Loading...
HomeMy WebLinkAbout26257 PE-1859 DISHMAN COMMON , ';-ts~'~ - c ` ' - ~ ~ ~ , . - ~ • ~ , ` ti' ~ ' ' ' _ ' • , . ` . T_`I u'}~_ , . _ , PW Autho~r~lz~at:r:o~n-~ _ . " 362$ Ea~t Fer'ry . - - ' ~ . ' . . ~ , ~I , , . " ; • ~ ' K , ~ ~ ' r~j,_ , ' ' , " ~ ; ' : . _ . T~• SpoKane, VJashing4on 99202: ~ • ' • ' - . , , • , . , . ' , _ . . ' ' , . ~ . . - , . .(509 ) 534-97] l . . - . . • - , • . { , ; • . _ , . - . . _ ' ~ . . ; . - ~ . . ..l • - . _ . ~~i• , ;_:,'Please:. review this information carefuily -to•;_verify 1h6*`~mutua! understanding~ and,teims.of_~this' Work;Quitiorizaiion Attactiments, applicable ,to,ihis VVork Authbrization a~e~checked.: Pcovisions ofapplicatile aiiachmenis~a~e h2reby-.mad'e'a- part`,af ihis Work-Auihorization: •,F1lease`reiurn a'signed original:VUo~k,'Authorizatio.n ta STI~Ndrthwe'st io'~aufhorize the work to:begin: ; . . - , • . - , . . . . - ~ " • . : 4 . . _ • , . - ~ . , - ,PROJECT INFORMATION ' ,Client•Name: Northwest'ReQiorial.:Facilitators~ , _ . • . _ ~,Phone:' . _~(509)484-67.33' . • c • c . . . y . . . . - " y- . , ;Biliing Address: 5'25 East 'Mission Avenne;: -Spokane; ,Wasbiri gtony ;9~9202:.. . . . ~ , _ . . . _ , .Clieni's'.Represenlative' . ' Chris, Venne* , • . - . . . `Phon~: ' (509)484'-6,733, . • ~ . ~ . Represenialive's Address: Same, as above - " . ' , , , ' , _ - ~ , . • • . _ , ~ - ' - : _ • - ~•Work'Description:, Constriiction.~insvection-arid •materiai' testin~ -for-~Dishmaa-Commons~ • • ~ ~ • ' . ~ ~DeveloAment. ~ "s ~ ~ :r"-- - ' . . - , . , r • - ~ . . ~ , - 1. , , - ~ ~ ` ' • ` ' . ' ~ ' • ' ' . . • • • . • ' _ _ 1 . t ~ ~ • ~ • ' ' , , . ~ l. ' ~ • • ~Location of Work' . _ ~16th Felts-' Road; i'Spolcane; {,lashin~ton. • . • ~ ~ . _ , - ; . . ~ , ' _ . . ~ ' ' . ~ • - . ~ . . - ~ - ~ . . . . . , • . , ~ . ~ ; r'• . . - ~ . F , . - - ~ • ' • . ~ ~ Client.Will'Proyide'':. A~proved ':nlans, permits;lanascaping-plansd=processi.n~.-fees. • , . . . - ~ - ~ ~ - . . ~ ~ - ~ . ~ ' ' . ' , - . . - • 2: APPLICABLE ATTACHMENT. A1i'achmenls which appljr to this Work-Authorization; musl.be ;checkeii.< ~ ~ ' ' ~ . • ' ' - • . ' ` • ~ DETAILED DESCRIPTION~'OF UVORK: • ~ ~ ~ ` - ' ~~V . ~ . ~ ' - ~ • ~c' - . , . SEE`AtTAGHMENT;,A-"t~~ , ~k+~~~~°~: , ' ; : • { ~ - . ' • , . , . A~ ~Ifl~#a`'~ _ ~ = ~ H NOTICE TO OWNER: : ~ • ~ . ' ' -SEE.AT~QCFiME,NT "Cf`0` • - . . ~ ~3. PROPOSED KEE', - . ~ • _ Y - - ~ : r ~,y'.Y " ~ • ' - ` • , l ' _ ~ ' - ' , . ~4 - ~ ~ ' ' l • =-SPOKANE'COUt~TY.'EN,GiN@,~~ ~ ' , . ~ f . • ' _ - . "BASIC.SERVICES'FEE: . ~Pez AttacLment •"•A'-`' - . _ . . . - . ~ , . -SPECIAL•.SERVICES Recommended-Budget•> ' • . .N./A. ;~:-i . . ~ ~ - •-i : , ~ - :t. , _ " , ~ , . . • - - • . . . . ' _ . _ r., . . _ . .:t,. •i; ~ - PROCESS ING'FEES Recommenc~ed Budget: - , : , , • ~,_'N%~t~-~ , . , ~ . . , . Y`~- " ~ . _ : , ~ ' ' ' EXECU710N' OF 1NORK-,AUTHORIZATION-.~ ' . .r~"-'. : : '•••.;r, : : -..,;'ti ` . The CUENT confirms,thathe,tias-.receivetl copies,o;f a11`applicabl,; 'e attachmeqts~as•indieated above:arrd,all.five pages,-, '.,of~this Work Autho~ization~forrri'and'tFiat.all information included~•in the'Wp'rk Au{horizaifon:is true and Correct.. ~•:~7' _ _ . ~ ~ ~ A ' - ~ T _ ' ~ _ • i t „t ~ ~ . ~ - - - _ . t~S., • ,v~ :g%~ * ' -'~,•,.y'r . - . ' ;,CL'IENT::. ' -NorttiWest, e~ion.l~~Faci1i tors-:: ta Date: .aa~- • ;F tiy: . . , , ~~~T`. . „ ~rl' , 'i. • ` ~p.~~~}3~'' • • B . 'STI N EST _ ~ _ , . . ' ~ ' • . - ~ = .z. . , ~ ' - _ " ~ _ - ENGINE . rf\ " " , '~,.Y' , _ • ' , `za,"' ' 1 • : i 1,4 `1• . ' . • • . BY ~ . _ . - rT,itle=' :'Vice-,President; .Date:- • . • , . , ~Date W.A. Received f~om'CLIbNT~ ~ ~L~,-~; _ ~f•` : - ~pate~W:A•..R~opoS~d ~ . 6116/00_ •i~_ . • . ' - ' Jbb Name• . ' • ~ . . ~ ~ Disbman Coi~ons ' :-Irisvecti`on~` - ' ~ . , ~ . ~'.~Job'No: ~°•.;~C`70-S000204::~ ~ - , „ . = _ _ . - ` ' " • . • _ ` ~ . . ; . ' _ , • " . - ~ ' . _ . `r ~ . . - ~ . ^ ~ . - . ~ : STl WORK AUl'HOR]ZATION.,,- ' ' , _ : " . , . _ , , , • ~ ~ - ' . . : . , ~ ~ • - - ~ - • PAGE•1_OF,'S''. . . . . , , , • , . ~ . , t~ - ' _ _ . ~ 'j ; ~ : ' . - ~ ; . . ' , REV-619/Mt • - - . . - ' ~ ' - - • - - - _ . . . . : - • ~ . . . , f . 'z~ .,1~k ' ' s _ . _ : i: • . ' ' ' ~ ' . ~ - - • ~ • ' , - ~ - - - - ~ _ ~ ~ : - • ' • ' • • - . ' , : • - . . . , , - . . , . . ' . ~ - • ` ~ • ~ . ~ ' • • - ~ ~ - . . . , ~ . . -."_5_ -,BASI'C SERVICES AND~SPECIALSERVICES ~ . ~ - : ~ ~ ~ • ~ ~ , • • ' - _ ~ , . , . . . , . • . . _ . ~ . _ . . . • Engineering-BASIC SERVICES shall be ihose seryices`which are well defined aYthe time of'execuiion ,of.iFie: WORK ~ AUTHORIZATION and'for whicK-ST,I Northwest; he~einaft'er-referred'to as the ENGINEER, can establish a fizecJ fee maximum- budgei to,'perfbrm BASIC SERVICES: Unless •oiherwise noted, the: BASIC F€E shall represerit full compensation-.for peiiormarice of itie,BASIC SERYICES ~on 'a one ticne "only. basis. Ttie "ENGINEER may pertorm additional,services. in addition'to ihe 8AS1C SERVICES wfien the scope of the work required exceeds lhe-BASIC , . , SERVICES' outlined in this VVork-~Auttiorization; -wfien applicable, and Attachment.;'A". These. additional services . shall. be:referred to•as SPECIAL SERVICES'and,sfiall be_peifo'rmed asheeded o,r as'requested by the.CUENT, or his agent bn~a time and expense,basis: SPECIAL SERVICES FEES besed on_time and expense shall~mean that ihe fee ~charged is`compuied based on`the total-number of•hours-required by each, employee.to accomplish the required work plu~ an allowa.nce-for overhead.,and,profii, ~lus, expenses' directly_ aitributable ~to the job,as :outlined. below. Fees charged for SPECIAL SERVICES shall berin addition io the BASIC FEE+ ' ~ ' . ' 6. FEES FOR•BASIC.SERVICES" ' . ' ; - ' Y ~ ~ . . , • ~ , _ . • . The ENGINEERnwill present ihe CLIENT"with ~an itemiie'invoice- eash ~month for`BASIC SERVICES~ performed the -previous morith. -The amount'of-the BASIC SERVICES'FEE chargedeach"month shall be based on amount of time - • - and expenses, experided_each rrTanih but -ih'e- aggregate of atl BASIC SERVICES FEES charged on monihly invoices • ' . ~shall~not exceed,ihe iotal BAS,IC SEFZVICES- FEE.'auihorized herein.-' ~ 7;- FEES FOR SPECIAL SERVICES - ; ~ ' ' ~ " ' , ~ - • ' , , - . , ' . • ' , . ~ ' - 1lVhen the 'services provided by the_ ENGINEER are not-.included in the BASIC SERVICES descripiion of work;-then - • ihe work will be billed to the'CLIENT as SPECfAL S,ERICESbased on the amouni of tirrie_and_expenses expended eaeh,month.to-perform,ihe SPECIAL SERVICES. , ~ ' ; ~ , ' ~ _ ~ ' ~ • - - ~ . ' : ~ - , ~ . . . ~ ` . . - ~ ' - ' - . _ . ~ . . _ • _ , - ~ - ' 8.' C011IIPUTATION'OF TIME-AND EXPENSE • . - ; - , - - . , ; ; . ; . ' - ; - • To compuie the TIME portion of the.fee, the total"number of. hours required by 'each employee'to accomplish the ~ required work shall be multiplied by each, employee's job 'classification hourly billing i=ate.- 7he hourly billing raie shall -include the cosi;of•wages, payroll taxes,."personal'properly taxes,,emplojree benefit5; office ~ent,'telephone charges,, , roUtine postage expeqses, check,prints and.documeni- size'copies usecl internally to prod'uce ihe work,'depreciation of equipment, miscellaneous office and " drafting suoplies; `computers, plotiers, survey ~equipment, sofiware, vehicular = -expenses.incurred within metropoliian Spokane.or Cd`eur d'Alene"area,•administrative overti'ead,•and profit. : • ~ . - - _ • . . - ~ . . , . ; . . , ~ . The maximum:hourly,billirig,rates' b"yjob;classificatioh•ari~,as follows:,,' ~ ~ . ~ . , ~ . - ~ - • _ , , • . , . . . , , ' ~ . ~ • : 'Job Classification . ~ ~ . : Hourl~r Billina Rate . - ~ .,'~.Job..Classification - . ~ ~ • Hourlv Billina Rate - • ~ Principal Engineer. ;,$95.00. Sur.vey;Coordinator/Designer":, 64.00 Project-Erigineer . - 90.00 • 'DraftsrriaNlnspector, 50.00 ~ • . ~ ' . , ~ ~"Design'Engineer -,70.00'~ `2-Man Survey,Crew w/Equipmerit, ' 91.00 :r • ~ - , ~ . "Junior Engineer 60.00 : Cterical." 32:00 • ~ ~ . . . . . ~ • • - , . ~ . - = ~ . , , : ' - _ ~ . - . - : ~ ~ . ~ - . . ~ . . ~ The ~EXPENSE.portion of,ttie'fee wilP:be for out,~ofi.pockef E~XRENSES'dir'ecily.chargeable'totthe. project., Examples • of EXPENSES'wliich ~will be' charged,,in~additiori• to-~cha"rges•for time are as_follows: ~ ~ ~ . ~ . ~ " • ' • • ~ _ . . . . : : . . - . - . • - , ; ~ _ . _ ~ ~ ~ A, tJse "of e ui mqnt renteii es eciall for the' ^ ~ S• , H , - , -n „ - ! , . q p p y project'in question will be charge~at invoice,cost• plus 15%.;' • . B.,_.Travel related to-the,project,outside ihe metropolitan Spokane or_Coeur.d'Alene area will be.charged at $0.50 per. . ~ : mile. : ' • • . r . - . ~ . " . ' - < ' _ . , . . - C: Per-diem' EXPENSES for irayel, lodging,or,meals,for STI;,Northwest employees 'when presence of employee is. ~ :required outside the metropolitan'Spokarie o_r,-Coeur d'A,lene area,will-be ch6'rged at eost- plus 15%: . Q. _,Prints~or,document~~siie~ cbpies produceci-~for. the use:,of CL-IENT. qP.his 'ageilts will.'"be cha~ged at. tFie following ~ . rafes:, -Blueline . Prints; (24536) _ $4~ 00/sfieet; ~Sepia`2nd; Oi~iginaEs (24X36) ~$1D.00%sheet; Documerit Size copy- ' ~ ' - • (8.SX11 or.8.5X14) =-$0.15/sheet., ~ . ~ _ , r , ~ ~ • • . - - . , . . ' , ~ E. - Maierial .directly:.attributed, to the projecl sucti as maps;`Survey ~stakes, .survey mbnuments, monument'cases, - . ' ' - etc., wifl ' be charged at,'cost.plus 15%. - ~ ' ~ ~ - ~ . - , ; _ ~ ' ~ ~ . • • • • ' ~ , ~ ~ , . F. Fees or EXPENSES paid by STI Northwest,on_bqhalf"of~ihe: CLIENT will•be charged at eost~plus 15% ~ , ' • ' ' - • • z " . , ' - ~ S71' WORK AUTHpRI~?kT10N . = . ~ ~ " ' ~ . ° - . . • , - ; . . . - . ; • . ' . PAGE 2 OF 5 , , . ' _ : , : . • . . . - . , ' , ' . ' ' , ' - • , . ~ . . . ~ . . - ' , ' . ~ . • , REV 6/9%99 ' . . . - ~ - - . ~ . ~ - . . . . _ . . , . . - • ' - •d " ' ' , " , _ _ - • ^ f ' 9., 4#1110NTFiLY BILL"I1VC, PRCICE!]L1RE AN❑ FORMAT- ; • r = r , . . • - • y ' , `7he'E'NGkNtEk 1v;+iii preserii,ihe CLIENT vv,ith ar~-snVOice each manth, with'BASiC,FEES iferr'siied.,sepasaiely, frornJ. • • - SP~CfAL, 5ERVICES F~ES' ~r~~i' ~PENSLS th'arges`will, he i#ernized 6Gategary.~,vf'work-performeJ - ksy'-'aII_ emplo ye~s col~ecti~e~y, t~t~E wifl NDT b~ iier,nized showing e~ch'emplQy~:e's billir~g.raie,andpr~ui-nbec' ot Fiours'wo'rk6e~' - pn.fhe=pro;ect;, Inforrinat4en detailFng ernplpyee•,billing.!rates and #he exaci number of hours -i+vorked-an.the CLIENT'S' r': - _ -prolect v+iiff be rnade avaslable t❑ ihe QLlENT.if_requested.: Charges 5a,r:E?CPENSES'wi31-be.ilemized montFily fnV01CE- , ' - - " ' - ~ ' ' - " i , • ' - , - - y _ ` - , , • - _ : ' Mani~ly inv41ces, are due and payalale uponpresenE~itiori and aee past =due 30 day5 following.:the^ i~ivoice dale - .'-fnterest at the'rate Qf.1'.!4°Iti.per month wif9 be eharged'c~n aII past due accaunt~,wst9i inferest~~ieing'calculaied li`am 4fi7e ~ in~r~ice'date Interesl w+ill be-compQUradeii mgr~ifi~ly:';Tkie CL'IENT;agreesta pay ali reasanahle aitvrney's fee5:andlor - ccsllectron cosfs° sncurred. t6 'collecl:pa5t-due arnQUnt~ VI1ORKMAY Bt 5ll5PEfVUER QN ANY PRDJECT"-THATp", PECOMES 60 DAYS. PAST 6UE WOR}t WILL N 0T RE SUME.l1NT,IL._THE -ACCD'UNT ;15 .PAID T6 A CU R R E fVT_ ' • STATUS' - - - • ' - - . - _ ` ' ' ' ' - " - • - • - ' - - - ~ . - • - - = Withi~ 30 days-aftei t h e invaice dale ot'any in~oice sent by the.E[+9G91VEER i'o 1he GLIEN,T.. pursuarat_.t❑ t~iis,projecl, ilie CLIEEVT shall give•'wriiterr notice #or any•claia'rretl deticiencies, defects; or iack- i~f`performance with respECt,4p:`. -serC+ices cvvered- by said'in vaice;'qtFierwise, 5aid - servfces.shall be riue "~ccording tUrits terms, as•an~account siateci r 3he purpose of thES` Qrovis:on is toyroVide a.me'arrs of, ~rornpt natice, so;9hat_f3~e ENGaNEER .wil! not •he: prejudiced-, - asid can acf expeditiousfy to rgscrfve any_claErr~eti'd'efecls, deficiencies,.or.[ack'of perfQrrnance.' . . , , , •i, ' ' 10- pUYHQRITY " ' - . . , , _ • _ : . _ . . - - - , - . . : - : - r;,_ - - ln t h e case rrf conflicts beiween* the VIlDRK Ak]THORI ZATION fflrrrrand its ArtTACH MENTS• or AN"iENOMENTS,~I 4e. following order s{~all prevail with.the higher dcacum enf'taking preceder~ce oy er a tlocu merrt listed; underrieaih ' , , , " ' ' . ' r , ' . - : . „ , • ' . . • ' - ;A, AMENDMENT, ta the WORK AUTHORIZATIQN . - ' ' . • - ' ~ ' - 6. SPECIAL, PRflIlI SIaNS,tothe 1!1!C]RKAUTF-IQR1Z4Tl0 hf (Atf'ach ment "B'). ' ; - . . - :C_ I]ETAILEf] CIESCR1P7iC1N•~DF WORK=[Aitachrr3ent "A"I. , e' , . . . , • r_ • . WORK•Fi[.fTHOR1ZATlC7N forrn , • - , ` - . , , Executed , ~ '•111., GENERAL PERFOE+MANCE PROVIS10N5 - , i ; ' . ' ' . . , t ' , ' ~ - ` A. STI NOF2THWEST, herein, referred i❑ as E3VGINEER,.`agfees.to perform prgfessional setvic'es-as described; in , '.this, WORK AUTHtaRIZATION snciur3ingapplrcatale=aftachmients,for- the'CLIENT;.antf the-CL•IENT 60rees~to , - , em{~lay arrd campensate #he ENGCNE ER i n •accc~rdarice with ihe terrri.s of•the WGRk AUT,HaRIZATIC3N _ • - . . , ' n i' 1 8- -C]urirag.the_ pe46rrrrance ❑f-ses cvaered tay'I3tis~lNC7RK AUTHQF~1ZAT ft~N,'ihe.sctspe Qf ih,e,ENGINE!EF~'S services and,com perrsatifln'th ereo n may-be ac#justed by -rriutuaily- agreed upon amendments. • _ 's _ _ - - , , . - - , _ . • ; - • - ' ' C-.urisdiCtion ❑f.the + c~ i C. ~This V11aRK AvTHC)F.I~TION.'shal1 be goaerned;by-ihe iaavszof t h e j p eef for whiCh the`wD6k%' . J'., is bei~sg'pee~orme~i or~ when, there is rro prvject site, then the j urisdict~an~~~vh~re the;vvork;is'performed. ;j~• , ' , , , • ' , ~ . , ' • ' , " ' Q: If, •thrvugh• no fauit of ihe ENG&NEER, v+iork conteenplafed under 1he,WC7RK;'Al fTHOfitIZAT;I'DN e~itends`longer`-'- • th'an,tvveliie rr3onth'$ frorri fhe dafe af exeeulion•;af said VIPaRK ;AU7NOR 47-AT1ON;. the-un-15illed ~8Pt516 "FEE,(rf.', applicatiPe), SPECIAL- SERV.IGES 61116g r,ates, -arsdlor exper~se iterrES rnay -beJ~&easL-oa as'rnuiua!!y; agredd fvr - eacta -ye~r• lhe WDRK A:R~THCJRI~T1c7N rerraains in;e'ffe6t-`{~ast• 4he ,~`irs#iyear-, t0"' reileci,=the,increased coito~_` . = - doing business'andlor, changed Cvnditians. _ar:ifieLENGIEVEER' bY-.^-9'srrin` 9t''?.Wriiten :rieitice. ~ This' 1NC7RK.AUTH4JR1ZAT1ON ,may .be terrninaied.by' 1he CLkENT. , i a resuft~of suk~st~~tiak~failuse toT seen'rl~ysri~adaarice ofthe te~mi'nati+on,'~fat6; by-,rnufual"~agr~er'rrer~f-~or'~s - - i_ • p'erfarrn in accordanbe with'the terms Qi ihe WORK AUTFiaRlc'ATiON by•the'athOr pa(ty.ihroug~.n,of~ult',of~t~i'e:'' • . ierm`ir►ating party:" I'f, tor'any reasan`this'+JJRK-AUTFi0RlZATICJN'is lerrriinafed-, the`, ENGlNEEFi'sh611 be PafdE`J . - ~for ihe extent of se`rvices perfQrmed by hi~n Eo the, lerrrtiqatian date- includ9n~_ reirrybursable expenses fhen due.: F rThe drawing.origirrals, e8ectrvni6 €i€es, specifications,, repvrts, °arld general'ocoject-fi9es produced in_pursuit of . ihe' a- - ' t- -'wark contemplafed' ijnder this_ WORK A4JTHORIZATIC3N shaif remair~,in-the.p~~per.#y'-o~~the-ENGINEEF~ ;T'~e - - CILIEN~' shall 6e ent9tlecf tQ flne set af apprvverl.blueline pfints,,specificat~ohs, reporls, •e#c ;-aPpli~able:~to rhis. 'parti~ular WORK AiJTHt~RfZAT401~l, ~a~ part ofthe- BASIG •FEE. The•,CLILNT s3iafl'be er~liiied"t4•ad~itiana copies andlar second vriginals af,drawmgs, sp~cGfications, reports antl~pcaject -fflesf,qr the`cast otharidling ST2 1Vf7RK AL1THi]Rd2A'1"IpN'' - - - ' • - - ' • ' . +AAGE3'[7F5 ' ~ - _ . - , , . ' ' - ..f'_ _ ' • ; , - • _ : • ' _ • . _gCV619199; - , - " , : . _ . . • • . . . ~ . . ' r _ • " ' , . , • --AUTHc7RlZAT1DN., The cast vf Teproducticrn of said addrtional'documents"shall be in add'ifiian ta ihe E~A,Sfc FLBE.' ' Eleclronic files created. hy ihe ENGlNEER in -the, pcacluctiori,Qf, the -CLIENT'S .w6rlc -cointains _proprietary _ ~nforcnation which is ' the sale proper#j+ 6f ihe ENGINEER . Efectronic fifes s'~all t~e t'~e sole property 4f the . , ENGINEER and wilf be7eleased to the CLIENT or ihe-CLIENT'S agent~solely-at #he dscrefion-af the ENGINEER. - G. fn the euent tha1 the CLIEiVT provides, erroneaus information to- fhe ENGPNEER_Qr revf5es inforonalion previously provided, creaiing a sstuativn wheEe the-ENGINE ; E Ft'has performed -wvrk that must be- cQrrected -by the ENGINEER, Rhen all `such work will be bEl1ed to 1he GLIENT as a SPECIAL SERViCE '-It 4s further ~sndersiQC~d - that the CLkENT shall hold ihe E3VG[NEER I°fARN1LE55 fror~i all liabililies, wMich may acccue tv the ENGINEER as_a resuft vf said erroneous or ~evised information. ` _ . • t , _ : - . . , ' - , . 12 ENGiNEER RESPC►N51Bt1_ITIES. - _ A. The ENGENEER will aci as tti,e CLIENT'S agent wiih respect to those phases af the projecf °to which this 1NORK ALDTHORIZATION applies. . . - - - - - , . -B The EIVG1NEER will perfcrrm his work in a tirne[y rnanher, buf it is, agreed- upon befy+ieen_ the parfies to ihis WORK AUTHC7RlZP+T1C7N that the ENGINEER ss n ot respon5ibfe, ior delays caused by facttirs heyond his control,, or by factors which cauld not reas6rr`ahly have been foreseen af the time this WbRK pUTHC7RIZRTEON v,ras executed li is agreed ihat "timely manner" shall- mean a trme ftame•roughly eqraa4 to that 4aken by,-oiher engineers on similar projecSs under similar cbndifions, requiring 'sirrrilar aR~rovals frorn simiPar agencies. _ C. 7he Eh4G9NEER wrll perfvrrro'his woek in accvr~tarace vviih' gerrerafly -acceptet~ prvfessional practices and,in atcvrdance with avaEEab3e pubAshed st~ndards ❑f apprmving agencies and rnakes no viher vvarranty. D. It is understoad ihat the ENGINEER shafl he responsible for services, pravided 6y pe'r5onnel in_his tlirect employ and ihat:ihe ENGINEER does noi guaranlee the pertormance of any other'contrac#or asso'ciafied witFr.this project. E. It is underslaad dhat ihe ENGINEER is rroi responsible for directingJthe GLlEN7'S conEractor or. far scfieduling cvnstruction actrviiies. F Il is undersiaod that ihe ENGINEER shall ncri be responsible to-coordinaie wiih uiilGty companies for Ihe design and insda4fairon of electricaE service, telephvne servi~,e, cable TU sen+ice,, street dighting Qr other utiliiies which _the CLIENT may require. • . . - - , „ 13 CLIENT•FtE5PON5161L4TIE5 • - _ , . , - . . . - _ _ , - - , , A-The GLIENT will provide a11` cnteria and full inforrnation as to his requirem,e'rrts far ihe.prajecE. The"CLIENT wiEl . , assisf the ENGINEER by placsng at his'disposai ail *aaailable' writ#en data pertiner~f tt~ tf~e site af,#he project inclu~ling preaious reparts, correspond'er~ce ~rvith public n,r prii+ate'agehcies _or indiuitluals, topvgraphic maps, off •ihe,project area, pertinent bvundaeysusveys and riglil-4f-way sUrveys, snifs reparts„ proteetive cvve,nants, and any, other matenal ❑T a technical nature periinent,to, the proj'ect siie whieli may ❑e required.•' 8: The _GLIENT ,wil1 examine afl StLldEeS, reports, sketches,- ;spe6fica'lions, , drawings, agreements' and • other dacumerits presented by ihe ENGINEER tv the CLIENT. :TPie"CLIENT•will giv6 prarrEpf vs+riiten rrolice ta the _ ENGfNEER whenever he observes or.gtherwise becomes aware of defects pertafining to ihe,,ENGINEER'S work - on the prajeet. " : . A - . - , • : ~ ' • ' • . ' ' = ' < ' - WkthETI 30 day5 af#EI' 1115 If1Vf5lCe dafB ❑T any invoice se~mt hy the ENGlNEER=to` thC- CLIENT._pursuant-tea_ lfi~is . , WaRK AUTHOR1ZATION, the GL1EN"f.shall give wriEten~ nofice -tp lhe E~1GEN~~R of-a~ay 'claimed. deficiencies, ,-_defects; or lack af perforrriance wFth respect to ~services:covered';by:s~id inv.oicevttierinrise,-•pajrment'for said " services shaEl be due accordingr fo the terms of the WORK AU7HbRl74TION. The purpose.af ihese"pr~Visians are lo prQvide a means c~f prompt.noiice ta Ihe, ENGf~IEtR sa 'th?t =he- i+rifl nvt be prejucfi,ced' and can.act - ' expeditiausiy fo resofve any cRaimed defects,, de€iciencies,1,grlaek Qf'perfmririance.-.,' : , - - " : _ - - C.. The CLSENT wrC4 designate in writirig a person tv' a0 as- his represeniative vvith respeci tn .th' e= ENGINEER'S "seuvices to be performed under-ihis W[?RK AUTHORIZAT1C7N. -Such _person shail have aulharr~}r to transrrsit instructions, receiue inforrnation far 1he CLiEN7,, receiue and review-ihe ENGI'NEER'S invaices ; ;and interpreC and deiine tl~e CLIEN~f'S polfcies and decisions with re~spect, ta theE NGIN~EF~'S serusces covered f~y #his . Wi~RK AUTHORfZATIQN. ' - , • . , . ' - " , , - - - ` - I'' - . - . - - - - • ` - , _ - - STI WQRK AiJTHOR]ZATION R . ' • - " . PAGE,4 OF S ' • - . ' - REV 6; 9r99 ~ . °~D-- T 4~e CL•IENT wFli- be respbnsible_ta'~ake p~avtsians_farciYre-ENGINEER'S Iega6-ac~ess fi~ priv,aie fa~ds ~s rn ~y be- - requsrec~'to peFFDrrn required seraices under ti~is ~J'~lORK.AIJTHC)R1ZAT1oEV. , - , - - ~ • . , . . - „ . . . . . - ' _ . - • f ° . E.-The GLIEN-T will=be re~por~sif~fe fQr 9he prspa'ration andlar iegai'review ot-a ny cbntracts or oiherlegal dacurn~nts: •~vhsct~ ~nay be'required,in pursuo4''Qf, waric cantemplated by this'WORK AUTHOR1ZA71ON - _ . - • , - • . j ' • ~ , " . ; . f . _ : , • . -.F The CLIENT wifl advise- hEs.canfracf4r of lhe coniracior's responsibrlity to-Protsct 691,swivey,st,-akes,_rnonumienis,, - rnarkers, arid re#efence, points: 7Yse CL1ENT or his cai?iractor sfiall•~~resp~ris~~9~_,t~ ihe ENG[NEiER ihree.;; - • .wvrkirrg ~iays m advance af Che-require~rient fo'r the,_Placemenl~oi canstruction siakes,_as-t~ullt ~ur~eys''~s~dlor,_~.. •',enspections Whi1e it, is undefslo6d,.6y -tne EEVGINEER' and, fh~ C~.fE~i7 tha#: situatio6s_• rrsay, arise -where. thre`e~`,', _ -working days advar~ce notice'rrfay not_be praclical', the nolice {~rov~isir►n fs esia~r1ssi~ed to.aid its.t~e;detetminativn -P -oi whelhe,r avertime charges are_ justitEed by the EN6INEEF~.` It is{ further--unders#aQd.that:in-the' cases whRre; proper noiice=is not..practicaf,alhe ENGINEER wilf, rnalserevery reasonable effort;:incftiiding (~vei-lEme, hrours,;;iQ - - - accomrriod'atetfie_CL6ENYS'scheduPe_ - . . , ' _ - : . - - • , _ , . _ . , . . _ - - G' -The CLIENT will'execu&e°an a Ismely basis a1l- apprapr"safe,dacurnenis.required Oursuafi# 4o the iul#sEimerit'0fihe- ;•ENG4hJEER'S and-CL1EN7'S-respvnsihttities under fhis WaRK AUTHQ'Rf7ATI0N.-~ , . . . , . , . : ; ; . '.H. 7he GLIEfVT i+vsll'prvvids further-information, vr fees on a limely basis, as reqLriret~, Thisinformaison ;as~dl,or' f,ee, ; . , may include, h~st is nc~tFfimiied to• ihe_fvllowing' . ; . • . ~ , ^ n Y` . 1 ' _ , , . . ' i . 5ewer T V -fees = . . . . " . : _ - ' - , ' , ~ . _ _ . ~ . -2 ,qpplication and prQcessing fees - , - - ' . : . - - . - - - - , 3. Agency design Eeview fees - , . . , ~ _ ~ . , . - `4. Cos9 of pnnting a.rid'rnapling daGumenls and reporfs , . , ' . ; , . ; , . . 5.; Qther fees not specifrcally drscussed elsewhere in Fhis WO R K AU7HO RIZATIaN., "I" It shaU hethe CLiENT'S responsitaifiiy to make arrangement=with'appropriate Utility corripanies_for ihe,-design and' installaiion oi uth4ilies whsch may l~e requtred'to -be ir~stalled conGurrent withsireei, storm' draina9e,, sevv~r~, ~vater - ' or` other faciiity •being designed. andlor. inspected =by the. ENGINEER: Said utilities~ miay inc[ude,, tiui ~re:_nat; - - . limiled to, elec4s+cal power se9vice, iefeph4ne serviee, cable TV=serVice, csr street lighting - , - ~ n - .E 4t' 4s 5pecifically underslriod thai 1he CLIENT has ncrt retai~ed the ENGINEER -as a canstsuctian manager . ' responsible For tfirectsng tfie.CC4ENT'S canlractor anrifar scheduiing.construcii9n.aclivities fhe CLIEMT sha11 be • , ' . - • responsib9e t❑ wiih Gurreril approved:plans and specificatians ~ _ _ _ F ` • , i . ` ` . , ' . _ . • , . , . . v " F . , 13 'WORI{iIVG WOLIRS ANb OVERTIME- . , • ' ° . - . . , - , : ; _ - - ~ , • lt is,uriderstoad Cf~ai'the~~NGiNE ER'~ regular warking. hours~For akl` of~his er~plcayees-is•eight hours per=d~y•and 6p'rty<.- - --'fiiours.per weeK,less paid°ha1iday 6our5 vahicti may occur.in a _partEcu9ar -week.- Regu1ar Wdrk'-days;are:'Monday.. thr4ugh Friday._ -Tihe EIdGINEER'S, e5#ablished.pasd 9io9idays, aF& aS foiiowS` New'Year.'s D ay,~Washingtcaia's~ 'F " ~day,',f1+4smvei6l Day,'tFie Fod]rtfi of ;luly,. Labor Day; Thanksgiving, and Ghsistrna's- 8iri Nfien, 'at the discretivrf'Qf ihe E~ NGI~€EER, tf~e'-~NGINEER'S office=wid~ woak ltaad reach~s.a'1eve6-whe,re more,tY~an - - ~ - _ regufar workEng hours are, Fe6uired.io,aCCOfC1pIISh t11@ WC3f{C Ol"k a _41f'flEly ~3a595,.and whie'n the CLIENT has giVen,'proper r; -nalsce'of:~wi~'r'k fo-be. per(armed,.t'~e ENGINE~R may-elect tfl require his employees towork.in_ ezces$,oi ihe,regulitr;~-. . worfcir~g haur~ ar~s~ charge.f6r'619 work'al;ttie regularworking h;nur`bi{fing`.rate. . • - - . - - _.._r,, _ . - . I!•, h6wever,the CL1ENT-`fails tb.giae pi~aper notice of vvorW be, performed ❑r the 'vrslurne 4f work=tv'be.performed iis.;' obviausly. i~ excess.QF`•what~~can-~e.p~r~r►rmeci du'ring' tf~e re~uI'ar 'working firau~s available;' g"syeri;tfie ,EN~1lV~Ef~'S - , norrrfal`manpower-level,`then tFi~ ENGkNEER rnaj+ requsre'his,,ernpfoyees-tv war9c in,excess;of, ihe,regular wvrki'ng, 4 ' hour's;and charje, the CLlEijlT for ine exeess ti~urs-al-an-oyertirri'e.raie.of 15-ti~es:the requ1ar'billing_rate: ft' is urt~ierstood fhat the EN0INEER:S FEE for 6A51C'SERVlCES and'.#he,hour1y raies for.SPECiL SER1IlCff5,is- b ~ ~ased'6n-being-ab1e,to:perform ,nearf}r all work,p'rapose~ in full shifts;o,f eigh#.hours ar,more,- ,if for reasons be}rvrfd . - tWcvnt►cil of the ENGiNEER; his empfoyees cannat peafarrn the propvsed work substantialsy,in eight,-hou,r shifts tFien ~ 4he EIVGIIVEER'S FEE may-be rene6otiaied Eo afEow f vr~.ri~erteme pay rMes . - ' ~ • - • _ - ` , ' • - . . . " ' , , - . - , ' ' - , • , ~ - . y ;4 " . ; - ' • - - - ' ' • . , _ . ~ _v , • ` . , - . - - ' _ - STI 1Arf]HK AUTHO321Z.:T1dN ~ - . ' _ . . . _ _ J • - - ` " • ' _ ' • , . ' ' PAGE_S DF 5• • ' ' • . ~ • • ' - - , - _ - • . - - , , . , w . . , - , - - • . REV 619199 - - L" . ' - M1 f _ V : „ . ' ; - : . - . ' • • - . ' . •r,:•a; ~ r . " . - - • ' , . • _ • - . _ • , . , , , _ ~ "SlVVORK AUTHORIZATION ATTACNIIIIENT "C" NoTICE TO QWNER OF RIGHT TD GLAIM A L3EN _ 1MPi7RTANT. READ B[]TH PAGES OF TH15 NOT1CE GAREFULL.Y TO: Nord&est °[[emi.ona.t Fhei7ir.atum 7O: ctzris verwe Owner AgenUCvnfractvr FRONl: CLC A55DCIATES, INC. flATE: June lfi. 2000 FROJECT: nisbman commons Inspectivn PFZQJEGT c-70-sv00204 TNIS IS NC3T A LfEN; 7his natice is sent tQ you tv te11 you whv is providing professiQnal senrices, materials, or equipment fvr the improvement vf yvur prvperty and to advise you af #ne rights vf these persans and your respvnsibilities. Also take note that [aborers on your prvject may claim a 1ien withvut sending you a natice. OWNERlOCCUPIER OF EXI571NG RESIDENTIAL PROPERTY: Llnder Washing#vn Taw, thase whv fumish Iabor, professivnal services, materials or equipment fvr the - repair, remadef, or alteration of yvur owner-occupied principa1 residence and vvrhv are nnf paid, have a right to enforce their ctaim for payment against yvur prvper#yr. This claim is known as a construc#ion lien. The law limits the amount that a lien elaimant can cfaim against your property. Claims may vnfy be made against fha# portion of the cvntract price you have nvt yet paid to yvur prime contractor as vf the time this notice was g4ven tv you or three days after this natice was mailed #o you. Review the second page of this notice far mare informatian and ways to avvid lien claims. GC]MMERCIAL ANDIOR NEW RESIDENTIAE. PROPERTY: V!!e have or will he praviding professional services, materia(s, or equipment fQr the imprnvement of your commercial vr new residentiaf prvject. fn the event you flr your contractvr fail tv pay us, we may fife a lien against your prvperty. AlRen may be claimed for aq professivnal senrices, materials or equipment furnished a#fer a date tha# is sixty days before this nvtice was given #v you vr mailed ta yvu, unless the improvement ta your property is the canstnaction af a new single-family residence, then ten days before this notice was given tv you vr maifed tv you. , a 1MRORTANT INFDRiIIiliAT1ON aN NEXT P'AGE ATTACHMEIVT C PAGE 1 +DF 2 S P C SENDER_ CLC ASSOCIa4TES, INC. ADDRE5S_ 70711'll. 7TH RVENUE, SUETE 200 . SPQKANE,INA 99204 TELEPHONE: (509) 458-6840 - Brief descxiptian vf professional services, materials, or equipment pravided or to be provided: PTofessi+onaf engineering and related services. - 1WlPt7RT►4NT INFORMATlON FOR YOllR PRC)TECTIUN: This natice is sent tv inform you that we have vr wiil provide prafessivnal ser►ices, materials or equipment fvr the imprvaement of yraur prvperty. We expect tv be paid by the persvra whv ardered vur services, but if we are nat paid, we have the right tv enforce aur clairn by fEing a cvnstruction lien against yvur prvperty. LEARN moxe about the lien Eaws and the meaning vf this natice by discussing them with yaur cantractor, suppliers, Department of Labor and lndustries, the frm sending yvu this notice, your lender, or yvur attorney. CQ'NEMC?N METHODS TO AVOla GoNSTRl1CTION LIENS: There are several metfavds aVai'fable tfl prvtect yvur property frorrt canstruction liens. The fo9[awing are twv af the ' mare commanly used methods. flUAL PAYCHECK (Joint Checks]. 11Vhen paying yvur contractvr fvr senrices ❑t` materials, you rrray make checks payable to the cvntrac#ar and the frrns furnrshing you this nv#ice. L1EN RELEASES: You may require your cantractor ta prvvide iien releases signed by all the suppliers and subcontractQrs from whom you have received this nptice. If they carrnot vbtain lien releases because yvu haue nQt paid them, yvu may+ use the duaf payee check meth4ci to protect yvurself. YOU SHQULD TAKE APPRDpRIA7E STEPS TO PROTECT YQUR PR(]PEFiTY FROM L1ENS. YQUR PRIME CC]NTRACTOR AND YOUR CONSTRUCT1OM LENCIER ARE REQIJIRED 8Y LAW TO GIVE YOU VlfRlTTEN INFORMp,IiON ABDUT LIEN CLAiMS. IF YaU NAVE N[3T RECERVED IT, ASFC THEM FOR 1T. A71'AGHMENT C PAGE 2 ❑F 2 o~. A ~ ~ ~ NORTHWEST ~ SoILS, TESrInrG & iNSPEcrIOnr WDRK AlJTFiORIZRTfON RTi'ACHMENT "A" DETAILED ❑ESCRIPTIDN OF WORK (6112100) Dis'hrnan Commons Cons€naction Inspection (3,076 I.f, of Road Im,praVements, and 2,507 I.f. af Public Sewer) STI N❑rthwest W.O. # S000204 STI Northwest will perForm constructivn inspectivn and nnaterial testing services as vutfined befow and charge for said services vn the basi5 of time and expense. A. ROAD and SEWER CDNSTRUC7IQN INSPECTIQN OF: 1 Earthwork and subgrade preparation. 2. Placement and cvrnpaction of all base materia9, and pavemen#. 3. Placernent and rompactivn of sewer backfill. 4 Verifcation af Side Services, and marker pvsts. 5. Curb and sidewalk installation. 5. Drywelfs, inlets, and general facilities. 7. Temparary drainage facilities. 8. Erasi❑n con4rvl. 9. Coardinativn with Spokane Caunty. 10. Preparation and subrniftal af s#reet and drainage "Recard Drawings", prepare and submit sewer uRecvrd Drawings°. 11 SQil and materiaf testing fvr compactivn and backfll for ifems 1 thru S B. Direct Expense 1. Mileage at $0.30 per mile 2. Reproductivn of prints. 3628 'E. Ferry • 5pokane, WA 99202 ■ Phvne (509) 534-971 1 ■ Fax (5(}9) 534-9755 . ~...vw.. Inspectian page 2 2. DESCRIPTIDN OF WORK Inspectian by STI Northwest personnel or o#her agency personnel shall nat celieve the cantractor of his respansibility to construct ihe facilities cavered by this agreement to the Iine arad grade showm on the apprvved plans or as staked by the engineer. This contract agreement daes nvt include canstruction manegement, scheduling actiVities, or preparation of irrigation "Recvrd [3rawingsn as required by SpQkane County for final acrep#ance of the s#reet and drainage plans. 1. The scape of these canstructivn engineering serVices includes: A) Perivdic ca4ser►►afivn and repvrting of specifiG caristr-uctivn activities vn this prvject which include; Sewer, Subgrade, Bases, Pauement, Concrete Curb and Gut#er, 5idewalks, Starrn arainage, and Materiaf Testing; B} Maintenanre of aII canstruGtion records related #o canstructivn activities vutlined in paragraph "A° abave, which may include; daily inspection reports, manufacturers' certifications, ma#er9al test reparts, and carrespendenr.e; C} Assurance that the canstruction of the rflads and sewer is accordQng to the apprvved plans accepted by the Spvkarre Cvunty Engineer, the Spokane County Utilitoes Department, Spokane County General Prvvisiflns, the Standard 5pecifications, and applicabls partians of the WSDQT +Canstructivn Manual; Q) DevelaQment of IPvst Constructivn Reeard Drawings fflr Sewer, Street and Storm Drainage Facilities; it is understvad the faciEities inspected by firms other than STI Narthwest will be certified by tFiose firms in a form acceptabke t❑ Spa4cane County; E} Govrdina#ion of the testing of canstruction materials for rrampliance tv the plans accepted by the 5pakane Gounty Engineer, 5pokane County General ProVisiQns, the S4andard 5pecificativns, and applicabPe pQrtians of #he WSDQT Cansfructivn IlAanual. - 2. Priar tv acceptance of the sewer, r+vads and drainage faGilities by 5pokane Cvunty, the Engineer shall submit all canstructivn rer.ards and the Recard Drawing ta the Spvkane Caun#y Engineer, and the LJtilities Deparfment. 3. The effvrt ta compie#e inspectivn and cer#ificativns in accordane.e with Spokane Cvunty requirements ►raries widely and is Glvsefy refated ta how well yaur cpntractor plans his activities, communicates with vur inspection staff, and the quality of his wark. A pre- canstructian meeting with the cantractoc, pr❑j@Ct 5poI`15oP, and STI staff is s#rongly recommended ,prior tv cvmmencement of any construction activity. 7his meeting will be held to deter►nine the schedule, ciisnt cantac#, vwners representative, and payment responsibility for re-inspeGtion charges for incamplete ar inadequate work. Inspection page 3 The soil and material testing is billed on a time and expense basis. A monthly invoice will be prepared and sent to you for the inspection and materials testing. The amount of testing is impossible to anticipate, and will require your contractor and construction manager to coordinate with our inspection department. As you know, there are some soil and material testing guidelines required by Spokane County, but the requirements are only the minimum and additional testing may be required. STI Northwest requires 24 hours notice prior to any construction activity. The services described herein will be performed as needed and billed on the basis of time and expense as outlined in the maximum hourly billing rates by job classification included in the Work Authorization. We estimate the cost of inspection services as outlined above to be approximately $12,055.00. Northwest Regional Facilitators shall also include provisions in their construction contracts to back charge their contractor for the cost of STI services which may be required for re-inspection or re-testing of facilities which failed to meet the required standards. Billings for said re-inspections will be carefully identified on STI's billing to Northwest Regional Facilitators. Northwest Regional Facilitators will be responsible to back charge their contractor. It is also understood that no work shall commence within any portion of the proposed Spokane County Right of Way without first obtaining a written permit and approved plans from the County Engineer. It is also understood that any project facilities constructed without adequate inspection and documentation by STI Northwest will be removed and reconstructed in accordance with approved project plans and Spokane County Specifications, or STI will not be , responsible for project certification or submission of record drawings to the County Engineer. q y~ ~ a , NORF HWEST 50lL5, TESTlWG & 1N5PECTifC7N WORK AUTHORIZATIDN ►4TTACHMENT 'K DETAILED DESCRCPTION +QF WaRK (611 2f0D) Dishman Commnns Canstnrctivn 1nspectivn (3,076 I.f. of Road Imprvvemen#s, and 2,507 l,f. of Puhlic Sewer) S7f Northwest W.O. # 5000204 STI N❑rthwest will per#arm construction inspection and material testing services as outrined below and charge for saRd services on the basis of time and expense. A. ROAB and SEWER CONSTRL1GTi10N iNSPECTI[3N 01F: 1. Earthwark and subgrade preparation. 2. Placement and, cvmpaction of all base rnateriaf, and pavement. 3. Pfacement and cvmpaction of sewer hackffl. 4. Verificatiora of Side Sen►ices, and marker p❑sts. 5. Curb and sidewalk installation. & Drywells, iNets, and general facilities. 7. Tempvraryr drainage facrlGties. 8. Erosion control. 9. Gmordination with Spvkane Cvun#y. 10. Preparation and submittal of street and drainage "Record Dravvings", prepare and submit sewer "Record Drawings". 11. Srail and material #esting for compaction and backfill far items 1 thru 5. B. I]irect Ex,pense 1. Mileage at $0.30 per mile. 2. Reprvduction of prints. 3628 E. Ferry ■ Spoka ne, WA 992[]2 • Phvne (509) 534-9711 •Fax (509) 534-9755 ..,...,..~..r, Inspection page 2 2. [3E5CRIPTIDN OF VV[]EtK Inspectivn by STI Narthwest persvnnel ar other agency persnnnel shali not relieve the cvntractvr of his respansEhtlity ta cvnstruct the facilities cravered by this agreement to the line and grade shvwrr vn the appraved plans or as staked by the engineer. This contract ageeement does not include construction nnanagernent, scheduling activities, vr prepara#ivn of irrigation "Record Drawings" as required by Spvkane Cvunty far final acceptance of the street and drainage plans. 1. The scvpe af these consfructivn engineering services includes: A} Periodic observation and reporting at specifc canstructivn activities ❑n this project which include; Sewsr, 5ubgrade, 6ases, Pavement, Cancre#e Curb and Gut#er, Sidewalks, Storm Drainage, and IVlaterial Testing, B) Maintenance Qf all canstruction records related tv construction aGtivi#ies outlined in paragraph "A° abave, which may incEude; daily inspectivn reparts, . manufacturers' certificatians, material test reparts, and cvrrespondenr,e; C} pssurance that tfie constructian vf the roads and sewer is according ta the appraved plans aGcepted by #he 5pvkarae Caun#y Engineer, the Spokarae County lJti9ities Departrnent, Spvkane Caunty GeneraE Provisions, the Standard Specificativns, and applicahle partions vf the WSDO7 Canstruc#ion Manuak, Q) Devefvpmen# vf E'ast Constn.rctivn Record Drawings far Sewer, Street and 5torm Qrainage Facili#ies; at is understood the facilities inspeGted by firms other than STR Northwest will be certified by thase firms in a form aceeptable fv Spokane County; E) Goardinativn vf the #esting of canstructian materials fvr campliance tv the plans accepted by the Spokane Caunty Engineer, 5pokane County General Prodisions, the 5tandard Specifications, and applicable portions of the 1NSDDT Cvnstruc#ivn Manual. 2. Privr tn acceptance vf the sewer, roads and drainage facilities by Spvkane Caunty, the Engineer shall submit ail c.onstruetivn records and the Recnrd ❑rawing #v the Spokane County Engineer, and the Utilities Department. 3. The effart tv complete inspectian and certificativns in accordance weth Spokane County requirements varies widely and is cEvsely related ta how well yvur contractvr Rfaras his activities, communicates with our inspectivn staff, artd the quality vf his wQrk A pre- cvnstructivn meetirtg with the contractmr, project sponsvr, and 571 staif is strongIy recc+mmended priar to comrnenceonent of any ronstructi~~~ activity. ThFS meetang will be held to deterrnine the schedule, client contac#, owmers representative, and payrment respansibifity far re-inspectian charges for incamplete vr inadequate work. Inspection page 3 The svil and material testing is billed on a time and expense basis, A mvnthly iravoice wi6i be prepared and sent to you far #he inspectian and materials tes#ing. The arnvunt af testing is ompvssible to anticipate, and will require your contractor and construction manager to cvordinate with our inspection department. As yau knvw, there are some sail and materia6 testing guidelines required by 5pvkane Caunty, but the requirements are only the minimum and additional testing may be required. STI Nvrthwest requires 24 hours notice pripr to any construction activtty. The services described herein wi11 be perFarrned as needed and billed on the basis of time and expense as ❑utlinsd in the maxirnurn hourly biffing rates by job cCassitication included in the Wort Authvrrza#ivn. We estimate the cost vf inspection services as outlined abave to be apprvximately $32,055.00. Northwest Regional Facilitatars shall alsv include provisioras in their constructiQn cantracts to back charge their cantractor for the cnst ❑f STI services which may be required fvr re-inspectivn vr re-testing of facilities which failed to meet the required standards. BiIlings for ssid re-inspections wili be carefully identifed on STI's biliing to Northwest Regsonal Facilitators. Northwest Regivnal Facilitatars will be responsible to back charge their carttractor. It is aIsa understaad that n❑ wark shall commence within any pvrtivn af the prapmsed Spakane County Right vf Way withvut first ❑btaining awritten permit and approved plans from the County Engineer. It is also understvvd that any prajec# facifities cvnstruc#ed withaut adequate inspection and dvcumentatinn by STI Nvrt'hwest will be remoded and reconstructed in accordance with appraved project plans and Spvkane County Specifications, ❑r STI wilE nvt be responsible fvr project certificatian or submission af record drawings t❑ the Cflunty'Engineer. F14X COVER SHEET SFnKANE CaUNTY - ENGINEERS 3rd FLC1QR FA}4 # (5(79) 477-3478 ~ PHONE # (509) 977-3478 1026 W. BR[?ADWAY SPOKAhIE, F7A 99260 PHQNE # (509) 477-3604 ~ `r ~ DATE: 7 March 0~1 FAX #:458-6844 41 TO- Tim Schwab, P.E.1 C7aug Uesmond CC7MFANY: CLG CI'Y`YISTATE: Spokane WA NUMBER DF FAGES (IlVCLUDING C[)VER SHEET): 1 FRUIi~: Ed Parra. F.E_ ~(Plan Review) SLTBMCT: P1859 -16`b Ave. & Dishman-1Vlica Predesign Meeting Qu+estiaos TirnlC)oug. 1 checked with 5certt Englehard ora the questi4rs abaut the road corrfigurations from aur meeting gn dhis project. As far as the 16'' Aveoae parlcing atalls, firaffic caIming, and pedestrian pathvvay section, the cw'rent proposals are different fitom the sCandard details nr the 1 fi0` Avenue Special Section 'Cletail, so ihe Caunty Engineer would nqed itv approrre a Design Deviation Rdequest on these ifiems prior to plan submit#al. Privste Road Walkwayltrmveled way width: Walkway can be adjacent to the traveled way as part af the resadvvay prism, but is not caunted as gart vf the tradeled way. The minimum traveled vuay widfih is for vehicles. Lot count for roadway width: An undivideci duplex lot has historica9ly been counTed as a sing9e loi for roadway puiPcases. Divided duplex lofi.s (since the didided parts can be srsld or transferred independently) have historically been r.,ounted as 2 tots for roadway purpvses. If the conda Lots are divided, they count 1 for l in the roadway width caiculations; df uindiaided, it courits as one lot 17'h Lane: should be a consistertt width through the groject. Agaira, if sarrsething different is desired, a I]esign DeViation Request shQU1d be submitted Sidewalk connectian: Cannection is serisibly rnade at the west end vf the exisfiing sidewalk near khe Mini-Mart. DriVew$y extension south fram 1b0 aad nortb frnm 17'b for Condominiums: This wipl be accepta.ble if Lots 1, 2, 4, & 5 are combined as one 1at on the Final Pjat map. My apalagies for the delays on this iesponse. Please call if you have any questions. Thanks Ed Parry CLC ASSOC1ateS IIIC. FORMEF LY 11100 707 West 7th 5uite 20(} ]une 20, 2000 Spokane. WR 99204 509-458-6840 509ti458-6$44 Fax Spokane, WA - Denver, Ca Mr. Ed Parry Spokane County Engineers Develaper Services 1026 West Brfladway Avenue RE[;EIVED Spakane, WA 99260 J U N 21 20go RE: l)ishrnan CQmmons 5POKANE COUyTY EPlGINEER 4 CLC #99353 Dear Mr. Party: Enclcased please find two sets of road and drainage plans alang wifih reports and various iocumentation #'or the above referenced project. During the pre-design meeting you requested that we submit a maintenance planlagreement for the private alleys in the project. Jim Frank (Greenstvne) says that a H.O.A. will talce care of the maintenance and is unsure of ~ vhat yau need and yau could not be reached fvr clarificafiion of this issue. Tr~ order ta submit the plans we have not incl~nded maintenance laraguage in the subrnittal, if you require more I information please caLL and let me know. Flease reView ths plans and adv3se aur office +af any necessary changes. Sineerely, CLC Associates, Inc. f DaugJ. Desrrnand Praject Manager 'nJn/ef Enclpsures Planning ~ Enginesring ! Architec#ure ~ Landscape Architecture ~ Larad Survey3ng Formerly IPE - SPOKANE VALLEY FIRE DEPARTMENx ~ 5pokane Caunty Fire Distrrct l 10319 EAST SPRAGUE AVE. • SPDKANE, WA 49206-3675 •(504) 928-1700 • fPX {5(]9} 892-4125 R. Pat Humprirkes Chiei Jl,llle 20, 2000 avug I7esmond CLC Associates 707 West 7~ 5uite 2000 Spvkane, WA 99204 ~ECEIVED RE: Dishrraan Commons JUN 21 2DOp SPOKAIVE GOUNTt' EHGlNEER Qear Mr. DeSE710ftd: The Spakane Valley Fire Department wiH require tne installatian of twa new fire hydran#s at the folEawing Iacatians: 1. 51N comer vf 1e and Herald . 2. NIIW corner of 9 7t' and Herafd Access is adequate as drawn. Silncerel , ~ KeVin Miller Fire lnspector KMldc . , S P o 1--- .4 N s LT N -r Y DIV1sioN oF ENCIrrEErunrG ,arrD xonDS A L7iV15tO1V OF THE AUBLIC W{1IiK5 QEPARTN[EN'i" William A. johris, P.E., Caunty Eragineer July 10, 2000 TirrY Schwab, F.E. CL.C Associates, Tnc. 707 West 7'f` Avenue, Suite 201 Spvkane, WA 992044 SLTg3ECT: P1859 - Dishman Commoas 1" 5ubmittal Gentlemen: We 11ave cvnducted acursory review vf your 3une 21, 2000 subaittal of Design Dacuments for this prtrject, anti we kave fotYnd t3iat the submut#al generally daes nat canfQrm ta the requirements of the Spokane County Standcrrds for Road und Sewer Cors.struction ar the Guicfelines for 5tormwuter Management. We are, therefore, unahle to accept your sutrnirttal for review at th.is time. The attached comurtent list contains the items of cvncern which we discovered, and it is not tv be construed as keing cotnprehensive. If yvu have any questions about fihis reView, please contact Ed Parry at 477-3600. Thanc you. Sineerely, Wrlliam A. Jahns, P. E. 5pokane Cvunty Engineer ?.e-, ard J. P , P.E. ~evieW ~~gineer enci.: Qesign DocUmencs - ~lans Comments { t page? rc: project file reviewer (oomments only) SpQnsar. Northwest Regional Facilitators 1026 W Broadway Ave. ■ 5pokane, WA 99260-0176 9 (549) 477-3604 FtVt (569) 477-7655 (2nd Floor) 477-7478 (3rd FiQOr) • TI7D• (504) 477-7133 . ~ Tim Schwab, P.E. P1859 - Dis6man Commons 1" Submittal July 10, 2000 Page 2 of 2 Items needed: 1) ESC Ptan: Need to identify a location for Concrete Truck washout 2) Sheet 2: a) Nced to show how the curb line is located at least 2' north of the most northerly power pole, per Condition of Approval #1 for the Design Deviation (Bill Johns' memo dated April 26, 2000). Power Poles need to be indicated b) Need offset distance for CB at callout #1 c) Should provide a standard plan reference or a detail callout for the "traffic candles" (callout #2). Has this been coordinated with the County Traffic Engineer? d) Stations for street lights should be indicated e) Stations for change/transition from Type B curb (catlout #5) to Type A curb (callout #6) shoutd be indicated ~ Need offset distance for pipe outlet at catiout #9 g) How is maintenance access provided to pipe outlet (callout 49)? 3) Sheet 3: a) Taper should match callouts b} Inbound tapers are typically 10:1, 100' minimwn 4) Sheet 4: a) Need station & offset distance for pipe outlet at callouts #3 &#6 b) Curve data for C 13? 5) Sheet 5: a) Need station & offset distance for pipe outlet at callouts #3 &#9 6) Drainage Calculations: a) Certification statement on basin map should be provided b) Energy Grade Line analysis for pipe systems should be provided c) Sub-basins need to match the basin map (e.g., Basin A) d) Basin calcs nced to show how the weighted C factor is calculated (e.g., Basin A) e) Do the basin calcs include the sidewalk & curb in the impervious area? f) "C" factor of 0.10 for Basin B(as an example) onty wortcs if those lots are kept in tawn. How does that fit with the development p(an? A typical lot development plan might be helpful in documenting the assumed drainage surface factors g) Pipe system calcs nced to show how the assumed Q is obtained (e.g., Pipes C2i-C+C5) h) Grate calcs work if the 6" water depth dcesn't obstruct the roadway. Nced to maintain at least a 12' clear lane centered on CL. Grates should be evaluated for the flows they actually receive 7) Per previous e-mai1, alleys aze private thoroughfares, and should be maintained by the Homeowners' Association 8) Need to provide the O&M manual, to include Sinking Fund calcs for replacement of facilities located outside the public R/W 9) Pavement Design: Nced to include CBR test data & calculations, data used to conveR CBR to Iv1~ 10) 208 Lot Plans: Need to include a swale section detail for those lots with swales s V Submittal Checklist for Road & Drainage Projects in Spokane County - Plats/Short Plats This Submittal Checklist rs to be completed and signed by the Sponsor's Engineer, and included w1lh each plan submittal tnto the Spokane County Engrneers Office Ir thrs form is not fully completed and signed, do not submit plans and calculations to Spokane County for review arrd acceptance. Incomplete submrttals will be returneci and ►vill eaiese unnecessary delays for your clrent. ~~CCE 9~ e n i GV Project Name: 40V2zdA2AX JUPI [ 1 ZOQO Spokane County Project No. P19S9 Date: --__6~cb SPOKANE COUNTY ENGINEER Project Engineer: 64 G AIV6 TIM Sc49-14 Phone: 415-d~6 9y0 Project Sponsor; &2MZ1war R,~~ F~.rA.~s Phone- y8`/- 673.3 GI(iL13 V~N~ A. Preliminary Process Prior to Submittal of Road and Drainage Plans, the following events are to have already occurred: (By checking each rtenr off shown below, you are stating lhat you have verifred these events/ltems have been completed) Adoption of a HearinQ EYaminer's Report for this long plat, or a Planning Report for this short plat. At least one Pre-Design Meetmg has been held Nvith Counry staff at the En,gineers Office. An "Agreemen[ to Pay Fees" has been signed by the project sponsor, and submitted to the County Engineers Office. Ci` A Channelization Plan (e.g. sigung and striping plan) of public roadway improvements, has been coordinated and discussed with the County Engineers Office. B. Road and Drainage Plan Submittal The items listed below are to be provided as a muiimum with a road and dramage plan submittal. Additional information may be required to demonstrate that the plans meet all applicable standards. (By checking "yes" for each item shown below, you are verrfying that these rtems have been completed and are included ln thrs submrttal. For any box checked "n/a", a tivritten justrfication oj any omrssions at the end oj thrs section is requrred.) Item Description Q'yes Road and drainage plans, two print sets. (Certification statement on cover of plans) 6'yes Each Plan Sheet of record is signed and dated by the project sponsor. • CYyes The road and drainage design meets the requirements of State law, WAC 196-27 regarding '`conformity with accepted standards"; that is, the design reflects the "state of the practice" for the proposed concept. CYyes The plans, Drainage Report, basin map(s), and any other calculations are stamped, signed and dated by an engineer licensed in the State of Washington. Cr yes D n/a Drainage Report, tivo sets. To include: basin map(s), time of concentration routes in basin map, and Certification statement on cover of report and basin map. - L9~yes ❑ n/a Geotechnical Report, one set. (Include all soil test pit/boring logs.) 6'yes 0 n/a Structural Pavement Calculations, one set L9'yes ❑ n/a Cross-slope grade calculations for road widemng projects. 0 yes B' riJa Maintenance Ntanual and Sirnking Fund calculations for dradnage facilities located ❑utside of Caunty road rsght-of-way. ❑ yes Ef n/a Wntten explanatian of wh4lwhat entaty wzll be respnnszlale £or maentairung dralnage facilitses «lhich are located outside of public road right-af-way, and that the plan is acceptable ta the County Engineers +Qffice . e' yes 0 n/a ChaxxnelizatiQn Plan, or signing and striping infarmation provided Ln the road plans To be included in rtiad and drainage nlan set C9''yes 0 nla I have r~d the Heazing Exarruner's Repart (iong plat), ar Planivng Depfi Fi.ridLngs and Conciitians (short Dlat), for t.ius project The design meets the conditians in the report, PK yes ❑ n/a Capy of Approved Desip;n L)eviatLons S" yes ❑ rila Fire Distnct Approval, Foc priwate rvads . &`yes 0 n/a Loe PZans Required for any lats with drainage easements and whsch frant a publyc rdad, or for lats wtuch receive and treat runoff fi-om a pubiic nght-vf-waY . 0 yes 9'nla Any applicable State and Federal permits have been obtained. (L e HYA, JARPA, etc Foc Perrrufis with cvndxtions, a cQpy of the perrrut and conditivns are uicluded uY the plan subrruttal C~r`yes ❑ n/a Inspectsan Agreement between the spansor and ifis engineer. Q yes O'nla For off-site easements ta 6e granted ta Spokar►e County, the following items shall be mcluded: legal descnotion, exhibat, and proof af ownership plyes ❑ nla Erosion Control Plan, required for "Major Land-Disturbing Ac[tvity." Ta be included m the road and dranage nlan set. Explanation far any items 1'ts€ed abQVe which are nat inciuded in this submittal (Nate, an insufficient justificauan of why an itein rvas not included in tlie subrrutted, ar incarnptete docuinents, znay result in the subm.ittal being retumed without review nr ivithflut acceptance PravYde attackunents if necessary ) By s1gning below, the engineer ss stating that ihe infarnaation provided in the subrmttal is cqmplete, that tlxe mfannatirsn provided tin the SaibmilPad Checklasi is accura#e, and the plans and ca9culatsons are in accordanGe wlth the Spakane Countv Staradrards for Raad & S'ewcr CQrastr-uctiorr, and the Gurdeiines far Stormwarer Mirnagement, eYCept «here an apprQved Design deviatiora allows otherwise, Engineer's Signature Date- -0/0cr Engineer's Name _T1hWWY (piease pnnt) If there crre arry questrarrs a6out this form or approprrcrte procedures, please ccat!' Deuec'opmanz Services, Spokane C'oairaty Publtc Works, at (509) 456-3600 _ For Spakane County Use On1y Submittal No- ~ County Plan Reviewer: 0 Accepted i.n £ar Revsew ar Construci:on ;K--- Returtaed to the engineer wsthout revzew anWer , See attached letter of explanatzon Prcrcessing Date 10 Jv4.60 Subrruttal Check7ist 2 Spokane Caunri Puhlic War'dcs; Apnl 29, 1998 r ` 1 4 , + ~ _ __.....------f+~--~-~----- - ~ ~ - . ~ - ~ ~ - . ~ - ~ ~ _ ~ " ' . , ' i S P CJ x- A N E ~ C) LT N T Y DiVISIdN OF ENGIIVEEitING AND KQADS A OIVISTnN OF THE PUBLIC V1ipRK5 1JEPAATMENT WiAiam A. Jrshns, P E, Caunty Engzneer Jilly 10, 2000 TI111 SChw"dt7, P.E. CX..e ASSi]C1ateS,_ZIiC. 707 vvest 7'h AYenue, suite 201 spoxane, wA 99204 SUBJECT: P1859 - Uishman Commans V Submittal Gentlemen: We lave Gonducted acursory review af your dune 21, 2000 submittal of Design Documents for this project, and we have fvund that the submrt.tal generally daes nat conform ta the requirements af the Spokane County Stcrndards far Roud and Sewer Construction or the Guidelines for Starmwater Management. We are, therefore, unable tp accept your submittal for review at this time. "Ihe attached cariunent tig contairs the atems of concern which we discoverei, and it is nof to be canstrued as leing cvmprehensiVe. If you have any questions abaut this review, please contact Ed Parry at 477-3600. Thank yau. Sincerely, William A. Juhns, P. E. Spakane County Engineer ?~r Edvuard J. P , P.E. Plan Review Engineer ettcl.: Design Documenfs - plans Comments ( Z page) cc: prvjec4 file reviewer (corrjmenfs onfy) Sponsor. Northwest Regivnai Fac'slitafor5 1026 W Braadway Ave. • Spakane. WA 99260-0170 +(509) 477-3600 FAX. {509} 477-7655 {2nd Flvnr} 477-7478 (3rd Floor) • TDI]• (509) 477-7133 Tim 5cbwab, F.E. P1$S9 DISh1IlAi1 Chmri1DItS 1't 5ui1m11tal July lQ, 2000 Page 2 of 2 Items needed: l} ESC Plan: Need to identify a ivcation for Crrncrete Truck wa,shaut 2) Sheet 2: a} IVeed to show hnw ths curb lirre is iacated at ie.ast Z' north of rhe most norttierly pawer pole, per Condition oF ApproVal # 1 for the Design Ueviatiora (BiIE ]ohns' merna dated April 26, 2000). Pawer 1'vles need ta be indicated 6) l+ieed vffset distance for CB at callQUt #I c) Should provide a standard plan reference or a detail callout for the "traffic candles" (callout #2), Nas this been coordinated with the Cvunty Traffic Enginaer? d} Statians for street lights should he indicated e) Stations for c}langeltransition frvm Type B cu.rb (eallQUt #5) #o Type Acurb (callvu# #6) should be indicateci - t) Need offset distance for pipe outlet at caliout #J g} Hvw is maintenance access pravided to pipe outlet (caliout #9)7 3} Sheet 3: a} Tager shnuld match callouts b) Yribaund tapers are rypicaliy 10:1, 100' minimurn 4} ;haet 4: a} Neei station 8c offset distance for pipe outlet at callouts #3 Sc #b h) Cur►+e data for CM 5) 5heet 5: a} Need statian & offset distance for pipe outiet at caillouts #3 &#9 f) Drainage Calculations: a) Cer#ification statement on basin rnap should be provided b} Enecgy Grade Line analysis for pipe systems shauld be pravided c} Sub-hasing need to match the basin map (e.g., Basin A) d} Basin calcs need tv shuw hew the weighted C factor is calculated (e.g., Basin A) e) Da the basin caics include the sidewalk & curh in the imperviuus area? f} "C" factor nf (?_lU for Basin B(as an exampte) vnly wnrks if those lats are kegt in lawn. Haw does that ft wlth fihe development plan? A typical lvt deaelopment plara might be helpful in documenting the assumed drainage surfac,e factors g) Pipe systearn calcs need tn show how tJhe assumed Q is obtained (e_g., Pipes C2+C+CS) h) Grate calcs wark if the 6" water depth doesn't abstruct the roadway. ATeed to maintain at teast a 12' clear lane rentered on CL. Grates shuWd be evaluated for the tlvws they actually reaeive 7} Per previous e-mait, alley+s are priVate thorougtifares, artd should be maintained by the Hvmeowners' Associativn Need tfl provide the ()&M manual, to inciude Sirking Fwntl calcs for replamment af facilsties lccated outside #he public RIQV' 9) Pa►+eznent I}esign: Need to include CEH #est daia & caiculations, data used to cnnvert CBR to Mr 10) 208 Lcrt Plans: Need to include aswale sectian detail for those tats with swales Submit#al Checklist fnr Road & i?rainage Prajects i❑ Spokane Cvunty - F1atslShart Plats Th7s submirrar checklist is rQ be comprered and stgned by the sponsor's Engtneer, and rncludecl,vrth each pdarr submrttal into rize Spokarre County E"ngiraeers 4f~ce If lhrs farm rs raot fudIy completed etnd srgrred, do nat submat plcrns ancl cafculatrorrs to 5'pakcrne Caunty for revrew and acceptance. Incompdete submtttals wilI be returned and tivrlT caarse unnecessurydelays for your ctrent R ELE 'E `4 tk~~D Pro}ect Name- _D_0NI19AW l.nnarnQAY - JUN l 1 2000 5pokane County Project No P18 5-9 Date G 1l91 to SPqKANE (:UUiV3Y ENGINEER Froject Engineer. 6L C /106 Trm sc,4,v.t~ Fhone- yS-1-699'0 P3'(3]eCL S}7dI150T: &~M7tH3z151- Phone- 5/i?Sr- 6733 G►IRa 5 l1g~yN~,. A. Prelimanary -Process Pnor to Submittal of Raad and Drainage Plans, the followirrg even[s are ta have aIready accurted' (I3y check:ng each r[em off"shativrr below, you are staia►rg lhat,vou hcrve verif ed these evenls/items haue freen compdeted) Adoption of a Hearuzg Exanunner's Repvrt for tius long plat, or a Plannirsg keport fvr tlus short p6at f C3" ~ At least ane Pre-Design Meeting has been held with County staff at the Engineers (7ffice An "Agreement ta Pay Fees" ha.s been signed by the project sponsar, a.nd submitted tv the County Engirseers C3flice. A Channelization PIan (e g. sigling and stnping plan) of pu61ic raadway improvernents, has been coordinated and daseussed vviih the County Engineers Office. B. Raad and Drainage Plan Submittal T'he i#ems listed below are to be provided as a aunirnum rvith a road and drainage plan subn-urtai. Additional Lnfannation may he required to demonstrate that the plans rneet a!1 applicable siandards (By checkrng '"yes"ror each item showrr belaw, yvu crre verifyrng thQi rhese items hrave been completed and are rncluded in this subrruttg(. F'rar any 6ox checked "nIn", a wrrtfen jus[rcation af any ornrssrans ae the errd aj thrs sectaarr 3s requ:red ) Item Description C't'yes Rvad and draunage p1ans, two print sets (Certificatzon statement on cover of gians) T'yes Eaeh Piar► 5heet af recard is slgned artd dated by #he praject sponspr [ir-yes The road and drainage tiesign meets the requiremen#s af 5tate ladv, WAC 196-27 regarding confornuty vvith accepted standards", that is, the design reflects the "state of the practice„ for the qraposeti concept. (3'yes The plans, Drainage Repart, basia map(s), and any other calculations are stamped, signed and dated by an engixieer licensed m the Stace of Washn.gtora. {-I'yes C3 nla Drai.r►age Report, two sets. "I'o enclude: basin map{s}, time of concentratien routes in basm map, and Certification statement on caver of report and 6asin maD ff'yes ❑ nfa Geotechrucai Report, one set. (Inciude afl sod test pitlborng iags.) 6'}+es 11 nla 5tructural Pavement Calcutati4sss, ❑ne set , ff~yes Cl nla Crass-slope grade calciaiations for rvad widenuig prajects. . 17 yes 8r nIa Mauztenance Manual and 5inkLng Fund cakculations for dra►nage factilskies Iocated outside of CauntV road nght-of-way ❑ yes L'f n!a Written explanation af svholwhat entity wilt be responsabie for maxntaLning draunage facilittes «Fuch are located outside af publsc rvad right-of way, and that the plan is acceptable to the Countv Engineers affice. R' yes 0 n!a Channehxation Plan, or sigzwng arac3 stripmg infarnzativn prflvided ui the road plasis To be included m road arsd draunage plan sct 6'ycs ❑ Ev`a i have read the Hearing Examiner's Report (long p1at), or Pia3antng I}ept Fuadings and Condittans (short plat), for tltis project The design rneets the cnnditions tn the report C►Kyes ❑ nla Copy vf Approved Desz,gn Deriataons Y yes 0 nla Fue Dastnct Appraval, for pnVate roads [~T'yes Q nfa Lot Plans Reqraired for any lots with drainage easements and whic3a front a public road, or - for lots whzch receive and treat runoff'from a p❑blsc nght-of way. ❑ yes B'"nIa Any applicabie 5tate and Federal permrts have been obtained. (i.e EPA, ]A,R,PA, e#c.) For F'entiits with conditaons, a cflpy v£ the perrrut and conditians are included m the plan submitcal K'"yes ❑ nl'a Inspectaan Agreement between the sponsor anci its en,gineer. 0 yes a~'nfa Far off-site easements to be gra.nted ta 5pokane Cvuncy, the following items shall be inctuded legal descriptson, exh.sbit, and proof of ownerslup .'C!Yyes ❑ nla Erosion Cantroi Plan, required for "Ma3or Land-Disturbing Act7vsty " To be tncludcd m the road and drauiage plan set Exglanation for any iiems listed above whcch are nat mcluded in ttus subrriittal: (Nate an insufficient }ussif"icauon vf wliy an item was nat tncluded in the submitted, or tncflmplete docutnents, may res,lt in the submittal being reiurned withaut review ar withauc acceptance Provide atiachrnents if necessary ) By signa.ng belaw, the engi-neer is stating that the uifbrmation presvided in the subrruttal is eomplete, that the LnformataQn pravsded in kkae Subrnattcz! Checkdis[ ss accurate, and the pfans and calcuiations are in aeeardance with the Spakane County Sfarrdards for Road & Sewer Carastruction, arxd the Grlclelanes for 5tormwater Management, exeept where an approved DeSign Devia[tan alIowS otlxerwise Engineer's Signature- _ -941~ Date ~va Engineer's Name. ~t+ya'm`f A • <cwwA S (glease pnnt) 1f there are any questrons C7bpul Ij?75 ~f7TT7t ar appropriare procedures, please ca2I £)evedapment Services, Spakc7rre C'aunryPublic Works, at (509) ¢56-3600 For Spokane County Use On1y Submittal Na- ~ County Ftan Reviewer- 6D AVi#,~P e, t7 Accepted saa for Revsew or Canstructtan Returned tca the enguseer without reView , See attached Ietter of expYanat«sn. Processsng Date 10 Sub[ruttal Checklisf ~ 5pokaiie Caunn Public Wasks. Apnl 29, 1998 / \ ~~FVal PUsLr, 130cuzEEvr Sediment Yield, Flaxman Metho*KANL-CpUf~~~~~~GENIEERsoF-,cE Project Name: Dishman C'ommonc1° P IPE ProjeCt N0. 9g353 SUb~~9iT`~1i. a~ 2 Engineer: Tim Schwab Trap ID Trap w/ Largest Swbbasin RET,;RN I1) C7't;NTY GNCINEER USC Soil Classification: S Variable Data Input: Avg. Annual Precip., P= inches Avg. Annual Temp., T= Degrees Fahrenheit Avg. Watshed Slope, X2 = 4 percent X2 . Particles Courser than 1 mm = 30 Percent/72 = X3 Percent Clay in Soil = 10 percent 2-yr Storm, Square mi., Q= 143 cfs X5 Basin Size, A= acres Time Period, T= 2 months pH of soil = 8<- assume worse case (P/'T)/1.43 = 0.31 X1 110 X4 SQRT(Y) = 40.90 Y= 1672.70 tons/square mile per year ' Y. = 0.218 tons/(acre'month) Y' for Basin = 4.49 tons/(basin'T) Volume of Sediment, D= 75 cubic Ft. ~ a ~l0' .r /0' 7'ea'A0it~fy P01u4 Fo2 sfDiy,F.t,T c.uItztfGkO T!/E VOtUM-d' OF SEDiMEIvr 2EQv1lL,EO 47- A DEprq oF Geiy 7y/rg,•0 3vi,usEs ~NY A. S . "'ARECEIVFD ~ AUG 0 6 2000 q~~~2818 Q SPOKANE COUNTY ENGINEFR s/ONAL~ ~ vcPiREs:9hl/o/ ~ 99353 CLC Associates, Inc. 6/16/2000 :=}a~-~ ' • r:~~~a~~~-}. ~ • • - - - ~ [ . . . ' ~ . - f" • ~ • ' . . -51o: _ e a.~nd crvss-s~lope-calculati~ons_ ~ " 'l•" ' f_ v r 16' Ave. . and Felts Ro a d ~ - - _ Pavement Widening - - . ' • - - a'•- ' r I_r. • ~ - ~ . . CLC ASSQGIATES, INC. . i PRvJEGr rNFORMA riaN rrPIcAL sEcrroN aA rA Prafsct D15HMAN COkNMDN3 Roadm+ay ha16 wrdth EN7ER- 20' PAVED WIOTH Job No, 99353 Road Name EPITER-y FELTS ROAD DlsC.IVv LeR vr Rrght ENTER-a LEFT Fife Name FELT5.PIAMTDES.WB2 Edge Type TYPf'B" CURB B GUTTER carcurated igy F-Mr srerron rntenvel ENTER-a so { I ~ I I MfNIM[1119 I MAXIA+tcIM ~ A I arsr. I IDisr FRoM E.P. EL€V. ;E.P. ELEv. 9 I CIL Ta I% SLQPE E+APE I CENFERLlAfE 1(-4.5% trami (2°lo from SELECTED I Edye Pa►+e. CIL % SLOPE 5A WCCIT !SAWClIT C/L 7'i7 PRYEMENT 'I TO EOP I sa+vcut tv sawCUt tn E f~,P ~ tu Gutter Edge of Pv. TDP OF STRTIQIV EtEYATlON CIZ ELEVAVTPdN I(FEE7) ~ 5{4'WCUT' °1 51~.8PE f { FEET} I edge [~f A1~' 1 edge vf P~ _,EfLEV. GRADE %GRADE Ci!!RB FL. A f I I I I ~ ~ I I i t $40 00 2028 78 ERR r 2028 72 ~ 200 ~ •3 OQ ERR 1850 2027 88 2€128 39 2028.20 0 -3,5 eRR ~ anaa ss _ 55000 202910 0 80 ~ 202913 ~ 2 00 ~ -2 50 ' 0.82 { 1850 ' 2028 39 202880 2028 78 ~ -2 12 ~ 116 ~ 2029 17 fiflp OD 202966 096 ~ 2029 63 200 ~ •1 50 ~ 1 UO ~ 1850 p2028ss 2[}29 30 202008 ~ -3 33 I 060 0 202947 650.00 y 2030,16 ~ 1 oa I 203013 200 I•1.50 ~ 1 oa ~ 4850 r zozs as ~ zoas ao 2029aa ~ -394 I 0.80 ~ 2029 87 70000 ~ 203063 ~ 094 ~ 2030 54 2 40 -4 50 ~ 082 { 1850 ~ 202980 ~ 2030 21 ~ 202988 ~ •4 OG ~ 080 ~ 203027 750Dd 203067 ~ 0 08 2030 63 ~ 2 DO ~ -200 0 19 I 1850 E 202989 ~ 203030 ~ 203028 ~ •2 72 ~ 080 ~ 203067 80000 zaai 50 E 166 ~ 2031.47 p z ea ~-i so 168 ~ 1850 k 2034 73 ~ 2031 ia ~ 2031.12 ~ -a i2 ~ 16e ~ 2031 51 f J 00Gl7MENTt993531FELT5 PVMTDES QPNJ 1 I]51(73100 CLC ASSOCIATES, lNC. . P,ROJECTlNFOR1HA TlON TYPfGaL SECTJON DATA Pmject• OISHMAN COMM[}N5 f2oadway laelf wEdlh ENTER- 19.5' PAVEa WIDtH Ja6 No 99353 Roed Nama EN7ER- 'EfiTN AVENUE Disc,No ' Lef€ or RPght ENTER- RIGTfT F1fe Name' 16TM5.PV1NTDES.YVB2 Edge Type TOP flF CL1R6 CaleutaEed By EMT 5tatron lntenral ENTER- 5Q MlN1Mt1M MAXlMLIM D15T. D157'FF2OlF1 E.P. ELEV! E.P. ELEV. SECIL TQ % SLOPE EQGE sEcr►OrvL►nrE (-4.5i from ( a°✓a,f1'o+7'+ 5ELEGTEO Edge Pave, 5EC/L % SLf1PE 8A WGifT SAWCUT SECfL 7°O PAVEMENT TO EDP sasvcut to sewcrrt to E O.P. tu Gutter Edy~ ~f Pv. raP oF STATfON ELEVATION SECIL ELE'YATIDN (FEET) SAWCi1T % SLQPE ( FEETJ edge of~v srlge ofp ELEV. 9a GRADE %GRADE CURB EL. I k I A I k I ! I saa ao ~ 20003a ~ eRR ~ 200009 ~ 1700 -ti ss I ERR 1800 f 2000as 2000a7 200007 ~ -200 ~ eRR I2000as 55000 ~ 2001s5 j 266 I 2001as ~ 1700 -7 1a ~ 274 1800 I 2001 aa 200144 zvos 44 ~ -2 oa I 274 200183 aoa na ~ 2002.89 ~ 248 I 200280 { 1700 -0.53 ~ 288 1800 p zoaz,,s ~ 200278 zvoz as ~ -z oa 268 2003i7 650on ~ 200389 4 200 20036e I 1700 -1 is I 378 ~ 1800 6 200365 I 200367 k 200367 ~ _z na ~ 178 aQVa os 700oa ~ zooa ss F 094 2.04 zz ~ 1700 -o az ~ 1,06 ~ 18 DO f 200418 I 2004zm p 2004zo ~ -z ao ~ 1 aa ~ 200459 750uo ~ 2005 00 I 123 ~ 2004 rs ~ 1700 •1 aa j 174 ~ 1800 ~ 200475 ~ 200477 I 204,77 ~ -z 00 114 f 200515 80000 ~ 200585 p 1 70 ~ 200567 I 1740 ~ -y ns I 1 7$ I 18 40 ~ 200563 I 2005.65 G znos ss ~ -z fla ~ 176 ~ 200604 860oo I 200e Bs I 200 200660 I 1700 -1 a7 I 1 SS i 18 06 I 200656 I 200558 ! ZUO$ 98 I -2 DO i 1,86 k 200697 90000 I 2007 94 f 218 2007 73 1700 -1 2a 1 2 28 I 18 UQ P 200769 I 200771 E 200771 I -2 Oa I 226 I 2008 10 95000 I 200924 p 2 60 200905 17 00 -1 12 1 2 64 I 1800 6 2009 01 1. 200903 I 2009,03 I -2 06 1 254 Y 2009 92 100000 I 201063 I 278 I 201046 17 QL1 -5 Oa I 7 82 I 16 oq ' 2050 42 I 201044 d 2090 44 I -2 Qa I 2 82 I 201083 7050QO I 2812.08 f 2 86 I 201187 1700 I -4 12 I Y 82 I 19 00 2011 83 I 2011 85 ! 201185 1 -2 na I 2 82 2012 24 110000 I 201346 1 2 80 I 2013 20 17.17[3 I -1 53 ~ 266 I S8 60 201316 I 2013 16 a 2p13 tE 1 -2 00 I 286 201357 155000 I 201496 I 3 00 201474 1700 I -1 29 1 308 I 78 00 201470 I 201472 2014 72 I -2 00 I 3 09 2015 11 120000 I 207859 h 326 207844 1704 I -088 E 340 1 f840 201640 I 201642 201642 d -200 I 340 1 201881 M 2418 24 I 201826 2a18 26 I -2 60 I 360 I 201865 125000 I 2078 39 V 360 2018 28 1700 I -0 6S + 3 59 1 1800 13[~0Uf? 9 2020 29 4 3 80 I 2020 13 17 00 I -0,94 i 370 I 18 ff0 1 202009 I 2020 11 2620,51 f -2 QO I 3 70 1 202050 135000 1 2022 19 9 3 80 1 2022 07 q 17 00 1 - 1 06 I 3 76 ~ 18.00 q 2021 97 I 2021 99 1 2021.99 I •2 0O 1 3 78 I 202238 1400 Q0 I 2024 11 I 3 84 I 2023 94 J ia ao d -1 06 I 3 88 I 1800 2023 99 1' 2023 92 1 2023.92 I -2 00 I 306 I 202431 145000 I 2028 02 I 382 I 2025,85 1 1700 9 -1 p0 I 3 82 I 18 OQ 2025 87 I 202583 I 2025,83 I -2.66 I 3 82 I 202622 150000 G 2027 81 I 358 I 202760 9 1700 7 -1 24 I 3 50 I 19 OQ 202756 I 2427 58 9 2027.58 I -2 OD I 3 50 tl 2027 87 155000 I 202948 I 3 30 I 2029 23 I 1700 d -1 35 I 326 1800 d 202919 ~ 202921 d 202921 I -2.00 I 326 I 202980 160000 I 2030 91 I 290 I 203064 I 1700 l -159 I 2 82 I 1800 1 203060 I 203062 l 203062 I •200 I 202 ~ 2033 01 lsso oa I 2032 31 I 2 80 I 203202 I 1700 d -7 77 I 2 76 I 18 06 I 2031 98 I 2032.QA I 2032 I -7 6a I 276 203239 J 1dOCL1A+1ENT19@353116TH5 PVMTLIES 0 PW 1 05103100 cLc AssOciArEs, INc. pROJEcr►NFoRM,arraN rvwIcAL sEcrioN aar,a Prajecf- 015HMAN COfVihRONS Roadway hali widEh ENTER- 14' PAVED WIDfiH Job IVo 99353 ,Road Name ENTER- 18Thi AllENUE OtsC No ' Left or Rrght ENTEFa--x LEFT File Narne 1ETHIV.PViN`C[3ES.WB2 Edge Type EDGE dF PAVEMENT Calculated 8y EMT SFatrvrr fnterual ENTER- 54 Y I I MfNIMIJM ~V1RXlMUN1 D1ST. ~ I OISTFROM I E.P. ELEY. ~ E.P. ELEV. I G/L TO I% SLOPE Ef]GF CEAITERLfNE 1(-4.5% frorn I {-3l fram sELEcTEp Edga Pave. ~ CIL 1 SLDPE SLiWCUT SAWCfJT I C/L Tf? PAVFNIENT I TO EOP I sativcuf to I sawcut to E oR tm Gufter I EdgQ af Pv. 7QP OF 5TA'i1QAf ELEVATfQN Ctt ELEVATION (FEET) I S.4WCUT SLOPE I { FEET} I edge ufp~Ll edge af qyl_ ELEV. % G,RADE %GRAC7g CURB EG. f 1 I I I ~ I I 1 ~ 400t10 ~ 1998 30 ERR ~ 5996 59 8 00 ~ -1 83 ~ ERR 14 d0 ~ 1897 83 V 1998 03 ~ 5998.45 ~ -1 75 ~ ERR { 199844 45000 ~ 7999 15 170 ~ 1959 71 900 ~ -4 fi7 ~ 1 84 14 Od ~ ] 388 75 ~ 199895 ~ 1898 85 ~ -2 DO ' 180 ' 199934 50000 ~ 2000 30 1 2 30 ~ 200034 $ OG ~ 17.67 ~ 246 0 14 00 199998 ~ 2000 78 ~ 2060 18 ~ -2 fl0 ~ 2 48 ~ 200057 55000 j 2009 aa 1 266 ~ atsoi ss { 600 1 -a sT 1 2 so ~ 14 oo ~ 2001 23 ~ zoai as I 2001aa ~ -200 I 2 50 I 2001 82 soo on ~ anaz es 1 244 ~ aanz sa ~ 600 e -s aa 1 206 ~ 14 00 ~ 20422a ~ 2002as ~ zooz aa ~ -z 0o ~ 206 I 2002 85 650on ~ 2003 e7 I 204 ~ 200358 600 ~ -a e3 I s sa ~ 14 oa ~ 200322 ~ aoua az ~ zaaa az ~ -2 fla ~ 192 I aooa ai 700no ~ avoa sa 094 ~ zooa gq 600 I -3 33 ~ i 42 ~ ia 00 I 200378 j aoos sa ~ 2003 ss I -2 00 ~ 112 ~ zoaa 37 75000 I zUida 98 t 24 1 20a175 600 I -2 63 I i 30 74 DO ~ 200443 r 20o4 63 I 200463 I -2 D0 tl 9.30 200502 8f1U OU I 2005 62 1 72 2065 78 5 00 I -063 9 i 98 E 1400 200542 I 200562 I 200562 I -2 fl0 ~ 1 98 200601 85000 200683 2 02 ~ 200884 fi OG I 0 17 ! 2 12 l 1400 I 200648 I 200668 ~ 20068B I -7 OU I 2,12 200707 90000 200794 2 22 I 200801 600 I 1 77 p 2 34 p 1400 I 200765 I 2407 86 ~ 200785 I -2 UU I 2.34 I 2008 24 95000 2009 24 260 1 2009 18 600 I -083 ! 2 36 ~ 1400 I 2006,83 I 2009 d3 1 200903 I -2 OU 2.36 2009 42 100000 I 201059 2 70 1 201050 ~ 600 I -9.50 9 2 82 V, 14 00 I 201014 1 201034 I 201034 I -2 00 2,62 2010 73 105000 I 2011 99 1 2 80 I 201 181 1 fi Oq I -3 00 I 2 52 k 14 OA I 2011 45 I 201165 P 2011.65 I -2 40 262 I 201204 110000 ! 201340 I 2 82 I 2013 23 I 600 I -2 63 I 2 84 Y 14 OQ I 201287 I 201307 h 2013 07 I -2 D6 1 284 1 201346 1550 OU I 20 14 84 I 2 SO I 201472 I fi l]D -1 33 I 2 98 I 14 OD I 2014 39 1 201456 V 201456 _ I -2 DQ ~ 298 9 2014 95 120000 I 2018 55 I 3 54 I 201543 1 600 -2.00 d 342 I 14 QO I 2016 07 II 201627 , 2016 27 I -2.00 342 I 2076 86 125000 I 2U18 35 I 380 I 201825 j 600 =1 87 I 3 84 I 14 00 I 201789 6 201809 I 201809 I -200 364 201848 130000 2024 23 I 3 78 h 2020 179 1 600 -2 33 I 356 1 14 00 I 2079 73 1 201993 I 201993 I -2 00 3 88 202032 1350 00 2022 53 I 380 V 202199 I 8 00 1 -2 33 I 3 80 I 14 Off I 2029 63 P 2021 63 202183 I -2Of} 380 2022 22 740000 2024 05 p 3 84 ~ 202401 1 600 -V 67 f 404 I 14 00 I 2023 85 I 202385 ~ 202385 I -2 {]0 4014 202424 1450l70 202599 I 3 88 I 202591 I 8 00 ~ -1 33 1 380 I 14 00 I 2025 55 h 2025 75 I 7025 75 I -200 3 90 202514 150000 2027.76 I 3`a4 I 2037 71 I fi OU ~ -0 63 I 3 64 _ I 14 00 I 2027 35 I 2427 55 I 2027 55 I -200 3.60 I 2027 34 155000 i 202935 I 3 58 1_ 2029 10 I 600 I -4 17 I 2 78 I 74 RO I 2028 74 I 202894 ' 202€9 94 I -2Da 7 79 I 202933 160000 I 203080 I 2 90 I 2030 49 I 6 40 I -5 1T I 276 ! 14 00 I 2030 13 I 203033 1 2030 33 I -2U6 ~ 2 78 i 2030 72 165000 d 2032 20 1 2 80 j 2031 88 I 8 40 I •5 33 1 276 q 14 00 I 2031 52 I 2031 72 r 2031 72 I -2 UO 2 79 i 203211 1700 40 a 2033 36 I 2 38 6 2033 28 I fi UD I •1 87 I 2 80 I 12 50 I 2033 04 I 2093 16 I 2033 78 I -1 97 I 2,88 I 203355 175040 J 203384 I 0 92 1 203385 I 600 I 017 1 i 54 I 7 33 I 2033 79 I 203382 I 2033 83 I -1 50 I 1 34 I 2034 22 I ~ J Sf]4CUMENTl9935311BTHN PVMTmES 0 PW 1 05i03100 CLC ASSQCIateS IIIC. - _ ~ FORFA ERLY 707 West 7th Suite 200 AugLaSt 7, 2000 Spokane, WA 99204 509-458-6840 509-458-88444 Fax RECEIVEQ 5pokane, WA - Den+rer, CD Mr. Ed Parry AVG 0 6 2000 Spokane County Engineers T}eveloper Services SPOKaNE cpUNrr ENGiNEER 1 026 West Broadway Avenue Spokane, WA 99260 RE: Dishman Cammans CLC #99353 Dear Mr. Parry: Enclased please ~'ind fiwo sets of reVised xoad and drainage plarts albng with reparts and various dvcumentation far the alaove referenced project. We have addressed yvu.r previous comments and included a OBiM manual with sinking fund calculakivns. Please review xhe plans and adVise our office of any necessary changes. Sincerely, CLC Assvciates, Inc. , I]oug . Zsmo0ndVW/"' Project Manager I]]Dfefi Enclasures Planning Engineering Architecture tandscape Architecture Land Surveytng Farmerly [PE r S 1' C~ K ArNT E CcJ CJ N T Y Dmsaonr oF ENGrNEsRmaG aND RanoS A D[VisioN oF 2HE PUBue WoiucS DEgnxTME,rr "1h°'illiam A. Johns, 1'.E., Causrty 6ng`srteer August 21, 2000 Tim Sch►vab, P.E. CLC Associates, Inc. 707 West 7`b Avenue, 5uite 201 5pakane, WA 992(}4 _ SL1rBTECT: P1859-&O ishman Cvmmarns 2AOgu-bmittal Gentlerr►en: We haVe r-ortducted a cursory reaiew of your August 8, 2000 submittal of Design L)ocurnents for this prmject, and we har+e fa►tnd that the sulamittai generally does not confomt to the requiremer►ts of 4he Spotcane Caunty Strrradards fQr ,Road and Sewer Constructian or the Guidelines for Storrrawater Marragement. `Ne are, therefore, unable to aceert y+aur suhmitta1 for coonsbruccion at this tirtne. The attached camment list contairs the items af coneem ihat we discaveredg 3I7d It 15 L1Ox 'CD be GonstTlled aS being comprehensive. GiVen the number and degree of items Co be resolved, a Fro-Submittal meeting is needed, sv that all parties can en5ure that the camment.s are adequately addressed priQr fiv the neact submittal. If yeu have any gue.stinns abairt this review, piease contact Ed Fatry, P.E. at 477-3600. Thaaik you. 5inc.ereiy, W illiam A. 9 ahns, P. E. 5pokane County Engineer dw . ~.E. Ptan Review Engineer er►et._ Uesigri Documents - plans Comments (4 Pages) r,,c: pmject fi9e teviewer (cornmenis onlY) 5gernsar: Narthwest Rzgivnal Faeiiitainrs 1026 W Broadway Ave. • 5pakane, WA 49260-017[] •(S09) 477-3604 F,3X. (509) 477•7655 (Znd Floor) 477-747$ (3rd Floor) + TC}T]• {509} 477-7133 s 'I"im Schwab, P,E. P1859 - DishQaaA Cummans 2°d Submittal August 21, 2400 Page 2 af S Items remaining from 1 ' suhmattal: 2} 5hed 2: , r : : c) Should proviae a stans1ard plan reference or a detafl rallout far the "traffic cancties" (callou# #2). Has thi5 beert cwrdinat.ed with the Courity Tri c Engineex? (Needs to Se coordinated with thE Cnunty Treic Engineer) indieattd g) Hnw is maintenance access prorrided to pipe autle# (callout #9)? (Veeds to be clearly indicated on the plans) 3} Stteet 3: hgbemdWpersaFeWpieallylO.:1,100'miiim 4) Sheet 4: b} . 5) S3eet S: 5} L)raixage Calculaticros: b) EneW ~'itacie Litte anaiysis for pipe system should be prvvided (System ,42A1 needs to hcrve the rr'm elevations indFcate.rl. System C7-C6-G3: edlcu[atiarrs indicarte that a freeboard less than the requrred.75' wil1 be pravidedj c} 5ub-basins neeci to match the ba,sin map (e.g., Basin A) (Need to tndicare topogra,pfy. The conrours pn ihe roarl pTarr.s in the vrcinrty of I,ot.s 1OA rhraugh 6A indicrrte that there mQy be c~ffsite areas f2nwing onto the site. I.f there are contributing offsite brrsin.r, rind they are to be cut off, then the pluits dvi!'1 need to ref2ect lhat) e) Do the basin calcs inelude the sidewalk 8i curb in the impervious area7 (Haw was thrs addressed?) f) "C" factor of 0_ 10 for Hasin B(as an eeample) only vvearks if thcyse iots are kept irt lavvn. How doe.s t.hat fit with the develvpmeirt plan? A rypical lcst deve4oprnent plan might be helpful in documenting the assiuned drairage surface factors {Not c[early crddressed; ba.srns need to be evuluaaed at the burlt-out candition) r t1) Gi3ke CalL'S WC]I'k lf tihe 6" 9Vafiei depth dOGSII'ti [7b5tr11ct thB Iik'LdWap. Need [U FSl&.lIiutil1 9t lea5t a 12' clesr lane centerad csn CL. Grates should be e►raluated for the flows tmy actuadly receive , , T'iio, 5ehwab, P.E. P1859 - Dishman Comenons 2'4 Subenittal Aupst 21, 2000 Page 3 of 5 Asseeiatien , 9) Pavement Design: Need to include CBR tesC data & calcuiations, data vsed to canverC CBR to Md (Data was prcavided with this submittad. Technica! Reference B of the Sdartdards does rrot indicate thcat cz direct conversion vf +CBR 1o Mr is an acceptabde standasd methodfor rletermining tYI,. Approval af a Design 1leWiation Request will be needed far thi.s msthncd; per our 13 July 00 e-mail cprrespnndence. ?'he Coxsnty's evcaluatian of this approach has,f`nund that CBR tests arre toa variable among srarnples within a sQid type to Fie a reliab?e,prea'ictcrr af the M, value. The CBR varrabilfty appears to he Trorrie out by the test data prrvided Please obtain the C'ounty Engineer's approval pf aDesign Leviatiora Request far thas methndprinr to the next submitta!) xQ} 248 Lat Plans: Need to ir►clude a swale section detail for those lvts with swales (Swale section detail was not received with this submittu2) Itemm,s noted on 2'd Submittal: 208 Lot Plsns . + Lrt 3, Slacte 1: ~ue to the s~ of the drainage easement +an Lot 3, Block 1, the easemea will need to be dedicatad as s separate tract, or the T.ot could be dedicated as a separate Tract for Draira„ge only. SEorn I3rain piping wiiI need to be cantained in an easement • T..ot 5, Block 1 T3ue to tkae size ofthe draiszage easement on Lot G, Block l, this L.ot will need to be dedicated as a separaCe kact for drairage purposes only. • 5toam Drain piping wild raeed to be contained in an easement + Lot 4, BIock t A separate tr-aet is needer3 for Pond B Stvrm Drain piping wi11 need to be cantained in an easement • Lat 2, Block l Aiorth line of the I?minage Eassement neeeds to be dimensioned atong the 16`h Avenue RfW 1ine, east line nee3s to be dimensioned from the 1 e Avenue RfW Sheet 2: Pipe systern from 16d' Avenue to Pond B needs to showwn ist profile Drainage easemert frrr pipc system neWs to be c3imensiared Sheet 4: CalUout #2: Needs za be ooordinsied with the detail Rage Cakut 43: Needs to be roordimtei with the detail page Caltout 46: Street light needs to be located outside the sidewalk 8t sidevvalk ramp Sheet S Need to indicate offsers for catch basins Castours in the ►+'scinity of Porzd B need to he completeaci Driveway (callout #7) appears to r,orrflict with streetlight at t 3+75 (17`h Lane) Tim Schwab, P.E. P1$54 - Dishmaa Commnns 2ad Subbuittal Augvst 21, 2000 Page 4 of5 Pipes need to be indicated in proFle; prof le of piping system is a.lso needed (GSM, paira. 2.1,a) Ta-act Glimi#s need to he clearly indicated • Callout #9: rim elevation needs to be coordinated with Detaal tiSheet $ Sheet 6 Pipes need to be indicated in raad prdfile; pmfsle of piPing system is also needed (CpSM; para. 2. La) CalTnut # k: Curb should transition similsr to deai12 0n she.et 5 Callouc #Z: Need to indicate affsets °for catch bssan Grate elevativn needs to be ~ardinatei with T1C e4er+s#ion +Callout 97: Grate ekevaiivn needs to be coordinated with TIC elevation Callout #14: Grate eleva#ion needs to tre coardimed vvith TIC elevation Deiail #4: Is the private road in a traet or an easetnent? Sneet 8: I]etail #1: Rim etevation needs to be r.oardinated with ca.ilout #9f5heet 5 Iecail #2: AIeed to indic,ate ca.sement d'uxkensiQns DeVClOped It00d.,S to Set PDfid B 11r1 a $Ep3PaIe tri1Ct Pipe from cnan'ho1e (Sheet 2, calloua #8) needs to be placed in an easernent Detail #3: Haw does the g,rading for Pand C remain within the proposei easerne.nt? What alavut slopes frarry the back of cur°b down to the drywells & pand flaar?' Detail #G: North line of pvnd easemert neecis to be dimen,sionei algng the R1'VV Me; east line of pond ea,sernent needs to be dimensioned fram FIW line Need to coearrlinate rim etevaiion with eallout #4iSheet 9 Pond nee+ds to be iocated sa cFiat runoff from pridate raadlaIley does not encroach upon public R1W, atherwise a License Agreement needs to be ececuted witta the County Detail #9: Developer needs to set Pond C in a separate tract Certified Record Drawings of the final pand corsfi~ urat;on wi11 need to tre pro►j'sded to the County Engineer's Of~ice by the L7eaeloper, not fihe ContraeCar. As an altemative, stativn & offset of certair► selected pnints on ihe pond floor (e.g., eurve tangent points) could be tabulated and indieated vn the plans Pipes need to be located within easemeri#s Shect 9: Is the private oonnect4an betvveen 16th A►+enue and 170' Larse a private road, asa alley, a drivewway ar a cotrtmercial access? APleys are t}+pically lacated between road iritersections, not aligneci with an intersectivn. Is the width adequate for the ruulti-family de►retapment enntemplated for the lcrts served by this access route? Perhaps just indicating acommeacial access of an apprapriate wzdth (erviih na oornectivn 'tetween 1C1 AVenue and 17'b Lane) wautd better senre the deveTapment cvncept for these lots. The Conditians oF Appraval appear to allow art a11ey only to serve L,ots Idm►agh 6 of Bluck 2. Ttm ~~wab, PZ P1859 - D3shman Commons 2°d Submi#tal Augzst 21, 2000 Page 5 af.5 Alignment of the private connection between 16th Adenue and 17'b Lane needs to be roordinated vvith the sevsrer plans. We are unable to rePease sewer construction permits if tlse road aligrirnents on these two set,s of plans don't rnatch. CL station for sout'► end af private connetian between 16th Avenue aand 17th Lane needs to be cocrrdinazed with ralIaut and strectlight shflwn an 5heet 5 Callout #3: Naed to inciicate statian Caliout #4: Need to indicate station & offset. Need ta aoordinate rim elevation with ralIout for curb inTet and with deLai1 6fSheet $ Basin Map: Haw wil! the lats be graded to ptavide the Tc path shown fcrr Basin H2? How will lots be graded to paavide the basin limits cantempWtW for this site7 Lisnits ofIiasirs F & 81, an+3limxts of Basins G& I] nead ta be cc7ordiriated wit'h the spot elevatiens shawn on Sheet 9 Pavement De.sigri CalcWatiors: 16`b Avenue is a 3 I,auaee Principal ArteriaL as vppased to the Callector Arteria3 nvted in the zeport The Tes1 Pit Map neeis to indicate where the CBR sample was takec► fr.am {"...from the approximate site acnter..." (Jay Lagan's 15 June 2000 letter) is not avery accurate descriptiva}. The samptes are typicaily taken fmm within or very near to the raadway corridor. Need ta provide sieve analysis results far the sample used in CBR testing. Roadway width,f pavement section, and timing of construction shouid be coordinatad with the Caunty's Engineesing Design 5ection. A Gvunty R+flad Project between Drshman-N'Tica Road and SR27 is aasticapatecf for 2003. Submittai Checklist far Raad & Draiaage Frajects in SpokaQe Couaty - PIatslShort Plats Thrs Submattcr2 Checklasr is to be cotnpleted and srgned by rhe Sponsor's Engineer, t7lTGI incIuded wF1h EC7CI7 pILYYT subrrritterl infio the ,Spolcane County Etzgir►eers f7ffrce. If tfats fQrm is not fully completed and sagned, clo not submri plans and calculataoras 1o Sprkane County fnr review And acceplance. Incomplete submit[ads wrtl be returned arrd wrll cause unnecessary delaysrfar your claent. Praject Name- ~ ~ava*V.S 5pakane County Fraject No. P 1W Date: $f S/nU Project Engineer: =IUV-M~S IAL . 7'i.o, SchwflO Fhane: .4 L-09C7 Project Sponsor: ~QC.WWW ~ 69&1&91~SS Fhone: Yr~Y-67~ QW5 A. Preliminary Process Prior ta SubmitCal of Road and Drainage Plans, the foIlowing events are to have already Qccurred: (By cfreckrng each itenr off shown beloiv, you crre sta(1ng that yau havs verrf ed these events/items have been completed) " Adcrptinn of as Heari.ug Exazniner's Report for this long plat, or a Planning Repart for tT:us sbort ptat ~ At least ane Pre-Design Meeting has been held with County staff at the Engineers OSce. C'r An "Agreement ta Pay Fees" has been sigued by, the project sponsor, and subn-ifiked to the Caunty Eqgineers Office. - A ChanraePizatian Plan (e.g. signing and stripi.ag ptan) o£pubIic rnadvjray improvements, has been coordinated and discussed with the Cvrinty Engiueers 4ffice • B. Road and Drainage Plan Submittai _ The aterns Iistecl belnw are tv be provided as a minsmum wifh a raad and tirainage pIan submittal. Additaonal informativn may be required Cca demonstrate that the pIans meet all applicatale standards, (Qy checking yes"far each ltejn shcrivrr 6elow, yau urre verifying lhat these items hrrve 6eerr crampleced and are included rn this submtttal. F'or any bax checked "rr/n", a tvrittenjusllfcacron of any arltlssiolTS aL the et7c7' of fI7i5 seCtlatt is required.) Item Description , - . a yes - Rvad and drainage ptans, two priat sets. (Certification statement on caver of gPans) W yes O'u1a dne set o£plans an 24" x 36" mylar media, or CAI] electrcsnic file .DWG or.DXF forriat 290 yes Each Plan Sheet of record is signed and datei by the prvject-spvnsor. - E!' yes The road and drainage design Tcets the requirements'of `State,,law, .WAC I96-27 regarding "confornuty with accepted standards"; that is, the design refleets,the "state of the pracfice" for the proAOSed conCept. . al'yes The pIans, I3rajnage Report, basin rnap(s), and any nther r,alculations are stamped,, signed - and dated by an engineer licensed 1n the S#ate of WasIain#;ton.,'' - 2?'yes 0 nla -Drairtage Repart, two sets.` To rciclude: basin maF(s), t.imme vfconcenxratian routes in basin . map, and Certaacatian statement Qn cavcr of reROrt and basin mav. W, yes ❑ nla Geotechnical Rsport, ane se[, (Inc[ude all soif test pitlboring lvgs,) 5;^ yes ❑ nla StruCtural Pawement CalculatFOns, one set L9' yes Q nia Crass-51ope grade calculations for road widenLng ptbjects Item Dcscriptian - C'Yyes ❑ nla Maintenance Manual and 5uiking Fuaid caicula4ions for draunage facifities l6cated outside o£ County road r'i ,ht-of-way. 0 yes W nla Wntten explanation of whaltivhat entiEy will be responsxble for maintaiaiing tiraznage facilities which are located vutside of pubIic road right-of-way, antl that the plan is acceptabie to the Cauraty Engszaeers Office. P yes 0 nAa Channefiza.tion Plan, or signing and striping int`orma#ivn provided m the road plans. T"a be uncluded in road and draznage plan set. P' yes 0 nla I haVe read the Hearng Examiner's Repvrt (long pIat), or Planra.ing Dept. Findings and Conditians {shart pIat}, fvr t}.vis project- The design meets the conditians in the repart. C~"yes ❑ nla Capy vf Approveii Design Deviations. D'ye.s ❑ nl'a Fzre l7zs#rict Approval, far private rnads, E3'yes ❑ n!a Lot PIans. Required for any Iots wiCh drainage easements and wtuch frant a public road, or for lots wfuch receive and treat runaff from a public-right-of-way. ❑ yes ff' n/a Any applicable 5tate and Federal permits have been mbtained. (i e. HkA, JARFA, etc.)- For Femi,its with condition.s, a cvpy of the pemiit and candi#xans are includsd izi the plan su6rnittal. Q'yes ❑nIaf. Inspectxon Agreement beriveen the sponsor and its engineer ❑ yes C3'nla Far aff-site easements to be granied to 5pokane CQtuaty, the follQwing i#ems shau be mciuded: IegaI descriptian, exhibit, and prvvF of awnership. yes 0 nla Erosion Car►trol Plan, required for "Majar Iland-Distur$ing Activity," To 'he includec} in the road and drainage plau set. ExpFanatian for any items Listed a6ove which are nat included in this submuttal: {Nate: ain insufficientaeLStification of why an item wa.5 not inctuded in the subtnitted, or incomplete dncurnents, may iesvlt in Khe submittal being recUrrsed withnut review or ivithput acr.eptance. Provide attachFnents if necessary } By siguing beIow, tlie engineer is stating that t.he information pravided in the submittal is complete, that the informatian provided in the Submitfal Checklrst is accurate, and ttie plans and calculatians are in accordance with - the Spokane Caunty Standards fnr ldoad & Sewer Corrstructivn, and the GuadeIrnes for Stormwafer Managernent, except where an approVed Design Deviation allows othenvise. - Engineer's Signai-ure: AM~A14~41, Date: 0~vv ~ r Engirreer's Name: - . .C~_WAJC - . (please prtnt) , If there ure any questians ubvut this form or apprapriate procedures, please call Developrttent Services, = ,.Spokane CounlyPrerblic Wnrks, at (509) 45£-3600. - . • . . . For Spnkane County r]se Unly . SubinittaP No: ~ Caunty P1an Reviewer: PAY4 _ Cl Accepted in for Review or Cpnstruction Retumed tn the engixteee without redmm=mdi&r acceptance, 5ee attacfied letter o€ explanativn. Processing T]ate. AU4 ev Submit#a1 Cliecklist 2 SpOIS8I1e CS][1IlC}r PtlbI1C WQPiCS; Apni 29, 1998 ~ , ' ► ~ ~ are no[ lisnited to demalition, constructign, c4earirtg, "WateY Body" shall mcluds thvse water bodies [hat , grading, fiiiing, iogging, and eYcavatian. are defined as surface waters of the state or waters "Minor L-ind-Disturbina Actqvity" is a land- defined as water5 of the sTate s~rsder Revised Cade ❑f (3ashsrbLng actzvity o£ less than one acre of disturhed ~"~~s~ington (RC`vV'} ~h~pter 9a 4S.[3?~, as aanersded area, an indtaidual, det.ached, sutgle faniily residence "tiVetland or Wetlancis°" nteans those areas in or duplex, or the creation or addition ❑f imperviaus 5po'karte County that are inundated or satarated by surtace areas less thars 5,000 square feet, surface or ground water at a frequency and a duration "L'vIajor Land-bisturbing Acti•rity" is a land- suf~icierst Co sup,part, and that under narmal disturbsng acCsuitv greater than or equal ta one acre cQndstians dv supgort, aprevalence of asgetatiran t~-ptc:~41} adapted for fife u1 satt~rated soil contiitians of dis[urb~d area or the cseat~oii vr addit`~n o~ tiVetlands general4y include sivamps. marshes. bti~s. imperviaus surface area greater t'~an ar eqs~al to and si~rular areas ~Vetlasids ma1~ include [hose ~,~0~ square feet artifscial wetlands inteil[ianallt crzated frant "Permanent Erasion anci SedBment CQntrol norsNvetland areas created t4 micigate conuersion of ~i~'I.easures" are erosion and sedzment corstrol devices wet4arsds, if permstted by the caunty or city (RC1V Cliat re,place any Cemporary devices and proaide far 36,70A 034), a.s amended For identifying and 4ong-tersm, pe['1T1aSleiYC 5~abflg7.3Tlf]R of 3 SICe deldneatirsg a wetfand, Spokane Caunty Nv'sll relv on "Permitted Activity" any acfiivttv for tvhich a pesmit tiie methodo4ogy conCained in the 4Vetland T)elineatdan is required under Coun[v ordinances. Maaua1 "Public 4Yarks Director" That person, ❑r hss!'her 4.5.400 EFtasioN AND SEDIiVtEiNT C4NTRQL desfgnee, who has been apposnted by the Soard of PLANS Count+r Comm155ione[5 tD direCf the aCtivltses of the 4.5.410 Submit#al of Plans Spokane County FublicWtirks Llepartment An ESC plan is required far majar land-disturbLng "Sediment° is earthen rnatenal moved b}F wind, activities that require a permit or p1an accep4ance by water, ice and trackLng. Spnkane Caunry An E5C plan xs not require.d for minor land-disiurbing acCLVities "Sedimentation" is the graviTational depasit of An ES C plan, v4hen reqsaired, shaII tae submatted lth transpoRed matenal ui flowing or standing water apernait applicat'son pnQr to anN land-disturkrin", "Site" means the piece of property whach L5 directLY ac[Lvity E5C plans are onlv required ta address the subject [v larsd-disturbing ac[svfties area of land that is su6gect [o [he land-disturbing "Soil" means the uncansalidated mfneral and arganic actIvstv far wh«h a periiiit is being requested matersal on the immediate surface of the earth that Althcaugh flthers rnay prepace [he '~~C plan, the serves as a na[ural medsum far Che growth of land Permit appficant is responssble for ensurzng that all plants requirements are addressed in [ne ESG plan T'he ESC pfan is required to be an file at [he Coun[y, "Stormwater" means #hat portion o£ precipitation ar a4though it tivill not be reviewed or appraaed by [he snow me4t that has noc naturally percalated Lnta the CQUnty. grourrd ar evaparated, but ss flowing vsa ouerland 4.5.42 0 Cnntent of Flans flow, in[erfloiv, channe4s or pcpes into a defined qt a muiunum, all ESC plans must be Iegibie. surface water channel, ❑r a canstructed detentivn reproducsble, and contain thc follo%%ung lnforma[ion anc3/ar infiltratian facilic;a 1) v*Title Block "Ti ernpvrary Erosion and Sediment +Control 2} yffame of proper[y owner Measures" ase erosian arid sedLment control devices a) Name of pe€rnit applicantME'bt used Co provide temporary stabilizatian of a site, 4} Narrte of contac[ person at project si[e t4cd'~ usually during construction or land disturbgng 5} 1rf'roject address acttivi[ies, before perma,nent devices are instailed. 6} Legal I]escriptifln ojcb "Tracking" is the deposit of sedirz~ent o~r tfl paved 7) ~ame of person preparing plan surfaces from Khe wheels of vehicles Guideisnes fot 5toemwater Management - Addendum 4-33 ~ Spakane Cnunty Apral 1998 9) verafessional seal (required for majar land- comply with stated performance standards cvntained disturbung ESC plans) in sectiqn 4,5.520 Special site condhtians may 9) *'descrtption of project include, but are not fixrsited to, steep slapes, slope 10)*Oescriptson of ESC mea.sures 1ength, sail type, ar VegetatIwe Caver 1 l)Oescription of e:,isting vegetation on tlie site 1) Zgnsiructson Access Route 12) Locatiota of anv existing water bod'aesvA L` Access for construc[inn vehicles shauld be 13},bate plan was preparecf l~~cale ofdsawing lLmited ta one ros~te rvl~ene~rer passi6le The lS) r~4~rth arro~v acce5s rou[e rnust he stabilized to muzimlze the ¢racking of sediment onto public roads . 163 Praperty baundary and dimension~ 17)/Vicisuty Map 2) o6tabdlization afDenu~led Areas 18},/LESt of sails an-site (in~'ormation may~ be Stabtlization of all e~posed soiPs to prevent soils c~t~tained at t~~e County Soii CrnservaCi~an ~ro~ ~roding ~.nd depasiting sediment I7€stnct) downstream 3) Prot~ction of Adtacent PraneniesiW~ter 19) Cert€~ication state~nent '~y the persfln prepanrsg the plan that the plan rneets the O'BadiesJPubiic a.nd Private Roads ESC 1 te uireme~st5 d~~ ,n rh-nr~r Protection of ad,~acent praperties, tivater bQdies, ~ 5~ 1~~••~-'~"~ 45 of the Gu's p€sblic and private raads ~'rom err~sion and 4 delines for Storm~aat~r Management. seciiment depositian. 'Ihe yntent is to keep sedrment Qn tha project site and not allow it to E5C Requirements far Minor Land- react3 adjacent ,properties, "ater bodies, and Disturbing Aetivities public and pnvate roads Though an ESC pla.n is not required te be submiited 4) VProteGtton of Iniets far minar land-disturbmg c1Cilvliie5 for 4Vl1]Ch a Protection ❑f da«mstream inlets ta drywe115, permit is required by Spokane County, the catch basins azzd other starm4aater managemerre PerfQrmance 5tandards and oCher provisions of chis facilit'ses C]rdiriagace sha11 remain ur affect The grovisions of 5},,Ancreased RunafFfrom Construction Sites this Orcinance shall ntrtgovern msnor farid-disturbing Considerattan and mitigatEan a£ the• e£f'ects and activyties for which no permit is reqraired. However, - rrnpacts of increased and concentrated runoFf' tndsvldualslproperty ati%-ners undertaking minar Iand- from 4and c€isturbing actzvities on dodvristream disturbing activities for wkuch a pernut is not propesties, water badies, and public and pnvate required Enay desire ta ensure that such actiaEty roads psotects adjacent and surrvunding private praperties d} Washou[ Site fr,r Concreee TruckS and E uiament~W Tb INN44% 4.5.440 E5C Pfan Requirements for Major Land- Designate the lcseat'son of a slum• pit ivhere Disturbing Activities concrete trucks and equipment can he washed All ESC plans for major land-disturbing activities out Slurry pits shall nQt be lacated in a swale, shall be prepared and have a sea.l afFixed by either a dras.nage area, stortnwatec facility, ar water body 6scensed professiflnal engineer ('FE) or a licensed nor in an area where a starrnwater faciltty is landscape archdtect (LA) Both the professicanal proQaSed engineer and the iandscape architect must be licensed 7} Material StoraaelStockD ile "4" ~#WCAIE cn the State of Washtngtan and be knvwledgeable fn Identify lvcatisan far storagelstockpile areas, bOth hydroYflgy and ESC practices. within [he propased ESC plan baundanes, for any soil, earthen and landscape rnaterial w}uch is The followLng fifteen (la) items shall be addressed sn used or wcl{ be used on-site E5C plans far majar land-ciisturkaing activitses. As 8) Masntenance and Permanent 8flafPs site conditivns dictate, additioraal measures relatrng to Maintenance of aU erosion and seduner►t contro4 ESC, as determined by the ticensed prpfe55ional BMPs is required duruig the land-disturbi,ng engsneer {PE} ar lrcensed landsca.pe arelutect {LA} aceivity Regular inspection and maintenanee of preparing the plan, shall be addressed in osder to all erosion and sedunent cantrol BMPs is msseet the untent and purpose of ttus chapter and to required to ensure successful perfon-rsance of the Guidelines frar Stormwater Nianagement - rlddendum 4-34 5gakane County Apn! 1998 4. . ~ BNfPs Permanent BMPs shall be iiiclraded in tie 4_5.540 NLUN'i'ENANcE, PERFORMA.C[cE plan to ensure th-at successfYrl transi€ion from STANDARD3, AND ENFORCENiENT ternporary BMPs to perinanent BMPs vccurs. 4.5.510 Maintenance Responsibiiity 9) Gleanne Lirraits L7elineation jp&-o Dursng any land-disturbing ac[ivsty subJect to this Field identLfication and de[ineation of all clearing ordLnanCe, the prvperty orvner(s) vr pernut applicaiit, lirnits, sensitiuelcritical areas, huffers, trees tcs be tf dEfferent fsom #he property awner(s), engaged in thc preserved, and draLtage courses land-dssturbLng actiwit}+ is responsible for preventisig 10} 5ediment `I raimine Measuses erassan and sedi~nentation ttirough the use o£ BMPs I]estgn and constructian of ~edrrnex~t ponds ~nd -~ze prap~er[y o~~ner(s) or permit applic~t, sf traps, penmetec dik~s, sedi~3zeiit blrrier~, and differznt from td3e ~aroperta~ oe.nLr(s), is sui~}ect to tiie vther r~nsite sedime~t trapp~n~ HNiPs ~s en~'orcement and penalty° pro«sions prousded herein. rsecessary prior to ~t~ star~ of other land and st is their respor~sibi4it~r to ensure BI~~IPs are used dist~.trb~ng a~t~~ti~s and the perFormance standards are niet After aa~~ 11) Cut and Fi11 SloOes [arsdEdisCurbing acti~+tty i5 complete and the site has QesLgm and ccsnstruction of eut and fill sl6pes in been persaianently stabilized, rnaintenance and t13e a manner that -vvill minianize erasLon prevention of erosion and sedirnentation as the 12} Stabilizatsan of Temnorasv Convevance responsibility of the property owner. Channels and Outlets Des;gn, constrsaction, and stabilizatian of afs 4.5.524 Performance Standards temparary on-site conveaance ehannels to The perfflrmance stasidards set faRh below are prevent erosion from the velocitr of nanoff from lntended to prcavide a minunum tlireshold fvr storms under developed condrtians Dessgn, cantrolling soil erassan and sedLmem[atsvn caused bv eonstructian, and stabilization of all temparary land disturbing actiVi[des and will be used to conueyarsce system outlets ta prevent ervslon of determine if the requiremeiits of thfs chapter ha\e stormwater facilities, adjacent stream banks; been met. slopes and dawnstreasn reaches 131 10'emaval of Temaorarv BMPs 1} Muumize Tracksng onTo Pubiic, Prsvate, and Removal of all ternpvrary sedursent contral Future Public Roads BMPs wathan 30 days after final site s[abilszatson Z) Protec['s6n of Puhlic Rnads and SiQrxnNvatzr or after the ternporary BivTPs are ss❑ longer Facilities needed Trapped sediment shall be removed y) Prap~~ Washour of Concrete Trucks and from the projeet site ar stabrlized on-site Equsprrsent Stabilization of disturbed soil areas resuiting 4) Frotectinn of Private Propenies fram removal of the Cemparary BMPs 5} Protection of Water Bod4es and Wetlands 14} [}ewateriniz CcsnsCructifln 5ite 7'he folgQwing critefia Nvill be used to determzne sf the Dsscfrarge of dewatenng deVice o appropriately performar►ce standards fisted abave have not been designed sediment traps ae sedimen[ ponds. met. 15) Cdntrcrl of Pollutants Other Than 5edimerst on 1~ Minimize 7'rackinR onto Pubisc. Private. and CORSCCCIC[1oC1 S1tiC5 Fu[ure Public ftaads Cantral of a!1 an-site pa3lutants oiher than The perForrnance standard for minimizin~ sedimen[ Gn a marsiaer tYtaC daes nvt cause tracking onto puhlsc, private, ar fitture ~aubtic c~ntamsnat~on of s~arm~vater c~r g~oundwater roads fnas nat been met iE sail, dirt, rnud ar deksrss 4.5.450 rvIodifications ta Plans is tracked anto apublsc, pnvate, or £uture pub1ic E5C psans may be mod€fied after submitta! Ca the road and there 'ss na evidence of ceasonabiy trr ing Caunty An amended plan should be subrnrtted to tv cantral it through the use of ESC BMPs ar illustrate any cnodifications to the techuques and experimenta! BMPs {i esweepuig}, botki as methods used co prevent and cantr4l ervsLon and defined in section 4.05 240 sedinientatLon. Cruidelines ferr Stormwater Manzgeinent - Addendum 4-35 ~ Spalcane County April 1998 ~ . ~ 2) Pratection of Fukaksc Roads zuid Stormwater, 2} No[ice of Non-Gomoliance Facilities "T'hhe Pubiic ►rVorks DJLrectorfdesignee «rill have the The performance sfi.andard far protectin; pubPic autlhvrity to issue a NaEice of Nfln-Compliance roac#s and stormwater facildties has not been met and penalty to the property owner(s), or perrnit tf there is deposition, other dian tracking, of more applicant if diff'ererst than the property o<<mer(s), than two (2) gallons (0.27cu6sc feet) per day ❑f en,gaged in the land-disturbing act«nty, if an sos[, dirt, dnucf or debris £rom the project sste anta action is besng undertaken that does not compsy adjacent publac roads andlar a starnwater svith all performance standard(s) of tiis chapter system withsn a pubfsc right-of-«ay 3} Prooer Washau[ of C6ncrete "T'rucks and A} Cvntent o~Nti~ice o~~on-Com~l~ance a Nvtice of Non-Compliance N\ tll corr[ain E uiornent 1} The narne and address of the pcoperty The performance standard for ensunng the oxvner(s) nr peranii aQplicanz to whorn die proper washou[ of concrete trucks and equ ipcnent NQtsce of Non-Compiiance ss directed, has not been met if there is obser-vation ar and ev~idence of concrete was'hout ma[erial «nthin a ii) T'he street address, when avaiiahle, ar a drainage area, stormwater facility, ar water general descriptian of the building, lat, ❑r body, nvr in an area where a stormwater faciliry land upon tivhieh the nan-compliance is is propased. oc~urrii~g; and 4} Pratection oFFrivate Pronerties iii} ~1 de~cription of Che specsfic nature, Spo~arse County d~es ns~t presently have e,,-tent, and date of ncan-compliance, and , suffcient sesourees ta ers.+farce the provissons of ivy A notice that the non-carnpliartt activity thss Urdina.nce for violatians that affect pnvake ce~~ and de~ist, and correcti~e a~tton be pzoperties Tl~ere£ore, ns~ performance standards unde~en to cnrrect the acti~aity ~~ithin have been esr.ablished ti~nth respect to the deposit ~~,v~~~y-~vur (~4~ hours; and of soil, dirt, rnud ar deb~is from a pr❑ject site A~~aternent that a cumu~ats~re ci~il anto adjaeent pn~+ate property P~iwate prapes~;r penalty in t~e arnount of n<<o h~dred- owners, ho~veaer, may have the absliny to seek ~~}y ($23p} dvllars per da~ fflr minor }udicial redress for such actior~s land-disturbing activitses ar ane-thousand 53 Pratection of GV'ater 8odies and We~lands The performance standard for protectsan of water - ($1,000) dollars per day fcar snajor land- bodies has npt been met if there is disturbing actsvstzes, wi11 be assessed for deposi4svn of svil3 dist, mud° or debns fram the each and every day fflllvwing the date set far crrrrectian an `~°hich t~ae non- project site into adjaeent ~vat€r hadies compliant activity continues. vs) A statement regardfng the appeal 4.5.530 Enforcennent prvcess 1) General Enforcement and penalties w4f1 be in accardance NotificatiQn ~ with tlv5 5eC[i0n whenever there i5 a vtalaTtfln of The Notice of NQn-Campliance will be issued the projects Erosion arsd 5edunent Control plan in writing, eikher by cer~ified mail with retum or any perFQrmarsce standard(s) contained heresn, receipC requestecf, or by per50nal 5en+ice, to as they relate to publiG facilities Failure to the property owner(s) or permik applicant If submit an Erasion and Sedirnent Cantrol plan the Notice of Non-Compliance is not issued will result in non-issuance ❑f underlying permit [o the propeny owner(s), the property owner The Public Warks ❑irectarldesignee has [he will 6e given a copy of The Notice of Non- autkionty ta assess penalties only related ta Compliarace so that the praperty owner(s) is pu6llc facdlities including but naC limlted to, infarmed that a Notice of Non-Complsance srvales, drainage aceas, or starm`vater #'acilitces has been issued to ttse permst applicant p Vialations rekaCed to prcvate property are a csail copy of tane Not«e of Non-Camplsance may matter and are nQt enforceable byf Spokane alsv be given to the contact persnn at the Coun[y prQject site. Gusdelznes for Stormwa[er Management - Addendum 4-36 CA 5pakane Caunty Apr`s4 1998