2011, 05-27 Permit App: 11001490 Residence Project Number: 11001490 Inv: 1 Application Date: 5/27/2011 Page 1 of 3
THIS IS NOT A PERMIT
Penalties will be assessed for commencing work without a permit
Project Information:
Permit Use: SFR W/ATT GAR Contact: MIKE LYNN
Address: 8915 E HARRINGTON
C- S-Z: SPOKANE VALLEY WA 99212
Setbacks: Front Left: Right: Rear: Phone: (509)994-7856
Group Name:
Site Information: Project Name:
Plat Key: Name: Range District: Nort
Parcel Number: 45173.2401 Block: Lot:
SiteAddress: 9826 E SPRINGFIELD LN Owner:Name: NORTHWEST DRYWALL ASSOC
Address: PO BOX 425
Location::CSV NEWMAN LAKE,WA 99025-0425
Zoning: R-3 SF Res District
Water District: 011 MODERN Hold: ❑
Area: 6,354 Sq Ft Width: 0 Depth: 0 Right Of Way(ft): 0
Nbr of Bldgs: 0 Nbr of Dwellings: 0
Review Information: -_ • : ,h
Review
Building Plan Review Released By:
Originally Released: 5/26/2011 By: tmelbourn
Landuse/Zoning/HE Conditions Released By: -
Originally Released: 5/26/2011 By: KKENDAL
Sewer Review Released By: 11
Originally Released: 5/26/2011 By: jdavis
Operator: JD Printed By: jmm Print Date: 5/27/2011
Project Number: 11001490 Inv: I Application Date: 5/27/2011 Page 2 of 3
THIS IS NOT A PERMIT
Penalties will be assessed for commencing work without a permit
Building Permit
Contractor: OWNER Firm: OWNER
Phone: (000)000-0000
This Application: Total Project:
Description Grp Type Notes Sq Ft Valuation Sq Ft Valuation
1&2 FAMILY R-3 VB 400 $40,380.00 400 $40,380.00
2ND FLOOR R-3 VB 1,133 $84,079.93 1,133 $84,079.93
DECK OPEN R-3 VB 100 $1,500.00 100 $1,500.00
GAR WOOD U-1 VB 400 $7,600.00 400 $7,600.00
Totals: 2,033 $133,559.93 2,033 $133,559.93
Item Description Units Unit Desc Fee Amount
RESIDENTIAL PERMIT FEE 1 SELECT $1,184.15
WSBCC SURCHARGE I SELECT $4.50
SF PLNS RVW<7999 SQ FT l SELECT $473.66
Permit Total Fees: $1,662.31
Mechanical Permit
Contractor: OWNER Firm: OWNER
Phone: (000)000-0000
Item Description Units Unit Desc Fee Amount
GAS WATER HEATER 1 NUMBER OF $11.00
VENTILATING FANS 1 DUCT 3 NUMBER OF $33.00
HOOD-TYPE II 1 NUMBER OF $11.00
Permit Total Fees: $55.00
Plumbing Permit
Contractor: OWNER Firm: OWNER
Phone: (000)000-0000
Item Description Units Unit Desc Fee Amount
TOILETS/BIDETS 3 NUMBER OF $18.00
SINKS 4 NUMBER OF $24.00
SHOWERS 1 NUMBER OF $6.00
TUBS 2 NUMBER OF $12.00
DISH WASHERS 1 NUMBER OF $6.00
CLOTHES WASHER I NUMBER OF $6.00
FLOOR DRAINS 1 NUMBER OF $6.00
Permit Total Fees: $78.00
Operator: JD Printed By: jmm Print Date: 5/27/2011
Project Number: 11001490 Inv: 1 Application Date: 5/27/2011 Page 3 of 3
THIS IS NOT A PERMIT
Penalties will be assessed for commencing work without a permit
FOR 212 N LOCUST,214 N LOCUST&216 N LOCUST(SHP-12-06),A 6-FOOT HIGH SIGHT-
OBSCURING FENCE,WALL OR LANDSCAPING MUST BE INSTALLED ON THE NORTH,
SOUTH AND EAST PROPERTY LINE PRIOR TO ANY BUILDING PERMITS.
Payment Summary:
Permit Type Fee Amount Invoice Amount Amount Paid Amount Owing
Building Permit $1,662.31 $1,662.31 $473.66 $1,188.65
Mechanical Permit $55.00 $55.00 $0.00 $55.00
Plumbing Permit $78.00 $78.00 $0.00 $78.00
$1,795.31 $1,795.31 $473.66 $1,321.65
Disclaimer:
Submittal of this application certifies the owner(or person(s)authorized by the owner)has both examined and finds the information
contained within to be true and correct,and agrees that all provisions of laws and/or regulations governing this type of work will be
complied with. Subsequent issuance of a permit shall not be construed to be a permit for,or an approval of,any violation of any of
the provisions of the code or of any other state or local laws or ordinances.
Signature:
•
Operator: JD Printed By: jmm Print Date: 5/27/2011
- ------ - 1 k i.cni USC vfhIy)
Permit Center F
1.170:1 East Sprague Avenue, Suite B-3 PERMIT NUMBER:
SCITY c Spokane Valley, LVA 99206 !
P*xatne Tel_ (509) 688-0036 Y PERMIT FEE:
Fax: (509) 688-0037 I
'''' Vtg] leY-
permitcenterOspokanevalley.org t
I V., l
RESIDENTIAL CONSTRUCTION PERMIT APPLCATION
:f5 NEW CONSTRUCTION ❑ ADDITION/REMODEL ❑ ACCESSORY BUILDING
❑ DECK ❑ OTHER
SITE ADDRESS: e(6ZCp e-, SP,¢ailFia-D L-^< ,
ASSESSORS PARCEL NO.: LEGAL DESCRIPTION:
BUILDING OWNER NAME:
NAME:
ADDRESS: �r Fr
z/2,
g 7 i- EQ yl iR:Aire STATE: �e� ZIP:G (.ry_I z/
PHONE: ?i 7_fL_ W — FAX: f2 70.,-q l CELL: y7�/ E3'.f
CONTACT NAME: /4 '/''c
PHONE: _ix( .74 y7Z_"/ FAX: CELL:
CONTRACTOR NAME: D i4JNE&
MAILING ADDRESS: _.._g'9/'S` _ /- 2 e`�&c1/4,../
CITY: Spc, F
STATE: A.,4iv
ZIP: f
PHONE: '( / 7 g5-0 — FAX: CELL:
CONTRACTOR LICENSE No.: e^'�.„- EXPIRES: CITY BUSINESS LICENSE NO.: .
DESCRIBE THE SCOPE OF WORK IN DETAIL AND INDICATE USE & PROPOSED USE:
****YOU MUST COMPLETE THE FOLLOWING****
MARK N/A IF NOT APPLICABLE
Height to Peak: `?[o• Dimensions: 2� 4D No. of Stories: Total Habitable
�- Space: I&'O()5f"
Main Floor SQ FT: Upper Floor SQ FT: Unfinished Basement SQ Finished Basement SQ
400 5r 0--- J/33 5T" ow-- FT: FT: k-
Garage SQ FT: Deck/Covered Patio SQ Impervious Surface 30% Slopes on
100 S Off- FT: {/r, y t7(L Area: Property: v
No. of Bedrooms: 3 ( Construction Type: Heat Source: , ,is Sewer or Septic: SFtver?,
TOTAL COST OF PROJECT: $
DISCLAIMER
The permitted verifies,acknowledges and agrees by their signature that: 1)if this per r t is for construction or on a dwelling,the dwell:nq is/will
be served by potable water. 2) Ownership of this City of Spokane Valley permit inure to the property owner. 3) The signatory is the property
owner or has permission to represent the property owner in this transaction. 4) All construction is to be done in full compliance with the City of
Spokane Valley Development code. Referenced codes are available for review at the City of Spokane Valley Permit Center. 5) The City of
Spokane Valley perr:ut is not a permit or approval for any violation of federal, state or local laws,codes or ordinances. 6) Plans or additional
information may he required to be submitted and subsequently approved before this application can be processed.
SignatureaitakiDate: ,,j�,? (//
Updated 1-11-1.1 Page 1 of 1
http://www.spokanevaliey.org/filestorage/124/938/210/948/1496/Building-Permit - Residential--11-11-11.doc
1
r'
it
Permit('enter
n 11703 E Sprague Ave,Suite B-3
Ile PERMIT NUMBER:
Spokane Valley_WA 99206
e r (509)688-0036 FAX:(509)688-0037
PLRMIT FEE:
Community Development ti«vyspol:anevailey.ora
Mechanical Permit Application ri Commercial X Residential
SITE ADDRESS: q e e . SP/L!/V�iC;t-_.-. !�-"-
Building Owner � I to L. aN
Mune: Phone: faa.sFar
Address: v- City: State Zi
/S� E , �r�R:� v.�/ 'i Wit/ p 7.74XI
Contractor p;lc' Ly,-..i
Name: Phone: Fax:
Address: QHS d .r �'d./ City
,S•I/'"/`ow& State: Zip:
..-
License No: City Business Lie:
Contact
Name: Phone: Ty
( 9 '0. /
DESCRIPTION OF WORK #OF UNITlS� X COST = TOTAL AMOUNT
1 FUEL BURNING APPLIANCE I E.ual to or less than 100,000 X $12.00 =
1 2 FUEL BURNING APPLIANCE More than 100,000 X $15.00 II
3 UNLISTED APPLIANCE(Additional Fee) Equal to or less than 400,000 X $50.00 el
4 UNLISTED APPLIANCE(Additional Fee) More than 400,000 X $100.00 El
5 USED APPLIANCE(WSEC min.AFUE ratio. E•ual to or less than 400,000 X $50.00 ■
6 USED APPLIANCE(WSEC min.AFUE ratan. More than 400,000 I X $100.00
7 BOILER/REFRIGERATION 1-100M RTU X S12.00 =
8 ; BOILER/REFRIGERATION 101-500M BTU X $20.00 =
9 I BOILER/REFRIGERATION 501-1,000M BTU X $25.00 = 1
10 j BOILER/REFRIGERATION 1,001-1,750M BTU X $35.00 _
11 BOILER/REFRIGERATION More than 1,750M BTU X $60.00 5
---- - -- ---- --
i 12 GAS LOG,GAS INSERT,GAS FIREPt.ACE X $10.00 1
13 RANGE 'f X $10.00 1 - O
14 DRYER X $10.00 j - • 0
15 FUEL BURNING WATER HEATER I X $10.00 = {0
16 MISC.FUEL BURNING APPLIANCE 1 X I $10.00 111
17 GAS PIPING(each outlet) X $1.00 5
18 DUCT SYSTEMS X $10.00 IS
19 VENTILATING FANS 5 X $10.00 ® 0
20 AIR HANDLER{_DOES NOT include ducting) Equal to or less than 10,000 CFM L X $12.00 5
21 AIR HANDLER(DOES NOT include ducting Greater than 10,000 CFM X $15.00 Ell
22 EVAPORATIVE COOLERS X sio 00 11.
23 TYPE I HOOD X 550.00 ■
24 TYPE II HOOD j L_ x 510.00 ® f O
25 HEAT PUMP/AIR CONDITIONER f 0-3 TON X $12.00 II
26 AIR CONDITIONER I 4-1510N X $20.00
27 AIR CONDITIONER 15-30 TON_ X $25.o0 ■
28 AIR CONDITIONER 30-50 TON X L $35.005
29 AIR CONDITIONER More than 50 TON X $60.00 Ell
-
30 LPG SIORAGETANK X $10.00
31 WOOD OR PELLET STOVE/INSERT X $10.00
32 WOOD STOVE-FREE STANDING i X $25.00 =
33 REPAIR&ADDITIONS X $15.00 =
34 VENTILATION SYSTEMS X $12.00 = i
35 VENTILATION MECHANICAL EXHAUST X $12.00 =
30 INCINERATOR-RESIDENCE X $19.00 =
37 INCINERATOR-COMMERCIAL X $22.00 =
METHOD OF PAYMENT: SUBTOTAL I
❑CASH [J CHECK ❑VISA 0 MC EXPIRES. PROCESSING FEE $35.00
CARD#: VIN' TOTAL PERMIT FEE DUE: i
AUI'IIORIZED SIGNATURE:
IiE:VISLll a.2a'Ga
,
Permit Center
,--somane
11703 F.Sprague Ave,Suite 13-3
..00.05Valley Spokane Valley,WA 99206 PERMIT NUMBER.
(509)688-0036 FAX:(509)688-0037
F
Community Development m ww.spokanc‘alLy.orr, PERMIT EE:
Plumbing Permit Application Commercial Residential
Residential
SITE ADDRESS: (1024 t. cfillik*fial, L1.
Building Owner
Name: Phone: Fax:
Address: City: State: Zip:
Contractor
Name: Phone: Fax:
Address: City: State: Zip:
License No: City Business Lie:
Contact
Name, Phone:
DESCRIPTION OF WORK #OF UNITS X COST = TOTAL AMOUNT
1 TOILETS WATER CLOSET,BIDETS 3 X $6.00
2 URINALS X $6,00
3 TUBS -I. X $6.00 =
4 SHOWERS PER TRAP) BATH,STALL,ONSITE BUILT I X ; $600 = (0
LAVSIRASINS,BAR.FLOOR,KITCHEN,
5 SINKS LAUNDRY,UTILITY,JANITOR,PHOTO, X $6.00
X-RAY,FOOD,PREP/CULINARY MEAT 4 7,--4
6 DISHWASHER I X $6.00 = CAP
7 CLOTHES WASHER i I X $600
8 GARBAGE DISPOSAL
X $6.00 =
9 WATER SOFTENER 111 56.00 = .. —
1 10 ELECTRIC WATER HEATER NOTE: IF GAS.SEE MECHANICAL 1111 $6.00 =
AREA.CASE,COIL,TRENCH. I
11 FLOOR DRAINS CONDENSATE I X $6.00 = (e)
12 ROOF DRAINS/OVERFLOW DRAINS
13 FOUNTAINS,DRINKING $6 00 ! = ,
WATER PIPING/DRAIN-IN WASTE, NSTALLATION,ALTERATION,REPAIR,
14 VENT,PLUMBING,REVERSAL REVERSALS $6.00
15 SEWAGE EJECTOR GRINDER,SUMP PUMP $6.00 .,
ICE AN/OR COFFEE MAKER,HOSE BIB,
16 WATER USING DEVICE STEAMER X $6.00 =
PROOFER,CARBONATOR,SWAMP
COOLER I
,----- VACUUM BREAKER.CHECK VALVE, I _
AND R.P.B P.O.FOR: VATS,TANKS,
17 CROSS CONNECTION DEVICE BOILERS X S6.00 =
GREASE TRAP,SAND TRAP,
18 INTERCEPTORS CHEMICAL HOLDING TANK X S6.00 =
19 MEDICAL GAS(per outlet) NITROUS.OXYGEN X S6.00 _
20 MISCELLANEOUS PLUMBING FIXTURE 4__ III S6.00 =
21 PRIVATE SEWAGE DISPOSAL/SYS II $20.00 =
,--
22 INDUSTRIAL WASTE INTERCEPTOR Ill S15.00 =
SUBTOTAL
METHOD OF PAYMENT:
PROCESSING FEE
EICASH 0 CHECK Li VISA 0 MC EXPIRES: $35.00
Card# VIN, TOTAL PERMIT FEE DUE:
AUTHORIZED SIGNATURE:
RFViCFD 5.,76'05
I
(
, .
,....,..„
• /Cc-PLANN! 'G # - 'T. AILPROVED ' >
3
BY.
,
4,..,
..r,„
DATE:
i 4 til 9 TI
i „....1...
•
1 ,eo.„..v..4,nt.rn,............91 J
''h.\ .....1
wel 21
,
1 CA --C1
1 .r, 014 1
ck I
A i
I @I'
t*Ii
11\
i 1 •
I1 ,rern
, 1 ea leeio ', -gtzz ,
I /4 -----Th
'
iiikt.....„•„,„,„, 4 4 1
1
\\,..N.
slit_ \ i I
L
i -..,...
1 i
i k
..‹,--......., 7 / „).!.. ....
I 11\ i
70
•
. :
\1,1 Jlit j
)4:1
/ .., ...„, ,•. „, >
'..N...\4,
•
For City Use Only
PLUS Project Number
CITYProject Spokane s
Valley®
11703 E Sprague Ave Suite B-3 • Spokane Valley WA 99206
50 9.688.0036 • Fax: 509.688.0037 • permitcenter@spokanevalley.org
As part of our on-going commitment to customer service during the review process of your project
application, we are providing you with a TARGET DATE for the initial technical application review. If for
any reason we cannot meet this date, we will contact you with a revised target date.
{
Your application review TARGET DATE is
The TARGET DATE is the date we estimate your project application will have had its initial technical
review. It is not the date for approval or permit issuance.
Tips for a Smoother Project Application Review
➢ Submit complete, accurate plans and documents.
Extra time may be required for re-submittals as project application reviewers work on multiple applications and it
may be several days before they can look at your new or revised information.
' Designate a specific contact person to communicate with the City.
While the person designated as the applicant's contact person with the City can be changed, one individual with the
expertise for dealing with reviewer comments would be the best choice for the entire review process.
➢ Call staff regarding the status of your project only after the target date shown at the top of the page.
Although you should be contacted on or by the target date,please feel free to contact us if you haven't heard from us
by your target date. Staff may contact you before the target date if the initial review is complete. By following this
procedure,you will save time and allow the reviewers to complete the work more expeditiously.
Steps in the Permit Process
1. Counter Complete. Your application has been accepted as counter complete. This means all of the required
documents, as indicated on your Pre-Application Checklist have been submitted or have been approved for deferred
submittal. This does not prevent technical staff from requesting additional information as a result of their technical review.
2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free
from substantive flaws that would prevent technical staff from completing the technical review once it is started. When
this step is complete, your application will be routed to the appropriate staff and remain in their review queue until it
comes up for review.
3. Technical Compliance. Once an application is administratively complete, it is routed to technical staff for compliance
review. Depending on the type of project, technical staff may include multiple reviewers. You should be contacted by
phone,fax, email,or mail by your TARGET DATE once the initial technical compliance review is complete.
4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re-
submittals, each reviewer will approve their section of the application and route it to the Permit Center. When all sections
of the application are received, a Permit Specialist will process the application and contact the person specified on your
application for permit pick-up. Information regarding fees and pre-construction meetings (if required) will be provided by
the Permit Specialist at that time.
WHITE-APPLICANT PINK-BUILDING FILE REV 9/07