2014, 11-06 Permit: SW-14001642 Sewer SPOKANE COUNTY UTILITIES
PERMIT
Application Number: SW-14001642 Permit Issued Date: 11/06/2014
Expiration Date: 11/06/2015
Project Description: SEWER CONNECTION
Project Name: CORBIN
Primary Contact: POUL CONSTRUCTION Applicant: POUL CONSTRUCTION
Phone: 509-979-5872 Address: 18902 E 2ND AVE
SPOKANE VALLEY,WA 99016
Phone: 509-979-5872
Email:
SITE INFORMATION:
Site Address: 18920 E SPRAGUE AVE Owner: PEHA, DARREN M&TONJA M
Parcel Number: 55202.0172 Address: 18920 E SPRAGUE AVE
GREENACRES,WA 99016-9653
Phone:
Assessor's Description: CORBIN ADD TO GREENACRES TRACT"1"OF Email:
SP93-836 RECORDED IN AUDITORS OFFICE IN
SP BOOK 14 PG 36 RECORDING#4103172 BEING
A PTN LT 6 BLK 21
Inspection Area: : (509)-477-3675
Water District: Consolidated Irrigation Fire District: Spokane Valley Fire
District#19
Zoning: Land Area: 1.12 Acre(s)
CONTRACTOR INFORMATION:
POULCC*932BQ, Exp.01/28/2015
POUL CONSTRUCTION
18902 E 2ND AVE SPOKANE VALLEY,WA 99016
509-979-5872
DETAILS:
Class Type Quantity Unit Charge Value
SEWER SEWER CONNECTION 1 $125.00 $125.00
$125.00
FEE DETAIL:
Processing-Utilities $26.64
Utilities Permit $125.00
Total Fee: $151.64
CONDITIONS:
Inside Public Transit Benefit Area
Plan review fee is required for all site plan reviews conducted by Spokane Valley Fire.
CALL 1-800-424-5555 BEFORE YOU DIG--AT LEAST 2 WORKING DAYS IN ADVANCE.SPOKANE COUNTY CODE REQUIRES THE
INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR&INDUSTRIES, INCLUDING THOSE
RELATED TO TRENCH SAFETY.
SEWER PERMITS ARE VALID FOR ONE(1)YEAR FROM THE DATE OF ISSUANCE. FOR SEWER INSPECTIONS CALL THE UTILITIES
DEPT AT(509)477-3604 FROM 8:30-5:00 MONDAY-FRIDAY PRIOR TO COVER.ONE WORKING DAY NOTICE REQUIRED. PERMIT
ALLOWS FOR A 30-MINUTE INSPECTION.ADDITIONAL INSPECTION FEES APPLY AFTER 30 MINUTES.
Date Printed:11/06/2014 13:56:53 Project Coordinator:Kathy Cummings
SPOKANE COUNTY UTILITIES
PERMIT
Application Number: SW-14001642 Permit Issued Date: 11/06/2014
Expiration Date: 11/06/2015
INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED
TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF
SEWER STUB PRIOR TO ANY OTHER EXCAVATION.
SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE
ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED.SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR
GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE.
THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE
LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF
UNDERGROUND FACILITIES.
Date Printed: 11/06/2014 13:56:53 Project Coordinator:Kathy Cummings