Loading...
2009, 06-03 Permit App: 09001422 Flood Plain Landscape Remodel Erosion ControlProject Number: 09001422 Inv: 1 Application THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Date: 6/3/2009 Page 1 of 2 Project Information: Permit Use: FLOOD PLAIN -LANDSCAPE REMODEL/EROSION CONT -PAVER PATH CONST Setbacks: Front Site Information: Left: Right: Rear: Contact: ALDERWOOD LANDSCAPING Address: 14212 N MARKET C - S - Z: MEAD WA 99021 Phone: (509) 467-8298 Group Name: Project Name: 8001 E SOUTH RIVERWAY-FLOOD PLAIN Plat Key: 001865 Name: ORCHARD AVE ADD TR 1-228 District: Nort Parcel Number: 45063.2133 Block: SiteAddress: 8001 E SOUTH RIVERWAY A Location:: CSV Lot: Owner: Name: MACKAY, MICHAEL & DEBRA Address: 8001 E SOUTH RIVERWAY AVE SPOKANE VALLEY, WA 99212 Zoning: R-2 SF Res Suburban District Water District: 002 ORCHARD AVENUE Hold: ❑ Area: .00 Acres Width: 0 Depth: 0 Right Of Way (ft): 50 Nbr of Bldgs: 3 Nbr of Dwellings: 1 Review Information: Review Flood Plain Permits: Released By: Originally Released: 5/29/2009 By: dgriffith Contractor: ALDERWOOD LANDSCAPING, Address: 14212 N MARKET ST MEAD WA 99021 Item Description Flood Plain Firm: ALDERWOOD LANDSCAPING, IN Phone: (509) 467-8298 Units Unit Desc FLOOD PLAIN PERMIT 1 NUMBER OF Operator: jmm Printed By: jmm Fee Amount $52.00 Permit Total Fees: $52.00 Print Date: 6/3/2009 Project Number: 09001422 Inv: 1 Application THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Date: 6/3/2009 Page 2 of 2 Notes;:.:........,... Must follow condtions laid out in email received on 5/19 from Kris Krohn. NO WORK IS ALLOWED IN OR NEAR THE RIVER Payment Summon,: ,rg, .R...,VISD...,... Permit Type Fee Amount Invoice Amount Amount Paid Amount Owing Flood Plain $52.00 $52.00 $0.00 $52.00 $52.00 $52.00 $0.00 $52.00 Disclaimer: Submittal of this application certifies the owner (or person(s) authorized by the owner) has both examined and finds the information contained within to be true and correct, and agrees that all provisions of laws and/or regulations governing this type of work will be complied with. Subsequent issuance of a permit shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of the code or of any other state or local laws or ordinances. Signature: Operator: jmm Printed By: jmm Print Date: 6/3/2009 Siam jValley CITY OF SPO NE VALLEY Permit Center 11703 East Sprague Ave., Suite B-3 Spokane Valley, WA 99206 Tel: (509) 688-0197 Fax: (509) 688-0037 planning@sDokanevallev.orci Wor Staff Use Only) DATE SUBMITTED: RECEIVED BY: FILE NO./NAME: FEE: FLOODPLAIN DEVELOPMENT APPLICATION (SVMC 21.30) PART I — APPLICATION INFORMATION APPLICANT INFORMATION: APPLICANT: ALDERWOOD LANDSCAPING CII Y ui- VALLEY 2009 vi • i� �w i=ri MAILING ADDRESS: 14212 N. MARKET ST. CITY: Mead PHONE: (HOME/WORK) (509) 467-8298 STATE: WA ZIP: 99021 (FAX) (509) 467-4183 (CELL) Please Circle NOTE: IF APPLICANT IS NOT THE OWNER, INCLUDE WRITTEN OWNER AUTHORIZATION, PART IV, FROM THE LEGAL OWNER. OWNER INFORMATION: LEGAL OWNER: MICHAEL AND DEBRA MACKAY MAILING ADDRESS: P.O. 130X. 11984 CITY: SPOKANE PHONE: (509) 922-7742 - WORK STATE: WA ZIP: 99211 (FAX) (CELL) PART II — SUBMITTAL REQUIREMENTS Check box to indicate that required information has been provided. All Floodplain Permit Applications shall contain the following required information. If required and not submitted, the application will be returned to the applicant as incomplete: X Three (3) to -scale (minimum scale is 1 inch = 20 feet) site plans showing the nature, location, dimensions and elevation of the property and identifying the portion of the property located within the designated floodplain, existing or proposed structures, location of proposed fill, location of storage of materials, and the location of drainage facilities. N/A N/A N/A N/A Proposed elevation in relation to mean sea level of the lowest floor including basement of all structures. (NO PROPOSED STRUCTURES OR MODIFICATIONS TO EXISTING STRUCTURES) Proposed elevation in relation to mean sea level for any structure that has been flood -proofed (NO PROPOSED STRUCTURES) For non-residential construction only, certification by a registered professional engineer or architect that flood -proofing methods for any non-residential structures meet the flood -proofing criteria of Section 5.06.08.2 of the City's Floodplain Ordinance. (THIS PROJECT ISA RESIDENTIAL LANDSCAPE REMODEL) Written description if applicable describing the extent to which a watercourse will be altered or relocated as a result of the proposed development. (WATERCOURSE WILL NOT BE ALTERED OR RELOCATED AS A RESULT OF THIS PROPOSED DEVELOPMENT) Effective October 28, 2007 Page 1 of 5 \\Server\shared\Documents\Alderwood Landscaping\Client Documents\MacKay 2009m\MacKay Floodplain Dev Permit App.doc FART III — PROJECT INFORMATION PARCEL NUMBER(S) OF SITE: 45063.2133; 45063.2132 STREET ADDRESS OF SITE (if any): 8001 E. SOUTH RIVERWAY AVE. SIZE OF SUBJECT PROPERTY (square feet): APPROX. 44,000 SQ. FT. (BOTH LOTS COMBINED) EXISTING ZONE CLASSIFICATION(S): 45063.2133 - 11 SINGLE UNIT; 45063.2132 - 91 RESIDENTIAL LAND UNDIVIDED LIST PREVIOUS LAND USE ACTIONS INVOLVING THIS PROPERTY: Areas of Special Concern: Pursuant to Section 5.06.13 of the Spokane Valley Floodplain Ordinance, the following areas shall not be covered by impervious surfaces or fill unless an engineering study prepared by a professional engineering licensed in the State of Washington is completed that shows no impact to the ability of the floodplain to infiltrate, store and release floodwaters. Please check the box if your property is located in one (1) of these areas: ❑ Chester Creek (downstream of Mohawk Road) ❑ Saltese Creek (all areas of ponding and infiltration) ❑ Forker (south of the intersection of Forker Road and Progress Road) O Central Park (west of Park Road) ❑ Glenrose (west of Carnahan Road and south of 8th Avenue) DESCRIPTION OF WORK: 1. Proposed Development Descriptions (check boxes that apply): El New Construction ❑ Alteration & Repair ❑ Stream Alteration ❑ Manufactured/Modular Housing ❑ Road, Culvert, Utilities X Other - Describe: LANDSCAPE REMODEL / EROSION CONTROL 2. Types of Construction (check boxes that apply): ❑ New or Existing Residential: square feet ❑ Addition: square feet ❑ Accessory Structure: square feet X Renovation: ❑ Interior X Exterior ❑ Temporary ❑ New Non -Residential X Repair (failing boulder walls) ❑ Utility Installation X Other - Describe: PAVER PATH CONSTRUCTION (IMPROVE EXISTING RIVER ACCESS) For Alterations, Additions or Improvements to an Existing Structure: If the cost of the proposed construction equals or exceeds 50 percent of the market value substantial improvement requirements shall apply. Please answer the following questions: a. What is the estimated market value of the existing structure?: $ 453,200.00 b. What is the estimated cost of the proposed construction?:$ 70,000.00 Effective October 28, 2007 Page 2 of 5 \\Server\shared\Documents\Alderwood Landscaping\Client Documents\MacKay 2009m\MacKay Floodplain Dev Permit App.doc 3. Filling & Grading (check boxes that apply): X Filling (Equal cut and fill proposed) X Excavation (Equal cut and fill proposed) ❑ Cubic Yards to be Removed: ❑ Cubic Yards to be Placed: ASSOCIATED APPLICATIONS: This permit is being applied for in conjunction with one or more of the following (check boxes): cubic yards cubic yards ❑ Residential/Commercial Building Permit ❑ Grading Permit ❑ Land Division Application ❑ Critical Areas Permit El Shoreline Substantial Development Permit ❑ Other - Describe: PART IV - LEGAL OWNER SIGNATURE (Signature of legal owner or representative as authorized by legal owner) (print name) SWEAR OR AFFIRM THAT THE ABOVE RESPONSES ARE MADE TRUTHFULLY AND TO THE BEST OF MY KNOWLEDGE. 1 FURTHER SWEAR OR AFFIRM THAT I AM THE OWNER OF RECORD OF THE AREA PROPOSED FOR THE ABOVE -IDENTIFIED LAND USE ACTION, OR, IF NOT THE OWNER, ATTACHED HEREWITH IS WRITTEN PERMISSION FROM THE OWNER AUTHORIZING MY ACTIONS ON HIS/HER BEHALF. It is hereby agreed that the City of Spokane Valley, its boards, officers, employees and agents shall be saved, indemnified and held harmless from all liabilities imposed by law by reason of injury to or death of any person(s) or damage to any property, including without limitation, liability for trespass, nuisance or inverse condemnation, which may arise out of the work covered by this permit, and does agree to defend the City, its officers, employees and agents against any claim or action asserting such liability. Accepting this permit or starting any work hereunder shall constitute acceptance and agreement to all conditions and requirements of this permit and the ordinance and specifications authorizing issuance ofuch permit. (Signature)'' (Dat NOTARY (For Part IV above) STATE OF WASHINGTON ) ss: COUNTY OF SPOKANE ) �`SiMiti4 D AND SWORN to before me this �-1.4i . ,fiRY/SEAL r-; c) �: � (n,� At/B%-v1'1 = / Oz ///,,9-09 A. i f `'if OF WASE\„ - l l ► I, \\\\"\-\`\'‘ day of Ma -v` NOTARY SI NATURE Notary Public in an for the State of Washington , 20(,) Residing at: My appointment expires: Effective October 28, 2007 Page 3 of 5 \\Server\shared\Documents\Alderwood Landscaping\Client Documents\MacKay 2009m\MacKay Floodplain Dev Permit App.doc FART V — CONDITIONS OF APPRO�AL FOR INTERNAL USE ONLY - TO BE COMPLETED BY THE CITY OF SPOKANE VALLEY Community Number: 530-342 Panel Number: Flood Zone: Flood Zone Depth No.: Base Flood Elevation at Site: Required Top of the Lower Floor Elevation: If the structure is to be flood -proofed, the required flood -proofing elevation is: Elevation Certificate Required: ❑ Yes ❑ No "No Rise" Verification Required: (Numbered A Zone) ❑ Yes ❑ No Conditions of Approval: In addition to those listed above and below, please refer to attached conditions of approval if applicable. 1. Required Elevation of the "top of the next higher floor" shall be (AE) feet M.S.L. 2. Required Elevation of the "top of the next higher floor" shall be (AO) feet M.S.L 3. Required elevation of flood resistant materials, utilities, etc. or flood -proofing construction for non-residential structures (the flood protected elevation) shall be feet M.S.L. 4. A "Building Under Construction" elevation certificate ❑ shall ❑ shall not be completed and submitted to the City for review and approval prior to any vertical construction. A "Finished Construction" elevation certificate ❑ shall ❑ shall not be completed and submitted to the City for review and approval prior to human occupancy or final inspection of on-site building(s), whichever comes first. NO HUMAN OCCUPANCY OR FINAL INSPECTION SHALL BE GRANTED PRIOR TO THE SUBMITTAL AND APPROVAL OF THE "FINISHED CONSTRUCTION" CERTIFICATION. Effective October 28, 2007 Page 4 of 5 \\Server\shared\Documents\Alderwood Landscaping\Client Documents\MacKay 2009m\MacKay Floodplain Dev Permit App.doc PART," — DEPARTMENT SIGN -OFF & AtROVAL City of Spokane Valley Community Development Department: As the Floodplain Administrator for the City of Spokane Valley, I certify the following has been reviewed and approved by me: The "Building Under Construction" elevation certificate has been reviewed and approved: ❑ Structure elevated BFE + 1 foot ❑ Structure built with waterproofed materials to the flood -protected elevation or more Kathy McClung, AICP, Community Development Director Date The "Finished Construction" elevation certificate has been , 20 It has been reviewed ❑ returned for more information on , 20_; ❑approved on , 20; Kathy McClung, AICP, Community Development Director Date PLEASE NOTE: THIS PERMIT SHALL EXPIRE WITH THE ISSUED BUILDING PERMIT OR IF THERE IS NO BUILDING PERMIT WITHIN TWELVE (12) MONTHS OF THE DATE OF ISSUANCE IF ACTIONS AUTHORIZED UNDER THE PERMIT ARE NOT SUBSTANTIALLY IN -PROGRESS. EXTENSIONS OF APPROVAL MAY BE SOUGHT IF SUBSTANTIAL PROGESS HAS TAKEN PLACE. Effective October 28, 2007 Page 5 of 5 \\Server\shared\Documents\Alderwood Landscaping\Client Documents\MacKay 2009m\MacKay Floodplain Dev Permit App.doc • ALDERWOOD LANDSCAPE ARCHITECTURE !CONSTRUCTION I iM 4,4 rq am the legal owner of record for the property located at _8001 E. South Riverway_ (parcel # _45063.2133, and 45063.2132_.) I hereby give my permission to Alderwood Landscaping to submit a Floodplain Development Application to the City of Spokane Valley, WA on my behalf. 'm 3 MA-k6Y PRINTED NAME zz-07 DATE 14212 N. Market St. Mead, WA USA phone www.alderwoodlandscaping.com 509,467.8298 fax 509467.4183 toll free 866 467.8298 >99021 • • Jodi Main Page 1 of 2 From: Deanna Griffith Sent: Wednesday, May 20, 2009 1:42 PM To: Permit Center Subject: FW: Floodplain Development Application Follow -Up (MacKay and Hurley Residences) From: Kristopher Krohn [mailto:Kris@AlderwoodLandscaping.com] Sent: Tuesday, May 19, 2009 10:59 AM To: Deanna Griffith Cc: Joe Addington; Mike Semerad Subject: Floodplain Development Application Follow -Up (MacKay and Hurley Residences) Hi Deanna, Mike asked me to send over the following written descriptions of the work we are proposing. Please let me know if you have any questions. MacKay Landscaping Descripition: Alderwood Landscaping is proposing the following improvements to the landscaping at 8001 South Riverway Avenue (the MacKay Residence): Proposed work within the 100 year floodplain: • Install non -permanent concrete paver pathways, natural granite bench rock boulders, and low -voltage (GFI protected) night lighting • Modify existing irrigation system • Install native grass seed mix to stabilize hillside • Install natural specimen plantings • Prune existing plant material • Install silt fence along river to prevent erosion • The existing conveyance of the Spokane River shall not be altered in any way. Hurley Landscaping Descripition: Alderwood Landscaping is proposing the following improvements to the landscaping at 7815 South Riverway Avenue (the Hurley Residence): Proposed work within the 100 year floodplain: • Install outcropped boulder retaining walls (no vertical walls to exceed 4' in height) 5/20/2009 • • Page 2 of 2 to help prevent erosion, repair existing irrigation system • Install natural style plantings • Install fine -fir bark in all bed areas • Add non -permanent black plastic edging • Repair existing lawn areas • Install silt fence along river to prevent erosion • The existing conveyance of the Spokane River shall not be altered in any way. 5/20/2009