn Crest 1st, 2nd and 3rd Additions. 2. That the preliminary plat as approved rernains consistent with the Generali~ed Cvmprehensive Plan frnr Spoka,ne County insafar as density AND vther . ; A , . . ~ 1 - Lxtension of Time Finduig~ PE-1570-89 • Page 2 , developnlent provisions apply, and the sponsor has taken substantial steps towards finalizing his plat, which shall include but not be limited to: . a. surveying the lots within the development, b. arranging for public szrvices to the site, c. obtairung necessary financing for all or a portion of the preliminary plat, d. the completion of studies or other requirements which were part of preliminary plat approval; RESPONSE: The approved preliminary plat remains consistent with the Urban category of the Comprehensive Plan, which remains the same since the original preliminary plat approved. In addition, lots within the original preliminary plat have been surveyed and public services provided as evidenced by finalizarion of Autumn Crest 1 st, 2nd and 3rd Addidons. 3. That at the time preliminary approval was granted, development of the proposal was conditioned upon thc extension of public services which, are not yet ava.ilable. This provision shall not apply to public utility extension which the project sponsor would normally fund. R.ESPONSE: Not applicable. , . . , , . _ • . v„ . no 8. No ad;ditional conditions have been recommended bythe various reviewing agencies and departments, including the County Engineer's Office, County Health District, County Utilities and the Department of Building & Safety. However, the Central Valley School District has responded to the extension of time request and has indicated that existing facilities are inadequate to accommodate the impacts generated by the proposal. The School I?istrict has_requested that the applicant be required to reach a voluntary agreement to mitigate the unpacts of this proposal on the School District. This request is included as a condition of approval for this extension of time. 9. This is the second request for a time extension. The total life of the preliminary plat has been approximately 5 years. . , , . . . DECISION BASED UPON TFE ABOVE Findings of Fact and Conclusions, an extension of time request for application PE-1570-89 is hereby APPROVED until-September_1;:1997. - CONDITIONS OF APPROVAL SPOKANE COUNTY PLANNING I)EPARTMENT (UPDATED) 1. All those cond.itions of approval specified by the Spokane County Hearing Examiner C;onunittee Findings and Order dated March 23, 1989, with the following updated conditions. 2. That the preliminary plat be given conditional approval until September 1, 1997. The applicant may request an extension of time by submitting a written request 45 days prior to the above expiration date. 3. The owner shall negotiate with Centtal Valley School District and subnnit a recorded copy of a voluntary agreement making provisions for public schools prior to finalization and recording of the plaL The agreement shall provide a wntten description vf the subject property to which the agreement applies and also state the dollar amount and any other agreed to mitigadng measures. The owner shall also notify any potential purchasers who have made an agreement to purchase property within said plat pursuant to the Revised Code of Washington (RCVV) 58.17.205, that adequate provisions for school facilities must be made conditioned on a future agreement between the plattor and school district. ---Voluntary agreements between the owner and school district shall conform to the requirements of RCW Chapter 82,02, "•'r'r~<i : : . + N,: a • ~ « " Y~icter:sibn of Tune Findu~gs PE-1570-$9 ~ Page 3 DATED THIS DAY OF AUGUST, 1994 jeniN PED RSON or Planner Under state law and county ordinance, you have the right.to appeal this decisiort.to the Spokane County He,aring Examiner Committee. Upon receipt of an appeal, a public hearing will be scheduled. To file such an appeal, you must submit a letter along with the appropnate processing fee payable to the Spokane County Planning Department, within ten (10) calendar days from the date this decision is signed. If you have any questions, please call the Planning Department at 456-2205. c: County Engineer County Utilities . County Health District County Building and Safety Central Valley School District Landreth Construction, 708 North Argonne, Suite 18, Spokane, WA 99212 Inland Pacific Engineering, 707 VVest 7th Avenue, Suite 200, Spokane, WA 99204 . . < , . . , . . , . , . . - - SPOKANE COUNTY HEARING EXAMINER COMMITTEE FINDINGS & ORDER DATE: March 23rd, 1989 RE: HUNTER'S GLEN - , PE-1570-89 Preliminary Plat ZE-7-89 Agricultural to UR-3.5 1. The proposat is to divide approximately 38.2 acres Into 109 lots for single family dwellings and to change the zontng from Agriculturai to UR-3.5. ; 2. Located: On the southeast comer of Progress and 16th Avenue in the Spokane Valley. The property is "L" shaped extending south from 16th Avenue and Progress to the vicinity of 22nd Avenue and then east to Suilivan Road. Located in Section _ 26, Township 25 North, Range 44 E.W.Ni.. Spokane County, Washirigton. 3. We find that the item has beQn properiy advertised in accordance with'state and local regulations. 4. We have consldered and evaluated ihe information and oonditions oontained in the Planning Report for thjs proposal. 5. . The Comprehensive Plan designates ihis area as Urban and is within the Priority Sewer Service Area (PSSA) boundary. . 6. That we believe the proposal is.oompatible with existing uses in the area which include singte family residential uses on similar size tots. 7. We note that ovmers of adjacent and nearby property spoke generally about improvements conceming 16th Avenue. No one appeared to oppose the proposal. 8. We find the provisions of the State Environmental Policy Act have been complied with. . 9. That we approve ihe reoommended changes in the oonditions of approval presented at the public hearing. , , , , . . 10. That the recommended guideline of 35' ft. setback was excessive along 16th Avenue and Sullivan Road due to existing development in the area and the remote necessity of the setbadc being necessary. DECISION AND QRDER VOTE: 2-1 to Approve jN.RFFERENGE TO TNE ATTACHED F{NDINGS & ORDER. THE HEARINa EXAMINER COMMITTEE ADOPT5 THE FOLL0INlNG CONDITIONS OF APPRQYALpTTAOED UR ' PLANNINQ DEPARTMENT CONDITlONS: /`aj~~ t4jt °t 3-89 HEC Findings Page 2 . ~1. That the below listed oonditions of all Departments and Agencies are binding upon the applicant, owner(s) of the property, heirs. successors or assigns. . 2. The preliminary plat of record approvai is for the property legaliy described in the application for thls proposal. ' 3. That the Finel Plat be des{gned substantialiy in oonformance with the preliminary plat of record as legally described and advertised. No increase of density or lot number shall oocur withoui a new epplic.ation submittal and approval'. 4.rf~i . ~ • „ ~.Y-: '4~.~ The Spokane County Subd'Nisbn Administrator shaii review any proposed Ftnal Plat to insure complianoe With the Findings and Conditions of Approval. That the preliminary plat be given oonditional approval for three (3) years to April 1 st, 1992. The applicant may request an Extension of Time by submitting a written request foriy-five (45) days prior to 1he above'- expiration date. ~6 Upon filin9 the Final Plat the zone change of the Final Plat area shall be finalized and the existing Agricuitural zone classification shall be changed to UR-3.5. :That a Final Plat namelnumber be lndicated before the final plat is filed; such name\numtier to be approved by the County Pianning Olrector/Designeo. . . _A-°•'- ~8: That appropriate road names be indicated on the plat. y# That appropriate utility easement5 be indicated on copies of the proposed finai plat. Written approval of said utility easements by said utility companies must be ;ec'eived with the submittal of the finai plat. 10. That 3 current certificates of title be fumished the County Planning Department prior to filing the final plat. 11. T~t the followin9 siatement be Placed in the fnal Plat dedication: "No more than $ dwelling stnacture be placed on any Lot nor shafl any lot be funher subdivided for'the purpose of cteating additional lois, ownerships, or building sites without fi~st filing a replat " . . 1`2. e final plat map shall indicate by a clear dashed line, the required setbacks from a l private, tract x or public roads. the dedication shall contain a statement that: e yard and rear yard setbadcs shall be determined at the time building permits are requested. The setbacks Indicated on this subdivision may bs varied from if p~,oper zoning approvals are obiained." In addition setbacks for buildings shall be 25' ft. from the Sullivan and 161h Avenue right of way. ~ 13. That a plan for water facilitles adequate for domestic service and fire protection be approved by the water supplier, fire protection district, Spokane County Building & Safety Department and County health authorities. The agencies wi11 certify on the WATER PLAN, prior to the filing of the final plat or any phase of the preliminary plat that the plan is in oonformance with their respective needs and regulations. The WATER PLAN and certification will be drafted on a transparency suitable for reproduction and be signed by the plat sponsor. . , . , . , `3-89 HEC Findings Pa9e 3 , . . . . . , , . 14. The purveyor will also certify on the Water Plan that appropriate contractual arrangements and schedule of improvements have been made with the ptat sponsor . ~ for construction of the water system in aocordance with the approved WATER PLAN. The time schedule for lmprovements will provide for completion of the water system and inspection by ihe appropriate health auihorities prior to application for building permits within the final plat. The arrangements or agreements will include a provision holding Spokane Counry and the purveyor harmless from claims by any lot purchaser refused a buitding permit due to the failure of the plat sponsor to satisfactorily complete the approved water system. , . ge~ ~5 The tinal plai dedication will oontain the followin9 statement: "The Public water s,ystem, pursuani the WATER PLAN approved by County and State Health : authorities, the local fire district,' County Building & Safety Department, and ` ater purveyor,' will be instatled within this plat, and the subdivider/sponsor will . pr,ovide for individual domestic water service as well as fire protection to each lot ~ , p~nor to sale of each Lot and prior to issuance of a building peRnit for each Lot." ~ . . - ~a_ . . . , , , . ~ AN:~~ That no building permit will be issued for an lot within the Final Plat until certified by a Washington State licensed engineer "that the water system has been . instailed pursuant the,approved WATER PLAN for the Final Plat", signed and stamped by said engineer., The^certification may be in the form of a lerier but is preferred to be cenified on s oopy of the WATER PLAN as a schemat+c map showing ~ . the "As Built" water system. 1-7. That a survey is required prior to the filing of a final plat. . y ` ,,gOUNTY ENGINEER'S CONDITlONS '2 w~ _ . That ptans, proftes, and cross-sections as designed to County standards showing proposed street centertine and curb grades be submitted to the County Engineer for ~ approval prior to construction and/or the filing of each final plat; road plans to be ~ prepared under the direction of a licensed Professional Civil Engineer,, . , -Ij2. That drainage plans and design calculations showing the alignment of drainage facilities be submitted to the County Engineer for approval prior to construction and/or the fi(ing of each final plat. Drainage plans to be prepared under the direction of a licensed Professional Civit Engineer. . .3. Construction within the proposed public streets and easements shall be performed under the direct supervision of a licensed engineer/surveyor, who shall fu+i-iish the County Engineer with "As Built" plans and a certificate in writing that ail improvements were installed to the lines and grades shown on the approved , construction -plans and that all disturbed monuments have been replaced. , i4. -No oonstruction wortc is to be performed within ihe existing or proposed public . right of way until a permit has been issued by the County Engineer. All work is subject to inspection and approval by the County Engineer. 5. All construction within the existing or proposed public Right-of-Way is to be ~ completed prior to filing each final plat or a bond in the amount estimated by the .j County Engineer to cover the cost of construction of improvements, construction ~ r. ' . ~ 1 t ( ' -.1.1 . . _ . ~ • ' 0~../'~. ~ . r c`~` ~ l^~~ ~ ♦ 3-89 HEC Findings Page 4 cert(fication. "As 6uilt" plans, and monumeniing the street centerlines shail be filed with the County Engineer. 6. , No direct access from bts to Stub Road connections until such roads are constructed to County Standards and estabiished as County Roads. r•x . 7~.:y Road design, oonsiruciion. and dra3nage oontrol for 1/2 Right of Ways and Stub Road oonnections are the responsibility of the developer. hat appropriate provisions be made that the folfowing descxibed property be he{d scx ~n trust until the oontinuation of the streets be dedicated or deeded: A I-ft. strip at the ends or edges of ali streets that tenninate or border the finai plat boundary. 440 (Temporary cul de sacs are required when streets terminate at the plat . oundartes.j r w~ - • ~ . . The applicant shouid be advised ihat individual driveway access permits are : ~ required prior to issuance of a building permit for driveway approaches to the County road system ,44 icaiion of 14' ft. of additional Ri!ht of WaY abn! Pro!ress Road as depicted on r , ' he Preliminary Piat. ,WDedication of 30' ft. of additional Rtght of Way along 16th Avenue and Sullivan Road ,,,,~r•~ `as depicted on the preliminary plai. ~•r A statement shall be piaoed in plat dedication that no direct access be allowed from lots to 16th Avenue or Suilivan Road. . , .12. Existing County roads provlding direct access to the plat shall be paved and curbed . to Spokane County standards. 13. That all public roads within the plat be designed and oonstructed to Spokane County . standards. " 14. That sjdewalks are required along the arterial(s) on Sullivan Road 16th Avenue and St. Chades Road. 15. The word "applicant" shail indude the owner or owners of the property, his heirs, assigns and suooessors. ,~.1.,6. ~The County Engineer has designated Typicai Roadway Section Number Two, Collector Arterial Standard for the improvement of St. Charles Road which is to be "construcied wiihin the proposed development. This will require the instaliation of - 40' ft. of asphalt. The oonstruccb~on of curbing and sidewalk is aiso required. . . . The County Engineer has designated Typtcal Roadway Section Number Two, Access • Street Standard for the improvement of internal streets other than St. Charles Road, which is to be constructed within the proposed development. This will require the insta!lation of 36' fl. of asphalt. The construction of curbing is also required. O 9-0~ ~a1 ~ ~ 169 , . •a+• . = uw /tl. . V ~J / ~ . 0 • 3-89 HEC Findings Page 5 The County Enginesr has designated Typical Roadway Section Number Two, Access Street Standard for the improvement of Progress Road which is to be constructed adjacent to the proposed devebpment. This will require the instailation of 10' to 12' ft. of asphait. The oonstruction of curbing is also required. . , '1~7: The proposed piat shall be improved to the standards set forth in Spokane County Board of Commissioners Resolution No. 80-1592, as amended, which establishes regulations for roads, approaches, drainage, and fees in new construction. ~ -J18 This plat or devetoPment ProPasal is located within a draina9e basin which has heen identified by the Spokane County Engineers Office as having stormwater runoff ~ problems. Since this plat or- development proposal Is affected by ar is a contributor to stormwater fiows, property owners should partic+pate in the _ ;;Vplannidesign,ng and implementation of a future basinwide stormwater management ~ , system. The following statement shall be placed in ihe plat dedication: "That the ~"`'~*owner(s) or suocessor(s) in jrrterest agree to oin In`an Coun roved Stormwater Management Program 'and to pay such rates and charges~as may be fxed through public hearings for service or benefit obtained by the planning, oonstructing,* maintaining or operation of stormwater controf facilities". Note: The proposed road rigM of way dedication deptcted on the preliminary plat is ' consistent with the County Arteriaf Road Plan. This dedication eliminates the need • for the establishment of a reserve strip along either of the arterials. z~e~ That Sullivan Road and 16th Avenue be improved per the approved Typical Roadway Cross Sectans for those roadways. A copy of these Cross Sections is available at the County Engineer's Office 'for inspection. These' improvements 'will consist of ' 1/2 right of way along the frontage of the site. .=20. Any change In alignment, removal or relocation of power lines located along the West side of Sullivan Road is the responsibility of the applicant. :21.. That the location of the 21 st Avenue intersection at Sullivan Road shall correspond :u• t with the intersection alignment of 21 st within the proposed plat of Ridgemont 3rd Addition. If the alignment of the intersections is not possib(e then the intersection shall be offset per Spokane County Standards. •22.- Construction of the median depicted on.the preliminary plat at the 21st Avenue, Sullivan Ro.ad intersectipn is subject to the approval of the Counry Engineer. Additional right of way width may be required if approval of construction is given. N UEALT~i DISTRICT C4NDITIQNa G I. A plan for water facilities adequate for domestic use, domestic irrigation use, and fire protection use shall be approved by the water purveyor. Said water plan must have been approved by the fire protection district and the appropriate health authorities. The health authorities, water supplier (punreyor), and the fire protection district will certify, prior to the filing of the final plat, on the face of said water plan ihat the plan is in conformance with their requiraments and will ' adequately satisfy their respecEive needs. Said water plan and certification will be drafted on a transparency sudable for repreduction. ~A u 3-89 HEC Findings Page 6 ~~22. The purveyor will also certify prior to filing the final plat on a capy of said water . pian that appropriate oontractual arrangements have been made with the plat sponsor for oonstruction of the water system, in accordance with the appraved plan and time schedule. The time schedule wili provide, in any case, for completion of , the water system and inspection by the appropriate health authorities prior to application for building permits within the plat.. The contractual arrangements will include a provision hQlding Spokane County/City of Spokane, Spokane County Neatth District, and the purveyor harmless trom claims by any IoUtract Pu rc haser refused a buiiding pertnit due to failure of the plat s~nsor to tisfactorily complete the approved water system. Am public sewer system will be made available for the ptat and individual service wlll be provided to each lot prior-to sale. Use of individual on-site sewage disposai . systems shall not be authorized. A#statement shall be placed in the dedication io the effect that: "A public sewer - ~~t'~r~► system will be made avaitable for the plat and individual service will be provided o each lot prior to sate. Use of indNiduat on-site sewage system shali not be a dthorized." . ,.5 The dedlcatory language on the plat shall state: "Use'of private wells and water s~stems is,prohib.iied." , _ . J .6.` The ptat dedication will oontain a siatement to the effeci that: "The public water ,"y~P system as approved by County: and State health authorities and the local fire district and purveyor will be instalted within this p(at, and the subdivider wil! #provide for individual domestic water service as well as fire pratection to each lot . prior to sale of each lot " gQVNTY UTILITlES DEPAR,TMEMT QQNDITIQ,Na 1 . This project will make connection to the Valley Sewer project. BUILDING & SAFETY DEPARTMENT QQNDITIONS The applicant shaU oontact the'Departmeni of 8uilding and Safety at the earliest possible stage of desigNdevelopmeni in order to be informed of oode requirements administered/enforced by the depahment; e.g., State Building Code Act regulations such as requirements for fire, hydranUflow, fire, apparatus access: ,road$,, private road designation/naming, street address assignment, building/demolition permits and general coordinatinn with other aspects of project implementation. FIRE DI$TRIQT NQ. 1 QgNDITIQK,S: 1. The installation of five (5) new fire hydrants. These fire hydrants for fire protection will be installed acoording to an approved water plan submitted to Fire Disirict No. 1. . . i(r. i i . . . . v ~ 3-89 HEC Findings Page 7 Approved on 23rd day of March, 1989. THE HEARING EX4MINER • ' COMMITTEE HEREBY' AYTESTS TO ~ ~ • ~ THE ABOVE FINDtNGS AND ~ CONCLUSION AND VOTE. . Chatrperson . of . ~ . i. Ir ' ~ . ~ .y ~ . ~ • • • . . . A T: . DOUGLAS S. ADAMS DATE: 3-23-89 Spokane County Subdivtsfon administrator , 7117 . . ~ . ~ . . - • . ,7a• . ' S P O K A N E A#Aft C O U N T Y • DIVISfON OF ENGINEERiNG AND ROAUS ~ A DIVISION OF THE I'U13(_IC WORKS DEPARTMENT WSlliam A. Johns, P.E., County Engineer , Dennis M. Scott, P.E., Director ' 'AGIt]CLi MEi N7C TO PAY FEES /6704D ENGINE, ER!S AGREEMENT NUMBER , • . , This agreement between Spokane County and c.Qtt andreth . , wllose interest in the project is owaer - . tSwIler, , . " is entered into this 4th A qf December ;-.I9 9Z.~:This agreement is appticable to the project G . known as:' rin field ~ &7 iz, That the individuals and parties named herein as liaving an interest in ihe above described property or project agree ro the following: l. Reimburse Spokane County,for project review and inspection fees as specified in Cliapter 9.14 oF ' the Spokane County Code. The fees will be based on actual salary costs incurred by Spokane , County for project reviews and / or inspections plus. a ten percent administrative charge, and will be billed monthly as accrued. Any billing amounts due, including any exnenses incurrecl in the ' collection of an overdue account, must be paid prior to, the County's acceptance of the project for filing. If a project is apnroved and/or filed witli a balance still owing, ttie unnaid balance sliall be paid within 30 days af the 'invoice date. ' . 2. The undersigned agrees that these fees are due and payable upon receipt of the billing as specified above. 3. Any invoices not paid within 30 days of the invoice date will be coiisidered delinquent. If any outstanding balance vn the account for tliis project is not paid within 30 days of the invoice date, no ftirtller reviews of the projeet documents will be conducted until the entire account balance is paid. Any balance on the account for this .project not paid within 65 days of the invoice date may result in legal action or' the initiation ofother collection procedures, including referral to a . collection agency: The Sponsor wili be liable for any and all expenses incurred,by the County for the collection of overdue accounts. . 4. The montllfy biiting sliould be sent to the attention of: ' NAME: Landreth Construction ADDRESS: 10801 EaSt Vallevwav CITY, STATE: Spokane, WashinQton ZIP CODE: 99206 G la: . . t • 1 , , PHONE (509)927-7401 I understand that failure to pay these fees may resutt in delay in completion or approval of the project or otliPr possible sanctions. . 0 If this fee agreement is completed by someone otlier than the Sponsor (i.e., the project owner or a principat in the firm sponsoring the project), such as the Engineer designing the project, tlien written authorization from the SPonsor specifically autliorizing the -Agent to execute this I'ee Agreement is attached to t1iis gFm~ement. GN.ATURE By: SI 5Cv . (PRINT NAMEj R~ i,~N YEL.t.QW COPY T() SI!QIKANr (:OUNTY T Yily EE Mskt\agteefee.cloc 2/1l96 1026 W Broadway Ave Spokane WA 99260-0170 (509) 456-3600 FAX:* (509) 324-3478 TnD: (509) 324-3166 . . ~ . , S P O it N E . C O U N T Y DiVISION OF ENG1tJEERiNG AND ROADS • A DIViSTON OF THE PUBI.IC WORKS DEPARTMENT William A. Johns, P.E., Coiinty Engineer Dennis M. Scott, P.E., Director AGRE EMENT TO PAY TEES - )D /45 70Q . ENGINE, ER'S AGREEMENT NUMBER This agreement between Spokane County and c tt andreth . , whose interest in the project is owner . , • Owner, agent, is entered into this 4th day of December , 19 97-.This agreement is applicable to the project known as:' S rin field puT AVAW , That the individuals and parties named herein as liaving an interest in the above described property or project agree to the following: 1. Reimburse Spokane County for project review and inspection fees zs specified in Cliapter 9.14 of the Spokane County Code. The fees will be based on actual salary costs incurred by Spokane. County for project reviews and / or inspections plus a ten percent administrative charge, and will be billed monthly as accrued. Any billing amounts due, including any exnenses incurred in tlie ' collection of an overdue account, must be paid prior to, the County's acceptance of the project for filing. If a project is approved and/or filed witll a balance still owing, the unpaid balance sliall be paid within 30 days of the 'invoice date. . 2. The undersigned agrees that these fees are due and payable upon receipt of the billing as specified . above. ' • 3. Any invoices not paid within 30 days of tlie invoice date wili be considered delinquent. tf any outstanding balance on the account for tliis project is not paid within 30 days of the invoice date, no further reviews of the project documents will be conducted until the entire account balance is paid. Any balance on the account for this project not paid within 65 days of the invoice date may result in legal action or * the initiation of other collection procedures, including referral to a collection agency'. The Sponsor will be liable for any and all expenses incurred by tlle County for the collection of overdue accounts. , 4. The montlily billing should be sent to the altention of: NAME: Landreth Construction ADDRESS: 10801 East Vallevwav CITY, STATE: , Spokane, Washinjzton ZIP CODE: 99206 PHONE (509)927-7401 I understand that failure to pay these fees may result in delay in completion or approval of the project or otlier possible sanctions. . O If this fee agreement is completed by someone otlier than the Sponsor (i.e., tlie project owner or a principal in the firm sponsoring the project), such as the Engineer designing the project, then written authorization from the Sponsor specifically autliorizing the Agent to execiite this Fee Agreement is attached to tliis Fee ement. , - t SIGNATURE By: 5-CO . (PRINT NAMEj , , RETi YEL ,OW COPY T() SPOKANI; COUNTY TNG1N EE kNAnagreefee.doc 2/1/96 1026 W Iiroadway Ave SpokAne WA 99260-0170 (549) 456-3600 FAX:'(509) 324-3478 TDn: (509) 324-3166 4• ~ ' • a .s~ i :~'',~`;%,=~;~,r ~a~ 4~,•.~~""° . ~ • t ~ ~l•id„cri~,c~~~ ~ ~Y') ~~~~0 ,'1.~~ ~ ~t~~ ~ y~ a~'~~ . `a,'~9 , . • 'J ti ~r~~~.a• , ~+~~.~~~.{8~ J1~ .~~,~~t,~~l' ~3NOW h'r~" r'~` t t;~" r` 1 ad_" ,~~,tx7~,~~ , a~,NN17j~ • ~ , , ~ .`~Nnp77~d , , ~'1~ i~+ ~'!i'. ~~.'S~;~t~, ~~it! . ~ Yy~tjk •'~:Y ~ •lti!~,,Y .i,'r~`t . ~F.t~ . . K ~MUH,.,.',.::=--,4 ~ . , ~ . ~ dldd~ ~ , . . I . , • ~ , 1 ~ii~'.'' 1 ' ' +i " . . ^rn ' ' ' ~t~~~4~~~T 411r17~Z~:ii Y, ~ 'Z ~ i) ^V•~"' A~O.I " ~r y ~ ~ t~ • a , ~tl~clt , 1 aj i t f~l t~,~ ~ ti`~.` ~ Z ' ~a\ ti+ tr~~ )1~~+ ~~h i~ t .~r~ ~~"''a ~ • ' ' ' . ' ~ y~ ~ , ~ e. " i 7r ~ , i' J. • ; .~1 • • ~ ~ ~ ~ ~~"ssaipP`d. . . . ' , ~ :~,,,~~Ya,~, ,~i• - ~ 4a3~ f. . ~ ~/~7) ~ ~L ~ ~ ~ ~'1'~.1 ~ ;t !'e,1~• f . ~ • , , . V 5~~~~0~ ~J ~{r wQ~~ Q + M 0+'~~+,~i??~C1'k•1'"3~,~a , , • ' ;t~ ~ . L~-~J ~ ` ~ ~ . ~ . , , , ~ ,~7~ . 'r , ~ ',,~1 j"~ C3,~~•. ~ . . ~ ~ ~ y'• ' ' ~ ~ ; p;• ~ • - . r ,r ./"'~s:~5• i. - ,4 r .11 t. ~ 4 39 , d 1 . • T AmouN'f ~ 9 ~ n N pEDUCTION ~ b - - , ~ . AMpUNT • , 1%A►- v~vlsIoN ~ CTtON '`NC' RESIDEN p _ ' . TH CQN,~RU - ESCRIPTION S t_ ' AW)a, - Count y Fee oATE 12-34-97 " • . _ ~ . ~~rl ~ ~ A 0 . . , ~ ~ • ~pp.~ K„ t „ , • , ' ~ . NUMBER ~ 70Tp`l.'S 541 • CONTRoL CK ~AT~ I ~ ~ NA7►4T1A~-6ANK 1' . 1 Z- 3O -9 ' . ~ SEATTL NISP E.''NA 892 '`NCH tU>N Sp~SPO . . . . • . . . 125 G CO~~S~~S~4N ~ ~ 1~ 509)9,2 .AY ~ p *,~c 10841 v Wp 992Q6 . l~.,, . c N10UN~ ~ S~►~t 0 _30 **~~oo.oa CONOL NuM6Ea TR ~t ER Q ,f• Tap~ ~ « . va _97 ~ PaY unty Engineers .v(~ -~HE O~ Spok ane Co ~ OS~ER ~ a . q 604i?1 o000 24~. S n n 5 t+ 3 Ci ~ • _ ~ JJ . • 1~~.1~~ ( ~pa},, ~~rf.~P~~' r-~~r I~e.. . ~ • ' N . i•~ ` !~~;.~~P~~j ~ ~ ~~:1;5.(11t~~~~r~:~ti~~e(1,':'~'3i~rt~,,~+ i.'j%i~i~~~~~~~i . ~ • ' •i • , ~ . ; , ~,ia ~ ~;~.;,3• t ~,~3: b~abo ~ • ~ . 3na , i~' .t ~'•`t' a 2:A~NOW e 3:)NVlV9 , ~t Now~MO~ 4c QIVd • ' . i ~ ~r . " .z~~~, ~ ' , , :;i~a~H~ . NlIOWV ?f ` -H$ 7NINN038 ~ , ' , . ( • CD t e•~;~ ~+~`t, ~;QIVd:MONIt~r~~+l~F11Nf10:):)Vt ~ .~yl''~4 ~4~ ~~i ,~'-.j~`. .(j:~ Y: +~3, ~ ~f~ t1 ~ . cA~iY~ f~. ~ . ~ ~ •1~'~' ~ ~ ~ • , , ~y ~ r ` 1 r. ( ~ • .,4., ~I~ r , ~ ~'r • ~ ~1 rr ~~l ,..i ,"Y l~'}~'~ ~ `~~fl~1~:x~1~°°~~ Yi.~~,~~~ i,~~: YO01' e,s~ n ~ ' ` v .~,r ~ kq ~ '1 z , ` ~ ~ ~ ~ ~°f~ y+"C~~f~~.LC~rt :~,.T ~ •~,~'S 'e~~~iSYN~1• ~~r, 4 , ' ' ' ~ ao~ 70V 110Q 1~ ~ ' ~f' ' ,,;ti ' ~ 0 1 . , ~'~♦y~ v ke 0 i' ~ _.,e • ' 1~at;' ' ~ ~ . 1✓ i ~ . ~ ~ ~ l~ti~`irst' ,.1~1 ° r'~ '•~1~,~~~~6 t~ j'~1~~'~i,~•~ .)i~~ . ~ ' $ . f:.rSSa]ppd}~::~ ~ b 1~'`' p~ i' a • ( ' ;t atl~: ,r~►)~.~` )`.~~'t ,`~.y.j+~ e~1;=,i..~' • ' . • ' ~ .,r,~ oad-;o3ni~~3*d ; ' ' . ; .r; , t,,l~'. ~ _ • i .`o~~~(l~,aj.~'`iI~'(iY1 i'F :4 A `'v, ~ , ` , 4~ ~s 1,6'• jt~ ' s~~.'(""~.I.VO ` ~ ° ~ ~ ~ I~~~'s;~,~:;~` D~,~~ n N ~ ~ ~ ~ . , , i. ..tYf? tr.ll~~C~•~; ; ,1ti~'t ~ • . , ' - ~ ' , . i , ~ i i ~ _ c ~ i+g: . . ~ . . ~ LANDRETH CONSTRUCTION, {NC. RESIDENTiAL DiVISiON 5439 ~ DATE DESCRIPTION AMOUNT DEOUCTION NET AMOUNT 12-30-97 County Fee 100.00 ~ 100.00 CaIECK DATE CONTROL NUMBER 12-30-9! ~ TOTALS ~ 100.00 .40 i, LANDRETH CONS''RUCI'ION, LNC. SEATTLE - FlRST NATtONAL BANK . S~~ Q,*-~ SPdKANE 8 EASTERN BRANCH i RESIDEN7TAL DIVISION SPOKANE, WA 99201 L. (509) 927-7401 ~ ~ , • : ' > 10801 E. VALI.EYWAY ' - 19'2 SPOICIW E, WA 99206 1250 . c . ~ m R e ~ 41d~o fi ~~~I.~ c rS . ~ . . ~ RAY • ~ ~ ~ , OATE CONTROL NUM6ER AMOUNT ~ Li; 12-30-97 . ' **$100. 00** ~ ru rHE ORDER OF Spokane County Engineers . . . . . • „ ~ . , . ~ - . • 6 . . ? ' • f rri . - ~ ' T ' 42 . ~ ii'00 539li' 1: 12 ~50000 2L.l: L49 50 604ii' . _ . . • , . ~A ♦ ~4~ . ~Q111 ,~i '~,(+C~l~~.{~4f It`~. ~ ~ ..T 1i : ; ~ n • I 0.! ~ 1 ~ . ~ ~ • i, c~ ~ ' 1! r ' t , , • f. ; ~ • a ' ' - . . . ~t.4 i~ f1~~. 1 1.(.~ ~ ' ~ , ~cJ • ' < {t~Yx~ 1 ''j 83GbO ''k' . . ~ ~ • 7nQ 6951'~~iA~1A0 :E A3NOW X)NMV9 ' H , ~14 ; ~ ~ , - o D . /I•, OI!/d ~ 1iJf101vd c- ``tkCN$Y) 37NVIV9 ' y ' u i•. ' : • t ~~f(~ ' Iji ~ . JNINM739 .~I~;~~~ , , . ~ ' •~:,;'~1r:-r ^~%J '~,QIVd~MOH~: ti,1..-~r`.,~.;~ j'1N(107:)V . ~ ; 3 ~455`'~~;~~, f: ~ ~ , , . , • ' ' at~~~ ,1 `~y'~' i{(' ~r~ ~ .1~~ , ~ ' ~l.~.ri~ . . ~ ~ 0 ' ~Y " :F~9~~t11/,~ lr'1•.~ ,4)~~1~r1 ~y~'~ ,1~4j!%;b.~' , . • ' ,•l~,t{. ~ ~Oj ° c $ )j -9/ S2lVllOa '/21,9 ~ I r~ 1x~'~r~~~~' t l~~}~ At~~ •~Vry~ l. ~ ~ , . , • • y , • ~ ~ ~ ~ ~•y~ • ~ q ~ssa?QPd' , . , , ~ . . ~')j' ( , ' • WOH? 07^I3✓3'8 A.LdQ F, . • b 3 S w n ►v ldll~'~s~~;: ; ~~tir ~',-i .a ~r r.. , . ~ ' . ti s •j,~ 'S . , . , ~ , ~ 5439 LANDRETH CONSTRUCTION, INC. RESIDENTIAL DIVISION ~ OATE DESCRIPTION AMOUNT DEDUCTION NET AMOUNT 12-30-97 County Fee ~ 100.00 100.00 CNECK DATE CON7ROL NUMBER 12-30-9i TOTALS ~ 100.00 J ~ . . , . - ~ ~ . • , • ~ " " ~ SEAT'TLE - FIRST NATIONAL BANK 5 4 3 9 j~,y" Lc~.NURETH CONS~TRUCTION, INC. SPOKANE 8 EASTERN eFiANCH R1;SIDENrITAL I3IVISION ' 3POKANE, WA 88201 av (509) 927-7401 ° • ' Y 10801 E. VAL4EYWAY 19"2 ~ SPOI:.AIYE, WA 99206 1250 n ~ i~e g)l a o ~D ~on' sh' CTS . . . ~ . ~ PAY DATE CONTROL NUMBER . ~ AMOUNT ~ TO THE 12-30-97 **$100. 00** ~ ORDCR OF Spokane County Engi neers , ~ , , • , , . . . ~ `l . Q ' i. t) ` S ~ m m ~ Z 11600S1,390 i: L 2 50000 241: 149 50 60 4li' - , ..F..._ . - PLAT NAA~ , . . NQ. . ~ ~ S ~ . :OSMD ~R ~E ~cJl A~~~~~ s1•A•rIs'i'lcs _ t~n~'r I~ P1at Clicck Fec Number of Locs Road Miles (New) ~ • 012, Total /lrea• . ' ' . , . ~ . • • ~ . . ..t... - - - . - . , . . . . _ - - - - - - . _ . - ~ E.~~. ~ . . , . ' . / Nortli Arrow - CY/'> Scalc Legend Proccdures & Equipmcnt I3asis,of Dcarings Plat 1..ocation IIy Titlz Official Signaturc IIlocks Surveyors Ccrtificate Av? ` Road Names ~~C t c~~fi 1~1/C , C)\ Road W idtlis ~ • Acljacent Area c? V,--tiW v(~y(L f} Lot ~Sc. Dlock Nutilbcrs ~ R/W ncclication dcsignatcd ra ~ 1 Foot Strips 3 RPS on GLO Corncrs Tract Y Lot Arcas Dcncli Mark A ~ C_losurc ~ - . . . . _ , a.. : - ~ , . ~ - ----r, . . llEUICA'I'ION scription (To M7p) • , , , . . . , , , , , . . v. - Dc . Description (To Cert) Owncrs Ccrcificatc to Plat 1 Fooc Strips ~ RID - CPR Stateriicnt /[l ~ Access Proliibitccl N ~4- I2/W Dedication ~ Drainagc Languagc /A ~ Drainage *3 140y 7 6 cvci ~ rlood liisurance V14 208 Bvncls -$1,000.00 ca 208 PLANS APP120VED In -e c k.. ~ 0k I'rivate Road Doc. N's Privalc Roa(l Wlrning . . . - Road Plans C) ~ Roacl 13oiu! ImProvcmcnt ~ AJ6Cj) 11K, Itoacl ISoiicl InsPcctioii • l` SigT ied IIy Cnsineer ' .li- . _ r. ~ : : , ~ . . . _ . . . . . . . ~ Y 75i (id NA& G 6rft5fsrj-,,-e J:S 61 - - - u - : . W1i\piatlist.c1:9195 . • ~ . , INLAND PACIFIC ENGINEERING, INC. December 30, 1997 Our Job Number 97117 Mr. Dave Berto Spokane County Engineer's Office North 811 Jefferson - Spokane, Washington 99260 RE: SPRINGFIELD AT AUTUMN CREST PE-1570-89 . ~ Dear Dave. . 6 -7 0 Enclosed please find two copies of the draft final plat referenced above. Please review for final approval. The enclosed check for $100 is the plat check fee. Enclosed also is a copy of the plat certificate, and a copy of the signed Agreement to Pay Fee. Please call if you have any questions. Thank you. Sincerely, INLAND PACIFIC ENGINEERING CO. ~Jo '-parling ~ _ BJS/bj s Enc. 707 West 7th • Suite 200 2020 Lakewood Drive • Suite 205 Spokane, WA 99204 Coeur d'Alene, ID 83814 509-458-6840 • FAX: 509-458-6844 208-765-7784 9 FAX: 208-769-7277 TRANSNATION TITLE INSURANCE COMPANY p NORTH 7 2 O ARGONNE SPOK1llNE, WASHINGTON 99212 Prepared for: Order No.: ME213812 LANDRETH CONSTRUCTION Charge: $125.00 10801 E. VALLEYWAY Tax: $10.13 SPOKANE, WA 99206 Total: $135.13 cc: Inland Pacific Engineering SECOND REPORT P L A T C E R T I F I C A T E Cert i f icate f or f iling Plat of : SPRINGFIELD A.DDITION PE-1570-89 In the matter of the subdivision to be submitted to Spokane County for approval,* this company has examined the records of Spokane County Auditor's and Clerk's offices, and the records of the Clerk of the United States District Court holding terms in said county. This certificate is made for the purpose herein specif ied, and is not to be used as a basis for closing any transaction. Liability is limited to the amount, if any, paid for this certif icate. From such examination, the company hereby certifies the title to the following described land, in said Spokane County, to-wit: That portion of Tracts 196 and 199 of VER.A as perplat thereof recorded in Volume "O" of Plats, Page 30, described as follows: BEGINNING at the Northeast corner of said Tract 199; thence South. 00002133" East, along the East line of said Tract 199, a distance of 26.40 feet to the Northerly boundary of AUTUMN CREST FOURTH ADDITION as per plat thereof recorded in Book 23 of Plats, _ Pages 73 and 74; thence Westerly along the Northerly boundary of said plat the following three (3) courses: (1) South 89046127" West, a distance of 125.00 feet; (2) North 0000213311 West, a distance of 26.28 feet; (3) South 89042157" West, a distance of 377.14 feet to the Northwest corner of sid AUTUMN CREST FOURTH ADDITION; thence continuing South 89042157" West, a distance of 145.00 feet to the • Westerly line of Tract 196 of said plat; thence North 000051071'` West, along said West line a distance of 307.87 feet; thence North 89°41'll" East, a distance of 522.37 feet; thence South 00002133" East, a distance of 14.41 feet; thence North 89046127" East, a distance of 125.00 feet to~the East line of said Tract 196; thence South 00002'33" East, a distance of 293.60 feet to the Point of Beginning; . Situate in the County of Spokane, State of Washington. (Parcel Nos. 45261.0306 and 45261.0614)' (Abbreviated Legal: B196 VERA & PTN. B 199 VER.A) Page 1 of 3 P . Order No. ME213812 VESTED IN: ERMAN CONSTRUCTION COMPANY, INC.7a Wa 'ngton Corporation. ~ ~ . EXCEPTIONS: 1. Taxes and assessments, if any, no search having been made thereof, as to Parcel Nos. 45261.0306 and 45261.0614. Parcel Nos. are provided from the latest Assessor's Maps available to the Company. Said parcel numbers are not a matter of the public record therefor, the Company makes no assurance as to validity or accuracy relating thereto. 2. ANY tTNPAID ASSESSMENT OR CHARGES, AND LIABILITY FOR FURTHER ASSESSMENTS. OR CHARGES BY VERA IRRIGATION DISTRICT NO. 15. ' 3. AGREEMENT AND THE TERMS AND CONDITIONS THEREOF: BETWEEN: Vera Electric Water Company, a corporation AND: - D.K. McDonald, A.C. Jamison, Andrew Good and Vera Land Company, a corporation DATED: April 25, 1908 1 . . RECORDED: April 25, 1908, In Book "H" of Contracts, page 292 RECORDING NO.: 200528 ,REGARDING: Providing for construction of ditches, flumes, pipelines, etc.; erecting poles and distribution lines, with right of ingress and egress to maintain said pipes, lines, etc.: and providing for lien for unpaid charges for such service 4. Reservations contained in Deed recorded under Recording No. 179518B, as follows: Grantors reserves the right to construct, repair, and maintain over and across said premises any ditches, flumes, pipe lines and electric lines, now existing or hereafter required by the Grantor, for district service, and the Grantor reserves an easement and necessary rights of way thereon and thereon for said purposes. and the Grantor further reserves the . right to make reasonable rules and* regulations regarding district service to and from said premises or any part or parts thereof and to levy assessments and tolls against the same or any part thereof or any and all district purposes. Page 2 of 3 (CIN Order No. ME213812 5. DEED OF TRUST AND THE TERMS AND CONDITIONS THEREOF: GRANTOR: Linderman Construction Company, Inc., a Washington Corporation TRUSTEE: ransnation Title l ance Company BENEFICIARY: ~shington Trust Ba , a corporation ORIGINAL AMOUNT : ~'j DATED: June 22, 1998 RECORDED: June 26, 1998 RECORDING NO.: 4237182 Investigation should be made to determine the present balance owed by contacting the appropriate lender/agency/individual. DATED AS OF July 2, 1998 at 8:00 a.m. TRANSNATION TITLE INSURANCE COMPANY ax 'For service onthis order call: . (509) 922-2222 (FAX) 926-1519 Micki Erwin, Title Officer sac Page 3 of 3 F~ .w a'._r. 4237181 I ott ' ' ~ 06~MII438 DI;QI N=110L illlF 116 WID Mpp After Recording Return To: BENNETT, ASNENBRENER & DAVIDSON, P.S. ~I I r ' 140 South Arthur, Suite 600, - - • • 4237161 Spokane, WA 99202 . _ 0612611998 O2 i4P iRIIMilpl. l[ilF 1N fD ID l9.00 6oaiut b, a ' tt7HIBIT A•. . STATOTORX WARRANT1f AEED a 1180 ~ ~ That portion of Tracts 196 and 199 of VERA as per plat thereof a, ~ecorded fn Volume °0" o£ Plats, Page 30, described as follows: The Grantor, t~Atmtt~ CoHST~tocriON, uNC., a Wnehington corporation, ~EGINNING at the Northeast corner of said Tract 199; thence South for and in consideration of Ten Dollare and other good and 00002133" East, along the EaBt line of said Tract 199, a distance veluable consideration, in hand paid, conveye and warrante, / oE 26.40 feet to the Northerly boundary of AVfUh41 CREST FODItTH V LINDERMAN CONS'fAUCTION COMPANY, INC., a Washington corporation,`fhe ADDITION as per plat thereof recorded in Book 23 of Plats, Pagea 73 following deecribed real estate, situate in the County of Spokane, and 74; thence along the Northerly boundary of said plat the state of waehington:h following three (3) couraes: (1) South 89046'27' West, a distance . , oE 125.00 feet; (2) North 00002133' Weat, a dietance of 26.28 feet; SEB ExiiIBIT A ATTACHED HERET'0 (3) South 89°42157" West, a distance of 377.14 feet to the; Northwest corner of sid AUTUt4i CREST FODitTfi ADDITION; thence ABBkEVIATED LE4AL: PT B196 & 8199 VERA continufng South 890421S7' West, a distance of 145.00 feet to the Westerly line of Tract 196 of said plat; thence North 000051070 . West, along said West line a distance of 307.87 feet; thence North PARCEL NOS, 45261.0306 AND 45261.0614 89041111' East, a distance of 522.37 feet; thence South 00002133' East, a distanca of 14.41 feet; thenca North 890461270 East, a s[reJerr To: cova+AN'rs, EASatFxrs, RESiRIC110NS AND RFSEkVATI0N5 OP RECORD. distance of 125.00 feet to the East line of eaid Tract 196; theace . South 00002133' Bast, a distance of 293.60 feet to the Point of , Beginning; , DUud thh 22ND d,y of lw,e,1998, Situate in the County of Spokane, State of Washington. END OF SC~DDLE 'A' . ' LANDRETH CONSTRUCTION, INC. ♦*~i~~f+~+ik*t*~*+~r~r+~+r~~~~4~r~~t***~t~*~+~fr~►~~~~~+*~~r*~~t*~ ~L1~ll~l~~A""'~~ ~ • THE FOLI,OWING,INFaRMATION IS PROVIDED FOA CONVENIENCE ONLY: . ~ (Pazcel No.45261.0306 and 45261.0614) BY§oon Lmdrah,Praiean (Abbreviated Descriptfon:PT B196 & 8199 VERA) a Q, STATE OF Wuhington ) ~ ) u. P COUNTY OF Spakme ) ~ M %D On thb day peaomlly appwM befat ase SCOTT I,ANDRET11, to me l7awn a Se the Rnidmi ot to IANDRC111 CONSTRUCRON, INC.,, the caranion ttut eacdacd Ihe torcgoin6 iKtru~. ~'i~6~ ~ 1h! {iVG iIWNllltl1110 ~fAtt vol ~W uni+ry ~cl ~nd dad of uiE wrpontion, for the use: and purposn dxrcin q meatiaKd, uid on oa~i iM~e~ ; euQarired to wxawe Ihe uld imwment. Givensa1t5G- dea- yollime, 1998.. ' 1l'•r~ NU~' 0. D., ~n'and uD, w,4~~Notary for the State . . 0 '~''►►lStlt►~~~ of Wnshington, rcsiding at Spokanc. o My commission expires✓/~ 2-~ o to . . m • , , o , o 0 . ~l . , . y..iwr , 4237182 h t: IO d 1D r ' 4237162 . . IaIISRUIO~ Ililf gt 115 f0 61 511,00 Aalve to, {l . ~ I 0612611998 ~014P 1mIf0t Illlf la c0 Oi 4 S11,00 Spotuk A, 4 LEGAL DESCRIPTION That portion of Tracts 196 and 199 of VERA as per plat thereof , recorded in Volume "0" of Plats, Page 30, described as follows: Af'TE0. RHCOADINO ItE1VIW T0: BECINNING at the Northeast corner of said Tract 199; thence South WAMaUMNTRunMNK 00002'33' East, aleng the East line of said Tract 199, a distance 71W,S~PRA6 BAV@fU8 of 26.40 feet to the Northerly boundary of AUTUMN CREST FOURTFI SPOXA►'QW^~ ADDITION as per plat thereof recorded in Book 23 of Plats, Pages 73 and 74; thence along the Northerly boundazy of said plat the ' ' following three (3) couraee: (1) South 890461270 West, a'-distance 434230 C1 of 125.00 feet; (2) North 00002133' West, a distance of 26.28 feet; V• (3) South 890421571 West, a dietance of 377.14 feet to the DEED OF TRUST Northwest corner of sid AUTUMN CREST FOORTH ADDITION; thence ~ continuinq South 890421570 West, a distance of 145.00 Eeet to the E ~ Westerly line of Tract 196 of said plat; thence North 00005'070 7NUDFFDOFTRUSTLtMADET1lS 2 2 N D droWUHE. 1998 ,moMUuCnnor, `-J West, alonq said Nest line a dietance of 307.87 feet; thence North , 89041'11' East, a distance of 522.37 feets thence South 000021330 IIADEAI►AN COpSTRUCTIaN tONPAWY. , INC., a Yashington Corparation East, a diatance of 14.41 feeti thence North 890461270 East, a' ~~•g~,~„~~ iRANiHATION 1ITlE INSUAAHtt CONpANY diatance of,125.00 feet to the East line of said Tract 196; thence South 00002133" Bast, a dlBtanCe of 293,60 feet to the• Po1nt of «i^T^"~). e~~~fiK°7. W~fINOTONtAUSTBANK,a ooipmuionorpn'urdandcaiuat Beginning; wder~eeb.yM~,ewwie of wuAiagroop~ia'lsnEu•), . Bortmr.in rauidmsbo 01 me ledcb~drcu 6eaia ra6ed ud die tnm Aerclo nated, irrermbly tAw Situnte in the County of Spokane, State of Waehington. ~~'sn7~,b~w•~vo+'a oruic,dutouo.int aacrbeePropnryioaaa~dx • Cwnryaf SPOSAAE Stiteof YASHIN6TON ' v►m nv oroonm.v •a. ABBREYIATED OESCAI7TIOH; F1 $196 t 8199 YEAA wS.*/• 030d ' rhic6huQieiddrasof YEAAOAIE.NA 99031 phpein •er"m tiaareu7 TOOEfIIF7t N'R11 ag dr hn, ro+ a kmher antd oo dr pqmr ,nd 911 921"Mem, dlnu, • ro{anaunm+. mu. Mun ud qofro maard a 'o ucroe tladrom (Do.era. mdr OgM g'nu ecaie a eK lader n mlka ud apply aeE nNt), ud i!I tncmean. Enedt+mem~, dtln ud ai►Bejn hkayuy a M iLnr rbe lplcruioinj ud JI flnna. atqiaul W equipneet rA[Y art eow er auy krcaM 6e ury rry nuclKd a of a pin of uid wl pcmnr a n7 iqortnmb taima Mding. bw riAaw limWq dw trncn[iry ol tlr bqoinS n0 plumbin;t. kuing. Iqhea. irc6em64. idrfger,tvp. ab aooliry. au cadiibofes. annw .aa UAing mpsrum njL,unn enf • eqoilxnn; aC ayfM4 plpn, doce tae4aresion, oatt. unlhk ioabn. eorQob. tbeimt. Palt ud t.achbwrdr, am 0uaw ro.a, anE.uha,, ftfRwoh W atn applime,: a prdkkm. abiaa, ane .Jboas: ud ury aN an mpboamri. bmumm ud phiwdor edk wkh Ripat b ury md dl of b Imgoiry. Ap o! Nim nid popaq dLll b bemoa r eaaiar a pn ddr ioh. , 10 SEGURH n I.adcr U) dr re{+~n ef tlrc IoOeMrdmu aldmeed Er Bonmrs ma damd: , J V N E 22. 1 9 9 8 (he,ch •µac• , in eie p,;iripal „m o f 1 A r e t H u n d r e 0 . Fifteen ihousand Do11ars and no~100 ' ryJecti of 0 odrcr meo. riA kum Meon~ adnmd M ~aa ' k+eiwiE b. 0 0 1 •iA ca mncm ud d+e poiat Ae Kcuriry d d+is Dad o! Troa: (E) me ped, ,,..e of Ae . i ud q.. i of Barowf kisin tawircd: le1 a,e rctiarmen of uq tuem , brurp, wip {nKrtq pipcok mde b BdArR A/ Itndd Mrwh b parynpE 21 kseon (hnsie *Fvmn Advarcef'h (d) Or ayqnen a nmGnioa d Qrc ablknkaf a YdaMadeeu. rAeda /lma a iidiam fiud a eammwn6 ' deeted by a fq lanh in , 6atcd • , u+0 ury rodifrouoat. tucroiau, annnb ot rtpluemenn d wd , ..,N a qieomeU►. lAe eumriry dir d Ob nde -or aAcr odqttioo n . ' (ux fa mm of Idabo oay) B. cacmnd dw F, b 4."Klud of dr emr acreby mneped ud Iw de iisM» (nn ud oonrry Cm Piope~rye++~ Crc Pmairy b..... mmertd. ud Qw 8otrom vi4 runn ud drknd geeinUr Cx mk n ft RopeRY ' ipien dl t4int aid OenrnEc, wDjea b tay dsJtntion6 nwrcatt ot tcaiktlau lkrd is a rba0uk of etteytioni b oe.mse b tq ti0e Ywnwe poliey InntMq laders IarcRO Is Orc hopciry, GM R[►. Nll lr'n M► IIMI7N IM t ,A' ~ ~ ' ` • ~ ~ ti ~ l ~i 7 / • 2 ~ - . . . . = y o • . o . . . ~ 1 7j,?09 ~2 ! o by . ' `w-lw~u ~ 8 AI ` J1 3 4 5 ~ - OD 5 P :~9. aa - ~ 9 8 ~ ~ )s A ' ~ a~. O N p 7 , ~ 229. 33; ~ a ~ ~ a ~ ~l I j~ •c ~ to `JA ~ X cY ./4 /,3 / , ~ ~ - . ~ ~ 265 93•S' -Ob! , d o o /5 161 Ao , .Zo l , , ~Ps' 3 . ~ 48 ~z D~~ ,~0 tg G-~ 2 ~ t~ ►n, ° i ~0 89.94 o D13 ~ 14 . 15'A 4 5 . s • ~2/ D \ P' . . 9 i.o .io ~4) -4 140 ~ 131 22 a 16 ~ O 'tj Io " 23/ ~ ~ m 0 ~ ~ . t~ II ~ 10 9 Fj 7.' ~ 24 -~r ~ 25 •o j - P► „ 7 ~ ~s~.i~• ` t~' do $ ~ ,20 Q1~ noR '`~LE 1NSURA~tCE 0@I~-,PANY 2C)~'}.~ /,Ar 6 ~ AV W h fs pro ' . without charge, fr. your 9° 90 S+o ~ is ~ intertded'l~vhow eQ ~natters ~ z 7 7 g ~ b the prope inc! ing, but not I mited to, o ~ ~ s 'mersians, ea roachrt~ s. or ~ 1 ~ 2 q~ 3 v 4 - 5 tocatior~ bourtAari VARIP'Ci r t at does i~ - ) ~ ,5 8 ~ ~ • G rtrodify. th cc~rit e~t or policy to wh c it is 9 l 1 r, hed/ ~Com rry assuma NW LfAB tTY fof • ~ bied io th' arW be q I. 71 9 0 90 Q o • 1'1 ' ~ 2 5 «O'Y ~~•~e~ =an acw twtl~er ~ ~ O ~,l 3 2 .~i 19 ~ o . ~ a~ ~ 0 5 (D6 33 C " l 9 0 ~ ; T 4 ? ~ } ~2 7 1 y ~ ~ 1~.1 - ~ FROM ANGLE DIST NORTH EAST 70 P1570D SF'R I NGF I ELD ADD I T I ON AT AUTUMiV CREST CENTERL I IVE ST CHARLES RD 2--27-98 D. R AUTO INVERSE START 2333.94635 1490. 1 5092 40 40 I NV - hf 0 02 33.0 W 153.9200 2487. 8b63Q► 1490. 03675 41 41 I NV N 0 02 33.0 W 154.2000 2642.06626 1489. 92237 42 42 INV hi 89 41 11.0 E 30.0000 2642. ?3047 1519. 92192 43 LAT & DEP 0.00391 --@. ~0073 43 HCLOSE N 10 34 12.5 W 0.0040 264; .23438 1519. 921 19 7 RREC = 1 TO 84953 No Area FROM ANGLE DIST NORTH EAST TO CENTERLINE 18TH COURT AUTO INVERSE START 2467. 66E30 1490. 03E75 41 41 I1VV S 89 42 57.0 W 317. 2600 2486. ?9281 1172.78065 44 LAT & DER 0.00739 0.00725 44 HCLOSE N 44 2E+ 35.0 E 0.0104 2486. 30020 1 172. 78790 31 PREC = 1 TO 30651 iVo Area , - - _ \ - . ✓ Status Fi le: common. LSF Stored. . ~Traverse Sequence Memory: common.TSM Stored. Status Fi le: common. LSF Loaded. Traverse Sequence Memory: common.TSM Loaded. Plot Sequence Memory: common.LPS Loaded. Wot^kfile: SP979. L3D ready for use. Room for 18 points. Current Directory: C:\LLCOGO\WORK 848429056 gytes free space available (21210726 Points). Wed Jan 07 08 : 1 1: 06 1998 FROM ANGLE DIST NORTH EAST TO P1570D SPR I NGF I ELD ADD I T I ON AT AUTUMN CREST PLAT BOUiVDRY 1--7--98 D. B. AUTO I IVVERSE STAR7 : 308. 30783 1645.16935 1 2 I NV S 89 46 27.0 W 125. @@00 2307.81514 1520.17032 2 2 I NV N 0 02 33.0 W 26.2800 2334. 09514 1520.15082 3 3 INV S 89 42 57.0 W 377. 1400 2332. 22466 1143. 01546 4 4 I NV S 89 42 57.0 W 145. Q+O00 2331.50552 998. 01724 5 S INV IV 0 05 07.0 W 307.8700 2639.37518 997. 55902 E 6 I NV N 89 41 11.0 E 522. 370@ 2E42. 23438 1519. 921 19 7 7 I NV S 002 33.0 W 14.4100 26:?7. 82438 1519.91050 8 ^ 8 I NV N 89 46 27.0 E 125. 00OQ+ 2E28. 31707 1644. 90953 9 9 I NV S 002 33.0 E 320. 00@0 2308. 31716 1645. 14690 10 LAT & DEP -0. 00933 0.02245 10 NCLfJSE S 67 2E 05.1 E 0.0243 2s08. 3@783 1645.16935 1 PREC = 1 TO 80756 Area 200849.39 sq ft 4.61087 ac FROM ANGLE - DIST NORTH EAST TO BLOCK 2 SIDELINES AUTO INVERSE START 2308.30783 1645.1E935 1 1 I NV S 89 46 27.0 W 125.0000 2307. 81514 1520. 2 7032 2 2 I NV N 0 02 33.0 W 32@. O000 2627. 81506 1 519. 93295 17 17 INV 1V 89 46 27.0 E 125. 0000 2628. 30775 1644. 93198 18 18 I NV S fLt 02 33.0 E 320. 2000 2308. 30783 1645.16935 19 : 308. 30783 1645. 1 E935 1 NO CLOSURC ERROR Ar,ea = 39999.80 sq ft 0.91827 ac FROM ARlGLE DIST NORTH EAST TO PLOCK 1 SIDELINES AUTO IhIVERSE START 2332.224EE 1143.0154E 4 4 I N.V S 89 42 57.0 W 135. Q►000 2331. 55511 1008. 0171 ? 22 22 IIVV N 0 05 07.0 W 3t1+7. 8800 2639.43477 1007.55888 23 23 I NV N 89 41 11.0 E 452.3700 2E41. 91 @83 1459.92210 24 24 I NV S 0 02 33.0 E 1 09. 2700 2532. 64086 1460. 00316 25 RAD I AL N 89 57 27.0 E DELTA 89 45 30.0 RT RAD I US 20.0000 TAN 19.9158 L-ARC 31.3316 RAD I AL S Q+ 17 03.0 E RP 2532.62602 1440.00316 26 25 CHORD S 44 50 12.0 W 28.2246 2512.62627 1440.10235 27 TANCdPT S 89 42 57.0 W 27 I NV S 89 42 57.0 W 21 1. 5400 2511.57711 1228.56496 28 RAD I AL S 0 17 03.0 E DELTA 48 11 23.0 RT RAD I US 25.0000 1 r71 V 1 1• J. V9.4 %J L--ARC 21.0267 RAD I AL S 47 54 20.0 W RP 2536. 57680 1228. 44097 29 28 CHORD N 66 11 21.5 W 20.4124 2519.81794 1209.88994 30 TANCdPT N 42 05 40.0 W RAD I AL N 47 54 20.0 E . DELTA 276 22 46.0 LT RAD I US 50.0000 TAN 44.7213 L-ARC 241. 1866 • RAD I AL S 48 28 26.0 E RP 248E.30020 1172.78792 31 30 CHORD S 0 17 03.0 E 66.6666 2453. 15` 14 1210. `2059 32 TANCdPT N 41 31 34.0 E RAD I AL N 48 28 26.0 W DELTA 48 11 23.0 RT RAD I US 25.0000 TAN 11.1803 L-ARC 21.0267 RAD I AL N 0 17 03.0 W RG' 2436. 57811 1228. 93693 33 32 CHORD N 65 37 15.5 E 20.4124 2461. 57780 1228.81294 34 - TAN@PT N 89 42 57.0 E 34 I NV N 89 42 57.0 E 21 1 &1700 2462. 6251 2 1439. 98034 35 RAD I AL N 0 17 03.0 W DELTA 90 14 30.0 RT RAD I US 20.0000 TAIV 20.0845 L--ARC 31.5003 RAD I AL N 89 57 27.0 E RP 2442. 62537 1440. 07953 3E 35 CHORD S 45 09 48.0 E 28.3439 2442. 64@20 1460. 07953 37 TAN@GT S 0 02 33.0 E 37 INV S 0 02 33.0 E 108. 8400 2333.80023 1460.16026 38 38 I NV S 89 42 57.0 W 317. 140m 2332. "734 1143.02416 39 LAT & DEP -0.00267 -0.00870 39 HCLOSE S 72 54 30. 7W 0.0091 GJJL... 224E6 1143.01546 4 PREC = 1 TO 241642 Area = 119253.85 sq ft 2.73769 ac FROM ANGLE DIST NORTH EAST TO CENTERLIhIE ST CHARLES ROAD AUTO INVERSE START 2333.94 • ~ 1490. 1 5092 40 40 INV N 0 02 33.0 W 1 3. 9300 2487 30 1490. 03E74 41 41 INV N0 02 33.0 15W.2000 26 . 7E26 1489. 9223E 42 42 INV N 89 41 11.0 3 0000 4*. 24047 1519. 92192 43 LAT & DEP " - _ -0 00609 _ -0. 00072===-_~~ 43 HCLOSE S 6 4E 12.9 W 0.00 6-. 23438 , 9. 9 11 g~- 7 F~REC = 1 TO 55158 No ea -~v < FROM ANGLE D T IV ST J TO _ CENTERL I NE 18TH+COURT~ AUTO INVERSE START 2487.87630 1490.03E74 41 41 INV S 89 42 57.0 2E00 ~4 6 . 30281 1172.78065 44 LAT &yDVR===--........ -0. 00261 `_-----=0. 00725 44 NCLOSE S 70 12 45.7 E 0.0077 T2486.30020 1 172. 78790 31 PREC = 1 TO 41148 - No Area , 7 ~ 0 Pre-Design Meeting Notes Spokane County Engineers Office Project Name: Project Number: P- ~ S 70 J~ i ~ Project Sponsor: Sponsor's Engineer: Design Firm: ` Engineer: ~ &-ut&I ~ Meeting Date: 98 Meeting Time: P30 0-.1- _ ~ CountY Staff Present at Meeting: f/.., Other Meeting Attendees: S'u,444,A_ wztlr_f~ JfA /117P E"_ name/represen6g U name/represeating namelrepresenting name/representing The Following Items need to be Discussed w/ the Design Engineer General Items 1 a. List certain special requirements listed in the Conditions of Approval, EIS, or MDNS. This is not an all-inclusive list. The Engineer and Sponsor is responsible for adhering to all Conditions and design criteria. , ~ ~ 6 P.-~) ' ~ cX41011- r . ~ 1 ~ description `~reference S-t. C'-j_k.~llps description ~ reference /9RI 1Z6eJ s-as . PaA W) - ~s 9 3-11 .*j7 description ~ re erence description reference lb. Does the Engineer have a copy of the Examiner's/Staff Conditions of Approval? ~ 2. Include Standard Plan notes in the Road and Drainage Plans. PtJ-*J_ 0"\- p d„~,~ ~ V Pre-Design Meeting Notes for Project: Page: 2 Spokane County Public Works Road Plans 1. Road Classifications and Design Criteria. #1 #2 #3 #4 ~ Street Name 54, G4'.'4A-5 5 Classification C-oII&VAar Roadway Width, W ~ O~ ~j~y, ~ S~~`3 udd . ~ Minimum right-of-way width see note (1) gr1 v l i Min. Horiz. Curve w/ super rC f~ r~~. ~ l'Ll ~ Min. Horiz. Curve w/o super •7 t,; t16 ~ General Land Slope/Terrain ~ Design Speed, mph 36) Curb Type & Clear Zone ~ 13 (see Sec. 3.15) ~ r Sidewalk reyuired? (yes/no) Y D-io kto Note (1) Additional right-of-way may be given by the Sponsor. Discussion: 16 81 Av'L ilsc-J 4e, loq- c..~✓cQTn.~c,~ ~ 1'.-~,rw~-~ +'n r- U PP t.L ~ 2. According to the Design Engineer, what is the maximum number of units which will have access from a single roadway? -Ole-- . What is the max. allowed per Sec.1.03? 3. Minimum intersection spacing is 300' for along a Principal or Minor Arterial (per Sec. 3.04), and 150' for a Collector or Local Access street. What spacing is provided for this project? ~-c~-,~•~~-~" i V V Pre-Design Meedng Notes for Project: Page: 3 Spokane County Public Works 4. Are any off-site slope easements needed, or off-site right-of-way acquisitions needed? If so, describe. J 5. What type of turn-arounds are needed? (i.e. cul-de-sac, hammerhead, etc.) Street Name Turn-around Type Location 0 s~~.~", t~~ C-- ~ -s t 6. Road Surfacing Requirements (Sec. 3.16) a) What method in determining road surfacing requirements does the Design Engineer propose to use (i.e. AASHTO Design Method, County thickn ss table, or other)? TdV!a-,t-OJ 6~- ~ ~ pr.~ ~ ✓ b) Provide the Design Engr. a copy of the Soil Sample Procedures, Design Report Format & Alternate Pavement Design Table. 7. Does the Engineer plan on applying for any Design Deviations? If so, briefly describe below. Please note that approval of all Design Deviation's must be obtained prior to construction plan submittal. Storm Drainage 1. B asin Map a) Did the Design Engineer bring to the meeting a basin map? If so, does the basin map show topography and sufficient information to be useful? / a_4`11 . ~ b) Does the basin map depict any contributing off-site runoff flowing onto the property? -7~ Does it appear to be correct? . If not, explain. c) Is a site visit needed to verify the basin limits? ~ Schedule for: . {Note: Concurrence with County Engineer's on basin limits is required prior to plan submittal. } 2. Is the site located within the Aquifer Sensitive Area (ASA)? i,~ What type of water quality treatment is proposed by the Design Engineer? ~ ; Pre-Design Meeting Notes for Project: Page: 4 Spokane County Public Works 3. What subsurface investigations, if any, are needed with this project to make sure the proposed disposal process will function as planned. l~ ~ ~ • ~ - Annc-oj 5or`/4 n-r-C-ra r41 t /0 10 Su-sa-n, R I 'v v L ~ 4. Are there downstream conditions which will affect the design of drainage facilities. If so describe possible mitigative measures. IflA 5. Is maintenance access provided to each GPA swale or drainage pond? If there is something unusual, what requirements were given to the Design Engr.? ~ 6. What does the Developer/Engr. propose for providing for perpetual maintenance of the drainage facilities? Please briefly describe proposed mechanism, and what is needed to accomplish this. ' A11) 1Q7" 7a. What Design Storm(s) should be used in the course of analysis (i.e. 10-yr, 50-yr, etc.). 10 - vv, ;s~-~P_ r~o r IU-6 oA= 7b. Is a Detention or Retention system proposed? Please describe. kLb 8. Are Erosion Control Measures required with this project? If so, briefly describe applicable requirements. kb 9. Is a second Pre-Design Meeting needed? . ~ . Pre-Design Meeting Notes for Project: Page: 5 Spokane County Public Works List of Documents Provided to the Sponsor's Engineer: a) b) c) d) e) Any easements needed outside of the plat boundary, for drainage or other, are to be acquired prior to road and drainage plan submittal. The Sponsor or Sponsor's Engineer shall provide separately a legal description and Title Commitment (or similar proof of ownership) of the affected parcel(s) for proposed easements. The Submittal Checklist, completed and signed by the Sponsor's Engineer, shall be provided with each plan submittal. Note: Provide a copy of this completed tlocument to the Design Engineer at the end of the pre- design meeting. filename:PreDesign meeting Submittal` Checkiist ° for Road & Drainage Projects-in Spokaae County - Plats/Short Plats rhis Submittal Checklist is to be completed and signed by th,e Sponsor's Engineer, and included with each plan submittal into the Spokane County Ef ngineers Office. If this form is not fully cornpleted and signed, do not subrnif plans and calculations to Spokane Cozcnry for review and acceptance. Incomplete submittals will be relurned and will cause unnecessary detays for your client: , ProJect Name: SP ~ i L) -4 r Q-t> A DDt TtQ~ ~ Aun~ . , SP okane CountY P.ro1'ect No. ✓a~Date: Project Engineer: ~141PPLE ; ?=e1 Phone: 4515 -(oi540 , . - Project Sponsor: ~ 0 L-3 L e t-~~~~ W_AA0 Phone: • , . ~ A.,_`;P`r,0lirn.inary Process ~~~~o~r;t6.~Su,brriitta,l of Road and Drainage Plans,' the follow~uag events are to have already occurred: (_che°cknnS' -each item o.ffshown below, You are statrng th~aty .f ou have veri ~ed these eve,nts/items have been comPleted.) " . By~~- A-doPtion of a Heari.n$ Examiner'~s ReP ~ _ - , ort, ~for this lon$-A~ la~ or a Planning RePort for this short~ Alat. ' ~ ~ ~ At 1'east one Pre-Des~ign Meet'uig has been~held"withF~Courity,~staffat the En,~ineers Office. . . An Agreement to Pay Fees" has.been signe'd'by tlie ,proj~eat sponsor, a.nd submitted to the County . , ,'ErD, gLQPErS OftiC.e. A Channelization Plan {e.g. signing and stnp,ing, plan)-'of public roadway improvements, has beea coordi_nated and,; "scussed with the Couri~tyy En~ineersO~ffice. WA . B. R-,oa,d, an,d Drainafti Plan Submittal T i~~ms 'listed below a~re ~t~o be provided as a rninun wn', witfi a road and drainage plan submittal. Additional . inforrna:tion rnay be required to demonstrate that tkie pland, m, eet:all, applicable standards. (By checking `yes" for,each item shown below; you are verifyi~ng that'these items have• been-coinpleted and are included in Ihis ,submittal. Far any box checked "n/a a written justif cation of any vmissions at the end of this section is required.) . , • , . . - Item Description ~ . . , - . Ca!yes Road and drainage plans, two print sets: r(C'ertifi'cation'statement'on cover of plaas)•;` .0!yes _ 0 "n1a •One set of.plans on 24". x 36" rn,ylar media,.or CAD electronic file DWG or .DXF'``,format . . . . e'y es - - Each Plan Sheet of record is signed and.dated'by ttie project sponsor.. o~• .~yesX ' • The roa:d and drainage design .meets the ,requiienients~of `State °`law; ;WAC 196=27 y~regar u_'`; ; g~ "confornuty with accepted staadards";~ ~that is,~ the dgn refl ects-:the:"state of tlieepnctice"' . ' , - ~ X for the proposed c_oncept. ~ • • ' - ; - - - - - . 2". yes The pla.ns, Drainage Report, basin rnap(s),,, and any ~other calculations are stamped,, sign'ed , _ - - and dateri by 'an en~ineer•Ticensed'in:the State of Washirigton: V`yes- 0 nla - Drainage Report, two sets. - To include: basin map(s),, time of concentration routes in basi.n map, and Certi5cation statcment on cover of report and basin map. el_y~`es 0, o/a Geotechnical Report, one set. (Include all soil test pitlboring logs.) 'P'R,eV 1 • • • es n/a Structtira`l Pavement Calculations, one sct Y '12,yes 4NPqi/a Cross-slope grade calculatioiis for road «MEning projccts. ~weYLL ~_r_ ` . . , , . - • . . .s.,.. .r _~LL- Item Description Q yes Vn/a Maintenance Manual a.nd S inking Fund calculations for drainage facilities located outside of County road right-of-way. 9111yes 0 n/a Written explanation of who/what entity will be responsible for maintaining drainage facilities which are located outside of public road riglit-of-way, and that the plan is acceptable to the / County Engineers Office. 0 yes ~n/a Channelization Plan, or signing and striping information provided i.a the road plans.. To be included in road and drai.nage plan set. 21*y'-es 0 n/a I have read the Hearing Examiner's Report (long plat), or Planning Dept. Findings and . Conditions (short plat), for this project. The design meets the conditions in the report. Pyes O n/a Copy of Approved Design Deviations. . 0 yes 9,1h"/a Fire District Approval, for private roads. 2--'y'-es ❑ n/a Lot Pla.ns. Required for a.ny lots with drainage easements a.nd which front a public road, or for Iots wh.ich receive and treat runoff from a public right-of-way. 0 yes 0'~/a Any applicable State and Federal pernuts have been obtained. (i.e. HPA, JARPA, etc.). For Pernuts with cond.itions, a copy of the pernut and conditions are included in the plan submittal. 0 yes go'fi/a Inspection Agreement betlvveen the sponsor and its engineer. (Cur> S'tpS.1 0 yes O'Sa For off-site easements to be granted to Spokane County, the following items shall be _ included: legal description, exWbit, and proof of ownership. 0 yes 2'~/a Erosiori Control Plan, required for "Major Land-Disturbing Activity." To be included in the road and drainage plan set. . Explanation for any items listed above which are not included in this submittal: (Note: an insufficient justification of why an item was not included in the submitted, or incomplete documents, may result in the submittal being returned without review or without acceptance. Provide attachments if necessary.) By signing below, the engineer is stating that the information provided in the submittal is complete, that the information provided in the Submittal Checklist is accurate, and the plans and calculations are in accordance with the Spokaae County Standards for Road & Sewer Construction, and the Guidelines for Stormwater Management, except where an prove esi Deviation allo otherwise. . Engineer's Signature: . Date: Engineer's Name: TO D-r,> (please print) If there are - any questions about this form or appropriate procedures, please cal! Developme»t Services, Spokane County Public Works, at (509) 456-3600. . : . . . ~For Spokane County Use Only ~ . . S7Accep al No: ~ County Plan Reviewer: ~c,l.f,ted in for Review or Construction ❑ Retumed to the engineer without review and/or acceptance, See attached letter of explanation. Processing Date: Z. ~ • qg Submittal Checklist 2 Spokane County Public Works; April 29, 1998 " . . -J . REQUEST FOR DESIGN I)EVIATION . - $30.00 DATE Februarv 27, 1998 AOAD NAME Progress Road CRp/RID 1# . IVAME OF PLAT SPringfield Addition at Autumn Crest plat # PE-1570D ADDRESS OF BLDG N/A vAME OF BLDG PROJECT N/A 'BLDG# B9 S T R FEDERAiJSTATE PROJECT # PROJECT LIlvIITS EXISTIlNG CONDITIONS: PROPOSED IMPROVEMENTS: ROAD WIDTH 12' ± 18' from centerline to face of curb ROAD SLTRFACE Asphalt Asphalt AVG. DAILY TRAFFIC Current Traffic Count , Design Year Traffic Counc PROJECT DFSCRIPTION- -Addition of 6.5' of asphalt and concrete curb & gutter ad-jacent to the proposed development and future phase. ?ROPOSED DESIGN DEVIATION County apvroval of Froposed and future curb grades less than 0.5x on Progress Road. Adjacent to Springfield Addition at Autumn Grest and the future phase of ' SprinRfield Addition at Autumn Crest. JUSTIFICATION: . Thhe egisting road grades on ProRsess Road are less than 0.5%. The flat gra.s3es encuuntered requires that the proposed widening matchthe ezisting gradesp-where pussible grades will be constructed at.or above the minimum 0.005'. SU73MI'ITED BY Todd R. Whipple, P.E., President Znland Pacific Engineering DqTE 3127198 ~DRES5 707 West 7th Avenue, Suite 200, Spokane; WA ZIP CODE 99204 PHpNE # (509) 458-6840 (509)458-6844 (fag) ADNtIIYI,STRATIVE VARIANCE FEE OF S30.00 PAID TO SPOK;ANE COUNTY 1026 W BROA.DWAY, SFOKANE WA 992E0-0170 PHONE (509)456-3600 FA.X (509)324-3478 ' -REQUEST WII.L YOT BE REVIEWED WCTHOUT FUNDS- CA.SH/CHECK-13 t. oa # lk~.->' 7RECEIVED BY ~ ~ ~ -bu•~ ~ DATE ' ~ ~ • . . ♦ DESIGN DEVIATTON . ` S"TAFF REC0M1ZENDATIONS - RlecoU.t 0 ~e(Z6J~!r~ WLIlk 7-t+S`7WO Cc~D iT i o.,v's Tt~~ A442E G'EVt-r,~)y4eP ► N 7-~. A-Ir*cA-~- ►MS-n+.4 DA-t~p 1990 /9-y -3-40,( . o z (p 6 u s K d . Approved Approved w/conditions Not Approved - Project Manager Date u; tiz W-c.00~ 1-(c~ s C~ ,L'7 4-r c-& .IL l;0A : c/'r3 USe v 3/~F Ig S~t ~c~ ~ Approved Approved w/conditions Not Approved ~ Project/Management Engineer Date Approved Approved w/conditions Not Approved . Operations Engineer Date SPOKANE COUNTY ENGWEER'S D ATION: - ' - - Approved w/no conditions Approved as recommended above Not Approved / . Spokane Counry Eng ee r Date ~ . - ^ ' w • ~ L ~ After Recording Return to: Spokane County Engineer Attn: Engineering Adminisvation RESOLUTION NO. 1 0029 BEFORE THE BOARD OF COUNTY COMMISSIONERS OF SPOKANE COUNTY, WASHINGTON IN THE MATTER OF ESTABLISHMENT ) OF ST. CHARLES ROAD, 17n AND 18n COURTS ) R E S O L U T I O N- COUNTY ENGINEER' S ROAD FILE NO. 2557 ) E S T A B L I S H M E N T No Assessor's Tax Parcel Number Assigned - Public Roadways This being the day set for the hearing on Spokane County Engineer's Report on the proposed establishment of ST. CHARLES ROAD, 17m AND 18' COURTS, proceedings for which were initiated by PRELIlMIINARY RESOLUTION NO. 0-1080, and it appearing to the Board on proof duly made that Notice of Hearing was published and posted in the manner and for the time required by law, and the Board after examining the report and maps of the Spokane County Engineer and all claims and papers on file and after hearing all other evidence adduced at the hearing; and IT FURTHER APPEARING that the rights of way have been dedicated as public roads, 60 and 50 feet wide, and that said roads are a public necessity and the same should be opened and established as County road. THEREFORE BE IT RESOLVED by the Board of County Commissioners of Spokane Counry, Washington, that the hereinafter described roads as reported by the Spokane County Engineer on the 2nd day of January, 2001, being more particularly described as follows: • ST. CHARLES ROAD - 60 foot wide right of way, from the south right of way line of 16th Avenue south to Lot 11 Block 1(one foot strip) of Springfield Addition at Autumn Crest south to the south line of line of Springfield Addition at Autumn Crest. 17TH COURT - 50 foot wide right of way, from the west right of way line of St. Charles Road west to and including cul-de-sac of Springfield 11 Addition at Autumn Crest. • 18T'H COURT - 50 foot wide right of way, from the west right of way iine o#' St. Charles Road west to and including cul-de-sac of Springfield Addition at Autumn Crest. Located in the Northeast Quarter (NE '/4) of Section 26, Township 25 North, Range 44 E.W.M. OFFICE OF THE COUNTY ENGINEER SPOKANE COUNTY, WASHINGTON TO: CHAD COLES FROM: DAVE BERTO DATE: July 27, 1998 SUBJECT: BOND ITEMS P1570D SPRINGFIELD AT AUTUMN CREST The bond for the above mentioned project is for the following items: 1) All the items on the approved road and drainage plans. ~ ; ; ~ . . 1 S P O K A N E C O U N T Y DNISION OF ENGINEERING AND ROADS A DIVISION OF THE PUBLIC WORKS DEPARTMENT January 17, 2002 Washington Trust Bank PO Box 2127 Spokane, WA 99210 Attn: International Banking Department RE: Bearing Account Number 434230 for Residential Construction of Springfield Addn. . at Autumn Crest. (P1570D) Dear Kim, Please be advised that the Bearing Accouat Number 434230 issued by your company to Linderman Construction, Inc. as construction for installations of roads and associated drainage facilities for the above mentioned plat in the remain.ing current amount of $75,230.00 may now be released in full effective immediately. The project roads have been established and the warranty period has expired. This final release should close out the above referenced surety. If you have any questzons, please call me at (509) 477-3600. Sincerely, e /o John Hohman, PE Development Services Engineer/Manager cc: Linderman Construction, Inc. File 1026 W. Broadway Ave. • Spokane, WA 99260-0170 •(509) 477-3600 FAX: (509) 477-7655 (2nd Floor) 477-7478 (3rd Flaor) • TDD: (509) 477-7133 \1 `Z___ - . ,J. ~ f" DEVELOPER BOND REVIEW FORM\' ' " C Project Name: AnP70MAJ Cle~T- Project Number: 15 70 ~ Location: J ' Y Original Bond Amount: 76, 2~5?D Original Bond Date: 7/ZZ~9~ . , Bond Balance: 75. Z30 Bond # REVIEW Last Review Date or Punch List Date: 6/07 /2ana Work Remaining to be Completed: ~...1A-4J 2, ZOo/ ~ Reviewed by: 1/e,7~ 4wAJ.C Date: 1128 1-01 Findings: L~~S n k-- ~ "S RECOMMENDED ACTION: Circle Action) - 1. Release Bond 2. Reduce Bond 3. Continue Bond By: Date: /a I Action Taken: (Circle Action) 1. Release Bond Letter 2. Reduce Bond Letter 3. Continue Bond 4. None By: Date: FOLLOW UP Follow up Scheduled: Comments: Files Updated Comments: Date: By: Files Updated Comments: Date: By: Files Updated Comments: Date: By: Files Updated Comments: Date: By: Files Updated Comments: Date: By: July 22, 1998 Bill Johns, P.E. Spokane County Engineer 1026 W. Broadway Avenue Spokane, WA 99260-0170 Subject: Developer/Borrower: LINDERMAN CONSTRUCTION, . INC. Mortgage Loan No.: 434230 Spokane Engineers Project File Funds in the amount of $75,230.00 are being held in a special non-interest bearing account in the name of LINDBRMAN CONSTRUCTION, INC. (Developer/Borrower) et ux, for the purpose of assuring completion of installation of roadway surfacing, including grading and gravel, storm drainage and monuments in SPRINGFIELD AT AIITZJMIlJ CREST (Name of Development), in accordance with the drawings and specifications as submitted t~ and approved by the County of Spokane Engineer's Office on the /s ~ day of ZU 1998. No funds will be disbursed from this account without written authorization of the Spokane County Engineer. This set aside of funds will not be revoked without the consent of the County Engineer. In the event that the completion and acceptance of the above-named improvements for maintenance by the County of Spokane are not accomplished within a period of one year from the date of this agreement, all funds remaining in the account will be forfeited to the County of Spokane upon written request by the Spokane County Engineer's Office to Washington Trust Bank (Mortgage Company). It is understood and agreed that upon the forfeiture of the funds to the County of Spokane, that the County of Spokane will then undertake completion of the subdivision to be accomplished within twelve (12) months from the date of forfeiture of funds. It is further understood and agreed that in the event of any shortage of funds to complete improvements, the County of Spokane may have recourse against LINDERMAN CONSTRUCTION, INC. (Developer/Borrower) named above. It is specifically understood and agreed by the parties, that in holding funds for this development, Washington Trust Bank (Mortgage company) is not serving as guarantor for any additional costs incurred by the County of Spokane in the completion and acceptance of the above-named improvements. ACCEPTED AND APPROVED THIS 22ND day of July , 1998. MORTGAGE COMPANY: WASHINGTON TRUST BANK Builder Services Address: P. O. Box 2127 City State Zip: Spokane, wA 99210-2127 Phone: 35 -4850 . By : Vice President DEVELOPER/BORROWER: LINDERMI•1N CONSTRUCTION, INC. Address: 4823 S. Sky Meadows Lane City State Zip: Greenacres, WA 9901--9771 Phone: 891-0190 By .VLP~ G. tinderman, resident OFFICE OF THE SPOKANE COUNTY ENGINEER: By: n ~ rt ' 0 ITEM MEASUREMENT QUANTITY SURFACE AREA- 2864.00 S.F. ROADWAY EXCAVATION 0.67 FT. 70.7 C.Y. CRUSHED SURFACING TOP COURSE 0.50 FT. 53.0 C.Y. CRUSHED SURFACING BASE COURSE 0.00 FT. 0.0 C.Y. ASPHALT CONCRETE 0.17 FT. 36.2 TONS CURB TYPE B EXISTING 0.00 FT. PROPOSED 308.0 FT. TOTALS ROADWAY EXCAVATION 995.1 C.Y. CRUSHED SURFACING TOP COURSE 792.5 C.Y. CRUSHED SURFACING BASE COURSE - 0.0 C.Y. ASPHALT CONCRETE ' 415.2 TONS CURB TYPE B 1505.9 FT. SIDEWALK 398.1 S.Y. STREET QUANTITIES PROJECT NO.- P1570D DESIGNER- DOUG BUSKO DATE- 2/24/98 PROJECT DESCRIPTION- SPRINGIELD ADD. @ AUTUMN CREST, ST. CHARLES, PROGRESS, 18T STREET # 1 ' LENGTH- 309.00 FT. WIDTH- 40.00 FT. JG STATION = 4632.00 ENDING STATION = 4941.00 INTER # 1 FUIaL INCLUDED ISWIDTH = 36.00 SK = 0.00 RAD = 20.00 TERM # 1 : CHOPPED TERM # 2 : CHOPPED ITEM MEASUREMENT QUANTITY SURFACE AREA- 14193.91 S.F. ROADWAY EXCAVATION 0.83 FT. 438.1 C.Y. CRUSHED SURFACING TOP COURSE 0.67 FT. 350.5 C.Y. CRUSHED SURFACING BASE COURSE 0.00 FT. 0.0 C.Y. ASPHALT CONCRETE 0.17 FT. 179.6 TONS CURB TYPE B EXISTING 0.00 FT. PROPOSED 597.1 FT. SIDEWALK EXISTING 0.00 S.Y. PROPOSED 39-8.1 S.Y. STREET # 2 IY►A~- ~8 :O ~LENGTH- 220.00 FT. WIDTH- 36.00 FT. BEG`I~~RIING STATION = 252.00 ENDING STATION = 472.00 TERM # 1 : CHOPPED TERM # 2: CUL-DE-SAC STANDARD PERM RADIUS = 45.00 RADII = 30.00 ITEM MEASUREMENT QUANTITY SURFACE AREA- 12778.24 S.F. ROADWAY EXCAVATION 0.83 FT. 394.4 C.Y. CRUSHED SURFACING-TOP COURSE 0.67 FT. 315.5 C.Y. CRUSHED SURFACING BASE COURSE 0.00 FT. 0.0 C.Y. ASPHALT CONCRETE 0.17 FT. 161.7 TONS ~ . . ( , ~ ► ~ ` CURB TYPE B~3XISTING 0.00 FT. _ -PROPOSED 597.6 FT. STR NAi~ i'i'aUh•E~S~ LENGTH- 308.00 FT. WIDTH- 8.00 FT. BEGINNING STATION = 4637.00 ENDING STATION = 4945.00 ONE SIDE ONLY PWIDTH= 18.00 EWIDTH= 10.00 QWIDTH= 0.00 TERM # 1: TAPER TAPER LENGTH = 50.00 TERM # 2: TAPER TAPER LENGTH = 50.00 ITEM MEASUREMENT QUANTITY SURFACE AREA- 2864.00 S.F. ROADWAY EXCAVATION 0.67 FT. 70.7 C.Y. CRUSHED SURFACING TOP COURSE 0.50 FT. 53.0 C.Y. CRUSHED SURFACING BASE COURSE 0.00 FT. 0.0 C.Y. ASPHALT CONCRETE 0.17 FT. 36.2 TONS CURB TYPE B EXISTING 0.00 FT. PROPOSED 308.0 FT. TOTALS ROADWAY EXCAVATION 903.2 C.Y. CRUSHED SURFACING TOP COURSE 719.0 C.Y. CRUSHED SURFACING BASE COURSE 0.0 C.Y. ASPHALT CONCRETE 377.6 TONS CURB TYPE B 1502.7 FT. SIDEWALK 398.1 S.Y. STREET QUANTITIES PROJECT NO.- P1570D DESIGNER- DOUG BUSKO DATE- 2/24/98 PROJECT DESCRIPTION- SPRINGIELD ADD. @ AUTUNIIJ CREST, ST. CHARLES, PROGRESS, 18T STREET # 1 • NAME- ST. CHARLES LENGTH- 309.00 FT. WIDTH- 40.00 FT. BEGINNING STATION = 4632.00 ENDING STATION = 4941.00 INTER # 1 FULL INCLUDED ISWIDTH = 36.00 SK = 0.00 RAD = 20.00 TERM # 1 : CHOPPED TERM # 2 : CHOPPED ITEM MEASUREMENT QUANTITY • SURFACE AREA- 14193.91 S.F. ROADWAY EXCAVATION 0.83 FT. 438.1 C.Y. CRUSHED SURFACING TOP COURSE 0.67 FT. 350.5 C.Y. CRUSHED SURFACING BASE COURSE 0.00 FT. 0.0 C.Y. ASPHALT CONCRETE 0.17 FT. 179.6 TONS CURB TYPE B EXISTING 0.00 FT. PROPOSED 597.1 FT. SIDEWALK EXISTING 0.00 S.Y. PROPOSED 398.1 S.Y. I # 2 NAME- 18TH COURT LENGTH- 220.00 FT. WIDTH- 36.00 FT. BEGINNING STATION = 252.00 ENDING STATION = 472.00 ~ ~ ~ l ~ Z'Z. ~ . ~3,to ~ `oy►. Z 73 ~-z 3 z 2~0 ~ ~ ~ 13 3 A t• ~ ~ to ~c, !s► . ~ iiooo . ~ ~ ~ a ~ ~ CAAA-1 43~,3 ~C ~ . ~ S. 00FO ~ ~ Z z A ~z 2 3' 33 1 ~ A~ k J co.i. C, ~~t~ 1-7 k ~ 3 4-w ACOP ' ~ ( « •i ~ 1 ~1 I • ~ ) _ BOND ESTIMATE ' PROJECT Springfield at Autumn Cre st ~ NAME Doug Busko DATE 24Feb-98 DRAINAGE ITEMS UNITS QUANTITY PRICE COST 1) Drywell - Type A EA 1350.00 0.00 2) Drywe11 _ Type g EA 4.00 1700.00 6800.00 3) Grate - Type 1 EA 320.00 0.00 4) Grate Type 2 EA 345.00 0.00 5) Grate - Type 4 EA 4.00 300.00 1200.00 6) Backfill For D!N CY 160.00 17.25 2760.00 7) Concrete Inlet EA 800•00 0•00 8) C.M. Pipe 10" Dia. LF 24.00 0.00 9) C.M. Pipe 12" Dia. LF 27.00 0.00 10) C.M. Pipe 15" Dia. LF 29.00 0.00 11) C.M. Pipe 18" Dia. LF 30.00 0•00 12) Precast Manhole EA 1500.00 0.00 13) Solid lid EA 325.00 0.00 14) Ditch Excavation CY 75.00 10.00 750.00 15) Sod SF 2000.00 0.70 1400.00 NON STANDARD DRAINAGE ITEMS 1) Wilbert Vault Curb Inlet EA 3.00 250.00 750.00 2) 0.00 3) 0.00 q) 0.00 5) 0.00 g) 0.00 DRAINAGE SUBTOTAL 13660.00 16) Monuments EA 185.00 0.00 17) Barricade LF 35.00 0.00 18) Street Signs E°► 90•00 0•00 OTHER SUBTOTAL 0.00 GRADING, SURFACING, CURB, AND SIDEWALK 19) Rough Grade CY 438.00 10.00 4380.00 20) Top Course CY 351.00 15.50 5440.50 21) Base Course CY 15.50 0.00 22) Asphalt Concrete Tons 180.00 46.00 8280.00 23) Curb Type A LF 7.50 0.00 24) Curb Type B LF 597.00 8.50 5074.50 25) Curb Type R LF 8.50 0.00 26) Sidewalk SQ YD 398.00 17.50 6965.00 NON-STANDARD ROAD ITEMS 1) 0.00 2) 0.00 3) 0.00 4) 0.00 GRADING AND SURFACING 30140.00 CONSTRUCTlON TOTAL $ 43,800.00 <:f+~ • ~ m1~ ~ ~ F L ' ' ~ BOND ESTIMATE - ) PROJECT Springfield at Autumn Cres , 1•= NAME Doug Busko DATE 24Feb-98 DRAINAGE ITEMS UNITS QUANTITY PRICE COST 1) Drywell - Type A EA 1350.00 0.00 2) Drywell - Type B EA 1700.00 0.00 3) Grate - Type 1 EA 320.00 0.00 4) Grate Type 2 EA 345.00 0.00 5) Grate - Type 4 EA 300.00 0.00 6) Backfill For DW CY 17•25 0•00 7) Concrete Inlet EA 800•00 0•00 8) C.M. Pipe 1(Y" Dia. LF 24.00 0.00 9) C.M. Pipe 12" Dia. LF 27.00 0.00 10) C.M. Pipe 15" Dia. LF 29.00 0•00 11) C.M. Pipe 18" Dia. LF 30.00 0.00 12) Precast Manhale EA 1500•00 0•00 13) Solid lid EA 325.00 0.00 14) Ditch Excavation CY 15.00 10.00 150.00 15) Sod S F 800.00 0.70 560.00 NON STANDARD DRAINAGE ITEMS 1) WiIbert Vault Curb Inlet EA 250•00 0•00 2) 0.00 3) 0.00 q) 0.00 5) 0.00 g) 0.00 DRAINAGE SUBTOTAL 710.00 16) Monuments EA 185•00 0•00 17) Barricade LF 35.00 0.00 18) Street Signs EA 90•00 0•00 OTHER SUBTOTAL 0.00 GRADING, SURFACING, CURB, AND SIDEWALK 19) Rough Grade CY 394.00 10.00 3940.00 20) Top Course CY 316.00 15.50 4898.00 21) Base Course CY 15.50 0.00 22) Asphalt Concrete Tons 162.00 46.00 7452.00 23) Curb Type A LF 7.50 0.00 24) Curb Type B LF 597.00 8.50 5074.50 25) Curb Type R LF 8.50 0.00 26) Sidewalk SQ YD 17.50 0.00 NON-STANDARD ROAD ITEMS 1) 0.00 2) 0.00 3) . 0.00 4) 0.00 ' GRADING AND SURFACING 21364.50 CONSTRUCTION TOTAL $ 22,074.50 • BOND ESTIMATE . PROJECT S'ringfield at Autumn CAMe NAME Doug Busko DATE 24Feb-98 DRAINAGE ITEMS UNITS QUANTITY PRICE COST 1) Dryweli - Type A EA 1350.00 0.00 2) Dryuvell - Type B EA 1.00 1700.00 1700.00 3) Grate - Type 1 EA 320.00 0.00 4) Grate Type 2 EA 345.00 0.00 5) Grete - Type 4 EA 1•00 300•00 300•00 6) Backfill For DW CY 40.00 17.25 690.00 7) Conctete Inlet EA $00•00 0•00 8) C.M. Pipe 10" Dia. LF 24.00 0.00 9) C.M. Pipe 12" Dia. LF 27.00 0.00 10) C.M. Pipe 15" Dia. LF 29.00 0.00 11) C.M. Pipe 18" Dia. LF 30.00 0.00 12) Precast Manhole EA 1500.00 0.00 13) Solid lid EA 325.00 0.00 14) Ditch Excavation CY 30.00 10.00 300.00 15) Sod SF 800.00 0.70 560.00 NON STANDARD DRAINAGE ITEMS 1) Wilbert Vault Curb Inlet EA 250•00 0•00 2) 0.00 3) 0.00 q) 0.00 5) 0.00 g) 0.00 DRAINAGE SUBTOTAL 3550.00 16) Monuments EA 185•00 0•00 17) Barricade LF 35.00 0.00 18) Street Signs EA 90•00 0•00 OTHER SUBTOTAL 0.00 GRADING, SURFACING, CURB, AND SIDEWALK 19) Rough Grade CY 71.00 10.00 710.00 20) Top Course CY 53.00 15.50 821.50 21) Base Course CY 15.50 0.00 22) Asphatt Concrete Tons 36.00 46.00 1656.00 23) Curb Type A LF 7.50 0.00 24) Curb Type B LF 308.00 8.50 2618.00 25) Curb Type R LF 8.50 0.00 26) Sidewalk SQ YD 17.50 0.00 NON-STANDARD ROAD ITEMS 1 ) 0.00 2) 0.00 3) 0.00 4) 0.00 GRADING AND SURFACING 5805.50 CON3TRUCT{ON TOTAL $ 9,355.50 . ~ ~ , r l~ . S P O K A t14 E C O U ~T T Y DIVISION OF ENGINfiER[NG AI`iD ROADS • A DIVISION OF THE PUBLIC WORKS DEPARTVIENT William A. Johns, P.E., County Engineer Dennis M. Scott, P.E., Director February 24, 1998 Todd Whipple, P.E. Inland Pacific Engineering 707 W. 7th Avenue Suite 200 Spokane, Washington 99204 Re: Road and Drainage Comments 1 for Springfield Addition at Autumn Crest Plat Number PE-1570D Todd, The County Engineers have reviewed the road and drainage plans recently submitted for this project. The following items must be addressed with the next submittal: 1. The contact at the County is now Jim Radke instead of Ed Pany. 2. Correct the point labels on the cul-de-sac profile. 3. The taper calculations submitted did not employ the correct method. The correct equation for a shifting taper as proposed is T=WS2/180, or 50', whichever is greater. 4. A Design Deviation must be submitted for curb grades less than 0.5%. 5. Add to Construction Notes 3 and 4 that the utilities must be relocated at least 2' behind the back of curb. 6. Note what kind of seed or sod will be placed in the Progress swale. 7. It appears that incorrect 10-year peak flow rates were used for determining the curb inlet dimensions for Sub-Basins T1 and U1. The peak flow rate for T1 is 0.76 cfs,and the peak flow rate for U1 is 0.99 cfs, according to your time of concentration calculations. 8. The amount of the financial surety required for the road improvements for this project is $75,230.00. Please contact me to obtain the paperwork necessary for the filing of this surety. 1026 W. Broadway Ave. 0 Spokane, WA 99260-0170 •(509) 456-3600 FAX: (509) 324-3478 TDD: (509) 324-3166 . r ~ ~y 9. Please submit the stamped lot plans for L 1, B 1; L3, B 1; and L9, B 1. Please return the enclosed red-lined plans with the next submittal. Feel free to call me if you have any questions regarding these comments. Sincerely, Spokane County Engineers ~ ~ . Doug Busko, P.E. Plans Review Engineer c: Scott Landreth, Owner PE-1570D File encl.: Bond Estimate; Red-lined Plans (IPEC only) ` INLAND PACIFIC ENGINEERING, INC. June 30, 1998 • W.O. 97117 Spokane County Engineers Engineering Development Services 1026 W. Broadway Ave. Spokane, WA 99260-0170 Attn: Doug Busko, P.E. Re: Springfield at Autumn Crest (P1570D) Street and Storm Drainage - Second submittal Dear poug: Enclosed please find the submittal package for the above referenced project. The following items have been included for your review and acceptance: _ ■ A completed submittal checklist. ■ Two mylar copies of the plan set, signed by the sponsor, and stamped, signed and dated by the Project Engineer, Todd R. Whipple, P.E. ■ Two copies of the signed, stamped and dated Drainage Report. Comments from your first review, noted in your letter dated February 25, 1998, have been addressed in the following manner: ■ The name of the County's contact has been changed to Terry Lightfoot. ■ The point labels on the cul-de-sac profile have been corrected. ■ The taper calculations for the taper on the east end of Progress Road has been left as previously submitted. The merging taper formula, WS 2/6 0, has been used at the request of the Project Engineer, Todd Whipple. An 18' paved width could result in two unmarked lanes, requiring a merging movement rather than a shifting movement. The shifting taper formula, WS 2/18 0, has been used for the taper on the west end, resulting in a 50' taper, as the 40' taper calculated fromW= 8' and 5=30 MPH is less than the minimum required. :~~~~Is v ~ ■ The approved Design Deviation for the curb grades less than the mi",iimup1908 is included. i' Eh'CINEER J: IDocuments1971171sub2 ' - • . 707 West 7th • Suite 200 2020 Lakewood Drive • Suite 205 Spokane, WA 99204 Coeur d'Alene, ID 83814 509-458-6840 9 FAX: 509-458-6844 208-765-7784 9 FAX: 208-769-7277 ■ Construction Notes 3 and 4 on Sheet 3 of 5 have been modified to indicate a minimum 2' distance from the back of curb for the relocation of the utilities. ■ Grass turf has been called out for the Progress Road swale, identical to the note in the Autumn Crest 31 Addition detail for Progress Road swales. ■ The curb inlet calculations for the Sub-Basins T1 and U1 have not been changed. Both ponds are intermediate ponds, designed to detain and treat a specified `208' volume, not the peak storm volume flow. If the 10 year flow peak flow rate were used for the curb inlet calculations in this situation, it would only serve to fill the pond more quickly to the maximum elevation possible before water would then flow back out the inlets and into the sump areas in Sub-Basins T2 and U2. The 10 year flow is used in continuous grade curb calculations where flow must be captured and diverted prior to leaving a plat boundary, but that is not the case here. ■ The stamped, signed and dated lot plans for Lot 1 of Block 1, Lot 3 of Block 1 and Lot 9 of Block 1 are enclosed. If you have any questions or concerns this submittal, please call our office at 458-6840. Thank you. Sincerely, INLAND PACIFIC ENGINEERING COMPANY Mark Kamrath MK/sm enc. cc: file, Lonrue Linderman J.• IDocuments1971171rub2 n 0- INLAND PACIFIC ENGINEERING COMPANY 707 W. 7th Avenue, Suite 200 Spokane, WA 99204 (509)458-6840 Fax: (509)458-6844 To: sR~IC-~-t~l E Gau r.3-1' DATE: -3 ' 3 -a 9 I.P.E. PROJECT ot-71 "7 ATTENTION: PDu Cq ?0V S4v PROJECT NAME: Description wv- MI Xerox Prints M+ Copy of Letter Original Drawing M~ Contract Documents ~-D~~w~ LAOl MP~ ?EAMFIT M~ M~ Work Authorization M ~ Report No. Copies Description PurpOSe II Information M~ Review & Comments M~ Per Your Request ~►Written Approval M~ Signature & Return M~ Remarks . ~ ~ ~ QL~ ; LY9 n ^p~ . ~ ' ii . . iA K u ~ Ititto 1 Signed• ~ cc: D:ITRNSMT.PMS 1 . , . e INLAND PACIFIC ENGINEERING, INC. RECEIVED February 3, 1998 3'{W (9 9 g W.O. 97117 ~ SPOKANE COU14n ENGNMR Spokane County Engineers Engineering Development Services 1026 W. Broadway Ave. Spokane, WA 99260-0170 Attn: Dean Franz, P.E. Re: Springfield at Autumn Crest (P1570D) Street and Storm Drainage submittal Dear Dean: The following items have been included in the submittal package presented for your acceptance for the above referenced project: A completed submittal checklist. - ~ Two bond copies of the plan set, signed by the sponsor, and stamped, signed and dated by the Project Engineer, Todd R. Whipple, P.E. ~ Fire District approval. - me/ Geotechnical information, stamped, signed and dated by our geotechnical engineer, Jerry Peterson, P.E. ■ Pavement design information, stamped, signed and dated by the Project Engirieer; , Todd R. Whipple, P.E. _ W/ Lot plans and cross sections for all ponds within the project, stamped, signed and ~t dated by the Proj ect Engineer, Todd R. Whipple, P.E. ■ Edge of pavement design calculations for the widening on Progress Road. J:1Documen1s4971171sub1 707 West 7ih • Suite 200 2020 Lakewood Drive • Suite 205 Spokane, WA 99204 Coeur d'Alene, ID 83814 509-458-6840 9 FAX: 509-458-6844 208-765-7784 • FAX: 208-769-7277 , . , ' . . Spokane County - February 3, 1998 Page 2 vb/ A drainage report, including a basin map with Time Of Concentration routes marked and topography labeled, stamped, signed and dated by the Project Engineer, Todd R. Whipple, P.E. If you have any questions or concerns regarding this submittal, please call our office at 458- 6840. Thank you. Sincerely, INLAND PACIFIC ENGINEERING COMPANY F / Susan Murphy; E.I.T. sm enc. cc: file, Scott Landreth J: IDocumentsl971171sub 1 i ~ ~ . ~ ~ • SPOKANE ~:~UNTY INTERIM ROAD~ DRAINAGE . 5UBMITTAL CHECKLIST PROJECT # DATE: ~ ZCo 1'q$ PROJECT NAME: 51T>Ft KY,,~iF-1 6-i~(D k) PROJECT SPONSOR: i2-0-ff- TEL.J ~Z7 -~o( PROJECT ENGINEER: 'r9 Do U)t4 1 pp '0' TEL# 0~~, L i' ~ ^ (Road & Drainage Plans) " D ~ PROJECT SURVEYOR: ~7 ~1f ~S`f~ , (Plac) PLEASE PROVIDE A RESPONSE TO EACH OF THE FOLLOWIlVG ITEMS. GENERALI'I'EMS Y[KoD N/A❑ 1. A signed "AGREEMENI' TO PAY FEFS" form has been submitted to Spokane Counry along with any applicable plac fees, prior to any pre-design/presubmittal meeting *yw'e5UNoON/,,❑ 2. I have a copy of, and have reviewed the most recent conditions of approval and any EIS/MDNS requirements and conditions of approval have been incorporated in this plan submittal. PROJECT DESIGN '4. s RN o❑N/A❑ 1. I have completed a minimum of one pre-design meeting with Spokane County Development Engineering Services Engineers where• agreement was reached on drain.age design approach. o0H/A❑ 2. I liave included the results of any geotechnical testing that is required by the design approach to verify design ~U,v000 parameters. YaE]NrA❑ 3. I have included any required pavement design calculatians on new Public roadways as required by the "SPOKANE COUNTY STANDARDS FOR ROAD AND SEVVFR CONSTRUCTION", latest edition. 'Y es 5d,4oO,vIn❑ 4. The road and drainage plans comply with the"STANUARD ROAD PLAN" requirements for plan, profile, and rypical cross section elements contained in"SPOK:ANE COIJNTY STANDARDS FOR ROAD AND SEWER CiONSTRUCTI4N" latest edition except as allowed through approved design deviations. veszoE]x,n❑ 5. The drai.nage report incorporates the minimum requirements for a storm drainage analysis as noted in the GSM and other items which are appropriate to demonstrate that the design meets all requirements of the Spokane County Guidelines for Stormwater Management except as allowecl through approved design deviations. ,reslnrro0r„A❑ 6. A complete drainage basin map with time of concentration paths shown has been included with the detailed hydrology calculations. I}rainage basin map shows topograph, proposed drainage features, and conelates wich hydrology calculations. ,rNoOrrIAe 7. All applicable traffic signing requirements are met and have been incorporated'in the plan submitcal. veS0No[]N1Au 8. I have included copies of all approved DESIGN DEVIATIONS which are required for this project. 'YcsUrraOrr~AR*'P9. The plans and drainage report are stamped, signed, and dated, and contains, the applicable certification statement. Yes~HoOH~AEre'00010. I have included an adequate erosion control plan and applicable standard plan notes. YxoOH,A❑ lI. I have secured approvals from all applicable outside agencies such as fire districts where applicable and have . included proof of their approvals.. 'V;0,va0N~A2e00012. I have provided an acceptable means for perpetual nnaintenance of street and drainage facilities that is acceptable to Spokane County and have secured and included copies of any required easements. _ veS0rro13N/A2000"13. I have reviewed the plans, calculations and other submittal data for completeness, accuracy and consistency and ^ have submitted two copies of plans and (1) bound drainage report. r ~ 13 0 - Atc*--A KWJT A" I1ckplatv1.0/May95 1 • . . _....~..4 . < . ~.1,.. „v.,~, .iv ~ <<<~ ii it- a iL a I a tI I I li ltl 1 t;l11111 CIII~UIS I1t;CCtiS~i1 [lJ l)L( IUf i!i Ltll :,~1! 1 I 4: ~ IC.'.~ lll (fIC 1)1C)jCCI -pla,s; :xnd that additional inforqiation sh~bc includcd wicli this subcnittal as nccessary' ~ ol - ` H ~ y • I uYiderstand that this submittal will be checked for completeness prior to review, and that it will bc returned for furthec information if it is found to be incomplete. . understand that this submittal will not be accepted for review (and placed on the review list) until alt required infocmation has been submitted. ' Form compteted by the responible Engineer: -I-&D D W t4 i PPL-C; ?e!--' Company: -rltJ eiFk-Lg~1 1AV65?!5'e(.t'7 . Address: 70 ? L[). 'f M 73;7 2_.DO. SAOAG9X)~~, GU~9- e!9 ZG~ Zip code Date: ~ FOR SPOK;ANE COUN'IY USE OiYLY z. ~3 . &D6 SUBMITTAL: Accepted for review. ~ Returned for submittal of the following: GENER.AL ITEM ' `ROJECT DESIGN fl : c • RESUBMITTAL ITEM f!: . . • Form returned to: . Company: . Address: ~ Date: ' By: Spokane Counry Pubiic Works Development Services 1 1 . . , Uckplatv l.0/May95 2 y~. vv 11uu aa.v~ .sw vvl C• '~~v v.vca.,u .saua.u• ♦ aav,t•~i l WJVVL • . SPQKANE VALLEY FIRE DEPARTMENT ~ Spokane County Flre District 1 1Q319 EAST $PRqCyUE AVE. • SPOKANF. WA 99206-3676 •(SOp) 928•1100 • FAX (SQq? 892-4125 R. Pa! Humpttrks Chift January 20, 1998 Tammy Jones County of Spokane Planning Department 1025 W. Broadway Spokane, WA 99260 - R8: PR-1570-89 BpRIMGFIELD AT AtJ'1'DM CREBT Dear Ms. Jones: The Spokane Valley FiYe Departntent will require the installation of a new fire hydrant at the N.W. corner of 18th and St. Charles. Acce6s appears adec;uate. Sincerely, v i Miller . . Fire Inspector I4M: sg - • ~ CC : Mark Kamrath ~ . . . Inland Pacific Engineez'ing ~ ,q , ~•r ~ INLAND PACIFIC ENGINEERING, INC. January 26, 1998 W.O. 97117 Office of the County Engineer Engineering Development Services 1026 W. Broadway Ave. Spokane, WA 99260-0170 ATTN.: Dean Fra.nz, P.E. 5, RE: Results of Soil Classification and `R' Vatue Testing ' Autumn Crest 5' Addition ~Please find enclosed the results of soils classification testing performed by Inland Pacific Engineering Company, Inc. (IPEC) on the soil sample obtained from the above referenced residential development. . Test pit TP-1 was excavated at the approximate location shown on the attached Test Pit Location Plan. The sa.mple was obtained from between 0.5 feet (approximate bottom of topsoil) and 2.5 feet below existing grade. The sa.mple location was determined by pacing from existing site features, and should be considered accurate to the degree implied by the methods used. A portion of the same sa.mple was delivered to Petroleum Sciences. Inc., who determined the `R' value to be 50 by the WSDOT 611 test procedure. We certify herein that the sample tested was obtained by a member of our stafffrom the approximate location stated above, and that based on the data enclosed, the USCS soil classification of GM is correct for the sample from TP-1. Please do not hesitate to call if you have any questions regarding this letter or other aspects of the project. Sincerely, INLAND PACIFIC ENGINEERING COMPANY T , ~nsy~~ ~ R F 0 IV •I ' ~ w ..AN 2 7 i998 Jerry . Peterson, P.E. j Geotechaica1 Engineer ?rris c~L~~ SPOKqNE COUtYfY EtIGINEER Enclosures: Sample Gradatio ' s ' Petroleum Science ' ting `R' value ,.wocumen"71 1M01Lchss.wpa 707 West 7th • Suite 200 2020 Lakewood Drive • Suite 205 Spokane, WA 99204 Coeur d'Alene, ID 83814 509-458-6840 9 FAX: 509-458-6844 208-765-7784 • FAX: 208-769-7277 t t I FUTURE PLATTING T BOI~IDARY I ~ I I ~w I i I O . 7 4 ; 3 2 I ~ ~ T Bd~ARY 2 2 ~ LEGEND ! 181H OOURT AP,PROXIMATE 1EST PIT LOCATION 6 3 I 7 8 9 10 t~ RAT 8pUNDARY--s, \ ~ R"T ~ . 4 1 . • ~I r I ~nvTuivi"r' „RE i4iH nuui7ivii ( I~ ~ d E \1 q 1 ~ i I I ~E N ~ Eli i SCALE: 1 "=140' ~ . ~ I NLAND PACiFic AUTUMN CREST 5th' ADDITION ~ ENQINEERING TEST PIT LOCATION . PROJECT No. 971 ~ 707 West 7th • Suite 200 (509) 458-6840 DATE: 01 /23/98 ~ Spokane, WA 99204 FAX: (609) 458-6844/ \ 4" GRA N S ZE D STR BUT ON SIZE OF OPENING IN INCHES U.S. STANDARD SIEI/E SIZE HYDROMETER ~ 1~5 3 /4' 3/g' 4 ql0 116~0 30 tD 5060 8P00 290 tpp T O 90-...----- - -10 . F- ~ gp....----- ~ -20 0 L1.J 70...------ . -30 W ~ m ~ so-...----- .4° W ~ Z Z •7-- -so Q LL- . ~ l'- 40...------- -so ~ W • w • 30...------ -70 U W W ~ (IL 20...------ -80 10-••------ -90 ' p -100 1000 100 10 1.0 0.1 0.01 ` 0.001 GRAIN SIZE IN MILLIMETERS COARSd MEDIUM I FlNE • • COBBLES GRAVEL SANp . FlNES (SILT, CLAY) ~ EXPLORATION SAMPLE DEPTH % MOISTURE % PASSING 200 STCN-aet.ES /r aTt+C-r ~#8Z 1 '7 .3 `/o : ~ PROJECT NO.: ~L7113 PROJECT NAME: ALY'uMAJ Ce-C-S:-l ' - DArE: ~ ~&a Fl a-L-11) . j ZU _ ga -T-ES.r. ~v I NLAND PACIFIC ~ ENQINEERIN4 rr- ~uL. turl 5u 1 17- rvL:t5 P. 0 1 • T- r , Petroleum Scownces., Im ,A,syitolt Technology • AsphaIt Emuisions a Poaymer Aehpalta •Rheology 4$17 N. Frrya St., 93 • P.O. l3ox 6304 o Spokane, WA 99207 (509) 489-1753 • Fax (509) 489-2401 ~ p~ ~~11 1nl:ind Pacific Hn&eering Co. ~ ~Yl 707 W. 7th, suite 200 c,c Spokane, WA 99204 Janua,y 22, 1998 Projcct #3354 Attn: Nclson Kc: St. C;hatles/l 8th Ct. R-value A sample of soil was subbnitted 1-16-98 for testing according to WSDOT bl I, R value. 7.lle sarnpling lacation rcgorled was "St. CharlWl8th Ct., @ apprax. S`I'A 48+00, 25` left of Cl.., from wo.✓' `V -2•5,,11 1Ns uiatcrial d,id zwt regislcr a swcll reading at any point. The sa,mple wi.ll bc retained for 90 cays befnrc bcing discardcci unless other arrangement arc made. Samplpl:i) R-value @400 es' SL Charlcs/181h C,'t. SO Revic;woct and re4vrted by, ~ Q~t Kcnt I4cuctc;rso13, VP'1`echnical Serviees ' i . ~ INLAND PACIFIC ENGINEERING, INC. January 27, 1998 IPE W.O. #97117 Spokane County Engineers Engineering Development Services W. 1026 Broadway Avenue Spokane, Washington 99260-0170 Attn: Dean Franz, P.E. RE: Springfield at Autumn Crest - P1570D Pavement Design Dear Dean: This letter is intended to provide you with the documentation for the pavement design for the above referenced project. The roads match the section designed for Autumn Crest 411 Addition, which is 2" ACP on 8" CSTC, in accordance with the 1981 County Road Standards, under which this project was designed. Petroleum Science Inc. performed an "R-Value" test, and determined the "R-Value"to be 50. All backup information for this design has been included with tlus submittal. Should you have any questions concerning this matter, please give me a call at our offce. Sincerely, Inland Pacifi gineering Company ~ was ~ o'C~ . Todd R. Whipple, P.E. ~ - ` - TRW/sm ~SI~N ~G enc. A~►. cc : file ~ EXPIRES 9/24/ J:1tlot.ymentl9i i 4pvmtdes 707 West 7th • Suite 200 2020 Lakewaod Drive • Suite 205 Spokane, WA 99204 Coeur d'Alene, ID 83814 509-458-6840 • FAX: 509-458-6844 208-765-7784 • FAX: 208-769-7277 .DCS%G~~1 P/M T- b&~-~16-iAj sPIRI,cJ6Fi84~ ~ ,,~raMld Ge-EST GUS bo T~ ~SPb .60. 779,4-r/ G/ /JDEX- A-L)T 157~ 0 ~S 52, L0 TS ~-v /a 7-ICIP5 /l-0 T11->111 - ~ zD l S /0 S77M47E7 /4s5 c~In c 1001 ~0 t=r t~t4~ 4-5 deX,15~rJJ(q-nv6~ E7 F124M OJS E~T ~G~ /-L-7 GUyoz'e~ 7z = ~ TiUd~~C . ~ io) ~s, qO -o , 047( t)) - y, o ~ o) (5-10 CD Su,P-Fi9Z4~1r--7 v4~-u.E' . ~ l ~~UL = T.L ~ i2 d )7 ~167 bor DE51671d CZ o/j S T--P-D m F167 / Ar aF M197~UU-AL /OFv,e., 21114-LP ~ 0/ ~ I n I a n d MEMO ❑ PROJECT~~~I ~6F/ eiz ~ P a C I f 1 C CALC. ❑ JOB N0. ff//7 SHEET-/ 0~ ~ En ineerin g g MEETING ❑ BY~J DATE ~/West 707 7th, Suite 200 Spokane, Washington 99204 OTHER ❑ CHK'D BY DATE ` 509 458-6840 Fax No. 509 458-6844 ~ ~ J • \ _ ~ 498 HANqBu'OK -OF~HIGHWAY ENGINEERING ~ ~ i . i TABLE 16-1. Traffic Categories Based upon Capacity . TABLE 16-2. Subgrade Categories Operation° 1. Based an Strength Tesi . • . Equivalent 18,000-1b• Traffic Ca/ifornia Bearing Des/gneilon Single Axle Loads Category Subgrade Cacegory Ratio (CBRJ Subgrade Modulus K . 1. City Streets and Parking Lots Very geod (YG) +10 +200 ~ Freeways _ 30,700,000 11 Good (G) +g to 10 +150 to 200 Locat street, industrial 6,570,000 g Poor (P) 3 to 6 " 100 to 150 Major arterial 5,260,000 9 • Local street, business 3,940,000 9 11. Based on Soil Classificatione " Truck parking lot, entrance 3,500,000 9 Shopping center, truck Subgrade ent~ance 1,680,000 g (~tegory Material Unified System : AASHO Sysiem Collector street 430,000 7 Very good Gravels snd GW, GP, GM, GC A-1, A-2-4, A•2-5. Truck parking lot, parking stal Is 35,000 saridy ~ SW, SP, SM, SC A-2-6, A-2-7, A-3 ~ grayets local street, residential 9,500 5 Good or Si(ts and ML, CL, OL, MH A-4, A-5, A-6, Car pa~king lot, more than poor clays CH, OH . A-7-5, A-7-6 50 stalls • 9,500 5 ~ . Car parking lot, 50 statls Silts and clays rated poor only under the following oonditions: or less . 950 3 (a) When they occur in fow-lying areas wher.e the natural drainage Residential driveways 150 3 is very poor and will not be improved. , (b) Where the condition of waier table and climate are such that • !t. Rural Roadsb severe frost heave can be expected. ' Traffic Equ/valeni 18,000-Ib Trucks Per Day (c) Where high percentages of mip-like fragments or diatomaceous • Caiegory Single-Ax/e Loads !n Design Lane Panicles produce a highly elastic oondition. This woutd occur ~ s: mainly in A•5 (ML and MH) soils. . , 11 . above 30,000,000 +4,000 • (d) Where it is desired to "bury" highly expansive soils, usualty } 9 t500,000 to 30,000,000 +100 to 4,OD0 A-7-6 (CN), deeper in the sectipn to limit the effects of seasonal ; 7 +10,000 to 500,000 +5 to 100 variations in moisture. ' - . 5 +1,000 to 10,000 1 to 5 8 . s_ 3 less than 1,000 less than 1 8ased upon Ret. 3 and 69. - h e' struction and/or maintenance. Most authorities do not ~ • beeSEd upon Ref. 22. , . Based upon Ref. 10. recommend the use of subbases for. full-dePth asPhalt ~v . pavements except as deep subgrade treatment against frost action. Selection of an adequate subbase or stabilization increments of pavement thickness between the groups. The Portland Cement Association correlation of CBR and Process is primarily based upon experience, and advice from . subgrade modulus can tie used to establish K values. local authorities should be sought. _ i The CBR values are those expected to occur in the road. ~t Thickness They can be estimated by tests made on samples compacted . in molds and soaked in water for four days prior to testing. In Table 16-3, thicknesses for the various traffic and sub- The soil classification can also be used to estimate the CBR. grade •categories .are listed for three types of -pavements. ~.,.•i 'Y - Soil classification guides for the three subgrade categories When Traffic Category 11 or Traffic Category 9 Over "poor" i' are listed in Table 16-2. It will be noted that the distinction soil are encountered, advice should be 'obtained from a-~~:; .:.:between good and poor categories is primarily one of drain- qualified Pavement designer. For very-'poor soil•conditionsp age, frost, elasticity , or expansiveness. . advice froni soils engineers -and/or pavement designers will The soaked laboratory test'provides an evaluation of the worst condition of sub8~'ade suPP ' ort that will exist. For usually produce more economical solutions. particularly troublesome condifions, «downgrading the classification of the subgrade (thereby requiring more SUBGRADE AND BASE STABILIZATION* pavements), or use of subbases should be considered. T'he quality and thickness of pavement layers is influenced ; x to a great extent by the strength properties of the subgrade. X. Materials A discussion of the engineering analyses related to soils and - rock as pavement subgrades is included in Section 15. • Designs are shown for only three types of pavement: full- Of additional interest, are the procedures for increasin8,=' depth asphalt, conventional asphalt, and concrete. subgrade strengths as a means of reducing overall pavement,;f The asphalt surfacing and asphalt base are considered to be standard hot mixes normally used for these purposes. ~osts. . The base course for the conventional asphalt pavement Subgrade ~is considered to be a dense-graded crushed aggregate. • • The eoncrete pavement is nonreinforced, except for wire Compaction ~ • mesh in the thinner slabs, and is assumed to have a design Subgrade compaction properly conducted, can become a~. flexural strength of 650 psi (4500 kN/m2 very important engineering tool because its use can offer..~ , Subbases or stabilization can in some cases reduce the .:gc cost of conventional asphalt and conerete pavement con- *Principal contributor-Chester McDowell. • . . ' db r ~ 90 0 5 10 15 20 25 30 - ~ 35 6" CTB o o r- 4"AC 9 80 3" AC ~ ro 30 ~ 211 AC ~ c~ 70 -A ~ ~ z ~ o r~ ~ 25 co 60 CO~ 06 > 00 20 CC p00~~~~ 1 0 aai ~G~t~~ 50 ~04~ p Q Minimum Depth of Crushed Surfacing under QpCY) ,0130 m Bituminous Mat 0 40 Pavement Type Depth , c~~d ~ ~4 5 'High 2" c~ ~ 1o4~dp0 i~ ~ Intermediate 21/2" 30 Low 316 ~ . C 10 "When exceptions are allowed in arid areas and Cement Treated Base is not required, this should apply. 20 3 1 Definitions of Pavement Types 1'0 5 'High Asphellbc Concrete 3' Min, on Cement Treated 8ase Inlermedlale AsphallicCancrete <3' 10 8i1. Planl Mix 4 ' Qn Aclequate Base 8it. Macadam 2' Min - . Bit. Road Mix 2' Min, Low BII, Surlace Treatment 314' Min. I Exemple !or Use o1 Chad 0 ' Exceplions are possible in arid arees O Given: 1, Subgrede solis with'R' value o140. • 2. SeclPon o1 roadway wilh TraHic Indez ol 6.0. The'R' velue and the Trefllc Index w(II ba iumished wiih Ihe Soils Report, ?o find tha total surlac(ng deplh requlred, caamect a 11ne lrom 40 on Ihe'R' Value scale Ihrough 8.0 on Ihe 7raflic Index scale and iind its intersection with the Totel Surlacing Deplh scate. Polnl A. This is indicated to be 15-112 inches and is Ihe tolal deplh requlred II a lighl biluminous surface lreatment Is to be used tar pevemenl. II e heavler pavemenl, tor example 3lnches ot usphaltlc concrele, is lo be used, a reducUon in lhe tolal surlacing depth may be made. To determine Ihk reduced or modified depth, find Ihe ~ inlersecqan ol lhe 15-1/2 inch Ilne with the ditigonal 3 inch AC Ilne end read 14-1l2 fnches on Ihe Modified SuAecing Deplh scale, poinl B. If in addilion, 8 inches oi CTB is planned, the 14•1/2 inch deplh may p~ be fudher reduced by moving hadzonlally lo the lefl Irom po(nl B to the Inlerseclion wflh the diegonal 8 Inch CTB line and Ihen down to 11 •1f2 inches on Ihe Moditied Surlacing Deplh scale, poini C. The reducUons In total surladng 8eplh ere additive, and each course, CTB or AC, contribules to Ihe lotal reduclion. Tha reduclions mey be determined In any order. The'Ihickened edge' asphailic concrele mat (2•112' at cenferline and 4' al edge) will be consldered es a unitorm 3' mat lor design purposes. ~ ~ ~D Figure 1.15. Sketch of WSDOT Flexible Pavement Design Chart - March 1957 ~ J • ~ -e Section 1.0-An Introduction to Pavement Structures Stabitometer R Value 3 0 10 20 30 40 50 60 70 80 90 . ~ r)A \ ACP ± ACB . 2.5 CP 0. 5' + .45 .35' ~ \ oj - 0.3 0. 5' 0. 01 . v ~ 025' + 0.3 ' 2 . s m 020' > A.5 601 1 I I I co ~ X > ~q'1 N. . w 0.5 - . o 0 0.5 1 1.5 C 2 2.5 3 5UL12f:7AC~ O(I - Modified Surface Depth (Feet) -D1=~~ Of: Example: , e)' ( ct . (n► , tc;) - Given an R va{ue of 25 and a traffic index of 6.0, cover thickness FOR_ {1,i 0;m0' ~ requirements can be deteRnined as foilows: jALP An equivalent gravel depth of 1.65' (round to 1.7) at point A. - A modified surfacing deptn of 1.05 feet at point 6 for a pavement of 0.35 foot ACP ± 0.35 foot ACB. A modified surfacing depth of 1.41 foot (round to 1.45) at point C for . pavement of 0.35 foot ACP. . Figure 1.16. Sketch of WSDOT Flexible Pavement Design Chart - March 1991 , . . - i-~1 February 1995 . . 7 INLAND PACIFIC ENGINEERING, INC. January 27, 1998 W.O. 97117 Spokane County Engineers Engineering Development Services 1026 W. Broadway Ave. Spokane, WA 99260-0170 Attn: Dean Franz, P.E. Re: Springfield at Autumn Crest (P1570D) Proposed Asphalt Taper-Progress Rd. Dear Dean: The following is a calculation supporting the proposed asphalt taper length shown on the Progress Rd. Road plan. ' Distance from existing edge of pavement to proposed edge of pa7ve ent = 4.25' Design speed = 30 Taper Length =(Difference in width) x(Design speed) ~ _ (4.25') x (30)=127.50' 3 Sincerely, ~ INLAND PACIFIC ENGINEERING COMPANY 01 Mark Kamrath rnlc cc: file J:IDocuments1971171laper 707 West 7th . Suite 200 2020 Lakewood Drive • Suite 205 Spokane, WA 99204 Coeur d'Alene, ID 83814 509-458-6840 • FAX: 509-458-6844 208-765-7784 • FAX: 208-769-7277 INLAND PACIFIC ENGINEERING PROJECT INFORMATION TYPICAI SECTION DATA Project: SPRINGFIELD Roadway haff width ENTER-> 18' Job No.: 97117 Road Name ENTER-> PROGRESS ROAD Disc.No,: Le(t or Right ENTER-> RIGHT File Name: EPDESIGN.WB2 Exist Edge Type EDGE OF ASPHALT Calculated 8y: MWK Station lnterval . ENTER-> 25 , DIST. , OISTFROM, T.C. ELEV. T.C. ELEV. SELECT SAWCUT GL TO % SLOPE EDGE CENTERLINE (4.5% hom (-2% from ED ELEV Edge Pave. C/L % SLOPE PVMT(EXST) SAWCUT C/L TO PAVEMENT TO GUTTER sawcut to sawcut to TOP OF fo Gutter CURB ` STATION ELEVATION C/L ELEVATION (FEEn SAWCUT % SLOPE (FEEn gutterJ gutterJ CURB EL. % GRADE %GRADE STATlON - - - _ 4637.26 2058.05 2057.87 10.00 -1.80 16.50 2057.96 2058.12 2057,96 -0.46 4637.26 4650.00 2058.09 0.31 1057.93 10.00 •1.60 0.47 16.50 2058.02 2058.19 2058.02 4.46 0.47 4650.00 4675.00 2058.15 0.24 2058.00 10.00 •1.50 0.28 16.50 2058.C9 2058.25 2058.13 •3.85 0.44 4615.00 4700.00 2058.23 0.32 2058.06 10.00 •1.70 0.24 15,50 2058.15 2058.31 2058.25 -2.92 0.48 4700.00 4725.00 2058.29 0.24 2058.17 10,00 •1.20 0.44 16.50 2058.26 2058,42 2058.36 •2.92 0.44 4725.00 4750.00 2058.38 0,36 2058.20 10.00 .-1.80 0.12 16.50 2058.29 2058.45 2058.45 -2.00 0.36 4750.00 4775.00 2058.40 0,08 2058.22 10.00 . •1.80 0.08 16.50 2058.31 2058.47 2058.47 -2.00 0.08 4775.00 4800.00 2058.39 -0.04 2058.17 10.00 -2,20 -0.20 16.50 2058.26 2058,42 2058.40 -2.31 -0.28 4800.00 4825.00 2058.28 -0.44 2058.10 10.00 -1.80 -0.28 16.50 2058.19 2058.35 2058.32 -2.46 -0.32 4625.00 4850.00 2058.33 0.20 2058.08 10,00 -2.70 -0,16 16,50 2058.15 2058.31 2058.24 -3.08 -0.32 4850.00 4875.00 2058.23 -0.40 2057.93 10.00 -3.00 -0.52 16.50 2058.02 2056.18 2058.16 -2.31 -0.32 4875.00 4900.00 2058.05 -0.72 2057.65 10.00 -2.00 -0.32 16.50 2051.94 2056,10 2058.08 -2.31 -0.32 4900,00 4925.00 2057.93 -0.48 1057.77 10,00 -1.60 -0.32 16.50 2057.86 2058.02 2058.00 -2.31 -0.32 4925.00 4945.13 2057.91 -0.10 2057.71 10.00 •2,00 -0.30 16.50 2057.80 2057.96 2057.92 •2.62 -0.40 4945.13 4975.00 2057.96 0.17 2057.68 10,00 -2.80 -0.10 16.50 2057.77 2057.93 2057.81 -3.65 -0.37 4975.00 5000,00 2058.02 0.24 2057.65 10.00 -3,70 -0.12 16.50 2057.74 2051,90 2057,74 4.46 -0.28 5000.00 , 5025.00 2058.09 0.28 2057.78 10A0 •3.10 0.52 16.50 2057.87 2058.03 2057,92 -3.69 0.72 5025.00 ~ 5050.00 2058.15 0.24 2057.93 10,00 -2,20 0.60 16.50 2058.02 2058.18 2058,13 •2.77 0.84 5050.00 5075.00 2058.24 0.36 2058.07 10.00 -1.70 0.56 16.50 2058.16 2058,32 2058.30 •2.31 0.68 5075.00 5100.00 2056.38 0,56 2058.20 10.00 -1.80 0.52 16.50 2058.29 2058.45 2056.45 •2.00 0.60 5100.00 5125.00 2058.55 0.68 2058.35 10.00 -2.00 0.60 16.50 2058,44 2056.60 2058.60 •2.60 0.60 5125.00 5150.00 2058.82 1.08 2058.55 10.00 •2,70 0.80 16.50 2058.64 2056.80 2058,80 •2.00 0.80 5150.00 5175.00 2059.19 1.48 2058.87 10.00 -3.20 1.28 16.50 ' 1058,96 2059.12 2059.12 -2.00 1.28 5175.00 5200.00 2059.65 1.84 2059,39 10.00 -2.60 2.08 16.50 ' 2059.48 2059.64 2059.64 -2.00 2.08 5200.00 , 5225.00 2060.15 2,40 2059.97 10,00 -2.80 2.32 16.50 2060.06 2060.22 2060.22 -2.00 2.32 5225.00 5250.00 2060.91 2.64 2060.65 10.00 -2.60 2.72 16.50 2060.74 2060.90 2060.90 -2.00 2.72 5250,00 i J:IDOCUMENT1971171EPDESIGN.W82 1 01113198 ~ ~ ^ .l ~ AFTER RECORDING RETURN TO: Spokane County Public Works Development Engineering Services, 2°d Floor 1026 W. Broadway Ave Spokane, WA 99260-0170 ~ Z3- l~ iVM A1Nf10O 3N7NOdS 8Olit7fly 1dNnOo (Mo80038 80 a31iJ 1dNiO180 AdOO Document Title: Drainage Declaration of Covenant Grantor: Landreth Construction Inc., a Washington Corporation and Washington Trust Bank, a Corporation Grantee: Spokane County and The Public Abbreviated Legal Description: Sec. 26, Township 25, Range 44, NE 1/4 Assessor's Tax Parcel Numbers: 45261.0306, 45261.0614 C ounty Reference No. P-15 7 0D In consideration of the approval by Spokane County of Springfield Addition at Autumn Crest (hereinafter referred to as the "plat"), undersigned covenants and agrees that: Spokane County and its authorized agents are hereby granted the right to ingress and egress to, over and from all public drai.nage easements for the purposes of inspection and emergency maintenance of dra.inage swales, ponds, ditches, culverts and other drainage facilities, if not properly maintained by the property owner. Spokane County does not accept the responsibility to inspect or maintain drainage facilities located outside of public rights-of-way, except in cases where Spokane County specifically assumes that responsibility in writing , does Spoka.ne County accept any liability for any failure by the property owner(s) to properly maintain such areas. The property owners within this plat shall be held responsiple for k6ping open and maintaining the surface path of natural or man-made drainage flow over and across their respective properties. If the property owners fail to maintain the surface path of natural or man-made drainage flow, or drainage facilities on private properties, a notice of such failure may be given to the property owner. If not corrected within the period indicated on said notice, Spokane County has the right to correct the maintenance failure, or have it corrected, at the expense of the property owner. 1 Spokane County does riot accept the responsibility of maintaining the drainage course on private lots or floodplain areas within private lots, nor the responsibility for any damage whatsoever, including, but not limited to, inverse condemnation to any properties due to deficient construction and/or maintenance of drainage courses in drainage easements on private property. Any building that is constructed on a lot in this plat shall be set at such an elevation so as to provide positive drainage away from any drainage entry point to the building (including but not limited to a window well, a window unprotected by a window well, or a doorway). Said positive drainage shall consist of a minimum slope of 3% away from the building for a distance of at least 10 feet from the building. The lots shall be graded so that either a) all runoff is routed away from the building, and conveyed over the lot to a natural drainage swale or approved drainage facility, or b) drainage intercepted on the lot is disposed of on the lot in an approved drainage facility. All drainage facilities for this plat, including any `208' swales, shall be constructed in accordance with the approved plans on file at ihe Spokane County Engineer's Office. Any proposed changes to the approved road and drainage plans must be approved by the Spokane County Engineer's Office prior to construction of said changes. There may exist properties located uphill and adjacent to this subdivision which periodically discharge stormwater runoff onto individual lots within this plat. Stormwater runoff from nearby uphill properties should be expected, and during snow melt periods or wet seasons the lots may be subjected to higher amounts of stormwater runoff that what is normally observed or anticipated. Because stormwater runoff from adjacent properties have discharged onto this plat prior to development, stormwater runoff will likely continue to do so after development. • , . ~ , ~ .--~1 ~ . ~ The property owners within this plat shall maintain all water quality swales ("208" swales) and drainage ditches situated on their respective properties, and any portion of a`208' swale situated in a public right- of-way adjacent to their respective properties, with a permanent ground cover as specified in the currently approved and accepted plans on file at Spokane Counfiy's Engineer's Office. No structures, including fences, shall be constructed directly over or within a`208'swale without the expressed written consent of the Spokane County Engineer. Spokane County does not accept the responsibility to inspect and/or maintain the drainage easements or drainage swales, nor does Spokane County accept any liability for any failure by the lot owner(s) to properly maintain such areas. This covenant and agreement shall run with the land in perpetuity, and shall be binding upon the owner, their heirs, successors and assigns, including the obligation to participate in the maintenance of the drainage facilities as provided herein. IN WITNESS WHEREOF, the undersigned has caused this instrument to be executed on this day of 1998. LINDERMAN CONSTRUCTION COMPANY, INC. A Washington Corporation rieLind rman, President ~ WASHINGTON TRUST BANK A Corporation ~ By „ • Its , ~ o ACKNOWLEDGMENTS STATE OF WASHINGTON ) )ss . County of Spokane ) . On this a014-day of 19 98, before me,~ the undersigned, a Notary Public in and for the State Washington, personally appeareA LOIVNIE LINDERMAN, to me known to be the President of LINDER:MAN CONSTRUCTION COMPANY, INC., the corporation that executed the within and foregoing instrument, and acknowle the said instrument to be the free and volunta.ry act and deed of said corporation, for the uses and purposes therein menti and on oath stated that he is authorized to execute the said instrument and that the seal affixed (if any) is the corporation said corporation. Given under my hand and official seal the day and year last above written. OFFICIAL SEAI NOTARY PUBLIC in and for the State of DEBRA L. PEHAN Washington, residing at Spokane Notary Public - State of Washingfon My commission expires V- ~-oZQ,C) I My Commission Expires 4-29-2001 STATE OF WASHINGTON ) )ss County of Spokane ) I certify that I lrnow or that I have satisfactory evidence that 60nS4&Ade- is the person who appeared before and said person acknowledged that 64 signed this instrument, on oath stated that sGt e- was authorized to execute the instrument and acknowledged it as the i U, -T~eg,'olutf- of WASHINGTON TRUST BANK, a Washington corpora be the free and voluntary act of such corporation, for the uses and purposes stated in the instrument. DATED this dA"4ay of J~u-tu , 19 Q8. ~ OfFICIAI SEAL NOTARY PUBLIC in and for the State of DEBRA L. PEHAN Notary Public - State of Washington W1S~11I1~011, residing at Spokane My Commission Expires 4-29-2001 My commission expires a9 -a 0 0/ ~ ~ Office of the County Engineer Spoka.ne County, Washington , 2 July 1998 To: Mark Kamrath Inland Pacific Engineering From: Development Engineering Services, Doug Busko, P.E. RE: Drainage Language for Springfield Addition at Autumn Crest P-1570D Please note : The Drainage Dec].aration of Covenant is to be signed by the Title Owner's. Please submit the signed Declaration of Covenant to the County Engineer's Office. The County will record the document. Please note that the • County Assessor's Office has strict requirements on document size and margins. ' The Declaration of Covenant will need to adhere to these requirements. An electronic copy of the Covenant is available upon request. Plat Dedication . Drainage easements, as platted and shown hereon, which are for the purposes of installing, operating and maintaining drainage ponds and drainage facilities to dispose of runoff, are hereby granted to Spokane County and the public. The drainage easements, lots and tracts are subject to the separate Declaration of Covenant as recorded under Auditor's Document No. which by reference is made a part hereof. ~ 0 AFTER RECORDING RETURN TO: Spokane County Public Works Development Engineering Services, 2"d Floor 1026 W. Broadway Ave Spokane, WA 99260-0170 Document Title: Drainage Declaration of Coveoant Grantor: Landreth Construction Inc., a Washington Corporation , Grantee: Spokane County and The Public Abbreviated Legal Description: Sec. 26, Township 25, Range 44,!NE 1/4 Assessor's Tax Parcel Numbers: 45261.0306, 45261.0614 County Reference No. P-1570D In consideration of the approval by Spokane County of Springfield Addition at Autumn Crest (hereinafter referred to as the "plat"), undersigned covenants and agrees that: Spokane County and its authorized agents are hereby granted the right to ingress and egress to, over a.nd from all public drainage easements for the purposes of inspection and emergency maintenance of drainage swales, ponds, ditches, culverts and other drainage facilities, if not properly maintained by the property owner. Spokane County does not accept the responsibility to inspect or maintain drainage facilities located outside of public rights-of-way, except in cases where Spokane County specifically assumes that responsibility in writing , does Spokane County accept any liability for any failure by the property owner(s) to properly maintain such areas. The property owners within this plat shall be held responsible for keeping open and maintaining ihe surface path of natural or man-made drainage flow over and across their respective properties. If the property owners fail to maintain the surface path of natural or man-made drainage flow, or drainage facilities on private properties, a notice of such failure may be given to the property owner. If not corrected within the period indicated on said notice, Spokane County has the right to correct the maintenance failure, or have it corrected, at the expense of the property owner. Spokane County does not acccpt the responsibility of maintaining the drainage course on private lots or floodplain areas within private lots, nor the responsibility for any damage whatsoever, including, but not limited to, inverse condemnation to any properties due to deficient construction and/or maintenance of drainage courses in drainage easements on private property. Any building that is constructed on a lot in this plat shall be set at such an elevation so as to provide positive drainage away from any drainage entry point to the building (including but not limited to a window well, a window unprotected by a window well, or a doorway). Said positive drainage shall consist of a minimum slope of 3% away from the building for a distance of at least 10 feet from the building. The lots shall be graded so that either a) all runoff is routed away from the building, and conveyed over the lot to a natural drainage swale or approved drainage facility, or b) drainage intercepted on the lot is disposed of on the lot in an approved drainage facility. All drainage facilities for this plat, including any `208' swales, shall be constructed in accordance with the approved plans on file at the Spokane County Engineer's Office. Any proposed changes to the approved road and drainage plans must be approved by the Spokane County Engineer's Office prior to construction of said changes. There may exist properties located uphill and adjacent to this subdivision which periodically discharge stormwater runoff onto individual lots within this plat. Stormwater runoff from nearby uphill properties should be expected, and during snow melt periods or wet seasons the lots may be subjected to higher amounts of stormwater runoff dhat what is nornnally observed or anticipated. Because stormwater runoff from adjacent properties have discharged onto this plat prior to development, stormwater runoff will likely continue to do so after development. The property owners within this plat shall maintain all water quality swales ("208" swales) and drainage ditches situated on their respective properties, and any portion of a`208' swale situated in a public right- of-way adjacent to their respective properties, with a pernianent ground cover as specified in the currently approved and accepted plans on file at Spokane County's Engineer's Office. No stcuctures, including fences, shall be constructed directly over or Nvithin a`208'swale without the expressed written consent of the Spokane County Engineer. Spokane County does not accept the responsibility to inspect and/or maintain tile drainage easements or drainage swales, nor does Spokane County accept any liability for any failure by tle lot owner(s) to properly maintain such areas. This covenant and agreement shall run with the land in perpetuity, and shall be binding upon the owner, their heirs, successors and assigns, including the obligation to participate in the maintenance of the drainage facilities as provided herein. IN WITNESS WHEREOF, the undersigned has cawsed this instrument to be ~ executed on this day of 1998. CORPORATE NAME ) STATE OF WASHINGTON ) COUNTY OF SPOKANE )ss I certify that I know or have satisfactory evidence that is the person who appeared before me, and said person acknowledged that (he/she) signed this instrument, on oath stated that (he/she) was authorized to execute the instrument and aclrnowledged it as the of to be a free and voluntary act of such party for the uses and purposes mentioned in the instrument. Dated: Notary Public In and for the State of Washington. My Appointment Expires: - ' I ..„ r