2013, 12-02 Permit: SW-13002070 Sewer SPOKANE COUNTY UTILITIES
PERMIT
Application Number: SW-13002070 Permit Issued Date: 12/02/2013
Expiration Date: 12/02/2014
Project Description: SEWER CONNECTION
Project Name: COVEY GLENN
Primary Contact: VIKING CONSTRUCTION INC Applicant: VIKING CONSTRUCTION INC
Phone: 208-762-9106 Address: 2605 W HAYDEN AVE
HAYDEN, ID 83835
Phone: 208-762-9106
Email:
SITE INFORMATION:
Site Address: 19429 E SPRAGUE AVE Owner: VIKING CONSTRUCTION INC
Parcel Number: 55202.0193 Address: 2605 W HAYDEN AVE
HAYDEN, ID 83835
Phone: 208-762-9106
Assessor's Description: 20-25-45: CORBIN ADD TO GREENACRES(AFN# Email:
3100770)L1 &L2 B21 EXC S 25FT THEREOF;
ALSO EXC W 125FT OF N 220FT L2 B21; ALSO
EXC PTN DAF: COMMENCING A SE COR L1 B21;
TH N00*04'56"W 25.00FT ALG W PL
Inspection Area: :(509)-477-3675
Water District:Consolidated Irrigation Fire District:Spokane Valley Fire
District#19
Zoning: Land Area:0.2327 acres/10138 sqft
CONTRACTOR INFORMATION:
NORTHEI044KF, Exp.05/01/2015
NORTHWEST EXCAVATORS, INC*
2207 W JACKSON AVE SPOKANE,WA 99205
509-217-5511
DETAILS:
Class Type Quantity Unit Charge Value
SEWER SEWER CONNECTION 1 $125.00 $125.00
$125.00
FEE DETAIL:
Processing-Utilities $26.32
Utilities Permit $125.00
Total Fee: $151.32
CONDITIONS:
Plan review fee is required for all site plan reviews conducted by Spokane Valley Fire.
Inside Public Transit Benefit Area
CALL 1-800-424-5555 BEFORE YOU DIG--AT LEAST 2 WORKING DAYS IN ADVANCE.SPOKANE COUNTY CODE REQUIRES THE
INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR&INDUSTRIES, INCLUDING THOSE
RELATED TO TRENCH SAFETY.
SEWER PERMITS ARE VALID FOR ONE(1)YEAR FROM THE DATE OF ISSUANCE. FOR SEWER INSPECTIONS CALL THE UTILITIES
DEPT AT(509)477-3604 FROM 8:30-5:00 MONDAY-FRIDAY PRIOR TO COVER.ONE WORKING DAY NOTICE REQUIRED.PERMIT
ALLOWS FOR A 30-MINUTE INSPECTION.ADDITIONAL INSPECTION FEES APPLY AFTER 30 MINUTES.
Date Printed:12/02/2013 15:02:44 Project Coordinator:Julie Shatto
SPOKANE COUNTY UTILITIES
PERMIT
Application Number: SW-13002070 Permit Issued Date: 12/02/2013
Expiration Date: 12/02/2014
INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED
TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF
SEWER STUB PRIOR TO ANY OTHER EXCAVATION.
SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE
ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED.SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR
GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE.
THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE
LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF
UNDERGROUND FACILITIES.
Date Printed:12/02/2013 15:02:44 Project Coordinator:Julie Shatto