2009, 04-30 Permit App: 09001024 Accessory Bldg Project Number: 09001024 Inv: 1 Application Date: 4/30/2009 Page 1 of 2
THIS IS NOT A PERMIT
Penalties will be assessed for commencing work without a permit
Project Information:
Permit Use: 16 x 24 ACC BLDG Contact: HILDEBRAND,D L
Address: 14009 E SPRINGFIELD AVE
C-S-Z: SPOKANE VALLEY,WA 99216-2052
Setbacks: Front Left: Right: Rear: Phone: (509)000-0000
Group Name:
Site Information: Project Name:
Plat Key: Name: Range District: East
Parcel Number: 45143.1318 Block: Lot:
SiteAddress: 14009 E SPRINGFIELD AVE Owner:Name: HILDEBRAND,D L
Address: 14009 E SPRINGFIELD AVE
Location::CSV SPOKANE VALLEY,WA 99216-205
Zoning: UR-3.5 Urban Residential 3.5
Water District: 010 VERA Hold: Fl
Area: 11,200 Sq Ft Width: 0 Depth: 0 Right Of Way(ft): 0
Nbr of Bldgs: 0 Nbr of Dwellings: 0
Review Information:
Review
Building Plan Review Released By: • j
Originally Released: 4/30/2009 By: tmelbourn
Landuse/Zoning/HE Conditions Released By;
Originally Released: 4/23/2009 By: tschmidt
Permits:
Operator: JD Printed By: jmm Print Date: 4/30/2009
Project Number: 09001024 Inv: 1 Application Date: 4/30/2009 Page 2 of 2
THIS IS NOT A PERMIT
Penalties will be assessed for commencing work without a permit
Building Permit
Contractor: TUFF SHED INC Firm: TUFF SHED INC
Address: 17500 W VALLEY HWY STE 100 Phone: (509)535-8833
TUKWILA,WA 98188
This Application: Total Project:
Description Grp Type Notes Sq Ft Valuation Sq Ft Valuation
POLE BDLG U-1 VB 384 $7,296.00 384 $7,296.00
Totals: 384 $7,296.00 384 $7,296.00
Item Description Units Unit Desc Fee Amount
RESIDENTIAL PERMIT FEE 1 SELECT $153.25
WSBCC SURCHARGE 1 SELECT $4.50
SF PLNS RVW<7999 SQ FT 1 SELECT $61.30
Permit Total Fees: $219.05
Notes• �... __ r , _ ..
Ground anchor engineer's letter required prior to final.
Payment Summary:
Permit Type Fee Amount Invoice Amount Amount Paid Amount Owing
Building Permit $219.05 $219.05 $61.30 $157.75
$219.05 $219.05 $61.30 $157.75
Disclaimer:
Submittal of this application certifies the owner(or person(s)authorized by the owner)has both examined and finds the information
contained within to be true and correct,and agrees that all provisions of laws and/or regulations governing this type of work will be
complied with. Subsequent issuance of a permit shall not be construed to be a permit for,or an approval of,any violation of any of
the provisions of the code or of any other state or local laws or ordinances.
Signature:
Operator: JD Printed By: jmm Print Date: 4/30/2009
.
i-
1
! :
31\10
. ! ,
..s.
\ / ,...: . —......--..... ... .. .. .
..-.7_,le •Ae
......- I Allk ,...........................
. .
, .
, .
- .
03A08d• , 'Id3a ONINNYld
- ' 5 '''' 1 •
, .
.„. i
1
„„•
1 \
1
i
,
I ,
. .. :
\ ..!
I
_.,
o-h ,••
\ ,
1 ,
,
i 1
1 _
1 ,)
,
1
iv..„
, .
CITY OF SPOKANE VAI EY
_ 7,' HEKW -LNILH
$
. ) /--.•-=1- 9 i
. _
: LI,__.,9 . •
For Cmbity er Use Only
S1itti11
rAdd1
doVa e
11703 E Sprague Ave Suite B-3 ♦ Spokane Valley WA 99206
509.688.0036 ♦ Fax: 509.688.0037♦ permitcenter@spokanevalley.org
As part of our on-going commitment to customer service during the review process of your project
application, we are providing you with a TARGET DATE for the initial technical application review. If for
any reason we cannot meet this date, we will contact you with a revised tar tCF:
date.
( 1
Your application review TARGET DATE is --f
`
The TARGET DATE is the date we estimate your project application will have had its initial technical
review. It is not the date for approval or permit issuance.
Tips for a Smoother Project Application Review
)=. Submit complete, accurate plans and documents.
Extra time may be required for re-submittals as project application reviewers work on multiple applications and it 1
may be several days before they can look at your new or revised information.
➢ Designate a specific contact person to communicate with the City.
While the person designated as the applicant's contact person with the City can be changed, one individual with the
expertise for dealing with reviewer comments would be the best choice for the entire review process.
➢ Call staff regarding the status of your project only after the target date shown at the top of the page.
Although you should be contacted on or by the target date,please feel free to contact us if you haven't heard from us
by your target date. Staff may contact you before the target date if the initial review is complete. By following this
procedure,you will save time and allow the reviewers to complete the work more expeditiously.
Steps in the Permit Process
1. Counter Complete. Your application has been accepted as counter complete. This means all of the required
documents, as indicated on your Pre-Application Checklist have been submitted or have been approved for deferred
submittal. This does not prevent technical staff from requesting additional information as a result of their technical review.
2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free
from substantive flaws that would prevent technical staff from completing the technical review once it is started. When
this step is complete, your application will be routed to the appropriate staff and remain in their review queue until it
comes up for review.
3. Technical Compliance. Once an application is administratively complete, it is routed to technical staff for compliance
review. Depending on the type of project, technical staff may include multiple reviewers. You should be contacted by
phone,fax, email,or mail by your TARGET DATE once the initial technical compliance review is complete.
4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re-
submittals, each reviewer will approve their section of the application and route it to the Permit Center. When all sections
of the application are received, a Permit Specialist will process the application and contact the person specified on your
application for permit pick-up. Information regarding fees and pre-construction meetings (if required) will be provided by
the Permit Specialist at that time.
WHITE-APPLICANT PINK-BUILDING FILE REV 9/07