2014, 05-20 Permit: SW-14000671 SewerSPOKANE COUNTY UTILITIES
PERMIT
Application Number: SW -14000671 Permit Issued Date: 05/20/2014
Expiration Date: 05/20/2015
Project Description: SEWER CONNECTION
Project Name: ORCHARD AVE
Primary Contact: ACME EXCVT & SEWER BORING CO
Phone: (509)228-0691
Applicant: ACME EXCVT & SEWER BORING CO
Address: 6808 S. LINKE RD.
GREENACRES, WA 99016
Phone: (509)228-0691
Email:
SITE INFORMATION:
Site Address:
Parcel Number:
7519 E SOUTH RIVER WAY
45063.2121
Assessor's Description: ORCHARD AVE ADD W1/2B14
Inspection Area: : (509)-477-3675
Owner:
Address:
Phone:
Email:
SAMPSON, LARRY P & LORALEE A
7519 E SOUTH RIVER WAY
SPOKANE, WA
Water District: Orchard Avenue Irrigation Fire District: Spokane Valley Fire
District #6
Zoning: Land Area: 20253.5 Square Feet
CONTRACTOR INFORMATION:
ACMEEES963LD, Exp. 06/04/2014
ACME EXCVT & SEWER BORING CO
6808 S. LINKE RD. GREENACRES, WA 99016
(509)228-0691
DETAILS:
Class
SEWER
Type
Quantity Unit Charge Value
FEE DETAIL:
Processing - Utilities
Utilities Permit
SEWER CONNECTION
Total Fee:
$26.64
$125.00
$151.64
1 $125.00 $125.00
$125.00
CONDITIONS:
Possible FEMA Flood Zone
Possible Shoreline On Site
Plan review fee is required for all site plan reviews conducted by Spokane Valley Fire.
Possible Floodplain
Inside Public Transit Benefit Area
CALL 1-800-424-5555 BEFORE YOU DIG --AT LEAST 2 WORKING DAYS IN ADVANCE. SPOKANE COUNTY CODE REQUIRES THE
INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR & INDUSTRIES, INCLUDING THOSE
RELATED TO TRENCH SAFETY.
SEWER PERMITS ARE VALID FOR ONE (1) YEAR FROM THE DATE OF ISSUANCE. FOR SEWER INSPECTIONS CALL THE UTILITIES
DEPT AT (509) 477-3604 FROM 8:30-5:00 MONDAY -FRIDAY PRIOR TO COVER. ONE WORKING DAY NOTICE REQUIRED. PERMIT
ALLOWS FOR A 30 -MINUTE INSPECTION. ADDITIONAL INSPECTION FEES APPLY AFTER 30 MINUTES.
Date Printed: 05/20/2014 09:37:21 Project Coordinator: Kathy Cummings
SPOKANE COUNTY UTILITIES
PERMIT
Application Number: SW -14000671 Permit Issued Date: 05/20/2014
Expiration Date: 05/20/2015
INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED
TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF
SEWER STUB PRIOR TO ANY OTHER EXCAVATION.
SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE
ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED. SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR
GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE.
THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE
LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF
UNDERGROUND FACILITIES.
Date Printed: 05/20/2014 09:37:21 Project Coordinator: Kathy Cummings