2013, 02-11 Permit: SW-13000065 Sewer SPOKANE COUNTY BUILDING AND PLANNING PERMIT Permit Issued Date: Application Number: SW-13000065 02/11/2013 Expiration Date: 02/12/2013 Project Description: SEWER CONNECTION Primary Contact: COURCHAINE EXCAVATION Project Name: CORBIN PROJECT Applicant: COURCHAINE EXCAVATION Permit Type: SEWER Address: 19818 E SPRAGUE GREENACRES,WA 99016 Phone: 509-928-0846 Email: SITE INFORMATION: Site Address: 18425 E SPRAGUE AVE Owner: REILLO, BEVERLY/SOUTHERN, VERONA Parcel Number: 55184.9032 Address: 221 W RAINIER WAY SPOKANE,WA 99208- Subdivision: SP-910-93 Phone: Assessor's Description: Section 18 Township 25 Range 45,TR'A'OF SP Email: 93-910A, R.O.S.,AUDITOR'S#4295191, BK 11, PG 63B. Inspection Area: Water District: Fire District: Spokane Valley Fire Consolidated Irrigation District#19 Zoning: Land Area: 30719 Square Feet CONTRACTOR INFORMATION: General Contractor COURCC*181 R7 COURCHAINE EXCAVATION 19818 E SPRAGUE GREENACRES,WA 99016 509-928-0846 DETAILS: Class Type Quantity Unit Charge Value SEWER SEWER CONNECTION 1 $125.00 $125.00 $125.00 FEE DETAIL: Processing-Utilities $26.32 Utilities Permit $125.00 Total Fee: $151.32 CONDITIONS: Inside Public Transit Benefit Area Plan review fee is required for all site plan reviews conducted by Spokane Valley Fire. Date Printed:02/11/2013 10:50:13 Printed by:IIS APPPOOL\SmartGovProdApp SPOKANE COUNTY BUILDING AND PLANNING PERMIT Permit Issued Date: Application Number: SW-13000065 02/11/2013 Expiration Date: 02/12/2013 CALL 1-800-424-5555 BEFORE YOU DIG--AT LEAST 2 WORKING DAYS IN ADVANCE. SPOKANE COUNTY CODE REQUIRES THE INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR&INDUSTRIES, INCLUDING THOSE RELATED TO TRENCH SAFETY. FOR SEWER INSPECTIONS CALL THE UTILITIES DEPT AT(509)477-3604 FROM 8:30-5:00 MONDAY-FRIDAY PRIOR TO COVER. ONE WORKING DAY NOTICE REQUIRED. PERMIT ALLOWS FOR A 30-MINUTE INSPECTION.ADDITIONAL INSPECTION FEES APPLY AFTER 30 MINUTES. INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF SEWER STUB PRIOR TO ANY OTHER EXCAVATION. SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED.SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE. THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF UNDERGROUND FACILITIES. Date Printed:02/11/2013 10:50:13 Printed by:IIS APPPOOL\SmartGovProdApp