Loading...
2010, 03-17 Permit App: 10000663 Reframe, Rebuild GarageProject Number: 10000663 Inv: 1 Application THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Date: 3/17/2010 Page 1 of 2 Project Information: ... :. . Permit Use: REFRAME AND REBUILD GARAGE Contact: HAMLIN, MARK R Address: 8010 E SOUTH RIVERWAY AVE C - S - Z: SPOKANE VALLEY, WA 99212-1811 Setbacks: Front Left: Right: Rear: Phone: (509) 922-0940 Site Information: ;r .. ,,., ...., , Plat Key: Name: Range Group Name: Project Name: gemmingemommammemon District: Nort Parcel Number: 45063.2802 Block: SiteAddress: 8010 E SOUTH RIVER WAY Location:: CSV Zoning: R-2 Lot: Owner: Name: HAMLIN, MARK R Address: 8010 E SOUTH RIVERWAY AVE SPOKANE VALLEY, WA 99212-181 SF Res Suburban District Water District: 002 ORCHARD AVENUE Area: .00 Acres Width: 0 Depth: 0 Right Of Way (ft): 0 Nbr of Bldgs: 0 Nbr of Dwellings: 0 Hold: ❑ Review Information: Review Building Plan Review Released By: Septic Sys Review Originally Released: 3/11/2010 By: tmelbourn Released By: Originally Released: 3/17/2010 By: LHALSEY Landuse/Zoning/HE Conditions Permits: Released By: Originally Released: 3/16/2010 By: MHARNOI Operator: jmm Printed By: jmm Print Date: 3/17/2010 Project Number: 10000663 Inv: 1 Application THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Date: 3/17/2010 Contractor: OWNER Description Grp Type Notes GAR WOOD U-1 VB Item Description RESIDENTIAL PERMIT FEE WSBCC SURCHARGE SF PLNS RVW < 7999 SQ FT Building Permit Page 2 of 2 Firm: OWNER Phone: (000) 000-0000 This Application: Sq Ft Valuation 792 $15,048.00 Total Project: Su Ft Valuation 792 $15,048.00 Totals: 792 $15,048.00 Units Unit Desc 1 SELECT 1 SELECT 1 SELECT Permit Total Fees: Notes: ma,. - m .._:... _ . . a.m .m Dry only- No plumbing. Payment Summary =::: wu..,..r F.. Permit Type Fee Amount Invoice Amount Building Permit $375.85 $375.85 792 $15,048.00 Fee Amount $265.25 $4.50 $106.10 Amount Paid $106.10 $375.85 Amount Owing $269.75 $375.85 $375.85 $106.10 $269.75 Disclaimer: Submittal of this application certifies the owner (or person(s) authorized by the owner) has both examined and finds the information contained within to be true and correct, and agrees that all provisions of laws and/or regulations governing this type of work will be complied with. Subsequent issuance of a permit shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of the code or of any other state or local laws or ordinances. Signature: Operator: jmm Printed By: jmm Print Date: 3/17/2010 • SpokjineCCPVor Valle CITY OF SPOKA,NA VALLE Community Devello.pment Department Permit Center 11703 East Sprague Avenue, Suite B-3 Spokane Valley, WA 99206 Tel: (509) 688-0036 Fax: (509) 688-0037 permitcenter@spokanevallev.org )PERMIT NUMBER: PERMIT FEE: (Staff Use Only) RESIDENTIAL CONSTRUCTION PERMIT APPLICATION ❑ NEW CONSTRUCTION ❑ DECK SITE ADDRESS: 8o/c ASSESSORS PARCEL NO.: BUILDING OWNER NAME: ❑ ADDITION/REMODEL ❑ ACCESSORY BUILDING [OTHER gPLAGE r. sou -n+ Zr vLie- WAY 16-44.3,2802- LEGAL DESCRIPTION: 6 ee.4M¢,a A.116. kt2D Pr Or 637 SEE. /15 Fr wet or NE Cog TNS To Pr. NAME: MAgK. R • 14A-Mu4 ADDRESS: 80m E. Scum' 7 i iz_ Wray CITY: S' 4 *t4C VALy PHONE: \u% - 2 "C 9515 FAX: ‘...Q)?'92'f' 7276 -CELL: CONTACT NAME: C;::. STATE: WA ZIP:�ZIZ^I®!� off'- 999-- ?MI PHONE: FAX: CELL: CONTRACTOR NAME: MAILING ADDRESS: 'V92r4,./te..., CITY: STATE: ZIP: PHONE: FAX: CELL: CONTRACTOR LICENSE No.: EXPIRES: CITY BUSINESS LICENSE NO.: DESCRIBE THE SCOPE OF WORK IN DETAIL AND INDICATE USE: WiciiefNaoc..a iptelo. PROPOSED USE: Effective October 28, 2007 Page 1 of 2 http://www.spokanevalley.org/uploads/Community_Development/Documents/Forms/Building/Residential Construction Permit App.1.doc ****YOU MUST COMPLETE THE FOLLOWING**** 1 Height to Peak: G( /J Dimensions: 22y- 31 No. of Stories: / Total Habitable A -- Space: Main Floor Q FT: A- Upper Floor Q FT: /i Unfinished B sement SQ FT: A. Finished Bas ment SQ FT: A Garage Ss FT: d14- rZ Deck/Cov red Patio SQ FT: Imperviou Surface Area: 30% Slopes on I Property: rk No. of Bedrooms: NA Constructio`.�}T Type: l�l� F Heat Soue: r/ Ai" Sewer or , r Septic: TOTAL COST OF PROJECT: $ f5707/Du0O e DISCLAIMER The permitted verifies, acknowledges and agrees by their signature that: 1) if this permit is for construction or on a dwelling, the dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley permit inure to the property owner. 3) The signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done in full compliance with the City of Spokane Valley Development code. Referenced codes are available for review at the City of Spokane Valley Permit Center. 5) The City of Spokane Valley permit is not a permit or approval for any violation of -neral, state or local laws, codes or ordinances. 6) Plans or additional information may be required to •e submitted and subsequ- tly appred before this application can be processed. Signature Date: Method of payment: ❑ Cash ❑ Check LJ Visa ❑ Mastercard Bankcard #: EXP: VIN#: 24/0 Authorized Signature: Effective October 28, 2007 Page 2 of 2 http://www.spokanevalley.org/uploads/Community_Development/Documents/Forms/Building/Residential Construction Permit App.1.doc Sio°lane~ Valley® For City Use Only PLUS Project Number Project Address 11703 E Sprague Ave Suite B-3 ♦ Spokane Valley WA 99206 509.688.0036 ♦ Fax: 509.688.0037 ♦ permitcenter@spokanevalley.org As part of our on-going commitment to customer service during the review process of your project application, we are providing you with a TARGET DATE for the initial technical application review. If for any reason we cannot meet this date, we will contact you with a revised target date. Your application review TARGET DATE is The TARGET DATE is the date we estimate your project application will have had its initial technical review. It is not the date for approval or permit issuance. Tips for a Smoother Project Application Review ➢ Submit complete, accurate plans and documents. Extra time may be required for re -submittals as project application reviewers work on multiple applications and it may be several days before they can look at your new or revised information. ➢ Designate a specific contact person to communicate with the City. While the person designated as the applicant's contact person with the City can be changed, one individual with the expertise for dealing with reviewer comments would be the best choice for the entire review process. ➢ Call staff regarding the status of your project only after the target date shown at the top of the page. Although you should be contacted on or by the target date, please feel free to contact us if you haven't heard from us by your target date. Staff may contact you before the target date if the initial review is complete. By following this procedure, you will save time and allow the reviewers to complete the work more expeditiously. Steps in the Permit Process 1. Counter Complete. Your application has been accepted as counter complete. This means all of the required documents, as indicated on your Pre -Application Checklist have been submitted or have been approved for deferred submittal. This does not prevent technical staff from requesting additional information as a result of their technical review. 2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free from substantive flaws that would prevent technical staff from completing the technical review once it is started. When this step is complete, your application will be routed to the appropriate staff and remain in their review queue until it comes up for review. 3. Technical Compliance. Once an application is administratively complete, it is routed to technical staff for compliance review. Depending on the type of project, technical staff may include multiple reviewers. You should be contacted by phone, fax, email, or mail by your TARGET DATE once the initial technical compliance review is complete. 4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re - submittals, each reviewer will approve their section of the application and route it to the Permit Center. When all sections of the application are received, a Permit Specialist will process the application and contact the person specified on your application for permit pick-up. Information regarding fees and pre -construction meetings (if required) will be provided by the Permit Specialist at that time. WHITE -APPLICANT PINK - BUILDING FILE REV 9/07 Pi114c4i. APPROVED 1 Slixt? M 1L- Zti Dour tk-'&4-(• 1 210. 415°2.8o ;I: $ Coturni Seer-a:me- Vokug-Lt I Os, ; C'111 (Lc.' 1:7