Loading...
2011, 01-27 Permit App: 11000136 Remodel, Project Number: 11000136 Inv: 1 Application THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Date: 1/27/2011 Page 1 of 2 Project Information: Permit Use: REMODEL MASTER SUITEBATHROOM/LOWER BATH/MECHANICAL ROOM Setbacks: Front Left: Right: Rear: Site Information: Plat Key: CONV Name: CONVERTED CNTY DATA Contact: TONY'S CARPET & CONSTRUCTION Address: 2003 E QUEEN C - S - Z: SPOKANE, WA 99207 Phone: (509) 981-0429 Group Name: Project Name: District: Nort Parcel Number: 45063.2128 Block: SiteAddress: 8015 E SOUTH RIVERWAY A Location:: CSV Lot: Owner: Name: MACKAY, MICHAEL J & DEBRA Address: PO BOX 1838 Healdsburg, CA 95448 Zoning: R-2 SF Res Suburban District Water District: 002 ORCHARD AVENUE Area: 17,320 Sq Ft Width: 0 Nbr of Bldgs: 0 Nbr of Dwellings: 0 Review Information: Hold: ❑ Depth: 0 Right Of Way (ft): 0 Review Building Plan Review Permits: Released By: Originally Released: 1/27/2011 By: tmelbourn Contractor: TONY'S CARPET & Address: 2003 E QUEEN AVE SPOKANE, WA 99207 Building Permit Firm: TONY YACOMELLA/TONY'S CAR Phone: (509) 484-6214 This Application: Total Project: Description Grp T pe Notes Sq Ft Valuation Sq Ft Valuation 1&2 FAMILY R-3 VB PLAN 0 $25,000.00 0 $25,000.00 REVIEW FEE Item Description RESIDENTIAL PERMIT FEE WSBCC SURCHARGE SF PLNS RVW < 7999 SQ FT Totals: 0 $25,000.00 0 $25,000.00 Units Unit Desc Fee Amount 1 SELECT $391.25 1 SELECT $4.50 1 SELECT $156.50 Permit Total Fees: $552.25 Operator: jmm Printed By: jmm Print Date: 1/27/2011 Project Number: 11000136 Notes: Inv: 1 Application THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Date: 1/27/2011 Page 2 of 2 Payment Summary: Permit Type Building Permit Fee Amount Invoice Amount $552.25 $552.25 Amount Paid $156.50 $552.25 $552.25 $156.50 Amount Owing $395.75 $395.75 Disclaimer: Submittal of this application certifies the owner (or person(s) authorized by the owner) has both examined and finds the information contained within to be true and correct, and agrees that all provisions of laws and/or regulations governing this type of work will be complied with. Subsequent issuance of a permit shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of the code or of any other state or local laws or ordinances. Signature: Operator: jmm Printed By: jmm Print Date: 1/27/2011 • Stie) °\* kane Community Development Department Permit Center 11703 East Sprague Avenue, Suite B-3 Spokane Valley, WA 99206 Tel: (509) 688-0036 Fax: (509) 688-0037 permitcenter(aspokanevalle /l -(x(3(0 RESIDENTIAL CONSTRUCTION (Staff Use Only) PERMIT NUMBER: PERMIT FEE: RMIT APPLICATION ❑ NEW CONSTRUCTION ❑ DECK SITE ADDRESS: ('. ASSESSORS PARCEL NO.: BUILDING OWNER NAME: NAME: / /'� < �" 7/` �( ADDRESS: (� ( �lt 1. C �i. 1 1 % G L. ADDITION REMODEL ❑ ACCESSORY BUILDING I/ ❑O Yr7 (3 2-i 2 6 LEGAL DESCRIPTION:7 /I)1i,— /1//7•z;fr't ( I)) A-14 4/ a <<, 1 Cm: PHONE: '•7( t/ CONTACT NAME: STATE: r'j zip: `/ `/,f/ 2 FAX: CELL: ` '/ L/ - `( PHONE: FAX: CELL: CONTRACTOR NAME: 61- ( 'P'(�--�jt /iM/z5wy y0 'ce) /n&�-"F MAILING ADDRESS: Zo (/ £ - 62l 1 CITY: PHONE: FAX: STATE: CELL: ZIP: Zi) -7-- ‘:,5O i -`1,S'I-��z CONTRACTOR LICENSE No.: /l}� ys�,�,60 '/EXPIRES: ,17/2..,,, CITY BUSINESS LICENSE NO.: bt?/ DESCRIBE S)COPE OF WORKIN DETAILAND I DICATE USDICAlE USE & PROI/OSXDUSE: -E ALG�-6/-6/1 � tJx.,r 4� ****YOU MUST COMPLETE THE FOLLOWING**** MARK N/A IF NOT APPLICABLE Height to Peak: /l IL— - Dimensions: No. of Stories: Total Habitable Space: Main Floor SQ FT: Upper Floor SQ FT: Unfinished Basement SQ FT: Finished Basement SQ FT: Garage SQ FT: Deck/Covered Patio SQ FT: Impervious Surface Area: 30% Slopes on Property: No. of Bedrooms: Construction Type: Heat Source: Sewer or Septic: TOTAL COST OF PROJECT: $ d 0 OL DISCLAIMER The permitted verifies, acknowledges and agrees by their signature that: 1) if this permit is for construction or on a dwelling, the dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley permit inure to the property owner. 3) The signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done in full compliance with the City of Spokane Valley Development code. Referenced codes are available for review at the City of Spokane Valley Permit Center. 5) The City of Spokane Valley permit is not a permit or appral for any violation of federal, state or local laws, codes or ordinances. 6) Plans or additional information may be requ' d o be bmitted d subsequently approved before this application can be processed. Effective October 28, 2007 P:\Community Development dmi Page 1 of 2 ration\03 Forms - Official Versions\Permit Center\Residential Construction Permit App 10.28.07.doc S6Ran� jUalley� For City Use Only PLUS Project Number //- Project / Project Address'' 11703 E Sprague Ave Suite B-3 ♦ Spokane Valley WA 99206 509.688.0036 ♦ Fax: 509.688.0037 ♦ permitcenter@spokanevalley.org As part of our on-going commitment to customer service during the review process of your project application, we are providing you with a TARGET DATE for the initial technical application review. If for any reason we cannot meet this date, we will contact you with a revised target date. Your application review TARGET DATE is ) / ` 21 l The TARGET DATE is the date we estimate your project application will have had its initial technical review. It is not the date for approval or permit issuance. Tips for a Smoother Project Application Review ➢ Submit complete, accurate plans and documents. Extra time may be required for re -submittals as project application reviewers work on multiple applications and it may be several days before they can look at your new or revised information. ➢ Designate a specific contact person to communicate with the City. While the person designated as the applicant's contact person with the City can be changed, one individual with the expertise for dealing with reviewer comments would be the best choice for the entire review process. ➢ Call staff regarding the status of your project only after the target date shown at the top of the page. Although you should be contacted on or by the target date, please feel free to contact us if you haven't heard from us by your target date. Staff may contact you before the target date if the initial review is complete. By following this procedure, you will save time and allow the reviewers to complete the work more expeditiously. Steps in the Permit Process 1. Counter Complete. Your application has been accepted as counter complete. This means all of the required documents, as indicated on your Pre -Application Checklist have been submitted or have been approved for deferred submittal. This does not prevent technical staff from requesting additional information as a result of their technical review. 2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free from substantive flaws that would prevent technical staff from completing the technical review once it is started. When this step is complete, your application will be routed to the appropriate staff and remain in their review queue until it comes up for review. 3. Technical Compliance. Once an application is administratively complete, it is routed to technical staff for compliance review. Depending on the type of project, technical staff may include multiple reviewers. You should be contacted by phone, fax, email, or mail by your TARGET DATE once the initial technical compliance review is complete. 4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re - submittals, each reviewer will approve their section of the application and route it to the Permit Center. When all sections of the application are received, a Permit Specialist will process the application and contact the person specified on your application for permit pick-up. Information regarding fees and pre -construction meetings (if required) will be provided by the Permit Specialist at that time. WHITE -APPLICANT PINK -- BUILDING FILE REV 9/07