2013, 11-21 Permit App: BLD-2013-2450 ResidenceSpokane
�,.I. Valley
•
Community Development Department
Permit Center
11703 East Sprague Avenue, Suite B-3
Spokane Valley, WA 99206
Tel: (509) 720-2540
Fax: (509) 688-0037
permitcentersookanevallev.orci
RESIDENTIAL CONSTRUCTION PERMIT APPLICATION
0 NEW CONSTRUCTION
❑ DECK
El ADDITION/REMODEL
❑ OTHER
❑ ACCESSORY BUILDING
"IT CENTER
SITE ADDRESS: TBD ST. CHARLES ST. - i 7711 (---. _l
ASSESSORS PARCEL NO.: LEGAL DESCRIPTIO: LOT 3 BLOCK 1 - ELLIOT ADDITION
BUILDING OWNER NAME: Viking Builders, LLC.
NAME: Viking Builders, LLC.
ADDRESS: 6223 W. Deschutes Ave. ste # 309
CITY: KennewickSTATE: WA ZIP: 99336
PHONE: (509)735-9332 FAX: (509)735-9332 CELL: (509)572-8014
CONTACT NAME: Ryan Olson
1& 2, • 671/
PHONE: (509)735-9332
FAX: (509)735-9332
CELL: (509)572-8014
CONTRACTOR NAME: Viking Builders, LLC.
MAILING ADDRESS: 6223 W. Deschutes Ave. ste # 309
CITY: Kennewick
STATE: WA zip: 99336
PHONE: (509)735-9332
FAX: (509)735-9332
CELL: (509)572-8014
CONTRACTOR LICENSE No.: 602-978-207 EXPIRES: 9-30-2014 CITY BUSINESS LICENSE NO.: 602-978-207
DESCRIBE THE SCOPE OF WORK IN DETAIL AND INDICATE USE & PROPOSED USE:
Proposed new single family residence with attached garage.
****YOU MUST COMPLETE THE FOLLOWING****
T APPLICABLE
Height to Peak: 27,-3„
Dimensions: 52,X43,-6
No. of Stories: TWO
Total Habitable 2669
Space:
Main Floor SQ FT:
1249
Upper Floor SQ FT:
1420
Unfinished Basement SQ
FT: N/A
Finished Basement SQ
FT: N/A
Garage SQ FT:
672
Deck/Covered Patio SQ
FT: N/A
Impervious Surface
Area: 2805
30% Slopes on
Property: NO
No. of Bedrooms: 4
Construction Type: CONV
Heat Source: GFA
Sewer or Septic: SEWER
TOTAL COST OF PROJECT: $ 185,000
DISCLAIMER
The permitted verifies, acknowledges and agrees by their signature that: 1) if this permit is for construction or on a dwelling, the dwelling is/will
be served by potable water. 2) Ownership of this City of Spokane Valley permit inure to the property owner. 3) The signatory is the property
owner or has permission to represent the property owner in this transaction. 4) All construction is to be done in full compliance with the City of
Spokane Valley Development code. Referenced codes are available for review at the City of Spokane Valley Permit Center. 5) The City of
Spokane Valley permit is not a permit or approval for any violation of federal, state or local laws, codes or ordinances. 6) Plans or additional
information may be required to be submitted and subsequently approved before this application can be processed.
Signature :::5.-) cc,Qr')
Date: 11/21/13
Updated 1-11-11
Z:\PDF PLAN SUBMITTAL\SPOKANE VALLEY\APPLICATION.doc
Page 1 of 1
tta
BITE FLAN
SCALE: 1"--= 20'- 0"
LOT 3 BLOCK 1
ELLIOT SUBDIVISION
SPOKANE VALLEY, WASHINGTON
67.350'
Nrojecl
h t.k..; c.1 V LL134„
Nuv 2 6 2013
CSV PERMIT CENTEP
PROPERTY LINE
20' MIN. REAR SETBACK
x5'-6"
PROPERTY LINE
U
z
2
52'-0"
SUB # i REV. # I
9'-10",1,
I ROI(SI D
CONC.
PATIO
I
PLANNING DEPT. APPROVED
,PROPOSED4�
/O/i',,TWO STORY/�%
SINGLE FAMILY RESIDENCE
5' MIN. SIDE SETBACK
PROPERTY LINE
00
0
0
iT
20' MIN.
GE
•
WATER
15' MIN. GARAGE SETBACK
10' UTILITY
'1 EASEMENT
13' BORDER EASEMENT
SIDEWALK
SWALE
PROPERTY LINE 67.J50';;
PROPOSED
CONC.
DRIVEWAY
29'-9"
NO PARKIN) SIGN
(V
UNDER N
GROUND
POWER
a
CURB
ST. CHARLES STREET
CROWN OF STREET
;,y •
///2-&/73
NO EXISTING STRUCTURES
ON THIS LOT. NO PROPOSED
ACCESSORY BUILDINGS AT
THIS TIME
LOT TO BE GRADED
TO RETAIN RUNOFF
WATER FROM HOUSE
ON LOT.
This site plan is bring submitted for the purpose of
obtaining a building permit and is a truc and correct
rcprcscntaion of the propsal. All known property
lint/dimensions, curb lints, structures and casements
have bccn idcntificd. Also indicated arc wetlands,
bodies of water, stccp slopes or othcr critical arcas.
(}cr
Signed: G:)�
Date: 11/21/13
SAFIRE
•
Target Date sheet
For City Use Only
PLUS Project
Project Address
11703 E Sprague Ave Suite B-3 ♦ Spokane Valley WA 99206
509.720-5240 ♦ Fax: 509.688.0037 ♦ permitcenter®spokanevalley.org
As part of our on-going commitment to customer service during the review process of your project application, we are
providing you with a TARGET DATE for the initial technical application review. If for any reason we cannot meet
this date, we will contact you with a revised target date.
Your application review TARGET DATE is
The TARGET DATE is the date we estimate your project application will have had its initial technical review. It is
not the date for approval or permit issuance.
Tips for a Smoother Project Application Review
D Submit complete, accurate plans and documents.
Extra time may be required for re -submittals as project application reviewers work on multiple applications and it may be
several days before they can look at your new or revised information.
D Designate a specific contact person to communicate with the City.
While the person designated as the applicant's contact person with the City can be changed, one individual with the expertise
for dealing with reviewer comments would be the best choice for the entire review process.
D. Call staff regarding the status of your project only after the target date shown at the top of the page.
Although you should be contacted on or by the target date, please feel free to contact us if you haven 't heard from us by your
target date. Staff may contact you before the target date if the initial review is complete. By following this procedure, you will
save time and allow the reviewers to complete the work more expeditiously.
Steps in the Permit Process
1. Counter Complete. Your application has been accepted as counter complete. This means all of the required documents, as
indicated on your Pre -Application Checklist have been submitted or have been approved for deferred submittal. This does
not prevent technical staff from requesting additional information as a result of their technical review.
2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free from
substantive flaws that would prevent technical staff from completing the technical review once it is started. When this step is
complete, your application will be routed to the appropriate staff and remain in their review queue until it comes up for review.
3. Technical Compliance. Once an application is administratively complete, it is routed to technical staff for compliance review.
Depending on the type of project, technical staff may include multiple reviewers. You should be contacted by phone, fax, email,
or mail by your TARGET DATE once the initial technical compliance review is complete.
4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re -
submittals, each reviewer will approve their section of the application and route it to the Permit Center. When all sections of the
application are received, a Permit Specialist will process the application and contact the person specified on your application for
permit pick-up. Information regarding fees and pre -construction meetings (if required) will be provided by the Permit Specialist at
that time.
CD -003 V-7/ 06-21-11 Page 1 of 1