Loading...
2014, 08-25 Permit App: APR-2014-0070 Approach, Driveway9 L4 l4 Ut):OLp Wcrri,il&ne VaHey- Community Development Department Permit Center 11703 East Sprague Avenue, Suite B-3 Spokane Valley, WA 99206 Tel: (509) 720-5240 Fax: (509) 688-0037 perm i tccnter(d?sPokaneval lw_or< (Staff Use Only) PERMIT NUMBER: PERMIT FEE: / APPROACH PERMIT APPLICATION PROJECT ADDRESS: 1!5-305— G Sintam�; e C r� 4-,5-14-4. rD 10P START DATE: I /A$ /m II ANTICIPATED COMPLETION DATE: 1T11Afi BUILDING OWNER NAME: Xc*v�Gr1 .4 h YD7 .-r► 5 MAILING ADDRESS: 15-305— f 1_ E n n CITY:% /SWY>� V OI l!� % STATE: L) A CONTACT PERSON NAME: c ^ R E v PHONE: V11— F_AX: CONTRACTOR NAME:!_0, C v,C -e � / a n MAILING ADDRESS: CrrY: fnfot STATE: /,,lq S U B PHONE: <0- j Zl 6 3331 FAX: 27 9 4W '� CELL: CONTRACTOR LICENSE #: e: Ii} i // ;9, Residential Driveway ❑ Existing Curb & Gutter ❑ Culvert Installation ❑ Other Conditions: ..3/1 ,r CITY BUSINESS LICENSE #: (Please Provide Site Sketch) ❑ CommerciaVIndustrial Driveway ❑ Rural Road Section ❑ Sidewalk Repair/Construction )i, n dt L /SSSS i¢l1t� Bond/Insurance certification must he on file with the City. DISCLAIMER The permitted verifies, acknowledges and agrees by their signature that: 1) if this permit is for construction or on a dwelling, the dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley permit inure to the property owner. 3) The signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done in full compliance with the City of Spokane Valley Development code. Referenced codes are available for review at the City of Spokane Valley Permit Center. 5) The City of Spokane Valley permit is not a permit or approval for any violation of federal, state or local laws, codes or ordinances. 6) Plans or additional information may be required to be submitted and subsequently approved before this application can be processed. Date: 57 Z DE -001: V-1 Received Time Aug.25. 2014 7:31AM No -0869 Page 1 of 2 PLEASE SHOW LOCATIONS OF ALL EXISTING DRIVEWAYS, w z n AND PROPOSED NEW DRIVEWAYS, INCLUDING DIMENSIONS. SHOW PROPERTY DIMENSIONS ALL STRUCTURES ON THE SITE w 5 ANY SIDEWALKS, STREET TREES, DRAINAGE SWALES ° PARKING METERS, FIRE HYDRANTS, TRAFFIC SIGNS AND MARKINGS, POWER POLES, AND ANY OTHER PERTINANT INFORMATION. i A EXAMPLE: 9106Wµ1{ sioewwc - 'O O G � � n 3 \ \ �10 s PROPERTY LINE - CURB LINE STREET NAME ADDRESS �— r w g z w w N CITY OF SP KANE DRIVEWAY APR CH APPLICATION PLAN TRANS SECTION A -A i ELEVATION GENERAL NOTES 1. EXPANSION JOINT MATERIAL SHALL BE PLACED IN THE CENTER OF ALL DRIVEWAYS OVER 20' IN WIDTH. 2, EXPANSION JOINT REQUIRED IF POUR INCLUDES ADDITIONAL DRIVEWAY AREA. 3. PORTLAND CEMENT CONCRETE SHALL BE CLASS 3000, AIR ENTRAINED. 4,ALL EXTERNAL EDGES TO BE TROWELLED WITH 1/4" RADIUS EDGER. 5, SIDEWALK TO BE SCORED EVERY 5. 3/8' EXPANSION JOINT TO BE INSTALLED AT LOCATIONS WHERE SIDEWALK INTERSECTS OTHER SIDEWALKS AND DRIVEWAYS. 6. MIN. 4" THICK CRUSHED SURFACING TOP COURSE LAYER UNDER DRIVE APPROACH. 7. FIRST 2' OF DRIVE APPROACH (AT CURB SIDE) SHALL BE THICKENED TO MATCH BOTTOM OF CURB. THROAT WIDTH DISTANCES TYP COMM. 30' 40' RES. 16' 30' `/2/39 �XPIRES 9 2 DEVELOPMENT SERVICES SENIOR ENGINEER