Loading...
1995, 03-27 Permit App: 95001800 Sewer SEWER CONNECTION PERMIT APPLICATION FORM PLEASE NOTE: This application form must be filled out accurately and in its entirety, and signed, or a permit will not be issued. Also note that sewer permits are valid for 12 months from the date of issuance. No extensions will be granted. PROJECT INFORMATION Job address: Dry Line Owner's name: 2M) i kA(5— ' 1- rVi Sewer? (Y/N) At G2 R$ ). -f cidt•S Owt City: S &.4-tio. City/State: 45, 1/323 , 'JP c Z- Zip: Zip: a/9 7-7-3 Parcel number (if known): Phone: X (Yr Qi 8i.1‹ z ORAVc.eG1:$r Pc-k 407— �► ?7 i /43q3---7',7 First-time contractors or home-owners performing the installation must first contact the utilities department (in person or via phone[456-3604]) before a permit can be issued. Name of Utilities Division person contacted: CONTRACTOR INFORMATION Contractor (company name): State contractor license number: Business address: Utilities installers permit number: City/State: Zip:, Phone: INTERIOR PLUMBING ALTERATIONS (if applicable)** Contractor (if different from above): Phone: Business Address: City/State/Zip: ** For plumbing reversal fee information, see reverse side of this form. FEE INFORMATION Sewer Connection: Number of Buildings X (times) $50 (per bldg) _ $ TOTAL FEE * One permit required for each separate building, shop,garage, etc., that will be connected to the sewer. * Condos, townhouses, &2-3-and 4-plexes require 1 permit per address/stub. *Multiple buildings (apartments, industrial complexes) require 1 permit per building. (For situations not covered here, call the County Utilities Division @ 456-3604) APPLICANT SIGNATURE: Date: -1-,2/ 'gJ/ Spokane County Division of Buildings West 1026 Broadway Avenue * Spokane, Washington 99260 * (509) 456-3675