Loading...
2008, 06-05 Permit App: 08002117 Reroof, Dormer, Eaves Project Number: 08002117 Inv: 1 Application Date: 6/5/2008 Page 1 of 2 THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Project Information: Permit Use: NEW DORMER AND EAVES,REROOF HOME Contact: RADIKA,RANDY T Address: 10402 E SPRINGFIELD AVE C-S-Z: SPOKANE VALLEY,WA 99206-3850 Setbacks:Front Left: Right: Rear: Phone: (509)926-2313 Group Name: Site Information Project Name: �....-:tea..... -;°:..s; :.. - w.1-- :-r:. .;,._...'-'. _<{m3 Plat Key: 000400 Name: CLACKS ADD District: Nort Parcel Number: 45174.0504 Block: Lot: SiteAddress: 10402 E SPRINGFIELD AVE Owner:Name: RADIKA,RANDY T Address: 10402 E SPRINGFIELD AVE Location::CSV SPOKANE VALLEY,WA 99206-38 Zoning: R-3 SF Res District Water District: 011 MODERN Hold: ❑ Area: 11,388 Sq Ft Width: 78 Depth: 146 Right Of Way(ft): 0 Nbr of Bldgs: 2 Nbr of Dwellings: 1 Review Information: n.swl,: -,_'9 ..... .. . Review Building Plan Review Released By: Originally Released: 6/5/2008 By: tmelbourn Building Permit Contractor: OWNER Firm: OWNER Phone: (000)000-0000 This Application: Total Project: Description Grp Type Notes Sq Ft Valuation Sq Ft Valuation 1&2 FAMILY R-3 VB DORMER/E 0 $2,800.00 0 $2,800.00 AVES/RER OOF Totals: 0 $2,800.00 0 $2,800.00 Item Description Units Unit Desc Fee Amount RESIDENTIAL PERMIT FEE 1 SELECT $83.25 WSBC SURCHARGE 1 SELECT $4.50 SF PLNS RVW<7999 SQ FT 1 SELECT $33.30 Permit Total Fees: $121.05 Operator: jmm Printed By: jmm Print Date: 6/5/2008 Project Number: 08002117 Inv: 1 Application Date: 6/5/2008 Page 2 of 2 THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Notes: :- g _. .:.tmtmg. , , r_. .g zf:.7 1g= .. .. ... _ . .ug Payment Summary: vow,- -rarac -,.. .: Permit Type Fee Amount Invoice Amount Amount Paid Amount Owing Building Permit $121.05 $121.05 $0.00 $121.05 $121.05 $121.05 $0.00 $121.05 Disclaimer: Submittal of this application certifies the owner(or person(s)authorized by the owner)has both examined and finds the information contained within to be true and correct,and agrees that all provisions of laws and/or regulations governing this type of work will be complied with. Subsequent issuance of a permit shall not be construed to be a permit for,or an approval of,any violation of any of the provisions of the code or of any other state or local laws or ordinances. Signature: Operator: jmm Printed By: jmm Print Date: 6/5/2008 Permit Center cm ofokane 11703 E Sprague Ave, Suite B-3 Spokane Valley,WA 99206 PERMIT NUMBER: 3 Z-(f'`1 Sp jValley. (509)688-0036 FAX: (509)688-0037 .-) BY PERMIT FEE: www.spokanevalley.org \A VALLEY Community Development a.d t Residential Construction n New Construction n Accessory Bldg f '- Permit Application )- : ' on/Remodel -n Deck btl SITE ADDRESS: i lO<10 Y'►1,�c{�1�• tU 5 p i VA-U/2-41 q 1 •Z-©cO o ASSESSORS PARCEL NO: 4 / ✓ /. C S O<1 LEGAL DESCRIPTION: ri._5 (C,k.)I C�2 Building Owner: Contractor: " Name: A N by -1-, KA 0,k.4 Name: tvk-N n 1- TCA 1>L KAn Address: £1( O 2- Spv l>nS Gild Address: f1 l©`r!OZ �loviIvtSQ-1�i(x City: S p,OA,L( State: . Zip: 20x, City: S P, U.ALlk.t7 State: )4;4.. Zip.9a2o1. Phone: -'©�j 1, 2:3 i Fax: Phone: S'09- Z 64?/ 3 Fax: Contractor Lic No: Exp-Date:- Contact Person (� City Business Lic.No: Name: - ,1.1(J i I Kala ; Phone: < X- 2_6,"Z. i 3 o{ .-- D scribeth scop of work in detail: Cost of Project: $ 570 d- d° Yl -ia "pp, 2. 1(1s` .A V m vi> Yi 2..1..t./ c�OY i i s r m n Korai +.0 r ± covv►frr- .-1 --_,0,4—v).90(1---1--O b grt--iefpid I_ S'yt ti_c, u)Lb '?0,16 d-lit- 3'rct s iiiiidi a�l 4.LC. sc 5 dig * Sot.itit.rcovvipmsiT� Proposed Use: **************The following MUST be complete: (write N/A if not applicable)********************** HEIGHT TO i EA': DIM SI2. GN,S 3b #OF S�Of�IES: TOTAL BITOA© SPACE: MAIN FLOOR TO SQ. 2"D FLOOR SQ. FTG: UNFIN BASEMENT SQ. FTG: IMPERVIOUS SURFACE FTG: t7 5,0 _- --- NA -3 p 5_ AREA: Q N/4 FINISHED BASEMENT GARAGE SQ. FTG: DE V. PATIO SQ. FTG: 30% SLOPES ON � SQ. FTG: 3 9 5 r7 (o © ` U t /�7 5- PROPERTY: TIC? tx/A #OF BEDROOMS: CONSTRUCTION TYPE: HEAT S .JJ CE: SEWER OR SEP 7_, btfc_(t 41-v-61/41,0k._ ® I 5i. cotr The permitee verifies,acknowledges and agrees by their signature that: 1) If this permit is for construction of or on a dwelling,the dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley Permit inure to the property owner. 3) The signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done in full compliance with the City of Spokane Valley Development Code. Referenced codes are available for review at the City of Spokane Valley Permit Center. 5) This City of Spokane Valley Permit is not a permit or approval for any violation of federal,state or local laws,codes or ordinances. 6) Plans or additional information may be required to be submitted, and subsequently approved before this application can be processed. SIGNATURE: DATE: Method of Payment: 0 Cash 0 Check ❑ Mastercard 0 VISA Bankcard#: Expires: VIN#: Authorized Signature: REVISED 2/15/07 S40.11.1°.%1111106 es 11703E Sprague Ave Suite B-3♦ Spokane Valley WA 99206 JO ♦509.688.0036 ♦ Fax: 509.688.0037 • 4, 0Valley® © Completed Building and Mechanical Application with: Accurate address, Parcel Number and/or Legal Description, description of work, owner and contractor information, signature and date. © Three (3) sets of plans including Site Plan, elevations, floor plans, foundation plans with details, roof plan, framing plans and details. © Show the height of any proposed buildings or accessory structures. © Floor plan for each floor: Dimension to scale(minimum 1/8") and label each room (including sq footage of house and garage on plans) show each level of existing house and square footage of any additions. ❑X Egress windows: Provide at least one window or exterior door approved for emergency escape or rescue from basement and in every room for sleeping. © Floor framing details: Joist type, size, spacing and installation details. © Roof framing plan and details © Furnace and hot water heater location ❑X All header locations: type, size and connections ❑X Foundation plan MInsulation information © Decks and Stairway details All braced wall panel types: show locations and details of installation, including engineered design Smoke detector locations 22" x 30" attic access location 18" x 24" crawl space access One-hour separation detail: between house and garage • New project.. • Project Previous pre-app meeting D ArN CITYp t ' I 4" ne Transmittal Plan revisions 0 ■ 41011000 Valley City of Spokane Valley Transmittal Date: Community Development Thursday,June 05,2008 Department 11703 E.Sprague Ave,Suite B3 Spokane Valley,WA 99206 Phone: 509.688.0036 Site Address: 10402 E SPRINGFIELD AVE Project Number: 08002117 Parcel Number: 45174.0504 Zoning: R-3 Water District: MODERN Fire District: FD 01 Applicant: RADIKA, RANDY T Owner: RADIKA, RANDY T 10402 E SPRINGFIELD AVE 10402 E SPRINGFIELD AVE SPOKANE VALLEY. WA 99206-385 SPOKANE VALLEY, WA 99206-385 (509) 926-2313 e-mail: e-mail: Contact: RADIKA, RANDY T Occupant: 10402 E SPRINGFIELD AVE e-mail: SPOKANE VALLEY, WA 99206-385 (509) 926-2313 C' --- r l r1 e-mail: i s J7 (L Contractor: OWNER Arch/Engineer: 11-11 '-_i - JUN U5200a , ( ) - �� '1 .1) li II i�L ) 'i 11‘\11e-mail: _ I_ Project NEW DORMER AND EAVES, REROOF HOME Description: Building Landuse Engineer Utilities Health Fire Dist Assessor APPLICATION CONSTRUCTION PLANS TDS ` Please send all plan review and project comments via e-mail to the highlighted individuals. a ..,....--........--..,..„,.,.,,.,...,.............,..,..--,.....,...,.-........-----.....,-..,„-..-..--.,-.....,...---------.---...-.- .., - ----... ,0? [ 1 •! 1 , N '."'" \*\,1 Os , ',11) . 0 zi C.:,iv / '. iti 4 V4d1°U / 7, 1.:7''fi'll '"r''' \ .i,1 /111 7 Ill ® , rxit, , --,--' ./ /1 ,,, ,, \ 1 N Ain N ill / 0-.1 ."`"' k / t ,e' \ /4 i 1,, 1 tiq (::.7 1 / i i 4.1 .../ • ,, 1,/, . 4 / . A? t- - k.:), r 61 0 '‘ .1 : .I ti k ' 1 TIT .., i o i i 1A :::(.1 1 1 a 1 U /1; -,,, ‘..., 1 ,4,--- 1 0 ) :11)4 i , ? y:h ,.. 1 I A 1 1 I. .,' ..........==z0 ./..., @ „I. do,. •,;,., -----....„ c \ e” .,,. A AA 0,0„In' i ("I 1 ‘ _ , A,.. , - \,,L„, , % 1 0.-,•- If 1-.F.--- 1 i 4-7 V A fis 1 1 _4— r3.7 x2 . a /'".....- - / 4, te•fr .",,•• ,,,•• .,,,,- 1,1°.g..) 0 pz _ . \ 10 . . ,,. / , . :41.,.(ir ,L.,,e,--?, ,,,—,.. „ 1 T \\ , ,.,. ..,... , ,,,,, ,. ,,, ,,,:„...._ . .,,.. I,"` ..... 11 +/I Al:tit lkil -. ' \\ v , . - tv• 1 Ii''''...,/''' "7/• 7— , -: -J:-. \ , /\ 7 •"`"It,yi '• . CiAj / '1--' '''''' . S' / - '''''+'1 ' '' ' '"--7q- i "1-• • ' / ‘‘'\ i , . ;---/ .1 ' . . ' ...,........,..„,__. . ., i / 1 1'1 ,,,/ , i 1 1 i:Z.,, t f•tt,'..,.,, „...,,,,... .„.1 ,11 , -1- ) -56.147"*. •:' A'2,!,),-', '•-1,:'' -k,1 i N -1,14: r4--- ; ......1 . i 1 - , , ---- i 1/4PI\ 7:stt \ 0 i i 4' 1,111'5) A ' Q 111 ,,,W . . i 94 1 :72 ..,...1„......j._________ i ._..- ---- -3. L-T2' ---...---:.-L-L---2---2.1,...-------- ----,„1- Or 1 —2 AA 3 AI 0 / ........._____ ,..,„ . / „,,.... ,. , ......_. i .7k , ,. I 4 i ,f ,,,/ i r.,,,,,, , if , • / .., ''' 7' '; 4 h( --; -, .,,.-C. / , iis: _4, ,. 400\II 11) 53ilt; 11 \t 11-41”9,9 in 1 ..4 I i,.2,4•:.: 1--:t.----, „...„‘„ ,., 1 (.....„.,„ ...., .., „,...?„,,,,...m....., J ,t , tY c.. C.),,, N7:•-• 3t IN,,,, li , -- ......,. tA,...t.io/C,t i1%,i' % \i 1 5 3r ,. 1 •-•- 01, 1 1 , / I .... —,. _ \\(........., _ „ ?,, ........1 6 / 1 \ i t i P i , i i, wt-tti r t ' 4 1 PI/U; it ,.1 V tt--, , i .,,,,tt• tr 1 ti, -I r .1 1‘ iX -I- c T 1 ,kA Coo re7 i IC, '' / r ' , - / t '3 : ' if' ......0;' A k!!.• 1 , )(-15 t t 1 ‹s, "t I ' ; t.,' - ' ,,, \ / ;. t .,...,A...4..: H f 1 ovc ..":',.?—– t--t----- •::,--4-------- ' t • ; 1 , i 1 \ ...,,, .1. • 't --c, kf I Lx..., '' ..... t 4 'flt ' ; 1 4 'r—— -,"-----,--*) ., 4 ,t ; , •.. -, 0- .,-• t . j •: t t •., „.-• t , A - 1 t k ; • 1 t t , , jt / '41,44,1,........“......1. . Y , ' 4 ' - ' •,---.' 1 , ;,••;:; t • ; 1 1 i i ; t 1 .. . t 1 ; ' 1 • ) / ii ,0,40--,,,„-•• / ... , Nr„,oe \ „*'" .; 0 , 4 '.7 644N4 / - 7. 1, , -7 A ,. -4) \ j ( ' ''') ..,/ 4 . / - 7 d / j N i - , , .....:, i .4 „e , ' , ‘,._,,,,,,‘ :,c ,1,, ,,,,, ,p. L., ‘1.• , (1; 1/44,, r fx PROVIDE DIAGRAMS AND ENGINEERING LAYOUTS FOR ROOF TRUSSES, BEAMS AND FLOOR SYSTEMS PRIOR TO FRAMING INSPECTIONS CITY COPY THIS BUILDING SUBJECT TO FIELD INSPECTION CORRECTIONS REVIEWED lalIey Wakin SPOKANE VALLEY Cad=COMPLIANCE fL! G D IS10N O,' • For City Use Only CITY OF � , PLUS Project Number 1 Project Address ,. r' r , , _` poliane lle ° 4Va y 11703 E Sprague Ave Suite B-3 ♦ Spokane Valley WA 99206 509.688.0036 ♦ Fax: 509.688.0037 ♦ permitcenter@spokanevalley.org As part of our on-going commitment to customer service during the review process of your project application, we are providing you with a TARGET DATE for the initial technical application review. If for any reason we cannot meet this date, we will contact you with a revised target date. Your application review TARGET DATE is 1 i` _ The TARGET DATE is the date we estimate your project application will have had its initial technical review. It is not the date for approval or permit issuance. Tips for a Smoother Project Application Review ➢ Submit complete, accurate plans and documents. Extra time may be required for re-submittals as project application reviewers work on multiple applications and it may be several days before they can look at your new or revised information. ➢ Designate a specific contact person to communicate with the City. While the person designated as the applicant's contact person with the City can be changed, one individual with the expertise for dealing with reviewer comments would be the best choice for the entire review process. ➢ Call staff regarding the status of your project only after the target date shown at the top of the page. Although you should be contacted on or by the target date,please feel free to contact us if you haven't heard from us by your target date. Staff may contact you before the target date if the initial review is complete. By following this procedure,you will save time and allow the reviewers to complete the work more expeditiously. Steps in the Permit Process 1. Counter Complete. Your application has been accepted as counter complete. This means all of the required documents, as indicated on your Pre-Application Checklist have been submitted or have been approved for deferred submittal. This does not prevent technical staff from requesting additional information as a result of their technical review. 2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free from substantive flaws that would prevent technical staff from completing the technical review once it is started. When this step is complete, your application will be routed to the appropriate staff and remain in their review queue until it comes up for review. 3. Technical Compliance. Once an application is administratively complete, it is routed to technical staff for compliance review. Depending on the type of project, technical staff may include multiple reviewers. You should be contacted by phone,fax, email, or mail by your TARGET DATE once the initial technical compliance review is complete. 4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re- submittals, each reviewer will approve their section of the application and route it to the Permit Center. When all sections of the application are received, a Permit Specialist will process the application and contact the person specified on your application for permit pick-up. Information regarding fees and pre-construction meetings (if required) will be provided by the Permit Specialist at that time. WHITE-APPLICANT PINK-BUILDING FILE REV 9/07