2009, 08-20 Permit App: 09002372 Deck Project Number: 09002372 Inv: 1 Application Date: 8/20/2009 Page 1 of 2
THIS IS NOT A PERMIT
Penalties will be assessed for commencing work without a permit
Project Information:
Permit Use: 144 SQFT COVERED DECK Contact: TIMBERLAND FABRICATION
Address: PO BOX 28777
C-S-Z: SPOKANE WA 99228
Setbacks:Front Left: Right: Rear: Phone: (509)599-5283
Group Name:
Project Name:
Site Information• . . .
Plat Key: 005998 Name: VALLEYWAY ADD District: East
Parcel Number: 45133.2902 Block: 2 Lot: 2
SiteAddress: 514 N SONORA ST Owner:Name: COOKE,LAWRENCE R&GLORI
Address: 514 N SONDRA LN
Location::CSV VERADALE,WA 99037-7933
Zoning: R-3 SF Res District
Water District: 010 VERA Hold: ❑
Area: 13,451 Sq Ft Width: 99 Depth: 135 Right Of Way(ft): 38
Nbr of Bldgs: 1 Nbr of Dwellings: 1
Review Information:
Review
Building Plan Review Released By:
Originally Released: 8/20/2009 By: tmelbourn
Landuse/Zoning/HE Conditions Released By:
Originally Released: 7/31/2009 By: mpalaniuk
Permits: - _
Operator: JD Printed By: jinni Print Date: 8/20/2009
Project Number: 09002372 Inv: 1 Application Date: 8/20/2009 Page 2 of 2
THIS IS NOT A PERMIT
Penalties will be assessed for commencing work without a permit
Building Permit
Contractor: TIMBERLAND FABRICATION Finn: TIMBERLAND FABRICATION
Address: PO BOX 28777 Phone: (509)599-5283
SPOKANE WA 99228
This Application: Total Project:
Description Grp Type Notes Sq Ft Valuation Sq Ft Valuation
COV DECK R-3 VB 144 $2,160.00 144 $2,160.00
Totals: 144 $2,160.00 144 $2,160.00
Item Description Units Unit Desc Fee Amount
RESIDENTIAL PERMIT FEE 1 SELECT $83.25
WSBCC SURCHARGE 1 SELECT $4.50
SF PLNS RVW<7999 SQ FT 1 SELECT $33.30
Permit Total Fees: $121.05
Payment Summary' .
Permit Type Fee Amount Invoice Amount Amount Paid Amount Owing
Building Permit $121.05 $121.05 $33.30 $87.75
$121.05 $121.05 $33.30 $87.75
Disclaimer:
Submittal of this application certifies the owner(or person(s)authorized by the owner)has both examined and finds the information
contained within to be true and correct,and agrees that all provisions of laws and/or regulations governing this type of work will be
complied with. Subsequent issuance of a permit shall not be construed to be a permit for,or an approval of,any violation of any of
the provisions of the code or of any other state or local laws or ordinances.
Signature:
Operator: JD Printed By: jmm Print Date: 8/20/2009
_ ��n (Staff Use Only)
Siö1thhhhhhhhh1
�al PERMIT NUMBER:
\iiiley PERMIT FEE:
CITY OF SPOKANE VALLEY
Community Development Department
Permit Center
11703 East Sprague Avenue, Suite B-3
Spokane Valley, WA 99206
Tel: (509) 688-0036
Fax: (509) 688-0037
permitcenterftsookanevalley.org
RESIDENTIAL CONSTRUCTION PERMIT APPLICATION__
0 NEW CONSTRUCTION 0 ADDITION/REMODEL 0 ACCESSORY BUILDING
el DECK 0 OTHER
SITE ADDRESS:514 NORTH SONORA
ASSESSORS PARCEL NO.:45133.2902 LEGAL DESCRIPTION:
BUILDING OWNER NAME:
NAME:COOKE LAWRENCE
ADDRESS:514 NORTH SONORA
CITY:CITY OF SPOKANE VALEY STATE:WA
ZIP:99037
PHONE:922-0990 FAX: CELL:
CONTACT NAME:PETE MCDONALD
PHONE:599-5283 FAx:292-8434 cELL:599-5283
CONTRACTOR NAME:TIMBERLAND FABRICATION
MAILING ADDRESS:PO Box 28777
CITY:SPOKANE STATE:WA ZIP:99228
PHONE:599-5283 FAx:292-8434 cELL:599-5283
CONTRACTOR LICENSE No.:TIMBEF*978MT EXPIRE5:8-2011 CITY BUSINESS LICENSE
NO.: 600 2 '.fes Y l
DESCRIBE THE SCOPE OF WORK IN DETAIL AND INDICATE USE:
REPLACE THE EXISTING FRONT STEPS AND PORCH WITH A COVERED PORCH AND STEPS.
PROPOSED USE:
Effective October 28, 2007 Page 1 of 3
htttn•//www.cnnkanevallay.nrn/iinInarlc/Community nwvalnnmant/nnriimantc/Fnrmc/Rnilriinn/Raciriantial Cnnctrilctinn Permit
• y- 237 -
****YOU MUST COMPLETE THE FOLLOWING****
MARK N/A IF NOT APPLICABLE
Height to Peak:14 FT Dimensions:N/A No. of Stories:1 Total Habitable
Space:N/A
Main Floor SQ FT:N? Upper Floor SQ Unfinished Basement Finished Basement
N/A FT:N/A — SQ FT:N/A SQ FT:N/A
•
Garage SQ FT:N/A Deck/ overed Patio Impervious Surface 30% Slopes on
SQ F :144 C f,- Area:N/A � Pro /A
No. of Bedrooms:N/A Const ction Heat Source:N/A ewer or eptic:N/A
Type:N/A
TOTAL COST OF PROJECT: $ 3 7t)6.• 86--
DISCLAIMER
(DISCLAIMER
The permitted verifies,acknowledges and agrees by their signature that: 1)if this permit is for construction or on a dwelling,the dwelling is/will
be served by potable water. 2) Ownership of this City of Spokane Valley permit Inure to the property owner. 3) The signatory is the property
owner or has permission to represent the property owner in this transaction. 4) All construction is to be done in full compliance with the City of
Spokane Valley Development code. Referenced codes are available for review at the City of Spokane Valley Permit Center. 5) The City of
Spokane Valley per ' not a permit or approval for any violation of federal, state or local laws, codes or ordinances. 6) Plans or additional
information may b: requi ed to be sub ed and subsequently approved before this application can be processed.
Signature 4 �" Date: 0 7 /7 /Lee?
Method of payment: ® Cash 0 Check 0 Visa 0 Mastercard
Bankcard #: EXP: VIN#:
Authorized Signature: /</ a12..s._ O 7 3/ 2_00
Effective October 28, 2007 Page 3 of 3
httnr//www-cnnkanevallev-nrn/iinlnarlc/Cnmmtinity flevelnnment/f)nniimentc/Fnrmc/Ruilriinn/Reciriential C'nnctrnctinn Permit
5 /7 n, ,ter.. r 37vy 6 Spar
Spofc�or�E vn-�-f r c✓� �'S0 3 7
P4A-E J- tt 4 c 1 *3. A-907--
6....— / 5c,ci
s-
1
4` li AIM?/,/
I �2
ems!` Ad- ri/ieGp
6 a
ro
C.‘ z
a %'Z' o �
.....ti
,1- (&B Fr --47 4 9 . 6 Y
CT' ir
ellQi — lir ---4 l'
0 va^ sc
i1 Fr
—I Z
m
" N\„, 3
G.)Ti.4 -a
C 0
m
v
For City Use Only
CITY OF PLUS Project Number t,_ `- l
pokane Project Address
a e °
y 11703 E Sprague Ave Suite B-3 • Spokane Valley WA 99206
509.688.0036 ♦ Fax: 509.688.0037 ♦ permitcenter®spokanevalley.org
As part of our on-going commitment to customer service during the review process of your project
application, we are providing you with a TARGET DATE for the initial technical application review. If for
any reason we cannot meet this date, we will contact you with a revised target date.
/ I / (
Your application review TARGET DATE is
The TARGET DATE is the date we estimate your project application will have had its initial technical
review. It is not the date for approval or permit issuance.
Tips for a Smoother Project Application Review
)=. Submit complete, accurate plans and documents.
Extra time may be required for re-submittals as project application reviewers work on multiple applications and it
may be several days before they can look at your new or revised information.
➢ Designate a specific contact person to communicate with the City.
While the person designated as the applicant's contact person with the City can be changed, one individual with the
expertise for dealing with reviewer comments would be the best choice for the entire review process.
➢ Call staff regarding the status of your project only after the target date shown at the top of the page.
Although you should be contacted on or by the target date,please feel free to contact us if you haven't heard from us
by your target date. Staff may contact you before the target date if the initial review is complete. By following this
procedure,you will save time and allow the reviewers to complete the work more expeditiously.
Steps in the Permit Process
1. Counter Complete. Your application has been accepted as counter complete. This means all of the required
documents, as indicated on your Pre-Application Checklist have been submitted or have been approved for deferred
submittal. This does not prevent technical staff from requesting additional information as a result of their technical review.
2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free
from substantive flaws that would prevent technical staff from completing the technical review once it is started. When
this step is complete, your application will be routed to the appropriate staff and remain in their review queue until it
comes up for review.
3. Technical Compliance. Once an application is administratively complete, it is routed to technical staff for compliance
review. Depending on the type of project, technical staff may include multiple reviewers. You should be contacted by
phone,fax, email,or mail by your TARGET DATE once the initial technical compliance review is complete.
4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re-
submittals, each reviewer will approve their section of the application and route it to the Permit Center. When all sections
of the application are received, a Permit Specialist will process the application and contact the person specified on your
application for permit pick-up. Information regarding fees and pre-construction meetings (if required) will be provided by
the Permit Specialist at that time.
WHITE—APPLICANT PINK—BUILDING FILE REV 9/07