Loading...
2003, 10-20 Sewer Connection RequirementsOCT 20 2003 7: b1HP1 brunnn . um/nes DTV6ION N. Bruce Rawls, P.E. Utilities Director C O U N r Y A DIVISION OP THB PUBLIC WORES DEPARTMENT FACSIMILE COVER SHEET DATE: ie)/ 20/03 TO: 12)04 ri T)omq v.v. G23-0034 FAX: GAS- 04937 CAI of Nrokekrie.Vialoy FROM: Roger Rivers Customer Service Representative Spokane County, Division of Utilities E -Mail: rrivers@spokanecounty.org PHONE: (509) 477-3604 DIRECT: (509) 477-7682 FAX: (509) 477-4715 TOTAL NUMBER OF PAGES (INCLUDING COVER SHEET): 4' "Rc 56W1$ V CormiscNC 0.1 far $2 t 1 E.. S+a'ht VGrL.sa. MESSAGE/SPECIAL INSTRUCTIONS: PiAAc.6,61 Ake COV4.6 k11Q.k Vt4 Ve- CCA..ke. -lo A —Cpuih of 64 01 w oehl (C1av a MS Cove k 424 " 400) anc� .rocQ,w%kh As(,, \Ao+m.5 (Z0la 55 t?54). Toc QSTNtjr‘10.,* LaQual AJ C ak1 %* InCoy. rrus.k1ort '. ,drove r+t outi F it CaM mi. IAC ' P u ha VBG denyevxdbkwoh6. 1026 W. Broadway • Spokane, WA 99260-0430 • (509) 477-3604 FAX (509) 4774715 TDD: (509) 477-7133 OCT 17 2003 09:02 477 7178 PAGE.01 OCT 20 2003 7:51HM SFUIcHrtt LuuniT UTILITIES DIVISION N. Bruce Rawls, P.E., Utilities Director October 17, 2003 A DIVISION OF THE PUBLIC WORKS DEPARTMENT 8211 E. SOUTH RIVERWAY CONNECTION REQUIREMENTS The following requirements must be met before a sewer permit can be issued for the connection of 8211 E. South Riverway to the Town of MiUwood's sewer system: The owner and his /her contractor must meet with the Spokane County Division of Utilities, the Town of Millwood, and, if needed, the City of Spokane Valley to submit a plan demonstrating as to how the connection will be made. The plan will require approval from the Spokane County Division of Utilities, the Town of Millwood and, if needed, the City of Spokane Valley. The "Documentation Of Sewer Connection Requirements" and all other necessary easements, operation & maintenance agreements, hold harmless agreements, franchise agreements, lease agreements, and other permits needed to facilitate the connection must be on file and, if needed, recorded with the Spokane County Auditor's office. All applicable fees must be satisfied. Kevin Cooke Sewer Planning & Design Manager Spokane County Division of Utilities Located at: 1026 W. Broadway, 4th Floor Mailing Address: PWK-4 • 1116 W. Broadway • Spokane, WA 99260-0430 (509) 477-3604 • FAX: (509) 477-4715 • TDD: (509) 477-7133 OCT 17 2003 09.02 477 7178 PAGE.02 OCT 20 2003 7: 51 HM Srutcrtnt uuun t T After Recording Return To: Spokane County Division of Utilities Attn: Roger Rivers DOCUMENTATION OF SEWER CONNECTION REQUIREMENTS This document shall serve to document the conditions under which Spokane County Division of Utilities will allow an interim connection of the residence on Parcel No. 45063.9031 to the Town of Millwood's sewer system. 1. The owner of the property may construct an interim sewer service connection that will connect to the Town's sewer system near the Town's westerly limit along South Riverway. It shall be the property owner's responsibility to secure the needed private easement(s) across adjacent property and/or permits from the appropriate jurisdiction for use of any public right-of-way. 2. Construction of the service line shall be in accordance with the requirements of Spokane County Division of Utilities, and shall be inspected by the Division of Utilities. Inspection shall be scheduled through the Division of Utilities at least 24 hours in advance. 3. Upon connection to the Town's sewer system, the property owner will pay the sewer General Facilities Charge to Spokane County Division of Utilities. 4. The property is located within the boundary of the Orchard Avenue Sewer Project (the Project), which is currently scheduled for construction in 2005. The Division of Utilities shall provide a service stub to the property from South Riverway in conjunction with the Project. 5. Upon completion of the Project. the Division of Utilities will charge the owner the Capital Facilities Rate (CFR) established for the project, less the General Facilities Charge. The owner will have the same payment options for the CFR that become available to other property owners within the Project boundary, as set forth in Section 8.03 of the Spokane County Code. Options for payment will include lump sum, or monthly payments over twenty years with interest. 6. Within one year of the completion of the Project, the property owner shall reconnect the sewer service line for the residence to the stub provided by the Division of Utilities, and abandon that portion of the service connecting to the OCT 1? 2003 09:03 4?? 7178 PAGE.03 OCT 20 2003 "/:b1Hf1 brunnnc ►,uui, , Town's system. A sewer connection permit shall be required for this reconnection to the County system. 7. Once the reconnection to the County's sewer system is complete, the property owner shall commence paying applicable monthly sewer service fees to the County. We agree to the terms set forth above by Spokane County Division of Utilities. We recognize that the connection of the subject property to the Town of Millwood sewer system will be an interim connection, and connection to the Orchard Avenue Sewer Project will be required in the future. We further agree to pay all applicable charges consistent with the charges assigned to other properties within the Orchard Avenue Sewer Project. DATED , 20 STATE OF WASHINGTON ss: County of Spokane OWNER: By: C. Ross Simmonds By: Karin M. Simmonds I certify that I know or have satisfactory evidence that and is/are the person(s) who appeared before me, and said person(s) acknowledged that (he/she) signed this instrument and acknowledged it to be (his/her) free and voluntary act for the uses and purposed mentioned in the instrument. Dated: (SEAL) OCT 17 2003 09:03 Notary Public in and for the State of Washington, residing at My commission expires: 477 7178 PAGE.04