2012, 04-23 Permit: SW-12001180 Sewer SPOKANE COUNTY BUILDING AND PLANNING
PERMIT
Permit Issued Date:
Application Number: SW-12001180 04/23/2012
Expiration Date:
Project Description: SEWER CONNECTION Primary Contact: KEN'S D ROOTER INC
Applicant: KEN'S D ROOTER INC
Permit Type: SEWER Address: 8215 E. NORA
SPOKANE,WA 99212
Phone: 509-999-3905
Email:
SITE INFORMATION:
Site Address: 4320 N SOMMER CT Owner: STRAND,TONY J
Parcel Number: 45021.6413 Address: 4320 N SOMMER CT
SPOKANE,WA 99216-2610
Subdivision: KRUEGER'S 4TH Phone:
ADDITION
Assessor's Description: KRUEGER'S 4TH ADDITION LT 13, BLK 1 Email:
Inspection Area:
Water District:Trentwood Fire District: Fire District 1
Irrigation District#3
Zoning: Land Area: 0.2583 acres/11250 sgft
CONTRACTOR INFORMATION:
General Contractor
KENSDDR888DL
KEN'S D ROOTER INC
PO BOX 1024
MARYSVILLE,WA 98270
425-252-5874
DETAILS:
Class Type Quantity Unit Charge Value
SEWER SEWER CONNECTION 1 $125.00 $125.00
$125.00
FEE DETAIL:
Processing-Utilities $25.94
Utilities Permit $125.00
Total Fee: $150.94
CONDITIONS:
Inside Public Transit Benefit Area
CALL 1-800-424-5555 BEFORE YOU DIG--AT LEAST 2 WORKING DAYS IN ADVANCE.SPOKANE COUNTY CODE REQUIRES THE
INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR&INDUSTRIES, INCLUDING THOSE
RELATED TO TRENCH SAFETY.
Date Printed:04/23/2012 10:32:57 Printed by: IIS APPPOOL\ASP.NET v4.0
SPOKANE COUNTY BUILDING AND PLANNING
PERMIT
Permit Issued Date:
Application Number: SW-12001180 04/23/2012
Expiration Date:
FOR SEWER INSPECTIONS CALL THE UTILITIES DEPT AT(509)477-3604 FROM 8:30-5:00 MONDAY-FRIDAY PRIOR TO COVER.
ONE WORKING DAY NOTICE REQUIRED. PERMIT ALLOWS FOR A 30-MINUTE INSPECTION.ADDITIONAL INSPECTION FEES
APPLY AFTER 30 MINUTES. _
INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED
TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF
SEWER STUB PRIOR TO ANY OTHER EXCAVATION. _
SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE
ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED.SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR
GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE. _
THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE
LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF
UNDERGROUND FACILITIES. _
Date Printed:04/23/2012 10:32:57 Printed by:IIS APPPOOL\ASP.NET v4.0