Loading...
2013, 03-07 Permit: SW-13000161 SewerSPOKANE COUNTY UTILITIES PERMIT Application Number: SW -13000161 Permit Issued Date: 03/07/2013 Project Description: Primary Contact: Phone: SEWER CONNECTION COURCHAINE EXCAVATION 509-928-0846 Applicant: COURCHAINE EXCAVATION Address: 19818 E SPRAGUE GREENACRES, WA 99016 Phone: 509-928-0846 Email: SITE INFORMATION: Site Address: Parcel Number: 7608 E SOUTH RIVERWAY AVE 45063.2211 Owner: Address: Phone: Assessor's Description: ORCHARD AVE ADD PT OF B17 BEG 225.01 FT N Email: OF SWCOR TH E 70FT PAR TO SL TH N PAR TO WL TO NL TH NWLY TO NWCOR TH S TO POB Inspection Area: : (509)-477-3675 TOBLER, PATRICE LOUISE 7608 E SOUTH RIVERWAY SPOKANE, WA 99212 Water District: Orchard Avenue Irrigation Fire District: Spokane Valley Fire District #6 Zoning: Land Area: 12026.5 Square Feet CONTRACTOR INFORMATION: COURCC*181R7, Exp. 10/10/2013 COURCHAINE EXCAVATION 19818 E SPRAGUE GREENACRES, WA 99016 509-928-0846 DETAILS: Class SEWER Type Quantity Unit Charge Value FEE DETAIL: Processing - Utilities Utilities Permit SEWER CONNECTION Total Fee: $26.32 $125.00 $151.32 1 $125.00 $125.00 $125.00 CONDITIONS: Plan review fee is required for all site plan reviews conducted by Spokane Valley Fire. Inside Public Transit Benefit Area CALL 1-800-424-5555 BEFORE YOU DIG --AT LEAST 2 WORKING DAYS IN ADVANCE. SPOKANE COUNTY CODE REQUIRES THE INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR & INDUSTRIES, INCLUDING THOSE RELATED TO TRENCH SAFETY. FOR SEWER INSPECTIONS CALL THE UTILITIES DEPT AT (509) 477-3604 FROM 8:30-5:00 MONDAY -FRIDAY PRIOR TO COVER. ONE WORKING DAY NOTICE REQUIRED. PERMIT ALLOWS FOR A 30 -MINUTE INSPECTION. ADDITIONAL INSPECTION FEES APPLY AFTER 30 MINUTES. Date Printed: 03/07/2013 10:27:50 Project Coordinator: Kathy Cummings SPOKANE COUNTY UTILITIES PERMIT Application Number: SW -13000161 Permit Issued Date: 03/07/2013 INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF SEWER STUB PRIOR TO ANY OTHER EXCAVATION. SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED. SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE. THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF UNDERGROUND FACILITIES. Date Printed: 03/07/2013 10:27:50 Project Coordinator: Kathy Cummings