Loading...
2015, 05-21 Permit: SW-15000476 Sewer SPOKANE COUNTY UTILITIES PERMIT Application Number: SW-15000476 Permit Issued Date: 05/21/2015 Expiration Date: 05/21/2016 Project Description: SEWER Project Name: CORBIN,LOT 22 BLOCK 8 Primary Contact: POUL CONSTRUCTION Applicant: POUL CONSTRUCTION Phone: 509-979-5872 Address: 18902 E 2ND AVE SPOKANE VALLEY,WA 99016 Phone: 509-979-5872 Email: SITE INFORMATION: Site Address: 19105 E SPRAGUE AVE Owner: GILBERT,CRAIG M&TARA L Parcel Number: 55173.1822 Address: 19105 E SPRAGUE AVE GREENACRES,WA 99016-9696 Phone: Assessor's Description: GUTHRIES VLY VW 5TH L22 B8 Email: Inspection Area: : (509)477-3675 Water District: Consolidated Irrigation Fire District:Spokane Valley Fire District#19 Zoning: Land Area:9600 Square Feet CONTRACTOR INFORMATION: POULCC*932BQ, Exp.01/28/2017 POUL CONSTRUCTION 18902 E 2ND AVE SPOKANE VALLEY,WA 99016 509-979-5872 DETAILS: Class Type Quantity Unit Charge Value SEWER SEWER CONNECTION 1 $125.00 $125.00 $125.00 FEE DETAIL: Processing-Utilities $27.12 Utilities Permit $125.00 Total Fee: $152.12 CONDITIONS: Inside Public Transit Benefit Area Plan review fee is required for all site plan reviews conducted by Spokane Valley Fire. SVRP Aquifer Boundary:Water Purveyor ability to serve statement required. If unable to serve,?mitigation certificate?(use of private well) from DOE prior to permit issuance. _ Plan review fee is required for all site plan reviews conducted by Spokane Valley Fire Public Transit Benefit Area CALL 1-800-424-5555 BEFORE YOU DIG--AT LEAST 2 WORKING DAYS IN ADVANCE.SPOKANE COUNTY CODE REQUIRES THE INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR&INDUSTRIES, INCLUDING THOSE RELATED TO TRENCH SAFETY. Date Printed:05/21/2015 14:40:22 Project Coordinator:Susan Clark SPOKANE COUNTY UTILITIES PERMIT Application Number: SW-15000476 Permit Issued Date: 05/21/2015 Expiration Date: 05/21/2016 SEWER PERMITS ARE VALID FOR ONE(1)YEAR FROM THE DATE OF ISSUANCE. FOR SEWER INSPECTIONS CALL THE UTILITIES DEPT AT(509)477-3604 FROM 8:30-5:00 MONDAY-FRIDAY PRIOR TO COVER. ONE WORKING DAY NOTICE REQUIRED. PERMIT ALLOWS FOR A 30-MINUTE INSPECTION.ADDITIONAL INSPECTION FEES APPLY AFTER 30 MINUTES. INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF SEWER STUB PRIOR TO ANY OTHER EXCAVATION. SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED.SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE. THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME.BOTH STATE LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF UNDERGROUND FACILITIES. Date Printed:05/21/2015 14:40:22 Project Coordinator:Susan Clark