Loading...
2009, 10-26 Permit App: 09003467 GarageProject Number: 09003467 Inv: 1 Application THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Date: 10/26/2009 Page 1 of 2 Project Information: Permit Use: ADD ON ATTACHED 22 X 25 GARAGE Contact: BLACKHAWK CORPORATION Address: 23900 E JOSEPH C - S - Z: OTIS ORCHARDS, WA 99027 Setbacks: Front Left: Right: Rear: Phone: (509) 226-2186 Group Name: Site Information: Project Name: Plat Key: Name: VERADALE PARK ADD District: Nort Parcel Number: 45141.0307 Block: SiteAddress: 1025 N ST CHARLES RD Location:: CSV Zoning: MF -1 MF MDR District Water District: 010 VERA Area: 10,800 Sq Ft Width: 0 Nbr of Bldgs: 0 Nbr of Dwellings: 0 Review Information: ,,,,,m,„_ ow..,. ,1 Lot: Owner: Name: ROHRBAUCK, NILES D & CHERY Address: 1025 N SAINT CHARLES RD SPOKANE VALLEY, WA 99037 Hold: Ill Depth: 0 Right Of Way (ft): 0 Review Building Plan Review Released By: Originally Released: 10/26/2009 By: tmelbourn Landuse/Zoning/HE Conditions Permits: Released By: Originally Released: 10/26/2009 By: mharnois Operator: jmm Printed By: jmm Print Date: 10/26/2009 Project Number: 09003467 Inv: I Application THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Date: 10/26/2009 Contractor: BLACKHAWK CORP Address: 23900 E JOSEPH OTIS ORCHARDS, WA 99027 Description Grp Type Notes GARAGE U-1 VB Item Description RESIDENTIAL PERMIT FEE ACCESSORY PLANS REVIEW WSBCC SURCHARGE Notes:.�.� Payment Summon': Permit Type Building Permit Page 2 of 2 Building Permit Firm: BLACKHAWK CORP Phone: (509) 226-2186 This Application: Sa Ft 572 Totals: 572 Valuation $10,868.00 Total Project: Sq Ft Valuation 572 $10,868.00 Units Unit Desc 1 SELECT 1 SELECT 1 SELECT $10,868.00 Permit Total Fees: Fee Amount Invoice Amount $248.56 $248.56 572 $10,868.00 Fee Amount $195.25 $48.81 $4.50 Amount Paid $48.81 $248.56 $248.56 $48.81 $248.56 Amount Owing $199.75 $199.75 Disclaimer: Submittal of this application certifies the owner (or person(s) authorized by the owner) has both examined and finds the information contained within to be true and correct, and agrees that all provisions of laws and/or regulations governing this type of work will be complied with. Subsequent issuance of a permit shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of the code or of any other state or local laws or ordinances. Signature: Operator: jmm Printed By: jmm Print Date: 10/26/2009 Permit Center Scm of 11703 E Sprague Ave, Suite B=3 . p0 ane I _ Spok r Vfi'lleg% . P$06 . Valley. X509 $B=UfJ16 I 09. 8-00 �g Community Development OCT Residential C instruct on `./.-:D 2:,:i, _._ ' Permit Applic to Submitta--rf--_- v pb'kanir Ilep`brg* PERMIT NUMBER: "/ 3 (4 PERMIT FEE: New Construction Accessory Bldg Addition/Remodel Deck Other: , 4. 6440,;(6'4/ - SITE }40f4 SITE ADDRESS: 4/5/411/?J/'3 ASSESSORS PARCEL NO: '' ? C' 1 LEGAL DESCRIPTION: ~.4 p,4 'p f.tt A,E` ? Building Owner: DIMENSIONS: # OF STORIES: Name: 4,3 ey"/.r,i%P<'" b 7 7 -4'(1 /ti44' . ,' (� > Address:/C Z -C c • '- —, C/` ."7"'2 , City: ^ _ �. ', i � 1,,„4:. State: .ti Zip: -,,,,,..2:,,,i, �� Phone: ''e 6,...._51 r Fax: Contact Person Name: PG Phone: Describe the scope of work in detail: Contractor: DIMENSIONS: # OF STORIES: Name: aeric— ,F'',)•: 't,' ! " L...-_ 7 7 -4'(1 2"D FLOOR SQ. FTG: Address: Lam,. �. 3,,.-,- t' , \%`G r /4„,,, -. FINISHED BASEMENT SQ. FTG: City:. > ,r//i'�C, J State: 1• �Gt ,.„,A. Zip .- '9 .2 7 Phone: 6 r, -4 i 5 Fax:,i ,, ''e 6,...._51 HEAT SOURCE: C tractor Lic,Nn: Exp Date: ,., City Business Lic. No: Cost of Project: $ °- Proposed Use: **************The following MUST be complete: (write N/A if not applicable)********************** HEIGHT TO PEAK: DIMENSIONS: # OF STORIES: TOTAL HABITABLE SPACE: MAIN FLOOR TO SQ. FTG: 2"D FLOOR SQ. FTG: UNFIN BASEMENT SQ. FTG: IMPERVIOUS SURFACE AREA. rs, r 'r FINISHED BASEMENT SQ. FTG: GARAGE SQ. FTG: L9 ((" �!S y ,; - „, '' DECK/COV. PATIO SQ. FTG: 30% SLOPES ON PROPERTY: # OF BEDROOMS: CONSTRUCTION TYPE: HEAT SOURCE: SEWER OR SEPTIC? The permitee verifies, acknowledges and agrees by their signature that: 1) If this permit is for construction of or on a dwelling, the dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley Permit inure to the property owner. 3) The signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done in full compliance with the City of Spokane Valley Development Code. Referenced codes are available for review at the City of Spokane Valley Permit Center. 5) This City of Spokane Valley Permit is not a permit or approval for any violation of federal, state or local laws, codes or ordinances. 6) Plans or additional information may be required to be submitted, and subsequently approved before this application can be processed. SIGNATURE: 47— Method of Payment: ❑ Cash Bankcard #: Authorized Signature: REVISED 2/15/07 (Check ❑ Mastercard Expires: DATE: /) ❑ VISA VIN#: RESIDENTIAL CHECK LIST DIRECTIONS: Place a check mark in box next to each document required for complete submittal. o SITE PLAN o Property lines and dimensions o Direction arrow pointing North and orientation to streets o Proposed/existing buildings (footprint and dimensions) o Utilities, septic tank/drain field locations and distances BUILDING PLANS (3 SETS) (minimum 1/8 inch scale or comple O Elevations (Front/Rear/Sides) with roof peak and wall height ❑ Foundation Plan (crawlspace, basement or slab on grade): o Footing sizes and locations o Perimeter concrete foundation wall sizes o Crawlspace ventilation o Setbacks to property lines o Distance between buildings o Right of way/easement location & sizes ❑ Driveway approach size and location tely dimensioned) including basement: o Supporting wood cripple walls or beams o Thickened concrete pads supporting beams or girder trusses O Floor Plan of each level (finished or unfinished) with dimensions: o Floor Joist direction, size and spacing o Header, beam or concrete lintel sizes o Brace wall panel locations o Water heater and furnace locations o Exhaust fan locations o Deck or concrete patio sizes and locations ❑ Roof Plan: o Engineered truss direction and spacing o Rafter and over frame direction, size and spacing ❑ Wall Section Detail including: Roof o Slope/ roofing material/ underlayment/ ice dam protection o Sheathing size and type Ceiling o Joist size and spacing Wall o Height/ top plate/ stud size and spacing/ sole plate o Exterior sheathing size and type Floor o Joist size and spacing Foundation Wall o Concrete or Masonry unit width o Earth to wood separation distance Footing o Size Radon o Passive system with 6mil vapor barrier Miscellaneous Construction Details ❑ Deck: o Floor plan/ side view/ dimensions o Floor Joist/ decking direction, size and spacing O Stairway tread rise & run and nosing o Window and door location and sizes u Window well locations if applicable o Room usage labels o Smoke detector locations o Attic and crawl space access locations o Fire Wall construction o Ridge, eave and valley lines o Beam and girder size and location o Truss or rafter size, spacing & connection o Attic insulation/ air space baffle/ ventilation o Size of ceiling gypsum wall board o Siding/ exterior house wrap/ anchor bolts o Insulation, vapor barrier, gypsum wall board o Sheathing or concrete floor size/ insulation o Footing bottom to finished ground level depth o Horizontal & vertical reinforcement if any o Reinforcement if any o Active system with 6 mil vapor barrier o Footings/ post/ and beam size and locations O Handrail / Guard height & spacing Spokane jUalley® For City Use(OnW PLUS Project Number `'-f 410 Project Address /(J 7 / 11703 E Sprague Ave Suite B-3 • Spokane Valley WA 99206 509.688.0036 ♦ Fax: 509.688.0037 ♦ permitcenter@spokanevalley.org As part of our on-going commitment to customer service during the review process of your project application, we are providing you with a TARGET DATE for the initial technical application review. If for any reason we cannot meet this date, we will contact you with a revised target date. Your application review TARGET DATE is �- The TARGET DATE is the date we estimate your project application will have had its initial technical review. It is not the date for approval or permit issuance. Tips for a Smoother Project Application Review ➢ Submit complete, accurate plans and documents. Extra time may be required for re -submittals as project application reviewers work on multiple applications and it may be several days before they can look at your new or revised information. ➢ Designate a specific contact person to communicate with the City. While the person designated as the applicant's contact person with the City can be changed, one individual with the expertise for dealing with reviewer comments would be the best choice for the entire review process. ➢ Call staff regarding the status of your project only after the target date shown at the top of the page. Although you should be contacted on or by the target date, please feel free to contact us if you haven't heard from us by your target date. Staff may contact you before the target date if the initial review is complete. By following this procedure, you will save time and allow the reviewers to complete the work more expeditiously. Steps in the Permit Process 1. Counter Complete. Your application has been accepted as counter complete. This means all of the required documents, as indicated on your Pre -Application Checklist have been submitted or have been approved for deferred submittal. This does not prevent technical staff from requesting additional information as a result of their technical review. 2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free from substantive flaws that would prevent technical staff from completing the technical review once it is started. When this step is complete, your application will be routed to the appropriate staff and remain in their review queue until it comes up for review. 3. Technical Compliance. Once an application is administratively complete, it is routed to technical staff for compliance review. Depending on the type of project, technical staff may include multiple reviewers. You should be contacted by phone, fax, email, or mail by your TARGET DATE once the initial technical compliance review is complete. 4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re - submittals, each reviewer will approve their section of the application and route it to the Permit Center. When all sections of the application are received, a Permit Specialist will process the application and contact the person specified on your application for permit pick-up. Information regarding fees and pre -construction meetings (if required) will be provided by the Permit Specialist at that time. WHITE -APPLICANT PINK - BUILDING FILE REV 9/07 G' 2.3,00 Extsrinic, HouSe- ze x3 G r /Q2$ At, ST: cwisitee"c PA,ecel- 4siy..L.12.3/2 2 /WA s _Er _to o 6.<4 A" 6 ts• Rip be- 22.xz6 S Fr r - 1 1 1 /6x7Dcreo v N'. (ki 1 PLANNING 13EP1.!,.. APPROVED cpb/M I / 44( <3 I 0 0 cn S _C eL Es iir2. 1 00 ?%•11TIC: )- • • ,(turnit'ai FOUNDATION PLAN PLEASE COMPLETE THE FOLLOWING INFORMATION AND ADD ON THE DRAWING BELOW. BUILDING DIMENSIONS: a /' ,t GARAGE OPENING AND HEADER SIZE: %C /,2. /11lC�'�� INDICATE THE LOCATION AND SIZE OF ALL WINDOWS AND DOORS ON THE PLAN. WIDTH C8 Please note that while every effort is made to assure the accuracy of the information contained in this brochure is not warranted for accuracy. This document is not intended to address all aspects or regulatory requirements for a project and should serve as a starring point for your investigation. For detailed informat on on a particular project, permit, or code requirement refer directly to applicable file and/or code/regulatory documents or contact the appropriate division. L Ely OT SPOKANE VALLEY BUILDING DEPARTMENT 11707 E. Sprague Avenue 105, Spokane Valley, Washington x9206 - Tel 509-588-0036 - Fax 509-588-0037 Following is a typical s-sec5on for a residen5al garage,- It may not represent the proposed project. If you are using His deal as a porton of your plan submitbd, please oompieie the requested infer Son in the boxes provided on both sides of the steal This completed sheet, along with any addII5oral informa5on needs to be submitted with your apl5ca5on and be on site at the 5me of inspe55on. PROTECTION AND OPENIhIGS BETWEEN DWELLINGS AND PRIVATE GARAGES SHALL HAVE: 1) MATERIALS APPROVED FOR ONE HOU FIRE RESISTIVE CONSTRUCTION ON THE GARAGE SIDE: ' 516' TYPE 'X' GYP BOARD (-HABITABLE SPACE ABOVE) ' 112' GYP BOARD (RESIDENCE/ATTIC, FLOORFCEIUNG) 2) OPENINGS BETWEEN GARAGE AND RESIDENCE SHALL BE EQUIPPED WITH SOUD WOOD DOOR, SOLID OR HONEYCOMB CORE STEEL DOORS NOT LESS THAN 1 318", OR 20 MINUTE FIRE RATED DOORS. ALTERNATE FOUNDATION FOR ACCESSORY BUILDINGS FROM • 40D SO. FT. TO 3000 SQ FT. SECTION A -A NOTE: Diagonal wa® bracing required on each comes and every 25 feet of waL. Walk within 3 feel of a property fine or within B feet of a dweli ig must be 1 hour rated. (yr type 'X. gypsum sheathing on both sides of wall). Openings are not permitted in these walk. Garages over 3,000 sq. tt require•proL:Son when closer tan 20 feet b the property fine. Parapets may be required. — ENGINEERED TRUSS OR RAFTER SIZE AND S Z x @ Z 5/ O.G. ROOFING MATERL&L ROOFING PAPER ROOF SHEATHING SOUD BLOCKING BETWEEN.TRUSSES WALL SHEATHING SIDING 1 6' MIN. Jilillli.' 24" MIN.-=� 4 DOUBLE TOP PLATE WALL HEIGHT,, 2x @ 26).C. PRESSURE TREATED SOLE PLATE 3-1/2' CONCRETE SLAB 8"x12' FOOTING ANCHOR BOLTS 112'x9' MW. (T INTO CONCRETE) 6' O. C. OR APPROVED ANCHOR INSTALLED PER MANUFACTURER.