Loading...
2007, 04-20 Permit: 07002288 Sewer *` SPOKANE COUNTY DEPARTMENT OF BUILDING & PLANNING 1026 WEST BROADWAY AVENUE • SPOKANE, WA 99260-0050 S1POK�COLI1yTY ,, Site Information Project Information Site Address: 19305 E SPRAGUE AVE Project Number: 07002288 Inv: 1 Issue Date: 4/20/2007 Permit Use: SEWER CONNECTION-CORBIN/MCMILLAN EST Parcel Number: 55173.1506 Subdivision: RANGE Applicant: SEELY,RONALD A&MICHELLE L Block: Lot: 19305 E SPRAGUE AVE Zoning: UNK Unknown SPOKANE VALLEY,WA 99016 Phone: (509)927-2397 Owner: SEELY,RONALD A&MICHELLE L Contact: SEELY,RONALD A&MICHELLE L 19305 E SPRAGUE AVE Address: 19305 E SPRAGUE AVE SPOKANE VALLEY,WA 99016 Phone: (509)927-2397 SPOKANE VALLEY,WA 99016 Setbacks-Front: Left: Right: Rear: Building Inspector: NONE Water Dist: Group Name: Project Name: Permits Sewer Connection Permit Contractor: COURCHAINE CONSTRUCTION License#: COURCC*181R7 SEWER CONNECTION 1 $85.00 PROCESSING FEE 1 $15.00 Total Permit Fee: $100.00 FOR SEWER INSPECTIONS CALL THE UTILITIES DEPT AT(509)477-3604 FROM 8:30-5:00 MONDAY-FRIDAY PRIOR TO COVER. ONE WORKING DAY NOTICE REQUIRED.PERMIT ALLOWS FOR A 30-MINUTE INSPECTION. ADDITIONAL INSPECTION FEES APPLY AFTER 30 MINUTES. THE INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED TO PERFORM TESTS FOR VERIFICATION.INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF SEWER STUB PRIOR TO ANY OTHER EXCAVATION. SEWER STUBS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED TO THE MAIN.SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE. THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF UNDERGROUND FACILITIES. CALL 1-800-424-5555 BEFORE YOU DIG--AT LEAST 2 WORKING DAYS IN ADVANCE. SPOKANE COUNTY CODE REQUIRES THE INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR&INDUSTRIES, INCLUDING THOSE RELATED TO TRENCH SAFETY. Payment Summary Total Fees AmountPaid AmountOwinz Tran Date Receipt# Payment Amt $100.00 $100.00 $0.00 4/20/2007 1951 $100.00 Processed By: DOMPIER,DAWN PERMIT Printed By: HINTZ,FAITH Page 1 of 1 NOTICE It is the responsibility of the applicant/permittee to see to it that the use described on the front of this permit complies with applicable codes and requirements and that required inspections are requested. Failure to request inspections as listed below and obtain the necessary approvals before progressing beyond the point where inspections are required may necessitate removal of certain parts of the construction at the applicant's/permittee's or property owner's expense. At a minimum, the following inspections ARE REQUIRED by County Code: 1. FOOTING - when forms and reinforcement are in place and prior to placement of concrete—all structures, including manufactured homes. NOTE: This inspection includes review of the structure's setbacks from property lines. Minimum setbacks are established by County zoning regulations.Typically, side and rear yard setbacks are measured from property lines,while setbacks for yards abutting streets are measured from the property line or the center line of the roadway right-of-way,whichever provides the greater setback from the center line of the roadway right-of- way.Curb lines and fence lines are not necessarily indicative of property lines.In some residential areas,the County can own as much as 20 feet of right-of-way between your property and the actual improved street/curb.The responsibility to comply with applicable setback provisions lies solely with the permittee—neither Spokane County nor its authorized representatives assume any responsibility for the verification or location of your property lines. Please verify their location prior to locating your structure. Failure to properly locate the structure may require its relocation at the owner's/permittee's expense. 2.FOUNDATION-when forms and reinforcement are in place and prior to placement of concrete. 3.FRAMING-after all framing, bracing and blocking is in place,and prior to concealing. 4.INSULATION-prior to the installation of drywall. 5.PLUMBING-after rough-in, before covering, and final. 6.MECHANICAL- rough-in of piping, before covering, metal chimneys before concealment, and final. 7. FINAL - when complete and prior to occupancy and/or use. Please provide 24-hours notice. All permits require final inspection. NOTE:In addition to inspection of the structure,this inspection includes review of site improvements(typically depicted on the approved site plan) required by ordinance or as a condition of approval of this permit.Items such as the installation of fire hydrants,fire department access,on-site drainage ("208 swales"), road improvements, parking, and landscaping are common requirements of a permit/site plan which must be completed prior to final approval of a building or issuance of a Certificate of Occupancy. 8. MANUFACTURED HOMES- Final inspection required when complete,stairs, handrails,skirting,etc. installed,and prior to occupancy;completed inspection record card must be available on site. Manufactured Homes must comply with the manufacturer's installation instructions. 9. SEWERS - prior to cover 10. RIGHT-OF-WAY/APPROACH - prior to placement of concrete, or, if gravel approach, after completion. In addition to the above,any plumbing or mechanical systems or material which would be concealed by framing,drywall,concrete,etc.,must be inspected prior to cover. Check with the department for"special inspections"in conjunction with commercial projects. FOR INSPECTIONS: TO INSURE PROMPT SERVICE, PLEASE GIVE ONE WORKING DAY/24-HOUR NOTICE PARTS OF YOUR PROJECT MAY REQUIRE PERMITS AND INSPECTIONS FROM MORE THAN ONE AGENCY. • Building, plumbing, mechanical and fire inspections, Department • Road cuts for utilities or driveways, Division of Engineering & of Building & Planning Roads - 48-HOUR NOTICE REQUIRED 477-3675 477-3600 or State Department of Transportation • Construction in a flood plain, Division of Engineering & Roads 456-3000 477-3600 • Sewer connection, Division of Utilities • Electrical wiring, State Department of Labor and Industries 477-3604 324-2640 or City Public Works Department 625-6300 • On-site waste disposal system,Spokane Regional Health District 324-1560 PERMIT EXPIRATION AND REFUNDS Unless otherwise noted,this permit will be considered null and void by limitation if the work authorized by the permit is not commenced or is stopped for a period of 180 days, unless a written request for an extension of the permit is received and approved by the Building Official prior to expiration.At a minimum an inspection should be requested at least once every 180 days to assure the validity of the permit.A permit may be renewed within one year of the date of expiration for one-half the original fee,subject to certain limitations—please call us if you have any questions. All refund requests must be made in writing by the applicant/permittee(shown on the reverse)no later than 180 days after the date of fee payment. Refunds of not more than 80%of the permit fee paid may be authorized when no work has been done under the permit.No refunds may be authorized more than 180 days after fee payment. MISTAKE? If you think we've made an error in processing this permit or in conducting inspections pertaining to it,or find erroneous information in the permit,please bring it to our attention immediately by filing a written request for correction within 10 working days of discovery.All such requests should be directed to the Department of Building and Planning at the below address. Spokane County Department of Building&Planning 1026 West Broadway Avenue Spokane, WA 99260 Phone: (509) 477-3675 Fax: (509) 477-4703 TDD: (509) 477-7133 FORM 30-050202 BLDG PERMIT