1992, 06-30 Permit App: 92004849 ResidenceSPOKANE COUNTY DEPARTMENT
-. ��BUILDINGS
w. 1303 BROADWArAVENUE
SPOKANE, WASHINGTON 99260
(509) 456-3675
I certify that I have examined this permit/application, state that the information contained in it and submitted by me or my t to compile said permit/application is true
and correct, and authorize Spokane County to proceed with processing. In addition, I have read and understand the INSPECTION REQUIREMENTS/NOTICE
provisions included herein and agree to comply with same. All provisions of laws and ordinances governing this type of work will be complied with whether specified
herein or not. I understand that the issuance of this permit/application and any subsequent inspection approvals or Certificates of Occupancy shall not be construed to
give authority to violate or cancel the provisions of any state or local law regulating construction, or as a warranty of conformance with the provisions of any state or local
laws regulating construction.
SIGNATURE OF APPLICATION
OWNER OR AGENT DATE
170P -A)
61,0-1c1
PROJECT NUMBER= 92OO4849 APPilCATIOK
****** THI% T% NOT A PERMIT »**»**
PENALT]F% WILL BE A%%E%%ED FOR COMMENCING WORK WITHOUT A PERmlT
. .
.7TREET= 7622 E SOUTH RIVERWAY AVE
A0DRFS2,:= JPOKANE WA 992i2
PERMIT U%E=
BLOCK -
AREA-
4 Or BLDG%=
GWNER=
ADDRE%%=
RE%IDENCE W/GARAGE - GA%(RERLACEMENT)
�Oi865
17
00000000
i
PLAT NAME- ORCHARD AVENUE ADD(TR1-22)
LOT= ZONE- UR -3.5
F/A= F WIDTH= 79 ;FPIH= R/W= 71
DWELLINGS- WATER = PAADENA PARK
CA%TOR, GEORGE
7622 E SOUTH RIVERWAY AVE
SPOKANE WA 992i2
PRONE= ��9 926 5332
CONTACT NAME':: LARRY ARNE%OH PHONE NUMBER= 1:.;09 291
BUILDING SETBACK. FRONT.,- 37.7 LEFT= 27.7 RIGHTREAR= 78
**************************** REVIEW INFOR�ATTON *»*u»***»««*«�«««»»�::���
DFPARTMENT
--------
�EVIEW COMMENT�
___________
BUILDING PLAN REVIEW REQUIRED
BUILDING �ET�ACK REVIEW REQUIRED
m-�ENGINEER
APPROACH/FLOOD PLAIN/DRAINAG[
"t31..iELT1-10IT NEW OR AT:30ITIONAL WASTE WATER
�
� PiAHNlHPLFLANKING. ,SJ FLANKING. %ETBACK
` *«***************************** 8UILDIN� PERMTT
CONTRAC7UR=
ETREET-
NFW=
D�FLL UNIT%=
3LDC W X D =
RFC PARKING=
ARNEGN CONSTRUCTION
i35O4 J HARVARD RD
ROCKFORD WA 99O3O
REHODEL=
i UCCUP. LD=
38 X 56 %Q FT=
4HANDICAP=
}0'mr.NT�
1/2.
-
�--Af-�-'
-
A;DITTON= CHANGE
HCT=
�PR{NKLER= �
CRITlCAi
MECH(f4NICAL PFkMIT
CON7RACTOR= ANDER%ON'% METAL
:.TTREET= )3903 F TRENT AVE
ADDRE== :,7POKANE WA 99216
*»****»********«****»****** PL; f; PERMi7 **
CONTRACTOR- ALPHA PLUMBING & HE�TINC
�TREEr= 58O5 E
.';HARP AVE
AODRE;Y:%= [:::POKAHE WA 99212
��3CE��ED 8y: JULIE �HATTO
PRINTED BY JULIE %HATT3
PLION E 505'' 9
�cw` '~- - y�\\�
:444, *x'»*^
L-7."7.9
NOTICE
It is the responsibility of the permittee, not Spokane County, to see to it that the use described on the front of this permit
complies with applicable codes and requirements and that required inspections are requested. Failure to request required
inspections and obtain the necessary approvals prior to progressing beyond the point where inspections are required may
necessitate removal of certain parts of the construction at the owner's/permittee's expense. At a minimum, the following
inspections ARE REQUIRED by County Code:
1. FOOTING — when forms and reinforcement are in place and prior to placement of concrete.
NOTE: This inspection includes review of the structure's setbacks from property lines. Minimum setbacks are
established by County zoning regulations. Typically, side and rear yard setbacks are measured from property
lines, while setbacks for yards abutting streets are measured from the property line or the center line of the
roadway right-of-way, whichever provides the greater setback from the center line of the roadway right-of-way.
Curb lines and fence lines are not necessarily indicative of property lines. In some residential areas, the County
can own as much as 20 feet of right-of-way between your property and the actual improved street/curb. The
responsibility to comply with applicable setback provisions lies solely with the permittee — neither Spokane
County nor its authorized representatives assume any responsibility for the verification or location of your
property lines. Please verify their location prior to locating your structure. Failure to properly locate the structure
may require its relocation at the owner's/permittee's expense.
2. FOUNDATION — when forms and reinforcement are in place and prior to placement of concrete. (Blocking for a
manufactured home is required to be inspected prior to the installation of skirting.)
3. FRAMING — after all framing, bracing and blocking is in place, and prior to concealing.
4. INSULATION — prior to the installation of drywall.
5. PLUMBING — after rough -in, before covering, and final.
6. MECHANICAL. — rough -in of piping, before covering, metal chimneys before concealment, and final.
7. FINAL — when complete and prior to occupancy and/or use. Please provide 24 hours notice.
NOTE: In addition to inspection of the structure, this inspection includes review of site improvements (typically
depicted on the approved site plan) required by ordinance or as a condition of approval of this permit. Items such
as the installation of fire hydrants, fire department access, on-site drainage ("208 swales"), road improvements,
parking, and landscaping are common requirements of a permit/site plan which must be completed prior to final
approval of a building or issurance of a Certificate of Occupancy.
In addition to the above any plumbing or mechanical systems or materials which would be concealed by framing, drywall,
concrete, etc., must be inspected prior to cover. Check with the department for "special inspections" in conjunction with
commercial projects.
CALL 456-3675 FOR INSPECTIONS.
TO INSURE PROMPT SERVICE, PLEASE GIVE 24 HOUR NOTICE.
YOUR INSPECTOR IS
UNDER CERTAIN ,,CIRCUI4STANCES, PARTS OF YOUR PROJECT MAY REQUIRE INSPECTIONS FROM OTHER
AGENCIES
• road cuts for utilities or drives, State or County Engineer's Office
456-3600
• on-site waste disposal system, Environmental Health District
456-6040
• construction in a flood plain, County Engineer's Office
456-3600
• electrical wiring, State Department of Labor and Industries
456-2792
• sewer connection, County or City Utilities Department
456-3604
EXPIRATION
Unless otherwise noted, this permit will be considered null and void by limitation of the work authorized by the permit is not
commenced or is stopped for a period of 180 days, unless a written request for an extension of the permit is received and
approved by the Building Official prior to expiration. At a minimum an inspection should be requested at least once every 180
days to assure the validity of the permit. A permit may be renewed within one year of the date of expiration for one-half the
original fee, subject to certain limitations — please call us if you have any questions.
MISTAKES?
If you think we've made an error in processing this permit or in conducting inspections pertaining to it, or find erroneous
information in the permit, please bring it to our attention immediately by filing a written request for correction within 10 working
days of discovery. All such requests should be directed to the Department of Buildings at the address found on the face of this
permit.
10/07/92
TAS
Technical Assistance Services
Northlt Ener+ Code
11:01 SPOKANE REGIONAL COUNCIL 002
October 7, 1992
SPOKANE COUNTY BUILDING DEPARTMENT
ATTN: Dave Silva
REFERENCE TO:
CONTRACTOR: Larry Arneson
i
SPOKANE REGIONAL COUNCIL
W. 808 Spokane Falls Boulevard
Spokane, WA 99201-3333
(509) (508)625-6370
Construction
This house qualified at the tine of permit by Prescriptive Path
II, Table 6.4 WSEC. The contractor requests changing 16 1.f. of
8' ht. below grade wall from the prescribed R-19 to an R-8.
The house will still qualify by the following calculations.
PROPOSED R-8 WALL:
U -Value = .068 x 128 s.f.
F -Value = .534 x 16 1.f.
CODE REFERENCE R-19 WALL:
U -Value = .036 x 128 s.f.
F -Value _ .554 x 16 1.f.
T 8.7
-- &.5
17.2 BTUH/DEGREE F
• 4.6
-
13.5 BTUH/DEGREE F
The project has approximately 255 s.f. of glazing (11%).
PROPOSED VTNYL WINDOWS;
U -Value - .48 x 255 S.f. w 122.4 BTUH/DEGREE F
ALLOWABLE CODE REFERENCE WINDOWS:
u -Value = .65 x 255 s.f. - 165.7 BTUI-I/DEGREE F
The proposed windows use 43.3 BTUH/DEGREE F less than the refer-
ence windows -- this more than offsets the 3.7 BTUH/DEGREE F
increase in below grade BTUH/DEGREE F.
If you have questions, please call me.
Thank you, 2„..
EDWARD R. FIELDS
Technical Advisor
CC: Larry Arneson
9.
1
- --Ms/Nd31>i
17.25
120'
—0
03
N
—a;
o
> 0
m r
ROADCENTER
1.)
0ZMj HU)
1
—
TH
NOR
I73.33
454p
o
147.03'
NORTH