Loading...
2014, 04-11 Permit: EGR-2014-0003 Paving, StormwaterSpokane 4,00Valley. City of Spokane Valley Community Development 11703 E. Sprague Ave., Suite B-3 Spokane Valley, WA 99206 (509) 720-5240 permitcenter(aspokanevallev.orq EGR-2014-0003 PROJECT NAME: VALLEY EAST SELF STORAGE - PAVING & STORMWATER SITE ADDRESS: 17907 E SPRAGUE AVE SPOKANE VALLEY DE -ENG -GRADING ISSUED: 04/11/2014 EXPIRES: PROJECT DESCRIPTION: ENGINEERED GRADING PLAN FOR DRIVEWAY(S) AND DRAINAGE POND PARCEL: 55184.9002 APPLICANT: VALLEY EAST, LLC PO BOX 2026 COEUR D ALENE, ID 83816- 2026 208-640-0711 DESIGNER: VERDIS LANDSCAPE ARCHITECTURE AND PLANNING 602 E GARDEN AVE COEUR D ALENE, ID 83814 208-667-1214 OWNER: ENGINEER: VALLEY EAST, LLC PO BOX 2026 COEUR D ALENE, ID 83816-2026 208-640-0711 Van Houten Consulting and Design, LLC 1013 E COUER D'ALENE BLVD COEUR D ALENE, ID 83814 208-755-8512 FEES: Fire Plan Review Grading Permit Paid $80.00 $21.00 Due $0.00 $0.00 Totals : $101.00 $0.00 CONDITIONS * Forty-eight (48) hours prior to construction (onsite and/or within the right-of-way), securely post a construction warning sign at each ingress to the project area that is clearly visible from the right-of-way. The sign shall be posted for the duration of the project. See Street Standards Section 9.7. * Construction of every drywell, including fabric and drainrock, shall be observed by the on-site inspector (Street Standards 9.4.2) to confirm that it meets the design details and specifications. Drywells not observed shall have their performance verified by a full-scale drywell test (SRSM Chapter 4). Printed by : Tamara Faurot on: 04/11/2014 10:51 AM Page 1 of 2 Spokane jValleyo City of Spokane Valley Community Development 11703 E. Sprague Ave., Suite B-3 Spokane Valley, WA 99206 (509) 720-5240 permitcenter(a�spokanevallev.orq DE -ENG -GRADING EGR-2014-0003 The ownership of a Spokane Valley Development Permit will inure to the property owner. The permit applicant, by definition, is the property owner or an authorized agent of the property owner. It is the responsibility of the applicant / permittee that the use described on the front of this permit complies with applicable codes and that required inspections are requested. Failure to request inspections as listed below and obtain the necessary approvals before progressing beyond the point where inspections are required and may necessitate removal of certain parts of the construction are the applicant's / permittee's or property owner's xpense. 7� r Owner/Agent Date: y //".20/ Y Staff Approval Date: Printed by : Tamara Faurot on: 04/11/2014 10:51 AM Page 2 of 2