2012, 04-20 Permit: SW-12001173 SewerSPOKANE COUNTY BUILDING AND PLANNING
PERMIT
Application Number: SW -12001173
Permit Issued Date:
04/20/2012
Expiration Date:
Project Description: SEWER CONNECTION Primary Contact: *ACME EXCAVATING & SEWER BORING
CO.
Applicant: *ACME EXCAVATING & SEWER BORING
CO.
Permit Type: SEWER Address: 6808 S. LINKE RD.
GREENACRES, WA 99016
Phone: (509)228-0691
Email:
SITE INFORMATION:
Site Address:
Parcel Number:
8207 E SOUTH RIVER WAY
45063.9032
Subdivision:
Assessor's Description: 06 25 44 W8OFT OF E244.5FT OF GOV L12 LYG N
OF NL OF S RIVE RWAY EXTENDED
Inspection Area:
Owner:
Address:
Phone:
Email:
SIMPSON, J G & M
8207 E SOUTH RIVERWAY AVE
SPOKANE, WA 99212-1952
Water District: Orchard Fire District: Fire District 1
Avenue Irrigation District
#6
Zoning: Land Area: 0.379 acres / 16541 sqft
CONTRACTOR INFORMATION:
General Contractor
ACMEEES963LD
*ACME EXCAVATING & SEWER BORING CO.
6808 S. LINKE RD.
GREENACRES, WA 99016
(509)228-0691
DETAILS:
Class
Type
Quantity Unit Charge Value
SEWER SEWER CONNECTION 1 $125.00 $125.00
FEE DETAIL:
Processing - Utilities
Utilities Permit
Total Fee:
$125.00
$25.94
$125.00
$150.94
CONDITIONS:
Inside Public Transit Benefit Area
Possible Shoreline On Site
Possible Floodzone On Site
Date Printed: 04/20/2012 11:11:03
Printed by: IIS APPPOOL\ASP.NET v4.0
SPOKANE COUNTY BUILDING AND PLANNING
PERMIT
Permit Issued Date:
Application Number: SW -12001173 04/20/2012
Expiration Date:
CALL 1-800-424-5555 BEFORE YOU DIG --AT LEAST 2 WORKING DAYS IN ADVANCE. SPOKANE COUNTY CODE REQUIRES THE
INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR & INDUSTRIES, INCLUDING THOSE
RELATED TO TRENCH SAFETY.
FOR SEWER INSPECTIONS CALL THE UTILITIES DEPT AT (509) 477-3604 FROM 8:30-5:00 MONDAY -FRIDAY PRIOR TO COVER.
ONE WORKING DAY NOTICE REQUIRED. PERMIT ALLOWS FOR A 30 -MINUTE INSPECTION. ADDITIONAL INSPECTION FEES
APPLY AFTER 30 MINUTES.
INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED
TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF
SEWER STUB PRIOR TO ANY OTHER EXCAVATION.
SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE
ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED. SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR
GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE.
THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE
LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF
UNDERGROUND FACILITIES.
Date Printed: 04/20/2012 11:11:03
Printed by: IIS APPPOOL\ASP.NET v4.0