Loading...
2016, 04-08 Permit: APR-2016-0045 Approach Community Development Department (Staff Use Only) Permit Center TriekaF n011'el\1111111% 11703 East Sprague Avenue,Suite B 3 PERMIT NUMBER: Spokane Valley,WA 99206 valley, Tel:(509)720-5240 PERMIT FEE: permit 09)688-0037 permitcenter crspokanevalley.org APPROACH PERMIT APPLICATION PROJECT ADDRESS: 2_20g 3 Co/0144_1.o Cr START DATE: t//////5-- ANTICIPATED COMPLETION DATE: BUILDING OWNER NAME: DOJ (N.)DM e MAILING ADDRESS: CITY: STATE: ZIP: / CONTACT PERSON NAME: D0,/ `fNv+tiL PHONE: V-O'l 3 FrGI - 3O bel FAX: CELL: CONTRACTOR NAME: , MAILING ADDRESS: I 2_ I Z �V CH-120 IV l GI E i2(. CITY: M EAI STATE: ( )4- ZIP: q`=Oz ( PHONE: S (�o�I /7'( 3/3 / FAX: 5-0 27,- d// 7 CELL: Lc, 4 cr 3 -‘. ©O CONTRACTOR LICENSE#: b42sr/yq4. EXPIRES: CITY BUSINESS LICENSE#: g PROJECT PROJECT DESCRIPTION(Please Provide Site Sketch) Residential Driveway 0 Commercial/Industrial Driveway O Existing Curb& Gutter 0 Rural Road Section O Culvert Installation 0 Sidewalk Repair/Construction • Other Conditions: Bond/Insurance certification must be on file with the City. DISCLAIMER The permitted verifies, acknowledges and agrees by their signature that: 1) if this permit is for construction or on a dwelling, the dwelling is/will be served by potable water. 2)Ownership of this City of Spokane Valley permit inure to the property owner. 3) The signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done in full compliance with the City of Spokane Valley Development code. Referenced codes are available for review at the City of Spokane Valley Permit Center. 5) The City of Spokane Valley permit is not a permit or approval for any violation of federal, state or local laws, codes or ordinances. 6) Plans or additional information may be required to be submitted and subsequently approved before this application can be processed. X71, Signature / �� � � Date: // 4PK -'tole-OU4S 77, DE-001:V-1 Page 1 of 2 APPROACH PERMIT APPLICATION REQUIRED SKETCH INFORMATION Provide required measurements(in sketch boxes),and include street name. 1.1.0$ CdrkI cC Check all existing conditions that apply: E Sidewalk Drainage Ditch ft wide EDrywell(show location on sketch) ft from back of curb Other(please describe below) Streetside Swale DISTANCE FROM NEAREST PROPERTY LINE AY BE LEFT OR RIGHT SIDE) w J FT(SEE TABLE) a. �j CONCRETE APPROACH C11R8 RETURN CURB/ II—4' THROAT WIDTH FT 4'_ ' WING (SEE TABLE) NO \IF CORNER LOT, DISTANCE FROM STREET NAME Cpm 4,4/ ,, �r RETURN 1FT(SEE TABLE) STREET WITH CURB DISTANCE FROM z�} NEAREST PROPERTY LINE iLEFT OR RIGHT SIDE) • FT EE TABLE) 15'RADIus us ASPHALT (RAD, APPROACH RETURN EDGE OF I--THROAT WIDTH FT F (SEE TAB \IF CORNER WT, ASPHALT DISTANCE FROM STREET NAME RADIUS RETURN FT(SEE TABU STREET WITH ASPHALT EDGE Approach Requirements: • Maximum 2 approaches per property frontage;one on arterials. • Total width of approaches not to exceed 50%of frontage width. Residential Approaches Commercial Approaches Distance from Curb/Radius Return 15'minimum 75'minimum Separation between Approaches(measured from centerline to centerline of See Page 7-27 each approach) None specified in City Street Standards Throat Width(flat portion) 16'min.,30'max. 30'min.,40'max. Wing Width(at curb line) 4 feet typical 4 feet typical Minimum Distance from Side Property Line(@a,r/w) 5.0' 5.0' Minimum Distance from Crosswalk 5' 5' DE-001:V-1 Page 2 of 2