2013, 10-30 Permit: SW-13001895 Sewer SPOKANE COUNTY UTILITIES PERMIT Application Number: SW-13001895 Permit Issued Date: 10/30/2013 Expiration Date: 10/30/2014 Project Description: SEWER CONNECTION Project Name: CENTENNIAL PLACE Primary Contact: MARKHAM HOMES INC Applicant: MARKHAM HOMES INC Phone: Address: PO BOX 14130 SPOKANE VALLEY,WA 99214 Phone: Email: SITE INFORMATION: Site Address: 1904 STEEN LN Owner: KDGRA LLC Parcel Number: 45124.0310 Address: 504 E FAIRHAVEN AVE BURLINGTON,WA 98233 Phone: Assessor's Description: SHP 08-12 LT 5&4 EXC PTN LYG E OF FOL LN Email: DAF: BEG AT NW COR OF LT 5 TH N00°07'36"E 80.07FT TO N LN OF SHP 08-12&TERMINUS OF LN Inspection Area: :(509)-477-3675 Water District:Consolidated Irrigation Fire District:Spokane Valley Fire District#19 Zoning: Land Area: 0.2327 acres/10138 sqft CONTRACTOR INFORMATION: MARKHHI971 DK, Exp.03/12/2015 MARKHAM HOMES INC PO BOX 14130 SPOKANE VALLEY,WA 99214 DETAILS: Class Type Quantity Unit Charge Value SEWER SEWER CONNECTION 1 $125.00 $125.00 $125.00 FEE DETAIL: Processing-Utilities $26.32 Utilities Permit $125.00 Total Fee: $151.32 CONDITIONS: Plan review fee is required for all site plan reviews conducted by Spokane Valley Fire. Inside Public Transit Benefit Area CALL 1-800-424-5555 BEFORE YOU DIG--AT LEAST 2 WORKING DAYS IN ADVANCE. SPOKANE COUNTY CODE REQUIRES THE INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR&INDUSTRIES, INCLUDING THOSE RELATED TO TRENCH SAFETY. SEWER PERMITS ARE VALID FOR ONE(1)YEAR FROM THE DATE OF ISSUANCE. FOR SEWER INSPECTIONS CALL THE UTILITIES DEPT AT(509)477-3604 FROM 8:30-5:00 MONDAY-FRIDAY PRIOR TO COVER. ONE WORKING DAY NOTICE REQUIRED. PERMIT ALLOWS FOR A 30-MINUTE INSPECTION.ADDITIONAL INSPECTION FEES APPLY AFTER 30 MINUTES. Date Printed:10/30/2013 09:45:22 Project Coordinator:Laurie Carver SPOKANE COUNTY UTILITIES PERMIT Application Number: SW-13001895 Permit Issued Date: 10/30/2013 Expiration Date: 10/30/2014 INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF SEWER STUB PRIOR TO ANY OTHER EXCAVATION. SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED.SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE. THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME.BOTH STATE LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF UNDERGROUND FACILITIES. Date Printed:10/30/2013 09:45:22 Project Coordinator:Laurie Carver