Loading...
2015, 05-18 Permit App: BLD-2015-1124 ResidenceSpokane Valley Community Development Department permit Center 11703 East Sprague Avenue, Suite 8-3 Spokane Valley, WA 99206 Tel: (509) 720-2540 Fax: (509) 688-0037 permitcenterOspoka neva llev.orq i PERMIT NUjMBEER: 8 (� PERMIT Fag I 1 2015 CSV PERMIT CENTER SUB # I INREV. _.- D. ACCESSORY BUILDING RESIDENTIAL CONSTRUCTION PERMIT APPLICAON Q NEW CONSTRUCTION Q ADDITION/REMODEL D DECK L. OTHER SITE ADDRESS: 528 S. ST CHARLES ST ASSESSORS PARCEL NO.: BUILDING OWNER NAME: Viking Builders, LLC. LEGAL DESCRIPTION: LOT 9 BLK 1 ELLIOT PLACE NAME: Viking Builders, LLC. ADDRESS: 2605 W. Hayden Ave. CITY: Hay den - STATE: ID ZIP: 83835 208-762-9106 208-762-4507 PHONE: FAX: CELL: CONTACT NAME: Mike Smith PHONE: 208-762-9106 Fax: 208-762-4507 CELL: 509-661-5126 CONTRACTOR NAME: Viking Builders, LLC. MAILING ADDRESS: 2605 W. Hayden Ave. Czrv: Hayden ... ..... ... _. . . _... PHONE: NE: 208-762-9106 STATE: ID FAX 208-762-4507 Zip: 83835 cEtt.: CONTRACTOR LICENSE NO.: 602-978-207 EXPIRES: 9-30-2014 CITY BUSINESS LICENSE NO.: DESCRIBE THE SCOPE OF WORK IN DETAIL AND INDICATE USE & PROPOSED USE: Proposed new single family residence with attached garage. ****YOU MUST COMPLETE THE FOLLOWING**** MMttP. 111/M it 1w1 r.,r1 ..+v.-......., Height to Peak: , „ 27 -9 Dimensions: 401 X 41, No. of Stories: 2 Total Habitable 2403' Space: Main Floor SQ FT: 987' Upper Floor SQ FT: 1,416' Unfinished Basement SQ FT: N/A Finished Basement SQ FT: NIA Garage SQ FT: 525' Deck/Covered Patio SQ FT: N/A Impervious Surface Area: 2,557' 30% Slopes on Property: N/A No. of Bedrooms:3 Construction Type: NEW Heat Source: GAS FORCED AIR Sewer or Septic: SEWER TOTAL COST OF PROJECT: $ 176,000 DISCLAIMER The permitted verifies, acknowledges and agrees by their signature that: 1) if this permit Is for construction or on a dwelling, the dwelling Is/will be served by potable water. 2) Ownership of this City of Spokane Valley permit Inure to the property owner.- 3) The signatory Is the property owner or has permission to represent the property owner In this transaction. 4) AH construction Is to be done In full compliance with the City of Spokane Valley Development code. Referenced codes are available for review at the City of Spokane Valley Permit Center. 5) The City of Spokane Valley permit Is not a permit or approval for any violation of federal, state or local laws, codes or ordinances. 6) Plans or additional Information may be required to be submitted and subsequently approved before this application can be processed. Signature nco.��C1 { Date: 5/14/15 Updated 1-11-11 Z:\PDF PLAN SUBMITTAL\SPOKANE VALLEY\APPLICATION.doc Page 1 of 1