Loading...
2015, 05-15 Permit App: BLD-2015-1109 Solar Rooftop SystemStioliane Community Development Department Permit Center 11703 East Sprague Avenue, Suite 8-3 Spokane Valley, WA 99206 Tel: (509) 688-0036 Fax: (509) 688-0037 pe rm i tcen to r@ sooka n eva l lev. o rQ (Staff .Use -Only) PERMIT NUMBER: PERMIT FEE: CSV PERMIT CENTER RESIDENTIAL CONSTRUCTION PERM i LICATLO v ® NEW CONSTRUCTION ® ADDITION/REMODEL ® ACCESSORY BUILDING Ild DECK ® OTHER J % q np SITE ADDRESS: Wil -1 6 SF r'a q 0e.. A�� oK-4,LC V " I( / WA 7! d/6 ASSESSORS PARCEL NO.: r LEGAL DESCRIPTION: S'�t� (.¢. nr Afeiii ,� BUILDING OWNER NAME: Day i'J � NAME: ADDRESS: TA .ter A. s a 46 ✓e CITY: STATE: ZIP: PHONE: ( 37--f FAX: CONTACT NAME: ), v got Rbef-f -S CELL: 2.(.4 3- 2..-n9 s-- FAX: CONTRACTOR NAME: a/(' C-At_r y) otc.y / �ti c. . (Zet SU) 5fe) MAILING ADDRESS: 460 I COO I Qr CITY: At frtpl PHONE: 3(P0 0-1 3 27' CONTRACTOR LICENSE No.:$MA.e—TC7 7d 1t CELL:C13:40.- S CCD— 1 7 STATE: (.0 A FAX: 'itS"5 = 35c - 74/3o ZIP: QST c 2 CELL: EXPIRES: O / / / G CITY BUSINESS LICENSE NO.: DESCRIBE THE SCOPE OF WORK IN DETAIL AND INDICATE USE & PROPOSED USE: (13 Z lit—)Pv S0/4f Roij6p S7s c ****YOU MUST COMPLETE THE FOLLOWING**** A IF NOT APPLICABLE Height to Peak:/0 /� /yl Dimensions: _ / /4 r(/ No. of Stories: _ / f /(/l Total Habitable /a Space: Main Floor SQ FT:A// /QI Upper Floor SQ FT: /V//� Unfinished Basement FT: /l�%� Finished Basemen FT: Garage SQ FT: /WM Deck/Covered Patio 3 FT: „ /.4 ace / Impervious Surface Area: �J 30% Slopes on / Property: /"`�'(/ No. of Bedrooms: A/At" Construction Type: Heat Source: �� Sewer or Septic: TOTAL COST OF PROJECT: $ DISCLAIMER The permitted verifies, acknowledges and agrees by their signature that: 1) if this permit is for construction or on a dwelling, the dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley permit inure to the property owner. 3) The signatory Is the property owner or has permission to represent the property owner in this transaction. 4) All construction Is to be done In full compliance with the City of Spokane Valley Development code. Referenced codes are available for review at the City of Spokane Valley Permit Center. 5) The City of Spokane Valley permit Is not a permit or approval for any violation of federal, state or local laws, codes or ordinances. 6) Plans or additional Information may be required to be submitted and su quently approved before this application can be processed. Signature Date:S7IS!i Updated 1-11-11 Page 1 of 1 http://www.spokanevalley.org/filestorage/124/938/210/948/1496/Building_Permit_ _Residential_11-11-11.doc Project RECEIVED OVER-THE-COUNTER BUILDING PERMIT CHECKLIST FOR RESIDENTIAL SOLAR PHOTOVOLTAIC SYSTEMS: ROOFTOP MOUNTED -D61.5--- L 5 Contractors can apply for an Over -The -Counter (OTC) permit where the PV system meets the requirements listed in this Checklist. All project plans and supporting documentation must be provided on site for the inspector. TO BE COMPLETED BY APPLICANT / Q Project Information Property Owner Name: L4' 14,/ -`'k No 1. PV system is designed and proposed for a detached one- or two-family dwelling or townhouse not more than three stories above grade or detached accessory structure that141) is code compliant to setbacks and height, or code allows expansion of nonconformity for solar modules. [IRC 101.2] Project Address: Jv2 i g-) r S Pra l ve 4jt- Parcel # ❑ 3. Rooftop is made from lightweight material such as a single layer of composition shingles,131 metal roofing, lightweight masonry, or cedar shingles. City: 5jfi� ee. v. k l� State: !,J /% ZIP: 710 /� Day Phone: 5. The installation shall meet the requirements of NFPA 70 National Electric Code, and all required electrical permit(s) must be obtained from the Authority Having Jurisdiction to administer the electrical code. [IRC M2302.2] ` 7 ❑ Contractor Name ,5#14r 4 1 , � 1 ID 7. The PV system is designed for the wind speed of the local area, and will be installed per the manufacturer's specifications. [IRC M2302.2.1(1)] Contractor License #: I 5'M n ErR� as 8. The ground snow Toad does not exceed 70 pounds per square foot. [IRC M2302.2.1(2)] Z Contractor Day Phone: C3ba) Zci 3 - 2 711 ❑ PV system description (include manufacturer and model # of PV modules and inverters): LI 3 2 IL G% Pt/ g+df4o , lac SrSA-t-v-. � Determine if your project qualifies for expedited permitting: Yes No 1. PV system is designed and proposed for a detached one- or two-family dwelling or townhouse not more than three stories above grade or detached accessory structure that141) is code compliant to setbacks and height, or code allows expansion of nonconformity for solar modules. [IRC 101.2] ❑ 2. Modules on pitched roofs do not exceed the highest point of the roof unless approved by the local jurisdiction. ❑ 3. Rooftop is made from lightweight material such as a single layer of composition shingles,131 metal roofing, lightweight masonry, or cedar shingles. ❑ 4. The installation shall comply with the manufacturer's instructions. [IRC M2302.2] W ❑ 5. The installation shall meet the requirements of NFPA 70 National Electric Code, and all required electrical permit(s) must be obtained from the Authority Having Jurisdiction to administer the electrical code. [IRC M2302.2] ` 7 ❑ 6. The installation shall meet the requirements of the International Fire Code as amended WA State. [IRC M2302.2] iiil ID 7. The PV system is designed for the wind speed of the local area, and will be installed per the manufacturer's specifications. [IRC M2302.2.1(1)] ❑ 8. The ground snow Toad does not exceed 70 pounds per square foot. [IRC M2302.2.1(2)] Z ❑ 9. Total dead load of modules, supports, mountings, raceways and all other appurtenances weigh no more than four pounds per square Not. [IRC M2302.2.1(3)] Enter total dead load of system (lbs/ftz): 1. !o 6 ❑ 10. To address uplift, modules are mounted no higher than 18" above the surface of the roofing to which they are affixed. [IRC M2302.2.1(4)] 0 ❑ 11. Supports for solar modules are installed to spread the dead Toad across as many roof - framing members as needed to ensure that no point load exceeds fifty (50) pounds. [IRC M2302.2.1(5)] 41 ❑ 12. The photovoltaic modules and supporting structure shall be constructed of noncombustible materials or fire -retardant treated wood equivalent to that required for the roof construction. [IRC M2302.2.1] [� ❑ 13. Roof and wall penetrations shall be flashed and sealed to prevent entry of water, rodents, and insects. [IRC M2302.2.2] ❑ 14. PV modules are listed and labeled with a fire classification in accordance with UL 1703. [IRC M2302.2.3] ❑ Comments: If you answered yes to all of the above questions, the project qualifies for the over-the- counter permitting process. © Submit this Checklist, Site Plan, and other required permit application forms to: [insert contact info for jurisdiction having authority] As the property owner or authorized representative of the above listed property, I attest that all information in this checklist is accurate to the best of my knowledge. Applicant Signature: \ Date: c- li S- ( 5, Applicant Name (Please Print): VAS) ► parceti7S TO BE COMPLETED BY CITY STAFF Qualifies for OTC Building Permit? ❑Yes ❑No Staff Initials Date: Permit Application #: Project aols-Ilcr PHOTOVOLTAIC NOTES PHOTOVOLTAIC NOTES t AN INVERTER OR AN AC MODULE IN AN INTERACTIVE PHOTOVOLTAIC SYSTEM SHALL AUTOMATIC ALL DE -ENERGIZE ITS OUTPUT TO THE CONNECTED ELECTRICAL PRODUCTION AND DISTRIBUTION NETWORK UPON LOSS OF VOLTAGE IN THAT SYSTEM AND SHALL REMAIN IN THAT STATE UNTIL THE ELECTRICAL PRODUCTION ANO DISTRIBUTION NETWORK VOLTAGE HAS BEEN RESTORED (NEC 690361) 2. ALL EXTERIOR ELECTRICAL METALLIC TUBING(EMT) CONDUIT FITTING SHALL 8E RAIN TIGHT THREADLESS COMPRESSION TYPE. 3. MODULES AND SUPPORT STRUCTURES SHALL BE GROUNDED 4. NAMEPLATES SHALL BE PROVIDED FOR ALL CIRCUITS IN THE SERVICE DISTRIBUTION AND POWER DISTRIBUTION SWITCH BOARDS, PANEL BOARDS, DISCONNECTING SWITCHES, TERMINAL CABINETS, ETC. ALL NAMEPLATES SHALL BE PERMANENTLY ATTACHED AND BE OF SUFFICIENT CAPACITY TO WITHSTAND THE WEATHER. 5. JUNCTION BOX/COMBINER BOX HAVE TO USE COMPRESSION TYPE STRAIN RELIEF POSITIONED FOR APPROPRIATE WATER RUN OFF. 6. CONDUIT RUNS SHALL BE PROVIDED W1TH SUFFICIENT WEATHERPROOF PULL BOXES OF JUNCTION BOX/COMBINER BOXES PER APPROPRIATE NEC REQUIREMENTS. 7. SEE PROVIDED CUT SHEETS FOR ADDITIONAL EQUIPMENT SPECIFICATIONS 8. WIRING MATERIALS SHALL BE SUITABLE FOR THE SUN EXPOSURE AND WET LOCATIONS. FIELD APPLIED PROTECTIVE COATINGS ARE NOT ACCEPTABLE. 9. JUNCTION. PULL AND OUTLET BOXES LOCATED BEHIND MODULES SHALL BE SO INSTALLED THAT THE WIRING CONTAINED IN THEM CAN BE RENDERED ACCESSIBLE DIRECTLY OR BY DISPLACEMENT OF 2012 EDITION OF THE CALIFORNIA ELECTRICAL CODE AS AMENDED ANO ADOPTED BY THE MODULE(S) SECURED BY REMOVABLE FASTENERS AND CONNECTED BY A FLEXIBLE WRING SYSTEM. (NEC 690.34) 10. IN AN UNDERGROUND PHOTOVOLTAIC SYSTEM. THE POWER SOURCE SHALL BE LABELED WITH THE FOLLOWING WARNING AT EACH JUNCTION BOX, COMBINER BOX, DISCONNECT AND DEVICE WHERE THE UNGROUNDED CIRCUITS MAY BE EXPOSED DURING SERVICE'. -WARNING - ELECTRIC SHOCK HAZARD. THE CURRENT CIRCUIT CONDUCTORS OF THIS PHOTOVOLTAIC POWER SYSTEM ARE UNGROUNDED BUT MAY BE ENERGIZED WITH THE RESPECT TO GROUND DUE TO LEAKAGE PATHS AND/OR GROUND FAULTS" (NECE 690.35(F)) 11. ALL PHOTOVOLTAIC MODULES AND ASSOCIATED EQUIPMENT AND WIRING MATERIAL SHALL BE PROTECTED FROM ANY PHYSICAL DAMAGE. 12 ALL ELECTRICAL DEVICES AND UTILIZATION EQUIPMENT SHALL BE LISTED BY AN APPROVED TESTING AGENCY. 13 ALL WORK TO COMPLY WITH THE LATEST EDITION OF CALIFORNIA ELECTRICAL CODE AS AMENDED AND ADOPTED BY THE CITY OF EASTVALE. 201 3 C.E.C. 10 ALL WORK TO COMPLY WITH THE CITY 15.OUTDOOR EQUIPMENT SHALL BE AT LEAST NEMA 3R RATED. 16.ALL SPECIFIED WRING IS BASED ON THE USE OF COPPER 17.CONTRACTOR SHALL OBTAIN ELECTRICAL PERMITS AND SHALL COORDINATE ALL INSPECTION, COMMISSIONING AND ACCEPTANCE WITH THE CLIENT, UTILITY CO. AND CITY INSPECTORS AS NEEDED 18. DRAWINGS ARE DIAGRAMMATIC ONLY, ROUTING OF RACEWAYS SHALL BE AT THE OPTION OF THE CONTRACTOR UNLESS OTHERWISE NOTED AND SHALL BE COORDINATED WITH OTHER TRADES. 19 IF DISTANCES OF CABLE RUNS ARE DIFFERENT THAN SHOWN, THE CONTRACTOR SHALL NOTIFY ELECTRICAL ENGINEER TO VALIDATE THE WIRE SIZE FINAL DRAWINGS WILL BE RED -LINED AND UPDATED AS APPROPRIATE. 20. WHENEVER A DISCREPANCY IN OUANTITY OF EQUIPMENT, ARISES ON THE DRAWINGS OR SPECIFICATIONS. THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING AND INSTALLING ALL MATERIAL AND SERVICES REQUIRED BY THE STRICTEST CONDITIONS NOTED ON THE DRAWIN050R IN THE SPECIFICATIONS TO ENDURE COMPLETE COMPLIANCE AND LONGEVITY OF THE OPERABLE SYSTEM REQUIRED BY THE ARCHITECT/ENGINEER. 21. ALL BROCHURES, OPERATION MANUALS, CATALOGS, SHOP DRAWINGS, ETC. SHALL BE HANDED OVER TO THE OWNERS REPRESENTATIVE AT THE COMPLETION OR WORK. 22 ALL WIRING CONCEALED IN WALL AND CEILING SPACES SHALL BE IN METAL CONDUIT. 23 THE SEISMIC BRACING AND ANCHORAGE OF ELECTRICAL CONDUITS SHALL 8E IN ACCORDANCE WITH THE "SMACNA"-GUIDLINES FOR SEISMIC RESTRAINS OF MECHANICAL SYSTEMS AND PLUMING PIPING SYSTEMS. 24. ALL OF THE LISTED SYSTEMS REQUIRED THAT THE SEISMIC LATERAL FORCE F INCLUDING CONSIDERATION OF a'P AND OP BE DETERMINED AT EACH LEVEL OF THE BUILDING SO THAT BRACE SPACING CAN 8E CALCULATED. THE DISTRICT STRUCTURAL ENGINEER CAN APPROVE THE SEISMIC LATERAL FORCE DETERMINATION. 25. A COPY OF THE CHOSEN BRACING SYSTEM(S) INSTALLATION GUIDE/MANUAL SHALL BE ON THE JOB SITE PRIOR TO STARTING THE INSTALLING OF HANGERS AND/OR BRACES. 26 WHEN INSTALLING DRILLED -IN ANCHORS AND/OR POWDER DRIVEN PINS IN EXISTING NON -PRESTRESSED REINFORCED CONCRETE, USE CARE AND CAUTION TO AVOID CUTTING OR DAMAGING THE REINFORCED BARS. WHEN INSTALLING THEM INTO EXISTING PRE -STRESSED CONCRETE TENDONS BY USING A NON-DESTRUCTNE METHOD PRIOR TO INSTALLATION. EXERCISE EXTREME CARE AND CAUTION TO AVOID CUTTING OR DAMAGING THE TENDONS DURING INSTALLATION. MAINTAIN A MINIMUM CLEARANCE OF ONE INCH BETWEEN THE REINFORCEMENT AND THE DRILLED -IN ANCHOR. 27. THE WORKING CLEARANCES AROUND THE EXISTING ELECTRICAL EQUIPMENT AS WELL AS THE NEW ELECTRICAL EQUIPMENT WILL BE MAINTAINED IN ACCORDANCE WITH NEC 110.26. 28. CONDUCTORS EXPOSED TO SUNLIGHT SHALL BE LISTED AS SUNLIGHT RESISTANT. (NEC300.601. 310.8 D) 29. GROUNDING BUSHINGS ARE REQUIRED AROUND PRE -PUNCHED CONCENTRIC KNOCKOUTS ON THE DC SIDE OF THE SYSTEM. (NEC 250.97) 30. THE GROUNDING ELECTRODE CONDUCTOR MUST BE PROTECTED FROM PHYSICAL DAMAGE IF SMALLER THAN a6 COPPER WIRE. (NEC 25064 8) 31. GROUNDING ELECTRODE CONDUCTOR WILL BE CONTINUOUS, EXCEPT FOR SPLICES OR JOINTS AT BUSBARS WITHIN LISTED EQUIPMENT. (NEC 250.64 C) 32. RACEWAY FOR GROUNDING ELECTRODE CONDUCTOR SHALL BE BONDED AT EACH END (CEC 25064 (E) 33. WHERE ALL TERMINALS OF THE DISCONNECTING MEANS MAY 8E ENERGIZED IN THE OPEN POSITION, A SIGN WILL BE PROVIDED WARNING OF THE HAZARD PER NEC 690.17. 34 EACH UNGROUNDED CONDUCTOR OF THE MULTI -WIRE BRANCH CIRCUIT WILL BE IDENTIFIED PER PHASE AND SYSTEM PER NEC210.5. 35. CIRCUITS OVER 250V TO GROUND SHALL COMPLY WITH NEC25097 8 250.92 (B) 8 LAMC 93250.97. 36. DC CONDUCTORS EITHER 00 NOT ENTER THE BUILDING OR ARE RUN IN METALLIC RACEWAYS OR ENCLOSURES TO THE FIRST ACCESSIBLE DC DISCONNECTING MEANS PER NEC 690.31 (E), LAMC 93.690.31 (E) 37. ALL METALLIC FRAME RAILS AND OTHER CURRENT CARRYING METALLIC COMPONENTS (CONDUIT, JUNCTION 8 PULL BOXES, RACEWAY, ETC) SHALL BE SOLIDLY GROUNDED PER THE MANUFACTURER'S INSTALLATION INSTRUCTIONS LAMC 93.690.110.3 6 93.110.313) 38 SCREWS, NUTS. BOLTS 8 WASHERS THAT ATTACH EQUIPMENT GROUNDING LUGS SHALL BE STAINLESS STEEL LAMC 93.110 3(8) 39. NO PIPING, DUCTS OR EQUIPMENT FOREIGN TO ELECTRICAL EQUIPMENT SHALL BE PERMITTED TO BE LOCATED WITHIN THE DEDICATED SPACE ABOVE THE ELECTRICAL EQUIPMENT. 40. ALL FIELD INSTALLED JUNCTION. PULL AND OUTLET BOXED LOCATED BEHIND MODULES OR PANELS SHALL BE ACCESSIBLE DIRECTLY OR 8Y DISPLACEMENT OF A MODULE (5) OR PANEL (S) SECURED BY REMOVABLE FASTENERS. 41. REMOVAL OF A DWP-INTERACTIVE INVERTER OR OTHER EQUIPMENT SHALL NOT DISCONNECT THE BONDING CONNECTION BETWEEN THE GROUNDING ELECTRODE CONDUCTOR AND THE PHOTOVOLTAIC SOURCE AND/OR OUTPUT CIRCUIT GROUNDED CONDUCTOR. 42 THE ROOF MOUNTED PHOTOVOLTAIC MODULES, PANELS, OR SOLAR VOLTAIC ROLL ROOFING MATERIAL SHALL HAVE THE SAME OR BETTER LISTED FIRE -RESISTANCE RATING THAN THE BUILDING ROOF -COVERING MATERIAL. 43. ALL ROOF MOUNTED CONDUIT WILL BE A MINIMUM 6' OFF THE ROOF SURFACE r,rarS 1 # • iriMla.pa4w +rra.++ww 45 ! .i VICINITY PLAN KT.S ey •^+ a,Pnc crn+•+ tSteppe.. VICINITY PLAN ILLS R E CIS 4.32 KW DC PV SYSTEM. . SOLAR ROOF PROJECT AY CSV PER David & Dorothy Rout 18214 E Sprague Av Spokane Valley, WA 99016 /bit 5/08/2015 tevision BY,I a5 2015 Scope of Work PROPOSED NEW 4.32 KW (DC) ROOF MOUNTED PHOTOVOLTAIC (PV) SYSTEM WITH FOLLOWING EQUIPMENT: (16) ITEK ENERGY IT270 HE SOLAR PANEL (8)BLUE FROG SOLAR APS YC500A - MIW MICRO INVERTER -SPIDER-RAX RED WIDOW RACKING SYSTEM CODE AUTHORITY: 2013 WASHINGTONSTATE BUILDINGCODE (20121 BC) 2012WASHINGTONSTATEEN ERGYCODE(2012IECC) 2013WASHINGTONSTATERESIDENTIAL CODE(2012 INTERNATIONAL RESIDENTIAL CODE WASHINGTON AMENDMENTS 2014 WAC51-51-2300 SECTIONM2302) 2013 WASHINGTON STATE ELECTRICALCODE (2012NEC) 2013 WASHINGTON STATE MECHANICAL CODE(2012UMC ) 2013 WASHINGTON STATE PLUMBINGCODE (2012UPC) 2013 WASHINGTON STATE FIRECODE (2012IFC ) Project 4.32 KW PV Solar Roof Project Project Owner David & Dorothy Routh 18214 E Sprague Ave Spokane Valley, WA 99016 Sheet Index: A-1 GENERAL NOTES, SHEET INDEX, BUILDING DATA, PROJECT DATA, SITE PLAN A-2 PV LAYOUT PLAN A-3 PV ARRAY AND RACKING CONNECTION E-1 SINGLE LINE DIAGRAM E-2 WARNING NOTES E-3 EQUIPMENTS: PV MODULE SPECIFICATION SHEET E-4 EQUIPMENTS: INVERTER SPECIFICATION SHEET S-1 EQUIPMENTS: RACKING SYSTEM Drawing General Notes,Sheet Index, Building Data, Project Data, Site Plan Sheet A-1 PV Panel Total: 16 Pieces X 270W = 4.32 KW DC Solar Panel: Itek Energy IT270 HE (See Sheet E-3) Inverter: Blue Frog Solar APS YC500a - MIW Micro Inverter (See Sheet E-4) Racking: SpiderRAX Red Widow (See Sheet S-1) E Sprague Ave W4mE p 0 ❑ ❑ -s - Sa,oaLaro -... ❑ ❑ COLoad J U 6a n Service Panel u(Inside Nouse) 0 0 0 0O m ; c m Cr) NMI � -11' ^f^ V/ �3 n 17m 2 _ m D N PV Layout Plan 0:.m 18214 E Sprague Ave Spokane Valley, WA 99016 David & Dorothy Routh Project Owner 4.32 KW PV Solar Roof Project Project Z O a o sluawyoenv to JagwnN 1116!8/ wags (S Ad lelol eaiv aJenbS eaiv 0 co o.) CL 0 0 CO0 n 0 0 v 0) ch CD 3 m m eaJv wenbS AeJiV TLA IeM wals,SS lelol N CO CO J O N r W T 0 H uogeInoleO Iean}onJTS 7J 0 0 H 0 0 0 u O 0 O 0 O 0 Production MeterE Load Center r vl (0 cA m 0 n. w (0 c�D v CD 0 0 0 O 0 O 0 Li a 0 O 0 O 0 a 0 O 0 0 O 0 O 0 O 0 0- 0 0 0 11 0 0) 0 (T aa1aW 19NLI T. D o 7 CO CD 0 0 n o 27 0 0 5 O 7r W CO N 7 (D A <m co -o '5 m *(0 > (0 D (0 < o m rn 0 0> n 0 0 0 0 c 4.32 KW PV Solar Roof Project v 0 JFJ&mm �§3; )) G"(m •>> C %m \ ®® 3/4" CONDUIT (3)10 AWG THWN-2 (Black, Red,White) (1)10 AWG THWN-2 Equipment Ground (Green) (1) 8 THWN-2 Bond Conductor (Green) 10 AWG RATE 90°C = 40A TEMPERATURE DE -RATING@ 104°F = 0.91 AMP=2.08A x 8 x 125%= 20.8 A 40A x 0.91 = 36.4 > 20.8 A OK TO INSTALL 10 AWG THWN-2 > > "< / 1 w \} << _ , 0, /A 2] 1 � q 70 \ / 0, ;_ mm -0 _ coI@k/§ ry -1 ¥ P \ § 0 ;Kzza3,KoM1:1=K,K § 3/4" CONDUIT (3)10 AWG THWN-2 (Black, Red,White) (1)10 AWG THWN-2 Equipment Ground (Green) (1) 8 THWN-2 Bond Conductor (Green) 10 AWG RATE 90°C = 40A TEMPERATURE DE -RATING@ 104°F = 0.91 AMP=2.08A x 6 x 125%= 15.6 A 40A x 0.91 = 36.4 > 15.6 A OK TO INSTALL 10 AWG THWN-2 7C•- MM(m` #E4 _ «\0:_ <-,1-00-0-15; -//@@)-1>�g2m2 \§(,,,30!2280 (2§W; ] -o ril c!''' / m ,,,ee _ �zmcOmm w:Gk. 2 -<)7$` -5§)CO §kk7> «(( / 0 Inverter Ratir { _ 5-3 0§ 8 `B :\4GA&t!G! & c.°yews < 50j.' '`S ° ^ <<" §)k `7 a§/ �2 \\\ \2 3/4" CONDUIT (3)10 AWG THWN-2 (Black, Red,White) (1)10 AWG THWN-2 Equipment Ground (Green) (1) 8 THWN-2 Bond Conductor (Green) 10 AWG RATE 90°C = 40A TEMPERATURE DE -RATING@ 104°F = 0.91 AMP=2.08A x 2 x 125%= 5.2 A 40A x 0.91 =36.4>5.2A OK TO INSTALL 10 AWG THWN-2 0 - CO 07®\£ \2/2z 0<_ r < » ,_ [ I G§m0M �\ a Q ain Panel Rating »m �° \ mt/k/ n (�)§k _ \� ii =«z-2 S I- ; ti Ed2f2 7m@@/ CO \) �� ■/ _ --a 0N3183ANI__ _ PV SYSTEM MAX DC OUTPUT ( DC STC) : 270Wx16= 4.32 KW PV SYSTEM MAX AC CALCULATION USING PTC PMAX: PMAX PER MODULE = 236.9W 236.9W x 16 =3.79 KW 3.79 KW x 95.5% = 3.62KW SUPPLY POWER = 30A+200A = 230A<200A x1.2=240AOK Output Calculation kV— — ) ill $ N.— — 0, " § z 47.., � __m _m °\. I`§ i �: Sheet E-1 Single Line Diagram 0 ( co 18214 E Sprague Ave Spokane Valley, WA 99016 David & Dorothy Routh Project Owner 4.32 KW PV Solar Roof Project Project 0 kE ` c - :5. D 0 "Warning" ELECTRIC SHOCK HAZARD DO NOT TOUCH TERMINALS TERMINALS ON BOTH THE LINE AND LOAD SIDES MAY BE ENERGIZED IN THE OPEN POSITION 1----REQ'D BY: NEC 690.17 APPLY TO: DISCONNECTS PV LOAD CENTERS COMBINER BOXES CAUTION SOLAR PV SYSTEM MAY REMAIN ENERGIZED AFTER DISCONNECT DURING DAYLIGHT HOURS 10----REQ'D BY:AHJ APPLY TO :DISCONNECTS PV LOAD CENTERS COMBINER BOXES CAUTION SOLAR CIRCUIT PHOTOVOLTAIC POWER SOURCE 2----AHJ APPLY TO: SOLAR CONDUIT WARNING PHOTOVOLTAIC POWER SOURCE 9----REQ'D BY: CRC R331.7 APPLY TO: MAIN SERVICE DISCONNECT 3----REQ'D BY: NEC 690.31( E) (3) APPLY TO: EXPOSED RACEWAYS, CABLE TRAY COVERS OR ENCLOSURES OF JUNCTION BOXES CONDUIT BODY W/ AVAILABLE CONDUIT OPENING MICRO INVERTER SYSTEM SOLAR BREAKER INSIDE PANEL IS PV SYSTEM DISCONNECT 8----REQ'D BY: AHJ APPLY TO: SOLAR BREAKER SOLAR DISCONNECT 4----REQ'D BY: NEC 690.14 ( C) (2) APPLY TO: AC DISCONNECTS WARNING INVERTER OUTPUT CONNECTION DO NOT RELOCATE THIS OVER CURRENT DEVICE 7----REQ'D BY: NEC 705.12 ( D) (7) APPLY TO: PV SYSTEM BREAKER THIS ELECTRIC SERVICE IS ALSO SERVED BY A PHOTOVOLTAIC SYSTEM 5----REQ'D BY:NEXT 705.12 ( D) (4) APPLY TO: MAIN SERVICE PANEL PHOTOVOLTAIC SYSTEM DISCONNECT AC CURRENT MAX AC CURRENT A VOLTAGE _V 6----REQ'D BY: NEC 690.54 APPLY TO: PV SYSTEM BREAKER Notes: 1. The marking shall be placed adjacent to the main service disconnect clearly visible for the location where the lever is operated. 2. Marking format: white letter on a red background, Minimum of 3/8 inches letter height. All letters shall be capitalized, aerial or similar font,non-bold. 3. Material: Reflective, weather resistant material suitable for the environment. Use UL969 as standard for the weather rating. Durable adhesive metal materials meet this requirement 4. Markings shall be placed every 10 feet on all interior and exterior DC conduits, raceways, enclosures, and cable assemblies, at turners above and/or below penetrations, all DC combines, and junctions boxes. 5. A warning label shall appear on the utility -interactive inverter or be applied by the installer near the ground -fault indicator at visible location. NO Date Revision BY 5/08/2015 Project 4.32 KW PV Solar Roof Project Project Owner David & Dorothy Routh 18214 E Sprague Ave Spokane Valley, WA 99016 Drawing Warning Notes Sheet E-2 i• itek Energy HE Solar Modules The high performance, high quality and affordable solar solution • Made -in -Washington using Cutting Edge High Efficiency Mono Crystalline Cells • 25 -Year Power Output Warranty • 1O -Year Workmanship Warranty • Exceptional Power Density (watts/m2} GL , DA -A. C661sti- di. SJpeer high Efficient? Morro cootoine cells •E 8 10 ce:i. r-ro/r..3 typos, diodes Gems 114Ta dear low W7* `tymper$2 noire Wes wits arts- la,e p i. nolic scbsurface te41re $.1 M/ layered. **goy resisl12I 1 polyester tego strength anc,tclized domino!, f,j,Tle f Smpotaw, w41, Cieth lop -doing °orric8 and bottom flange nlos.4ing . Nu:-rerous !longe TIIGW(11,0 notes an Inch panE4161Cn Ce1187,5 . MounOng hales spec 4co0y tin necro-lW TtYT 01:1D'KCfo7511 toter Cotteetear. 42' 9oC 12 A W G ry wad MC4 et eat C€alltled sa wtcy tlecho, c5 wtt_b^^ actuating raps . Figt4 Vancford Ea undir:9 igcalurrss pea module for reduced aground r,.re leeglo .4'6Ei ww V66 M47mm (64 8') 1 enc_ ..AL DATA 251; et 2Ztt. ;s: 2t .n4Yee: .. ._ _. M5 770 275 f0 4.1 lune, vOA} sie v. ;8. 3'.5 J .1 J1.8 J2.D 311 Mmknrm .o.a. C..esaa7 - 1,,4A1 8.1 82 8 3 8 4 8.5 open. c44 41 v4414.94 . V_ IV) 36.4 384 38.7 38.9 39.0 8481 Circuit Cur7.T0 - I, tA3 6:8 8.9 9 0 9.1 9.2 Pow*, OrWy {Wins') 155.8 158!3 161.9 164.9 168.0 171.0 280 xe.J 8.6 39 9.3 594.5"3" ME:= L DATA switsptl NSAXIMIL . RAT - 1 it n- c_e AT' tr:r(e 31155 -40 ft848. Yolf7ps es0TV hafi0n 104.111(U1 t 103 up lc l 13 bt/fl" MtwIns. toad 11.8 +>33). 5551 kg/m15410 dol Mnnhn*e. *88 Lona 1 1 3 tbs/fI Ma>t San.. Noe haling SA. Mrd. llara127 CuaaM 15A s.JIE! Specfrat1211,1 yxr 7C change w.'hOu1 ilonte TEMPERATURE RATINGS 4.3 SC C iaTnnc�Mv'p C-ae�xunl of f, . 0 47 %it: Te.f.as*ad".T'e CoalkcteMdV. -d32 "VC femyarR.,m CoN k8.'l p` 1. - Od 4 %/ C --- ---------- SenystreW.s C . 8e gent v,,. - C -45%J'_ (fitIAI lFI' .ATIONS Fininey 111 Wpy 'Ort Store •• ,LCkener y t�i�� 3608479531 1 itaeisnernrcvm NO Date Revision RY 5/08/2015 Project 4.32 KW PV Solar Roof Project Project Owner David & Dorothy Routh 18214 E Sprague Ave Spokane Valley, WA 99016 Drawing Equipments: PV Module Specification Sheet Sheet E-3 3t. biuefrogsolar Mt`:_:v0._I Our warship prod ust, the APS ?C500A-MfW is a grid- oed nwrorleerter r4tn redolent networking and motoring ,stems to mare mammun efficiency. Highly deper4ebk acrd cost atter-Me, tee VC 5/003 handles i to 3L0W modules rale negligtble awing. delivering 250W AL per mads* cath 0,.al MOOT. Halt the inreners and had The installation means teal Cost aaaOFS for residential and commercial tut -covers. APS YCSOOA-MIW Microinverter Datasheet INPUT DATA (DC) Reconenerbed Pv Med... Poem Range (STC) MDPT voaage Range Madre .m (moot Vnita9e Madtnrm 1001[ Current OUTPUT DATA (AC) Rated Output porn Maainfrr Outa t Current NOM mei Output Voltage/Range • 240v Wes 4.1 Output Votagei0.an9e - 208'r Nominal Output Fre9uanC r/aange Poem. FACT, Tow Hennoo.r Distortion Modeler., Units Per Brent+ EFFICIENCY Peak Effcieray (EC Wer9P-ed Efficiency Nominal MPP Tracking El(itleneu MECHANICAL DATA Storage Torment. Panne 0 0.-atng Terrperat.um kange 1Amprant/ ORera:n6 Temperature Range (Intntlw) n'N,aHMs CWd(35') i1Ches awrerreo 1 1W814108.-011 Wogta extreme Rating COeli p FEATURES E COMPLIANCE Ctnxwnicakan (00110- Life Emitsiens 8 180o.,,,5, (EMC)terrrp1mo SeteLy alas Cd7rukao o 640 C nnocti01) COnpkr20 iorodueouimer v oder.. w, rove- Wawe.aerm+e wry ea' •.memo a.ew w.• a e-wA>S•one- mr 180-3toW 22-150 550 123 a 2 50ow 2064 'e 2400 2.4A 9.2080 240V/2dv-264v- 208V/131v-2290• 60142/ 593-60.564r X199 <396 7car 208 a2 05591 9596 995'0 6 per 20e u 208v -4on, Le .ioso (- 99 C to .13595) -411-F m -199.F (-UPC m .65-C) dMF to • 1859c (-40•C m 385'5) 6.75" 36-51 •:IJ' 221mm. 1167331 s 29mm 5.5 Ios (2.569) r8EMA <x 0Lterai Coe.ettron Dower Wire 25 vows FCC PART 15.406156142003. rCE5-003 1R 1741. CSA 5222 80.107001 lECICU _ IEEE 1567 ee ..rdp Jt 4* bluefrogsola 1015 Hvstrrvark 5t_ Ste 104, Povlsbo. wA 95370 I 206,855.5349 I bhmtroasolat co- INSTALLERS- COMO 0011aetusba die Mir moron or BildiFrOo5dar 84,065197 iostaiNs NO Date Revision 5/08/2015 Project 4.32 KW PV Solar Roof Project Project Owner David & Dorothy Routh 18214 E Sprague Ave Spokane Valley, WA 99016 Drawing Equipments: Inverter Specification Sheet Sheet E-4 RSD WIDOW THE PATENT PENOINO RED WIDOW SYHTEM ALLDWH FOR STUD -LESS STRUCTURAL ATTACHMENT TO THE ROOF WHILE MAINTAINING LOCATION ADJUSTABILITY AND STRENGTH, LABORATORY TESTED TO 1 71 0 LBS PULL OUT FORCE AND 1 1 5 MPH WINDS, RED WIDOW WILL MAKE ANY PHOTOVOLTAIC INSTALLATION FASTER WITHOUT LOSING RELIABILITY. YOUR INSTALLATION WILL BE DONE IN RECORD TIME WITH RED WIpDW. BENEFITS OF fD WIDOW -CLAMP FITS ALL MAJOR BRAND PANELS 1 Ig" -" (29.5 - 5D MMI -PRE -ASSEMBLED -HAVES TIME AND LASDR COST -LAI?ORATORY TF9TCD TO 17 1 U LOS PULL CUT FORGE -WORKS FLAWLESSLY WITH COMPOSITE SHINGLE ROOFS -RATED FDR UP TO 1 1 5 MPH WINDS -2 COLORS AVAILABLE BgMADE IN USA SO STATE ENGINEERING -LIGHTWEIGHT DESIGN 'INTEGRATED GROUNDING •LOW COST PER WATT -ONLY 2 PART NUMBERS UNIT COMCB WITH MOUNTING SCREWS ANO UUTYL SEALANT PRE-INSTALLED DN RASEPLATE INSTALLATION ❑ E NM NADCW ATTACH ANYWHERE ON ROOF INSTALL OPTIONAL FLASHING BOND PANEL WITH TOP CLAMP 1-844-773-7729 WWW.SPIDERRAX.COM 51IDEI,- F9X NO. Date Revision BY 5/08/2015 Project 4.32 KW PV Solar Roof Project Project Owner David & Dorothy Routh 18214 E Sprague Ave Spokane Valley, WA 99016 Equipments:Racking System Specification Sheet Drawing EQUIPMENTS: RACKING SYSTEM Sheet E-4