Loading...
2012, 04-23 Permit: SW-12001180 Sewer SPOKANE COUNTY BUILDING AND PLANNING PERMIT Permit Issued Date: Application Number: SW-12001180 04/23/2012 Expiration Date: Project Description: SEWER CONNECTION Primary Contact: KEN'S D ROOTER INC Applicant: KEN'S D ROOTER INC Permit Type: SEWER Address: 8215 E. NORA SPOKANE,WA 99212 Phone: 509-999-3905 Email: SITE INFORMATION: Site Address: 4320 N SOMMER CT Owner: STRAND,TONY J Parcel Number: 45021.6413 Address: 4320 N SOMMER CT SPOKANE,WA 99216-2610 Subdivision: KRUEGER'S 4TH Phone: ADDITION Assessor's Description: KRUEGER'S 4TH ADDITION LT 13, BLK 1 Email: Inspection Area: Water District:Trentwood Fire District: Fire District 1 Irrigation District#3 Zoning: Land Area: 0.2583 acres/11250 sgft CONTRACTOR INFORMATION: General Contractor KENSDDR888DL KEN'S D ROOTER INC PO BOX 1024 MARYSVILLE,WA 98270 425-252-5874 DETAILS: Class Type Quantity Unit Charge Value SEWER SEWER CONNECTION 1 $125.00 $125.00 $125.00 FEE DETAIL: Processing-Utilities $25.94 Utilities Permit $125.00 Total Fee: $150.94 CONDITIONS: Inside Public Transit Benefit Area CALL 1-800-424-5555 BEFORE YOU DIG--AT LEAST 2 WORKING DAYS IN ADVANCE.SPOKANE COUNTY CODE REQUIRES THE INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR&INDUSTRIES, INCLUDING THOSE RELATED TO TRENCH SAFETY. Date Printed:04/23/2012 10:32:57 Printed by: IIS APPPOOL\ASP.NET v4.0 SPOKANE COUNTY BUILDING AND PLANNING PERMIT Permit Issued Date: Application Number: SW-12001180 04/23/2012 Expiration Date: FOR SEWER INSPECTIONS CALL THE UTILITIES DEPT AT(509)477-3604 FROM 8:30-5:00 MONDAY-FRIDAY PRIOR TO COVER. ONE WORKING DAY NOTICE REQUIRED. PERMIT ALLOWS FOR A 30-MINUTE INSPECTION.ADDITIONAL INSPECTION FEES APPLY AFTER 30 MINUTES. _ INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF SEWER STUB PRIOR TO ANY OTHER EXCAVATION. _ SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED.SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE. _ THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF UNDERGROUND FACILITIES. _ Date Printed:04/23/2012 10:32:57 Printed by:IIS APPPOOL\ASP.NET v4.0