Loading...
2015, 05-15 Permit: BLD-2015-1109 Solar Rooftop SystemCity of Spokane Valley ►OriAiIE' Community Development 11707 E. Sprague Ave., Suite 108 �;oo*W1ey- Spokane Valley, WA 99206 (509) 720-5240 permitcentera-spokanevalley.org BLD -2015-1109 BLD -RES PROJECT NAME: ISSUED: 05/15/2015 SITE ADDRESS: 18214 E SPRAGUE AVE SPOKANE VALLEY EXPIRES: 05/15/2017 PROJECT DESCRIPTION: INSTALL 4.32 KW PV SOLAR ROOFTOP SYSTEM PARCEL: 55191.0428 APPLICANT: SMART ENERGY TODAY INC OWNER: 1001 Cooper Point RD. SW OLYMPIA, WA 98502 509-893-1860 GENERAL CONTRACTOR: SMART ENERGY TODAY INC 1001 Cooper Point RD. SW OLYMPIA, WA98502 509-893-1860 VALUATIONS: Entered Valuation 1800.00 $1,800.00 Total: $1,800.00 ROUTH, DAVID & DOROTHY 18214 E SPRAGUE AVE SPOKANE VALLEY, WA99016 License: SMARTET870BS Expires: 01/10/2017 FEES: Paid Due Washington State Building Code $4.50 $0.00 Council Surcharge Building Permit $69.25 $0.00 Building Plan Review - R3 < 8K $27.70 $0.00 Totals : $101.45 $0.00 The ownership of a Spokane Valley Development Permit will inure to the property owner. The permit applicant, by definition, is the property owner or an authorized agent of the property owner. It is the responsibility of the applicant / permittee that the use described on the front of this permit complies with applicable codes and that required inspections are requested. Failure to request inspections as listed below and obtain the necessary approvals before progressing beyond the point where inspections are required and may necessitate removald�f�certain parts of the construction are the applicant's / permittee's or property owfi–er1 gx en iR. „ /)�, Owner/Agent Staff Approval Printed by : Bryan Happeny on: 05/15/2015 12:52 PM Date: I r I S— Date: Page 1 of 1