2014, 06-19 Energy Compliance Cert Property Address: 1 '� y 4/. /A,
Conditioned Floor Area: /tO J f Date: —�
Builder or registered design professional:
d
Signature: i ,
i r`>` I2R q.. 0
C41Kk s}� } 1• Nc$ ` Jj
i�3 fteN.ft ljt,it t r,+�i n+'\'+�jrt . ".. �as +n 1,'pt: ,` lb�,t�t�tt.%r t �q '�dt44�✓!�+;`;¢°y�4i,4
Ceiling: Vaulted R-go, Floors: Over unconditioned space R-
Attic R- 1/t Slab on grade floor R-
Watts: Above grade R- 2:2, Doors: Feb.,f R-
Below,
int. R- R
Below,ext. R- NnuSe GAfe/t It.. t2 i'lify1 �f t f17Itkr4sL 1113.1 � t ,"RI4, t'�M7
..4.M,4tc n .n..l . "i.,, fit �}f� f .1„1,r•i. `.`
r' NFRC rating(or) Windows U- 31 SHGC N/A
Default rating(Appendix,A WSEC 2012) Skylights U- SHGC- N/A
' .`,'
Jhr
Ya ff
"IF
rn:;li'tf�'i ' 0 ItYc
�S?�4{{s
f �!
�. 4 " Iww�.wnswn.sw
Mme.. t TP1t` R U fii ➢"r ��"6L �� �QdU tt f �,(j�rS"I r _i t I`I 'jt
> Bio
tSNI t ne i!.; 4 u ksA �'".o r.+r.' �::�!>~,�
System Type Efficiency
K: Heating 6--41-7 . f J
Cooling Ai%
DHW fat" ._
5 t e'at }y f /5 t o a to f W
' -��' > >G+y ism L _.. It y l� zr ' �a�t�4t1VI'A(f Sta.:�
,bA44,..
All ducts&HVAC in conditioned space (yes/6 Insulation R-
Air handler present 057 no)
Test Target yi,, CFMQ25Pa Test Result ! CFM@25Pa
Building air leakage target:ACH50<5.0-Tested leakage:ACH0 (g 3
I $I 't-u�v'>M1J; f1}tf s• /r. LI s�l�, �"y ; S�NeV.4h
t\t"; .N5Ai , S
4J 4 16f C t"if t j4 e i
System type: Rated annual generation Kwh
PART 1 Residence A dress LOOSE-FILL SPECIRLIZED
Ac\ �.5 \s ,, INSULATIONCERTIFICATE IIV_r�'7JLRTIQNINCy
Date Installed —7r/ (51 /z`I RESIDENTIAL • COMMERCIAL
509.489.3512 •
894 E. COZZA DRIVE
SPOKANE, WA 99208
CONT. LIE. # SPEC111999D7
PART 2 Ceiling Areas Insulated(Loose Fill)
Square Feet Existing Added R-Value No.Bags Lbs.Bag Total Depth Combined Insulation
R-Value R-Value Type
LI
2.
3.
PART 3 Wall Area Insulated(loose Fill) ❑Floor Areas Insulated
Square Feet Existing Added R-Value No.Bags Lbs. Bag Total Depth Combined Insulation
R-Value R-Value Type
1.
2.
This certified that the above residence identified in Part 1 was insulated as specified in Part 2,or 3 and the installation was
conducted in conformance to applicable codes,standards and regulations at the time of installation.
(AUTHORIZED SIGNATURE)
WHITE COPY TO CUSTOMER•YELLOW COPY TO CONTRACTOR•HARD COPY TO ATTIC